This document provides a project summary and schedule for repair work at an EDC plant from March 27-April 2. It includes:
I. A map of the work areas at the LTDC site.
II. The daily weather forecast.
III. Details of the manpower, tools, and equipment needed including the number of supervisors, safety personnel, laborers, tools like hammers and power cables.
IV. A schedule of repair activities to be completed each day including dismantling pole formwork, installing wiremesh and scaffolding, and coating floors. It lists the required manpower and equipment for each day.
This document provides a project summary and schedule for repair work at an EDC plant from March 27-April 2. It includes:
I. A map of the work areas at the LTDC site.
II. The daily weather forecast.
III. Details of the manpower, tools, and equipment needed including the number of supervisors, safety personnel, laborers, tools like hammers and power cables.
IV. A schedule of repair activities to be completed each day including dismantling pole formwork, installing wiremesh and scaffolding, and coating floors. It lists the required manpower and equipment for each day.
This document provides a project summary and schedule for repair work at an EDC plant from March 27-April 2. It includes:
I. A map of the work areas at the LTDC site.
II. The daily weather forecast.
III. Details of the manpower, tools, and equipment needed including the number of supervisors, safety personnel, laborers, tools like hammers and power cables.
IV. A schedule of repair activities to be completed each day including dismantling pole formwork, installing wiremesh and scaffolding, and coating floors. It lists the required manpower and equipment for each day.
Cloudy Sunny x x x x x x x x x x III. Manpower, Tools & Equipment A. Man Power B. Tools & Equipment Section Qty (MP) Remark Desc. Qty (Unit) Remark SPV 1 Palu 3 Safety 1 Kunci Rachet 2 Admin 1 Kabel Power 3 Scafolding 1 Mesin Mixer 2 Tukang 2 Mesin Gerinda 4" 2 Skill 2 Body Harness 6 Helper 4 Jack Hammer 2 Driver 1 IV. Activities Work Area : Week : No Picture S/C Location : LTDC Working Hours : 08.00 - 17.00 Detail Activities Activities No Today Tomorrow 1 Dismantling of Pole Formwork in Cooling Water Area Finishing Pole Area Cooling Water 2 Wiremesh Coating For LTDC Poles Continued Burglary Check Anchor 3 Install 1 Pole LTDC Wiremesh Install ITDC / Pole Area Pole Formwork 4 Inspection of Anchor Area C061 There is still something in the hole Install the HTDC East Area Scaffolding Analyzer 5 Chemical Coating Floor Area T21 6 7 Manpower Qty (MP) No Position Date 27 28 29 30 31 1 2 1 Supervisor 1 2 Safety 1 3 Scaffolder 1 4 Admin 1 5 Skill 2 6 Tukang 2 1 7 Helper 4 8 Driver 1 Tools & Equipment Qty (MP) No Desc Date 27 28 29 30 31 1 2 1 Palu 3 2 Kunci Rachet 2 3 Kabel Power 3 4 Mesin Gerinda 4" 2 5 Body Harness 6 6 Jack Hammer 2 7 Mesin Mixer 2 Highlight 1 2 3
Prepared By: Check By : Approved By :
PT. Pelita Usaha Daefa Akmal M/Endriyan E. Riszki Ari/Raka Steven