Oil mix lubrication system

SERVICE CODES SERVICE CODES MISCELLANEOUS ABBREVIATIONS ABBREVIATION OF THE PLANT


A ACID PR PURGE FAST SHUT OFF VALVE NOTES :
AA ACIDIC WATER FIGURE EIGHT REVERSIBLE LOCKED (CLOSED) ATMOSPHERIC GOOSE NECK VENT
PRO PROPANE OP OUTPUT PAA SOUR WATER TREATMENT PLANT WITH SPRING ACTUATOR
AAM SOUR WATER OSBL OUTSIDE BATTERY LIMIT PAA TRAIN 1 OF PHENOLIC SOUR WATERS 1. STEAM TRAP TYPICAL DRAWING :
AC HEATING OIL RA ATMOSPHERIC RESIDUE
RAE COOLING WATER RETURN OV OPERATOR VALVE PAA TRAIN 2 OF PHENOLIC SOUR WATERS
AAC OILY WATER BLADE VALVE P&ID REFRESENTATION ACTUAL REPRESENTATION
RE RELIEF OVHD OVERHEAD PAA TRAIN 1 OF NON-PHENOLIC SOUR WATERS
AAE STRIPPED SOUR WATER ATMOSPHERIC VENT WITH SCREEN
ACAA HIGH PRESSURE BOILER FEED WATER REF REFORMATE PLC PROGRAMMABLE LOGIC CONTROLLER PAA TRAIN 2 NON-PHENOLIC SOUR WATERS FIGURE EIGHT REVERSIBLE LOCKED (OPENED) HP
ACAM MEDIUM PRESSURE BOILER FEED WATER RV VACUUM RESIDUE PO PUMP OUT PAA COMMON EQUIP. STEAM LINE CONDENSATE LINE
ACI FIRE WATER S SULFUR PRESS PRESSURE BLOWDOWN VALVE
URA AMINE REGENERATION PLANT INSULATION, SERVICE OR AREA, ETC. INSULATION BREAK
ACL LIGHT CYCLE OIL SA BRINE PSE RUPTURE DISK
URA TRAIN 1 OF CO2 FREE AMINE BREATHER CLASS BREAK
ACP HEAVY CYCLE OIL SAE COOLING WATER SUPPLY PST PARTIAL STROKE TEST XXX XXX
PTP PTP PIPE TAP PLUGGED URA TRAIN 2 OF CO2 FREE AMINE (IF REQUIRED)
ACR RAW WATER SC CAUSTIC SOLUTION URA TRAIN 1 OF AMINE WITH CO2 HP
ADE DEMINERALIZED WATER SL SLURRY (DECANTED OIL) PWHT POST WELD HEAT TREATMENT VENT COVER
PV PROCESS VARIABLE URA TRAIN 2 OF AMINE WITH CO2 STEAM LINE CONDENSATE LINE
AE ANTIFOAM AGENT SG SPENT CAUSTIC URA COMMON EQUIP. MINIMUM DISTANCE
AF ANTIFOULING AGENT TUR TURBOSENE (R) RELOCATED TANK DRAIN VALVE
AH HYDRAULIC OIL V VENT REQD REQUIRED EFLUENT EFFLUENT TREATMENT PLANT MIN.
T
AHF HYDROFLUORIC ACID VA HIGH PRESSURE STEAM RF RAISED FACE FLANGE DRENAJE OILY WATER, CHEMICAL, SANITARY AND TWO-WAY DIVERTER VALVE
AI INSTRUMENT AIR, BREATHING AIR VB LOW PRESSURE STEAM RS REMOVABLE SPOOL AC-QUIM-SAN RAINWATER SEWER SYSTEM RECIRCURATING VALVE T
AL LUBRICATION OIL VM MEDIUM PRESSURE STEAM RTD RESISTANCE TEMP. DETECTOR -PLUV DAMPER
ALA FLUSHING OIL VO STEAM (OTHER) RTJ RING TYPE JOINT FLANGE TV-TE STORAGE TANKS 3/4" 3/4"
EXCESS FLOW VALVE 3/4"
ALQ ALKYLATE VR RELIEF VENT SC SAMPLE CONNECTION BOMBEO TV-TE PUMPING AND STORAGE SYSTEM
SCH SCHEDULE GAUGE VALVE PIPING SYMBOLS
AP PLANT AIR BOYAL ML IN LINE BLENDING 3/4" 3/4"
APO POTABLE WATER MISCELLANEOUS ABBREVIATIONS SCO SERVICE CONNECTION INTEGRAC- PROC INTERCONNECTING PIPING -
APR PROCESS WATER 1oo2 ONE OUT OF TWO VOTING SD SHUTDOWN EXHAUST HEAD
SET SET PRESSURE INTEGRATION BETWEEN PLANTS INDICATION OF SLOPE
APU POLISHED WATER 2oo2 TWO OUT OF TWO VOTING INTEGRAC- SERV INTERCONNECTING PIPING - SLOPE (xmm/m) P&ID REFRESENTATION ACTUAL REPRESENTATION
SG SPECIFIC GRAVITY OPEN SEWER
AR RECOVERED OIL/SLOP OIL 2oo3 TWO OUT OF THREE VOTING INTEGRATION TOWARDS SERVICE XX - SERVICE CODE
ARL BACKWASH WATER AG ABOVE GROUND SIL SAFETY INTERGRITY LEVEL FREE DRAINING
INTEGRAC- DUCT PIPELINE CONNECTIONS CONNECTOR BETWEEN DRAIN DIAGRAMS MIXING TEE MP
ARP MAKE-UP WATER ATM ATMOSPHERE SIF SAFETY INSTRUMENTED FUNCTION FREE DRAINING N1
SIS SAFETY INSTRUMENTED SYSTEM INTGRAC- RCK INTERCONNECTING PIPING - N1 - P&ID NUMBER STEAM LINE CONDENSATE LINE
AS UTILITY OR SERVICE WATER BF BLIND FLANGE XX
BL BATTERY LIMIT SO STEAM OUT RACKS & SLEEPERS INSULATION BREAK
AST SYNTHETIC SEAL OIL
ASU SULFURIC ACID BTL BOTTOM TANGENT LINE SP SET POINT BASC RAILROAD AND TRUCK SCALES PULSATION DAMPERS 9972 CLASS BREAK
SS STAINLESS STEEL BACKFLOW PREVENTER MP (IF REQUIRED)
ATR TREATED WATER BW BACKWASH
BB BUTANE-BUTYLENE BYP BYPASS S/S START/STOP CLOSED DRAIN STEAM LINE CONDENSATE LINE
BD BLOWDOWN CONDENSATE CC CHEMICAL CLEANOUT STD STANDARD XX - SERVICE CODE
BI BIOCIDE CCC CENTRAL CONTROL ROOM TC THERMOCOUPLE CONNECTOR BETWEEN DRAIN DIAGRAMS
BUT BUTANE CCS SATELLITE CONTROL ROOM TDH TOTAL DIFFERENTIAL HEAD PIPING SYMBOLS CALIBRATION COLUMN N1 N1 - P&ID NUMBER T
CA HIGH PRESSURE CONDENSATE CL CENTERLINE TEMP TEMPERATURE XX
CACAP HIGH PRESSURE OILY CONDENSATE CLC CHAIN LOCKED CLOSED T/F TANGENT TO FLANGE PROJECT NEW LINES SAFETY SHOWER AND EYEWASH T
THRD THREADED 9969
CACBP LOW PRESSURE OILY CONDENSATE CLO CHAIN LOCKED OPEN
CAM SOUE CONDENSATE CO CLEANOUT TL TANGENT LINE PROJECT NEW SECONDARY LINES
T/S TANGENT TO SEAM RELEASE DAMPER FINISHED GRADE LEVEL 3/4" 3/4" 3/4"
CB LOW PRESSURE CONDENSATE COF CENTER OF FLOAT NPT
CC HOT CONDENSATE COG CENTER OF GAUGE TSO TIGHT SHUT-OFF
T/T TANGENT TO TANGENT EXISTING LINES
CCC COLD CLEAN CONDENSATE CONN CONNECTION DESTINATION EYE WASH
CE STABILIZED CRUDE OIL COR CENTER OF RANGE TYP TYPICAL SERVICE
UC UTILITY CONNECTION B BURIED LINES LINE NUMBER CONNECTOR AMONG FLAME ARRESTER P&ID REFRESENTATION ACTUAL REPRESENTATION
CL CHLORINE CPL COUPLING 9968
CLI CLEAN CONDENSATE CP CORROSION PROBE UG UNDERGROUND DIAGRAMS (OUTPUT)
CLIAP HIGH PRESSURE CLEAN CONDENSATE CR CONTROL ROOM US UTILITY STATION TRACED LINES DESTINATION LP
V VENDOR DESTINATION DESCRIPTION HOSE CONNECTION
CLIBP LOW PRESSURE CLEAN CONDENSATE CS CARBON STEEL SHUTTER_OPEN STEAM LINE CONDENSATE LINE
CM MEDIUM PRESSURE CONDENSATE CSC CAR SEAL CLOSED VAAR EMERGENCY ISOLATION VALVE SERVICE
VAC VACUUM JACKETED LINE LINE NUMBER CONNECTOR AMONG
CR CRUDE CSO CAR SEAL OPEN 9967
VB VORTEX BREAKER DIAGRAMS (INPUT)
CS UTILITY CONNECTION CTR CENTER SOURCE FLEXIBLE HOSE LP
CT CATALYST CWO CHAINWHEEL OPERATED VNT VENT SUPPLIER PACKAGE LIMIT
VS ISOLATION VALVE DESCRIPTION SHUTTER_CLOSED STEAM LINE CONDENSATE LINE INSULATION BREAK
D FLARE DCS DISTRIBUTED CONTROL SYSTEM CLASS BREAK
DA ACID FLARE DE DE-ENERGIZE (FOR FIRE WATER SERVICE) 9970
W/ WITH EXPANSION JOINT (IF REQUIRED)
DAA OPEN OILY DRAIN DES DESIGN BATTERY LIMIT
W/O WITHOUT SERVICE INTERMITTENT BLOWDOWN T
DAC CLOSED OILY DRAIN DIA DIAMETER UTILITY CONNECTOR
DAP HIGH PRESSURE FLARE DISP DISPLACER NO. P&ID (BLOW-OFF) VALVE
DBP LOW PRESSURE FLARE DP DESIGN PRESSURE B.L T
INLINE MIXER
DC CLOSED DRAIN D/P DIFFERENTIAL PRESSURE GATE VALVE 9971 PROCESS FLOW DIAGRAM CONNECTOR ROTARY VALVE
DDA AMINE DRAIN DRN DRAIN 3/4"
DEA DIETHANOLAMINE DT DESIGN TEMPERATURE LINE IDENTIFICATION PLUGGED VALVE
DEAR RICH DIETHANOLAMINE DWG DRAWING PROCESS FLOW DIAGRAM CONNECTOR REGISTER AT AIR TRAP
DH WET FLARE (E) EXISTING XX-YYYY-ZZZZZZ-WWWWW-JJJ TO BATTERY LIMIT
DIA SOUR DIESEL E ENERGIZED XX PIPE DIAMETER BLIND FLANGE VALVE DRIP LEG AND LINE TO TRAP SIZE
DIE DIESEL EL ELEVATION YYYY FLUID SERVICE CODE CP
DIL DILUENT ESD EMERGENCY SHUTDOWN ZZZZZZ LINE NUMBER BLIND FLANGE 21 CORROSION PROBE HEADER SIZE DRIP LEG SIZE LENGTH OF DRIP LEG LINE TO TRAP
C.O CLEANOUT CONNECTION
DIS DISPERSANT EXT EXTERNAL WWWWW LINE CLASS BUTTERFLY VALVE (Inch) (Inch) (mm) (Inch)
DL FLARE SYSTEM DRAIN FOF FACE OF FLANGE JJJ INSULATION CLASS SOCKET CAP 12 6 450 1
DP STORM WATER SEWER (F) FURNISHED REGISTER WITH GRATE
DPC CONTAMINATED STORM WATER SEWER FA FLAME ARRESTOR INSULATION & TRACING DIAPHRAGM VALVE 14 8 550 1
DQ CHEMICAL DRAIN FC FAIL CLOSED WELDED CAP 16 8 600 1
DS SANITARY SEWER FD FLEX-DISC VALVE AC ACOUSTIC CONTROL INSULATION
CC COLD SERVICE INSULATION GLOBE VALVE 18 10 700 1-1/2
DT TRANSFER DRAIN FI FAIL INDETERMINATE REGISTER WITH HYDRAULIC SEAL THERMOWELL
DUBA ULTRA LOW SULFUR DIESEL FIF FLOW INDICATOR FLOAT TYPE CP CONDENSATION CONTROL INSULATION OUTER THREAD PLUG (MALE) 20 10 800 1-1/2
DW WATER SEWER FL FAIL LOCKED (LAST POSITION) EC ENERGY CONSERVATION INSULATION NEEDLE VALVE 24 12 900 1-1/2
ETL ETHANOL FLC FAIL LAST POSITION ON LOSS OF AIR, EC(CJ) OR PTC(CJ) CHILLED FLUID JACKETED
EC(CT) OR PTC(CT) CHILLED FLUID TRACED CONCENTRIC DIAMETER REDUCER GROUNDING CONNECTION 6" MIN 30 16 1140 1-1/2
GA ACID GAS FAIL CLOSED ON MINIMUM SIGNAL
GAM SOUR GAS FLG FLANGE EC(ET) OR PTC(ET) ELECTRIC TRACING PLUG VALVE 36 TO 42 18 1350 1-1/2
GAS GASOLINE FLO FAIL LAST POSITION ON LOSS OF AIR, EC(HJ) OR PTC(HJ) HOT FLUID JACKETED ECCENTRIC DIAMETER REDUCER W
MODULE BREAK FOR HEADER SIZE LESS THAN TWELVE INCH, REFER TO ET-032-PEMEX-2019 FOR DRIP LEG SIZE, LENGTH
GB BUFFER GAS FAIL OPEN ON MINIMUM SIGNAL EC(HT) OR PTC(HT) HOT FLUID TRACED
EC(SJ) OR PTC(SJ) STEAM JACKETED BALL VALVE T STEAM TRAP/DRAIN TRAP (NON PROCESS) OF DRIP LEG, AND LINE TO TRAP SIZE.
GCO FLUE GAS FO FAIL OPEN NOTE 1
GC FUEL GAS FP FULL PORT EC(ST) OR PTC(ST) STEAM TRACING STR 2. RISING STEM BALL VALVE DESIGNED TO LIMIT SEAL FRICTION TO A MINIMUM, WITH PREFERENTIAL
FP FIRE PROTECTION INSULATION RISING STEM BALL VALVE SP
GD SWEET GAS FV FULL VACUUM 21 DIRECTION, WITH TEFLON INSERT SEALS UP TO 190 C AND METAL SEALS ABOVE 190 C . API 6D DESIGN,
PP PERSONNEL PROTECTION INSULATION (P=PRESSURE SIDE) NOTE 2
GFE OFFSPEC GASOLINE GO GEAR OPERATED
PTC PROCESS TEMPERATURE
P
STRAINER
21 MISCELLANEOUS ISO 5208 PRESSURE TEST, API 607 FIRE TEST.
GI INERT GAS OR NITROGEN GR GRADE
GL GLYCOL HC HOSE CONNECTION CONTROL INSULATION CHECK VALVE T CONTINUOUS DRAINAGE TRAP 3. GENERAL APPLICATIONS FOR VENT/DRAIN VALVES WHICH ARE SHOWN IN P&ID.
GNA HIGH PRESSURE NATURAL GAS HDR HEADER N NO INSULATION
WT FREEZE PROTECTION INSULATION F FLUSHING OIL CONNECTION HORIZONTAL MAIN LINE
GNB LOW PRESSURE NATURAL GAS HH HAND HOLE
STOP CHECK VALVE DUPLEX STRAINER
GO GASOIL HHLL HIGH HIGH LIQUID LEVEL PIPING SPECIALTY ITEM
GOA ATMOSPHERIC GASOIL HLL HIGH LIQUID LEVEL (NO RETURN BOILER VALVE)
GOL LIGHT GASOIL HOA HAND/OFF/AUTOMATIC
ABBREVIATION OF THE PLANT SP XXXX FOR DRAIN
21 PURGE CONNECTION
GOLC LIGHT COKER GASOIL HP HIGH PRESSURE THREE-WAY VALVE BASKET STRAINER P
GOLV LIGHT VACUUM GASOIL HPT HIGH POINT SCI FIRE FIGHTING SYSTEM ZZZZ - SEQUENTIAL NUMBER (XXXX = PURGE MEDIUM)
GOM MEDIUM GASOIL HV HALF VACUUM T.E. COOLING TOWERS FOR VENT
GOP HEAVY GASOIL IAS INSTRUMENT AIR SUPPLY SGC FUEL GAS AND NATURAL GAS SUPPLY GATE VALVE WITH INLINE STRAINER
GOPC HEAVY COKER GASOIL INT INTERFACE RAI-RAP INSTRUMENT AIR AND PLANT AIR SYSTEMS SAMPLE CONNECTION
BODY BLEED
GOPV HEAVY VACUUM GASOIL ISBL INSIDE BATTERY LIMIT COG COGENERATION UNIT SC BY OTHERS BY SECL
SCOPE LIMIT
GPRP PREMIUM GASOLINE REST OF THE COUNTRY KCS KILLED CARBON STEEL SA WATER SUPPLY TS VERTICAL MAIN LINE
21
GPZMVM PREMIUM GASOLINE ZMVM LC LOCKED CLOSED PPA WATER PRETREATMENT PLANT
GR RECYCLE GAS LCP LOCAL CONTROL PANEL RC CONDENSATE RECOVERY & TREATMENT TEMPORARY STRAINER ZZZZ - SEQUENTIAL NUMBER
STEAM DISTRIBUTION MANIFOLD FOR DRAIN
GRA RECYCLE GAS (SOUR) LD LIQUID DRAIN RADN NITROGEN STORAGE AND DISTRIBUTION OR
GS DRY GAS LLL LOW LIQUID LEVEL RADAS SULFURIC ACID & CAUSTIC RECEIVING AND HANDLING TIE IN 21000-DMTXX-YYYY (TOP CONNECTION) (IN CASE OF NOT SPECIFIED)
H HYDROGEN LLLL LOW LOW LIQUID LEVEL UDC (DATM/DVAC) COMBINED DISTILLATION UNIT XX CT = COLD TAP (XX : BRANCH No. / YYYY : SEQUENCE No.)
CONE TYPE STRAINER HT = HOT TAP
HCL HYDROCHLORIC ACID LO LOCKED OPEN FCC CATALYTIC CRACKING UNIT FOUR-WAY VALVE ZZZZ
HCS SODIUM HYPOCHLORITE SOLUTION LP LOW PRESSURE ALKY ALKYLATION UNIT STEAM DISTRIBUTION MANIFOLD
HN HYDRAZINE LPT LOW POINT ISOC4 BUTANE ISOMERIZATION UNIT "T" TYPE STRAINER ZZZZ - SEQUENTIAL NUMBER
21000-DMBXX-YYYY (BOTTOM CONNECTION) V V
IBU ISOBUTANE MAG MAGNETIC PCR DELAYED COKER UNIT (XX : BRANCH No. / YYYY : SEQUENCE No.) FOR VENT
IC CORROSION INHIBITOR MAX MAXIMUM HDTGO GASOIL HYDROTREATING UNIT (COMMON EQUIPMENT) INLINE SILENCER OR (IN CASE OF SPECIFIED LETTER 'V')
ISM C5/C6 ISOMERATE MCC MOTOR CONTROL CENTER ANGLE VALVE "Y" TYPE STRAINER
GASOIL HYDROTREATING UNIT TRAIN 1 EQUIPMENT
KE KEROSENE MIN MINIMUM GASOIL HYDROTREATING UNIT TRAIN 2 EQUIPMENT CONDENSATE COLLECTION
L SLUDGE MOV MOTOR OPERATED VALVE HDDI (DUBA) DIESEL HYDROTREATING UNIT TRAIN 1 (HDDI 1) 21000-CMTXX-YYYY MANIFOLD (TOP CONNECTION)
LPG LIQUEFIED PETROLEUM GAS MPR MOTOR PROTECTION RELAY DIESEL HYDROTREATING UNIT TRAIN 2 (HDDI 2) RS (XX : BRANCH No. / YYYY : SEQUENCE No.)
(PROPANE-BUTANE) MTL MATERIAL REMOVABLE SPOOL AIR FILTER WITH COVER
HDN NAPHTHA HYDROTREATING UNIT TRAIN 1 (HDN 1) S S
MDEA METHYLDIETHANOLAMINE MW MANWAY FOR SIDE TAPPING
NAPHTHA HYDROTREATING UNIT TRAIN 2 (HDN 2) CONDENSATE COLLECTION OR
MDEAR RICH METHYLDIETHANOLAMINE NC NORMALLY CLOSED REF NAPHTHA REFORMER UNIT FLANGED CONNECTION (IN CASE OF SPECIFIED LETTER 'S')
RAM TYPE VALVE (SPECIAL PART) 21000-CMBXX-YYYY MANIFOLD (BOTTOM CONNECTION)
NA NAPHTHA NDE NORMALLY DE-ENERGIZED PNX PENTANE ISOMERIZATION UNIT AIR FILTER WITHOUT COVER (XX : BRANCH No. / YYYY : SEQUENCE No.)
NAA SOUR NAPHTHA NE NORMALLY ENERGIZED PH HYDROGEN PRODUCTION UNIT TRAIN 1 (PH21)
NAL LIGHT NAPHTHA NL NORMAL LEVEL
HYDROGEN PRODUCTION PLANT TRAIN 2 (PH22) SPACER, LINE TO BE BLINDED UTILITY STATION
NAPS HEAVY NAPHTHA NNF NORMALLY NO FLOW ES-21XXX
NAP PRIMARY NAPHTHA NO NORMALLY OPEN PTRG GAS TREATMENT AND RECOVERY UNIT INTERLOCK VALVES FOOT VALVE (XXX : SEQUENCE No.)
SIST. DESF. FLARE SYSTEM SIGNAL
NCO COKER NAPHTHA] NOZ NOZZLE (MECHANICAL SIGNAL)
PRA SULFUR RECOVERY UNIT BREATHING AIR STATION
P PROCESS LINES NAPT NATIONAL PIPE THREAD MEC. BLIND JOINT, IRREVERSIBLE LOCKED (CLOSED) EAR-21XXX
PTE COOLING TOWER BLOWDOWN NPT FINISHED GRADE LEVEL SULFUR RECOVERY PLANT TRAIN 1 (PRA 1) ATMOSPHERIC VENT 45 ANGLE CUT (XXX : SEQUENCE No.)
PP PROPYLENE O/C OPEN/CLOSE SULFUR RECOVERY PLANT TRAIN 2 (PRA 2)
PQ CHEMICAL PRODUCTS O/O ON/OFF
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. GENERAL LEGEND (1/5)
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00001A 00
CAD FILE :
NOTES :
TYPICAL TAG NUMBER SUBFUNTION FOR DCS TYPE OF CONTROL VALVES TYPES OF SIGNALS AUTOMATIC DEVICES MISCELLANEOUS
1. ALL TRANSMITTERS ARE EQUIPPED WITH LCD.
* SYMBOLS FOR SUB- FUNCTION DCS GENERIC GLOBE VALVE 2. TEMPERATURE ELEMENTS FOR DCS CONTROL OR ESD TO BE DUPLEX TYPE ACCORDING TO INDIVIDUAL
OP - OUTPUT PSE UNIT REQUIREMENT.
VARIABLE MEASUREMENT
DH - DIFFRENTIAL HIGH PV - PROCESS VARIABLE 21 INDICATOR OR LEVEL TRANSMITTER FLOAT TYPE 3. FLOW ELEMENTS ARE PRESENTED IN TABLE "FLOW ELEMENT".
FIRST MODIFIER TYPE DL - DIFFRENTIAL LOW
* SP - SET POINT RUPTURE DISC FOR PRESSURE RELIEF WITH TAPE MEASURE FOR STORAGE TANKS 4. IDENTIFICATION LETTERS ARE PRESENTED IN TABLE "INDENTIFICATION LETTERS".
FUNCTION TYPE (IT COULD BE FOLLOWED BY D - DEVIATION ALARM BALL VALVE LI
SECOND MODIFIER TYPE 21 HH - HIGH HIGH ALARM
PDC * H - HIGH ALARM 21 FLOW ELEMENT
XXXXXS
21 L - LOW ALARM INLINE FLOW INSTRUMENTS PSE SYMBOL NAME
LL - LOW LOW ALARM PLUG VALVE
SUFFIX Mo3 - AVERAGE OF THREE 21 RTD
INSTRUMENT LOOP NUMBER TD - TIME DELAY FLOW MEASUREMENT (DCS) REPRESENTATION RUPTURE DISC FOR VACUUM FE FIT TE TW ORIFICE PLATE
H L - CRITICAL SOFTWARE ALARM 21 21 21
DIAPHRAGM VALVE MULTIVARIABLE FLOW TRANSMITTER
FF
CRIT - CRITICAL SHUTDOWN ALARM FT FI/FIC MULTIV ORIFICE PLATE IN QUICK CHANGE DEVICE
REPRESENTATION
BUTTERFLY VALVE 21 21 L_
TYPES OF SIGNALS FOR INSTRUMENTATION INTERNAL FLOAT TYPE LEVEL INSTRUMENT VENTURI TUBE
* LEVEL TRANSMITTER / GUAGE
SUPPLY OF INSTRUMENTS ELECTROMAGNATIC LT/LG
3 WAY GLOBE VALVE FF *MAG : MAGNETIC TYPE
PROCESS CONNECTION OR SONIC SIGNAL (GUIDED) 21 DISP : DISPLACEMENT TYPE FLOW NOZZLE
FT FI/FIC ACTUAL
PNEUMATIC SIGNAL SOFTWARE LINK D / P : DIFFRENTIAL PRESSURE TYPE
21 21 TCV RADAR : RADAR TYPE
GWR : GUIDED WIRE RADAR TYPE WEIR
21 TEMPERATURE REGULATOR
ELECTRIC SIGNAL FOUNDATION FIELD BUS FE REF : REFLEX TYPE (FOR GUAGE)
4 WAY GLOBE VALVE TRA : TRANSPARENT TYPE (FOR GUAGE)
21 RADIOACTIVE : NUCLEAR TYPE
HYDRAULIC SIGNAL MECHANICAL LINK ELEMENT WEDGE TYPE
FLO : FLOATING TYPE
PCV PRESSURE REGULATOR WITH EXTERNAL INDICATOR LIGHT
IA INSTRUMENT AIR ** INSTRUMENT PURGE (**) MEANS OF PURGE ANGLE VALVE FLOW MEASUREMENT (DCS) REPRESENTATION 21 PRESSURE SENSOR 21 CORIOLIS, MASS FLOW METER
(ABBREVIATION FOR THE SERVICE FOR INTEGRAL TYPE. DOWNSTREAM CONNECTION FOR
REDUCTION OF PRESSURE (AS SHOWN)
CAPILLARY TUBE
ELECTROMAGNATIC OR SONIC SIGNAL
ACTUATORS UPSTREAM CONNECTION FOR BACKPRESSURE
DUPLEX ELEMENT TYPE DEFLECTOR PITOT
T_
(NOT GUIDED) FT FI/FIC PCV
SPRING AND DIAPHRAGM REPRESENTATION 21 DUFLEX TEMPERATURE ELEMENT
21 21 SELF CONTAINED PRESSURE REGULATOR
SYMBOLS FOR INSTRUMENTS, IDENTIFICATION & REPRESENTATION 21 DOWNSTREAM CONNECTION FOR ANNUBAR / AVERAGING PITOT TUBE
SYMBOL * INDICATE TYPE REDUCTION OF PRESSURE (AS SHOWN)
* M - ELECTRIC MOTOR UPSTREAM CONNECTION FOR BACKPRESSURE
LOCAL INSTRUMENT OR FUNCTION ONLY DISPLAY FUNCTION IN CONTROL ROOM S - SOLENOID
21 21 (DISTRIBUTED CONTROL SYSTEM) E - ELECTRO-HYDRAULIC PDCV SKIN M MAGNETIC FLOW METER
T_
H - HYDRAULIC FF 21
S FE FT FI/FIC PRESSURE REDUCING REGULATOR 21 TEMPERATURE ELEMENT SKIN TYPE
ACTUAL DIFFERENTIAL WITH INTERNAL AND
INSTRUMENT IN PANEL OR CONSOLE NO EXPANDED FUNCTION DISPLAY SOLENOID OPERATED VALVE, 21 21 21 TURBINE FLOW METER
21 IN CONTROL ROOM 21 (DISTRIBUTED CONTROL SYSTEM) THE ARROW INDICATES THE POSITION EXTERNAL SENSORS
FOR DE-ENERGIZING
POSITIVE DISPLACEMENT FLOW METER
INSTRUMENT ON RACK OR BEHIND THE PANEL LOGIC FUNCTION SYSTEM OR PSV
21 (SIZE) *T
IN CONTROL ROOM 130 ADVANCED CONTROL SYSTEM FLOW STRAIGHTENER (SET PRESSURE) TRANSMITTER
21 21
FLOW METER VORTEX TYPE
PRESSURE SAFETY VALVE
INSTRUMENT IN LOCAL PANEL PISTON TYPE - SINGLE ACTION
21 DECISION LOGIC (X OUT OF Y) FI PI
ROTAMETER ULTRASONIC FLOW METER
21 21 PRESSURE GAUGE WITH CHEMICAL SEAL
XooY PSV
** INTERLOCK SYSTEM CONNECTION (SIZE)
INSTRUMENT ON BACK OF LOCAL PANEL 135 (THE ARROW INDICATES INPUT PISTON TYPE - DOUBLE ACTION 21 (SET PRESSURE)
21 FO TH THERMAL DISPERSION FLOW METER
OR OUTPUT) VACUUM SAFETY VALVE
21 RESTRICTION ORIFICE
CONSECUTIVE NUMBER
AUXILIARY DISPLAY IN SATELLITE CONTROL BUILDING PRESSURE INTRUMENT IDENTIFICATION LETTERS
21 UNIT PNEUMATIC ACTUATOR FIRST LETTER SUCCEEDING LETTER
I = INTERLOCK IN DCS UNIVERSAL ROTATORY TYPE PSV MEASURED READOUT OUTPUT FUNCTION
IS = INTERLOCK IN SIS (SIZE)
21 /INITIATING MODIFIER /PASSIVE /ACTIVE MODIFIER
IP = INTERLOCK IN PLC SIGHT GLASS (SET PRESSURE) **
PNEUMATIC ACTUATOR REPRESENTATION VARIABLE FUNCTION FUNCTION
WITH HYDRAULIC PUMP PRESSURE- VACUUM SAFETY VALVE 21 A ANALYSIS ALARM
LOGIC SYSTEM & COMPUTER FUNCTIONS (CONSERVATION VENT)
DIAPHRAGM SEALS BURNER,
MANUAL ACTUATOR B USER'S CHOICE USER'S CHOICE USER'S CHOICE
COMBUSTION
I PIPING INSTR.
COMPUTER FUNCTION FIELD INSTALLATION LOCAL PLC FUNCTION C USER'S CHOICE COMPENSATE CONTROL CLOSE
21 21 CONTROL VALVE WITH HANDWHEEL MOUNTED LEVEL
** DIFFERENCE,
WITH ROOT VALVE (SIZE) D DENSITY DEVIATION
DIFFERENTIAL
PSV (SET PRESSURE) 21
I SENSOR,
COMPUTER FUNCTION IN PANEL OR CONSOLE PLC FUNCTION WHEN PART OF DCS S 21 E VOLTAGE
PIPING CLASS 150# THROU 300# PRIMARY ELEMENT
21 21 R SINGLE SOLENOID WITH MANUAL RESET TEMPERATURE MEASUREMENT REPRESENTATION PILOT OPERATED SAFETY VALVE ACTUAL REPRESENTATION FLOW,
(PRESSURE SENSOR CONNECTED TO THE F RATIO
FLOW RATE
BODY OF THE VALVE) PIPING INSTR.
COMPUTER FUNCTION INSTALLED IN LOCAL PANEL PLC FUNCTION NOT VISUAL GLASS, GAUGE,
S TI G USER'S CHOICE
21 VIEWING DEVICE
R REPRESENTATION
21 ** H HAND HIGH
SINGLE SOLENOID WITH REMOTE RESET
21 I CURRENT INDICATE
I (SIZE)
SEQUENTIAL OR INTERMITTENT PROGRAMMABLE 21
PLC FUNCTION IN LOCAL PANEL MATH FUNCTIONS PSV (SET PRESSURE) PIPING CLASS 600# THROU 1500# J POWER SCAN
LOGIC FUNCTION IN CONTROL ROOM 21 TIME, TIME RATE CONTROL
* * SYMBOLS FOR MATH FUNCTIONS TE TI ACTUAL REPRESENTATION K
PILOT OPERATED SAFETY VALVE SCHEDULE OF CHANGE STATION
21 21 NOTE1) DOUBLE BLOCK IS SPECIFIED ON DRAWING FOR HYDROGEN SERVICE IN CASE
I (PRESSURE SENSOR CONNECTED TO LINE OF HDTGO L LEVEL LIGHT LOW
LOCAL CONTROL LOGIC 21 ADDITION
I 21 SUBTRACTION / VESSEL AS REQUIRED) NOTE2) DEDICATED LEGEND FOR PRESSURE INSTRUMENT WILL BE USED IN CASE OF MIDDLE,
DCS INTERLOCK FCC AND REF. M USER'S CHOICE
21 MULTIPLICATION INTERMEDIATE
DIVISION N USER'S CHOICE USER'S CHOICE USER'S CHOICE USER'S CHOICE
VFD TIC ** = PT OR PG (1 CONNECTION)
VARIABLE FREQUENCY DRIVE HIGH SELECTOR REPREGENTATION
IS AI PDT OR PDG (2 CONNECTION) ORIFICE,
21 LOW SELECTOR 21 O USER'S CHOICE OPEN
SAFETY INTERLOCK RESTRICTION
21 SQUARE ROOT
REV REVERSE POINT, TEST
P PRESSURE
MCC COMPENSATOR CONNECTION
STATIC SPEED MOTOR DRIVE CABINET PILOT OPERATED RELIEF VALVE
CONVERTERS 21 /n AVERAGE
TE TT TIC ENCLOSURE WITH ENCLOSURE Q QUANTITY
INTEGRATE, INTEGRATE,
HIGH LIMIT TOTALIZE TOTALIZE
(OPTIONAL ) LOW LIMIT 21 21 21
DUPLEX R RADIATION RECORD RUN
*/* SW SWITCH
*/* SYMBOLS FOR CONVERTERS COMPUTER FUNCTIONS K PROPORTIONAL S
SPEED,
SAFETY SWITCH STOP
(INPUT/OUTPUT) f(x) UNSPECIFIED FUNCTION FREQUENCY
(OPTIONAL)
21 INTEGRATION PSV T TEMPERATURE TRANSMIT
A - ANALOG
SYMBOLS FOR COMPUTER
EXPONENTIAL INSTRUMENT PURGE DETAIL
D - DIGITAL * d/dt DERIVATIVE U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION
E - VOLTAGE * FUNCTIONS -K INVERSELY PROPORTIONAL EMERGENCY VENT VIBRATION,
F - FOUNDATION FIELD BUS 21 VALVE, DEMPER,
f(t) TIME FUNCTION FI V MECHANICAL
H - HYDRAULIC DDC - DIRECT DIGITAL CONTROL LOUVER
ANALYSIS
I - ELECTRICAL CURRENT SPC - SUPERVISED CONTROL SET POINT 21
P - PNEUMATIC DI - DIGITAL INPUT ADDITIONAL INFORMATION W WEIGHT, FORCE WELL, PROBE
DO - DIGITAL OUTPUT LV
2" VALVE SIZE INSTRUMENT ACCESSORY
AI - ANALOG INPUT PIPING SPEC 21 X UNCLASSIFIED X-AXIS
TUBING DEVICES, UNCLASSIFIED UNCLASSIFIED
AO - ANALOG OUTPUT FO -
FAIL OPEN UNCLASSIFIED
FO FLOAT VALVE
TSO FC -
FAIL CLOSED EVENT, STATE, AUXILIARY DELAY
Y Y-AXIS
PRESENCE DEVICES COMPUTE
FL -
FAIL LOCKED (LAST POSITION)
FAIL LOCKED (LAST POSITION) FCV DRIVER,
FL(O) -
VALVE OPENS IN DECLINE OF CONTROL SIGNAL Z-AXIS, SAFETY ACTUATOR,
21 POSITION,
Z INSTRUMENTED UNCLASSIFIED
FL(C) - FAIL LOCKED (LAST POSITION) DIMENSION
RECIRCULATING VALVE SYSTEM FINAL CONTROL
VALVE CLOSES IN DECLINE OF CONTROL SIGNAL ELEMENT
TIGHT SHUT OFF
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. GENERAL LEGEND (2/5)
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00001B 00
CAD FILE :
PROCESS EQUIPMENT

SINGLE PASS TRAYS

PIT
CHIMNEY
CENTRIFUGAL PUMP FLOATING ROOF STORAGE TANK
M (MOTOR DRIVEN) TWO PASS TRAYS

VERTICAL SHELL ANG TUBE TOWER TRAYS


DRAW-OFF TRAY NUMBER TRAYS
FROM TOP TO BOTTOM
PACKED SECTION

PROGRESSIVE CAVITY
PUMP / SCREW

MH MH
COOLING TOWER

SHELL AND TUBE EXCHANGER CONE ROOF STORAGE TANK

M RECIPROCATING PUMP TANGENT LINE

SHELL TUBE HEAT SKIRT HEIGHT


EXCHANGER KETTLE TYPE
M (REBOILER) VORTEX BREAKER
BY TEMA CODE MAN HOLE DESICCANT BED
CARTRIDGE FITER
VERTICAL INLINE PUMP

M BASKET FITER HAND HOLE


DOUBLE PIPE HEAT EXCHANGER GASFIER

VERTICAL CENTRIFUGAL
PUMP
STORAGE TANK WITH INTERNAL
SINGLE FITER FLOATING ROOF SLIDING GATE

SPRAY DISTRIBUTOR
M
HEAT EXCHANGER COILED TYPE MIST ELIMINATOR
LIQUID RING VACUUM PUMP (WIRE MESH, ETC.)
DUPLEX FILTER

DOME ROOF TANK


M LIFT STATION
PIT PUMP PLATE HEAT EXCHANGER

CENTRIFUGAL COMPRESSOR

API CLOSED PIT


M

SUMP PUMP RECIPROCATING COMPRESSOR OPEN ROOF TANK


HEAT EXCHANGER CORE TYPE
AND KETTLE REBOILER

M
SEAL TANK API PLAN 53C

CANNED PUMP SCREW COMPRESSOR


DOUBLE PLATE EXCHANGER

SEAL TANK API PLAN 52, 53A


SPHERE

ROTARY COMPRESSOR
M METERING PUMP

SPIRAL HEAT EXCHANGER


SEAL TANK API PLAN 23
M

M ROTARY PUMP
POSITIVE DISPLACEMENT BLOWER

THREE PHASE SEPARATOR

SILENCER

AIR COOLER
M
DIAPHRAGM PUMP
M
CENTRIFUGAL BLOWER / FAN

M
ELEVATED FLARE DESUPERHEATER
AGITATOR HYDRAULIC SEAL

PREHEATER STEAM COIL TYPE

RAIL CAR
DIRECT FIRED HEATER
EJECTOR OF EDUCTOR
STATIONARY TYPE RECUPERATIVE
PREHEATER SAMPLE COOLER
TANKER TRUCK

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. GENERAL LEGEND (3/5)
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00001C 00
CAD FILE :
MATERIAL HANDLING EQUIPMENT NOMENCLATURE TABLE FOR SHELL AND TUBE HEAT EXCHANGERS

BRIDGE CRANE FRONT END STATIONARY HEAD TYPES SHELL TYPES REAR END HEAD TYPES

FLANGED-FLAT HEAD VESSEL


FIXED TUBESHEET
E ONE PASS SHELL L
LIKE "A" STATIONARY HEAD

FEEDER CHANNEL
A
AND REMOVABLE COVER

REGENERATION TOWER

TWO PASS SHELL FIXED TUBESHEET


F M
ELECTRIC HEATER WITH LONGITUDINAL BAFFLE LIKE "B" STATIONARY HEAD
FEEDER

BONNET
HOPPER B
(INTEGRAL COVER)
FIXED TUBESHEET
G SPLIT FLOW N
LIKE "N" STATIONARY HEAD

ELECTRIC HEATER 2

MIXER
FUEL GAS FILTER

OUTSIDE
H DOUBLE SPLIT FLOW P
PACKED FLOATING HEAD

LOADING ARM

CHANNEL INTEGRAL WITH TUBE-


C
SHEET AND REMOVABLE COVER

DISENGAGING HOPPER
CARTRIDGE OR BAG FILTER FLOATING HEAD
J DIVIDED FLOW S
WITH BACKING DEVICE

REACTOR

PIG TRAP LAUNCHER


PULL THROUGH
T
CHANNEL INTEGRAL WITH TUBE- FLOATING HEAD
N
SHEET AND REMOVABLE COVER
K KETTLE TYPE REBOILER
CONVECTION SECTION

DRIVERS

M ELECTRIC MOTOR
U U-TUBE BUNDLE
REGENERATION COOLER

DIESEL MOTOR -D
D
AIR MOTOR -A
SPECIAL HIGH
D
HYDRAULIC MOTOR -H PRESSURE CLOSURE X CROSS FLOW

FUEL GAS K.O. DRUM


EXTERNALLY SEALED
W
FLOATING TUBESHEET
STEAM TURBINE
T
CHLORIDE ADSORBER

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. GENERAL LEGEND (4/5)
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00001D 00
CAD FILE :
TYPE A TYPE B TYPE C TYPE D TYPE E
NON HAZARDOUS AND LOW TEMPERATURE LIQUID SAMPLE LOW TEMPERATURE GAS OR FLASHING LIQUID OR HAZARDOUS LIQUID SAMPLE NON HAZARDOUS AND LOW TEMPERATURE LIQUID SAMPLE LOW TEMPERATURE GAS OR FLASHING LOQUID NON HAZARDOUS AND HIGH TEMPERATURE LIQUID SAMPLE SAMPLE CONNECTION CODE
(TEMPERATURE < 50˚ C) (TEMPERATURE < 50˚ C) (TEMPERATURE < 50˚ C) OR HAZARDOUS LIQUID SAMPLE (TEMPERATURE < 50˚ C) (TEMPERATURE > 50˚ C) NON- HAZARDOUS AND LOW TEMPERATURE LIQUID SAMPLE (TEMPERATURE < 50˚ C) A
LOW TEMPERATURE GAS OR FLASHING LIQUID OR HAZARDOUS LIQUID SAMPLE
(TEMPERATURE < 50˚ C) B
3/4" C
NON- HAZARDOUS AND LOW TEMPERATURE LIQUID SAMPLE (TEMPERATURE < 50˚ C)

MIN.
NOTE 3
HOT LIQUID LINE LOW TEMPERATURE GAS OR FLASHING LIQUID OR HAZARDOUS FLASHING LIQUID SAMPLE
(TEMPERATURE < 50˚ C) D
HIGH SPEC NOTE 5
3/4" 3/4" 3/4"
HIGH SPEC NOTE 2 3/4" PERSONAL NON- HAZARDOUS AND HIGH TEMPERATURE LIQUID SAMPLE (TEMPERATURE > 50˚ C) E
NOTE 2 NOTE 3 NOTE 5 NOTE 3

MIN.
MIN.

MIN.
3/4" 3/4" DELTA P DEVICE PROTERION NON- HAZARDOUS AND HIGH TEMPERATURE AND HIGH POUR POINT LIQUID SAMPLE
NOTE 3 F
NOTE 3 DELTAP DEVICE

MIN.
3/4"x1/2" (TEMPERATURE > 50˚ C)
MIN.

MIN.
NOTE 5 COLD LIQUID LINE NOTE 5
COLD LIQUID LINE 3/4"x1/2" HIGH TEMPERATURE GAS OR FLASHING LIQUID SAMPLE (TEMPERATURE > 50˚ C) G
3/4"x1/2" 3/4"x1/2" NOTE 5 RAE

MIN.
NOTE 5 3/4"x1/2" 1/2"
NON- HAZARDOUS AND HIGH TEMPERATURE LIQUID SAMPLE (TEMPERATURE > 50˚ C) H
FLARE CLASS FLARE CLASS 3/4" NON- HAZARDOUS AND HIGH TEMPERATURE AND HIGH POUR POINT LIQUID SAMPLE
FLARE CLASS DEPRESSURE LINE 3/4" SAE (TEMPERATURE > 50˚ C) J
NOTE 9

MIN.
1/2"
3/4"x1/4" 1/2" 1/2" HIGH TEMPERATURE GAS OR FLASHING LIQUID SAMPLE (TEMPERATURE > 50˚ C) K
MAX. 300 mm

1/2" TO FLARE 3/4"x1/2"


1/2" NEEDLE VALVE 3/4"x1/2" 1/2" 3/4"x1/2" NOTE 12 1/2" NEEDLE VALVE TO FLARE 1/2" SAMPLING DEVICE FOR VERY HAZARDOUS MATERIAL L
1/4"x1/2" TI

MIN.
MIN.

TO FLARE 1/2" NOTE 12


1/4" PI FLARE CLASS
1/2" NOTE 12 HIGH PRESSURE LIQUID / VAPOUR SAMPLE M

MIN.
MIN.

MIN.
1/4" NIPPLE 1/2"
NOTE 6 PI 1/4"
3/4" CATALYST SAMPLING N
1/4" NIPPLE 1/4"x1/2" 1/4"x1/2" CATALYST SAMPLING P
1/2"x1/4" 1/4"x1/2" NOTE 6 1/4"x1/2"
3/4" NOTE 8, 10 FLEXIBLE HOSE NOTE 8, 10 FLEXIBLE HOSE CATALYST SAMPLING Q
3/4" 1/4" 1/4" NIPPLE
300 CC EVACUATED (VACUUM) 1/4" SWAGELOK QUICK-CONNECT 300 CC EVACUATED (VACUUM) 1/4" SWAGELOK QUICK-CONNECT DAC NOTE 6
DAA DAA
OR NITROGEN PURGED FITTING OR EQUAL OR NITROGEN PURGED FITTING OR EQUAL 1. FOR OPERATING PRESSURE UNDER 125KG/CM²G USE SWAGELOCK QUICK-CONNECTS.
SAMPLE CONTAINER NOTE 1 SAMPLE CONTAINER NOTE 1
NOTE 4 DAA NOTE 4 3/4" STEMS : SS-QT8-5-8PM
BODIES : SS-QT8-8-8PM
* EQUIPMENT WITH UOP "A" TYPE. * EQUIPMENT WITH UOP "B" TYPE.
OR EQUAL.
DAA FOR OPERATING PRESSURE ABOVE 125KG/CM²G USE SWAGELOCK QUICK-CONNECTS.
STEMS : SS-QT2-5-4PM
BODIES : SS-QT2-8-4PM
TYPE F TYPE G TYPE H TYPE J TYPE K OR EQUAL.
NON HAZARDOUS AND HIGH TEMPERATURE AND HIGH POUR POINT HIGH TEMPERATURE GAS OR FLASHING LIQUID SAMPLE NON HAZARDOUS AND HIGH TEMPERATURE LIQUID SAMPLE NON HAZARDOUS AND HIGH TEMPERATURE AND HIGH POUR POINT HIGH TEMPERATURE GAS OR FLASHING LIQUID SAMPLE 2. DELTA P DEVICE IS ANY DEVICE OR INSTRUMENT THAT CREATES A PRESSURE DROP TO ENSURE
(TEMPERATURE > 50˚ C) (TEMPERATURE > 50˚ C) (TEMPERATURE > 50˚ C) LIQUID SAMPLING (TEMPERATURE > 50˚ C) (TEMPERATURE > 50˚ C) A SUFFICIENT FLOW THROUGH THE LOOP. SAMPLE INLET AND RETURN CONNECTIONS MUST HAVE
A MINIMUM DIFFERENTIAL PRESSURE OF IO PSI (0.7KG/CM²) TO MAINTAIN FLOW THROUGH SAMPLE
CYLINDER.
HIGH SPEC
3/4" NOTE 2 3/4" HIGH SPEC 3. USE DOUBLE BLOCK FOR ANY CLASS 900# LINES OR HIGHER AND FOR H2 OR H2S SERVICES FOR ANY
1" PERSONAL 3/4" 3/4"
3/4" HIGH SPEC NOTE 3 DELTAP DEVICE
NOTE 3 NOTE 2 CLASS 600# LINES OR HIGHER.

MIN.

MIN.
PROTERION 3/4" 3/4"
MIN.

HOT LIQUID LINE DELTAP DEVICE

MIN.

MIN.
NOTE 3 NOTE 2 NOTE 3
HOT LIQUID LINE 4. FOR OPERATING PRESSURE UNDER 125kg/cm2g USE WHITEY 304L-HDF4-300 SAMPLE BOTTLE OR EQUAL
MIN.

NOTE 3 NOTE 3 DELTAP DEVICE NOTE 3 NOTE 5

MIN.

MIN.
NOTE 5 HOT LIQUID LINE NOTE 7
ALA NOTE 5 3/4"x1/2" FOR OPERATING PRESSURE 125kg/cm2g AND ABOVE USE XXS 304L PIPE CYCLINDER.
ALA NOTE 5 3/4"x1/2"
NOTE 7 NOTE 5 PERSONAL
RAE PROTERION PERSONAL 5. TAKE SAMPLE CONNECTION FROM TOP HORIZONTAL LINE.
PERSONAL PERSONAL
PROTERION 1/2" PROTERION
PROTERION RAE 6. BEVEL ALL OPEN ENDS OF SAMPLE CONNECTIONS AT A 45° ANGLE WITH 75mm MINIMUM EXTENSION.
1"x1/2" 3/4" 1/2"
RAE 3/4" 7. USE OIL FLUSH AFTER SAMPLING HEAVY LIQUID.
SAE 3/4" 3/4"
RAE
NOTE 11

1/2" NOTE 9 RAE

MIN.
MIN.

8. ALL SAMPLING BOMBS SHOWN ON THIS PID SHOULD BE EQUIPPED WITH BLOCK VALVES ON EACH SIDE.

NOTE 11
1/2" 3/4" SAE
3/4"x1/2"

MIN.
3/4" FLARE CLASS
3/4" NOTE 9
NOTE 9 3/4"
1/2" 3/4" 9. THE COOLING BOX SHALL BE INTERNALLY COVERED WITH "EPOXY" THE COIL SHALL BE TUBING SPEC
VB SAE NOTE 9
NOTE 9
3/4" SAE VB 3/4" SAE 1/2" OR SS.
1/2" 1/2" TI 1/2" 1/2" TI 10. A SUPPORT FOR THE CYLINDER "BOMB" SHALL BE FORESEEN.
DEPRESSURE LINE
1/2" TI 1/2" TI 11. SAMPLING SYSTEM LENGTH MUST BE MINIMUM TO LIMIT THE PRODUCT LOST WHEN FLUSHING.
TI 1/2" FLARE CLASS 1/2"
3/4"x1/2" FLARE CLASS
FLARE CLASS 1/2" 3/4"
TO FLARE 3/4"x1/2" 1/2" 3/4"x1/2" 12. ROUTE TO APPROPRIATE FLARE HEADER (DAP/DBP/DA), OR AY/SY OR NEUTRALIZATION AS REQUIRED.
1/2" 1/2" NEEDLE VALVE
1/2" NOTE 12 TO FLARE TO FLARE 3/4"x1/2" 3/4"x1/2"
TO FLARE PI
1/2" NOTE 12
FLARE CONNECTION IS NOT REQUIRED FOR WATER SERVICE LIKE CONDENSATE.
1/2" 3/4"x1/2" NOTE 12 TO FLARE
MIN.

DAA

MIN.
1/2" 3/4"x1/2" NOTE 12 1/2" NEEDLE VALVE

MIN.
1/2"x1/4"

MIN.
DAA

MIN.
1/4"x1/2" 13. WHERE SAMPLE COOLER IS REQUIRED THE SUCTION IS TO BE PERSONNEL PROTECTED.
MIN.

1/2" NOTE 12
1/2"x1/4" 1/4"x1/2" PI

300 mm
1/4" 1/4"
14. SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE SHALL BE AS INDICATED

MAX.
1/2" NOTE 8, 10 FLEXIBLE HOSE 1/2"x1/4" AT THE SAMPLE POINT LOCATION ON THE PIPING AND INSTRUMENT DIAGRAM, WHEN HEAT TRACING
FLARE CLASS 1/4" NIPPLE 1/4" NIPPLE NOTE 8, 10 FLEXIBLE HOSE 1/2"x1/4"
300 mm

1/4" NIPPLE DAA DAA FLARE CLASS


DAA NOTE 6 NOTE 6 IS REQUIRED. THE CLOSED SAMPLING SYSTEM SHALL INCLUDE A HEATED ENCLOSURE.
MAX.

NOTE 6
300 CC EVACUATED (VACUUM) 1/4" SWAGELOK QUICK-CONNECT 300 CC EVACUATED (VACUUM) 15. VALVES AND PIPING INDICATED AT SAMPLING DETAILS SHALL BE OF THE SAME METALLURGY TYPE AND
1/4" SWAGELOK QUICK-CONNECT
OR NITROGEN PURGED FITTING OR EQUAL 3/4"
3/4" SAMPLE CONTAINER NOTE 1 3/4" OR NITROGEN PURGED FITTING OR EQUAL CLASS AS SHOWN ON THE PIPING AND INSTRUMENT DIAGRAM.
SAMPLE CONTAINER NOTE 1
NOTE 4
NOTE 4 16. AT LOCATIONS WHERE A CLASS BREAK IS INDICATED. THE CONTRACTOR SHALL INCLUDE PROPER CLASS
DAA * EQUIPMENT WITH UOP "A" TYPE. BREAK AT THE SAMPLE ASSEMBLY. CLASS BREAK SHALL BE OF SAME TYPE AS SHOWN ON THE PIPING
DAA (WITH SAMPLE COOLER)
DAA * EQUIPMENT WITH UOP "B" TYPE. AND INSTRUMENT DIAGRAM.
(WITH SAMPLE COOLER)

TYPE L TYPE M TYPE N TYPE Q


SAMPLING DEVICE FOR VERY HAZARDOUS MATERIAL HIGH PRESSURE LIQUID / VAPOR SAMPLE CATALYST SAMPLING CATALYST SAMPLING

PROCESS LINE
HIGHER PRESSURE CONNECTION
BLOWDOWN 4. CHECK THAT THE PRESSURE INDICATOR SHOWS NO PRESSURE. IF A PRESSURE IS
2" REPORTED, THIS IS AN INDICATION OF LEAKING UPSTREAM VALVES. OPEN VALVE 2 REDUCTION ZONE DETAIL "SAMPLE COOLER"
SAMPLING HORIZONTAL CONNECTION 3/4"
FLOW DIRECTION SUPPLY LINE 1-1/2"x2" FROM THE TOP OF THE SAMPLE POT TO BLOWDOWN TO VENT OFF ANY PRESSURE. TANGENT LINE
3/4" 250# SS
NOTE 3
MOUNTING FRAME OR PLATE FOR THEN CLOSE VALVE 2. STRAMMAN OR EQUAL RAW-TYPE
EASY CARRYING. FRAME TO HAVE 250# SS SAMPLING VALVE 300 RF.
3/4"x1/2" A CARRYING HANDLE CATALYST 3/4"
3/4" 3/4" SAMPLING RAE
3/4" 5. WITH CAUTION, SLOWLY OPEN VALVE 1 FROM THE REACTOR EFFLUENT LINE TO
POSITION FOR SAMPLE PROBE
THE SAMPLE POT. CHECK THAT THE PRESSURE INDICATOR IS READING CLOSE TO 2" SC
CS

COOLER WHERE REQUIRED FLEXIBLE ARMOURED


SEE DETAIL 'A' TUBING THE REACTOR PRESSURE. THE LIQUID SAMPLE LINE WILL DROP INTO THE SAMPLE POT. OPEN SPACES.
NOTE 13
1-1/2" VENT TO ATM NOTE 3 SAE
250# SS

3/4"x1/2" 1/2"x3/4" BASKET WITH 0.4 mm MAXIMUM


"SNAP-ON" COUPLINGS PI 3/4" 6. CLOSE VALVE 1 TO BLOCK IN THE SAMPLE POT. THEN CRACK OPEN VALVE 3 FROM THE BVSI 8 OPEN SPACES. AT SAFE LOCATION 3/4"
FLAME ARRESTER
(ONE ON SAMPLE DEVICE, BOTTOM OF THE POT TO ALLOW THE LIQUID TO PRESSURE OUT TO BLOWDOWN. KEEP OIL COLLECTOR
ONE ON FLEXIBLE TUBING) 1/2" RAE 100 DIAM 150 LONG JOHNSON SCREEN 3/4"
NOTE 9 THE VALVE OPEN UNTIL THE POT HAS DEPRESSURED TO ABOUT 7 BAR. THEN CLOSE TI
SELECTOR
VALVE (S.V.) 1 VALVE 3. FA
2 4 3/4" 3/4" BREAK FLANGE INTERNAL
3 ø4"x700 3/4" PIPING
3/4" 3/4" 7. WITH CAUTION, SLOWLY OPEN VALVE 1. CRACK OPEN VALVE 2 FROM THE TOP OF THE 3/4"
SAE
POT TO VENT TO BLOWDOWN. FRESH SAMPLE WILL FLOW THROUGH THE COOLER INTO
LG THE SAMPLE POT. THE SAMPLE SHOULD BE DRAWN SLOWLY ENOUGH THAT THE SAMPLE
A TI 3/4"
B VB POT DOES NOT GET HOT (OVER ABOUT 50˚ C). THE OBJECT IS TO DRAW 1-2 LITRES OF DAA
SAMPLE BOMB 1" 3/4"x1"
EVACUATION BOMB LIQUID INTO THE SAMPLE POT. THIS TYPICALLY TAKES ABOUT 30 SECONDS.
SIZE: SIZE: SET@ 15 BARG DAA
300 OR 500 CC SELECTOR CAUTION : THIS STEP IS CRITICAL SINCE THE HIGH PRESSURE SYSTEM IS DIRECTLY OPEN
300 OR 500 CC PSV PRESSURE CAUCT
VALVE (S.V.) TO BLOWDOWN. THE VALVES TO BLOWDOWN MUST BE CAREFULLY OPERATED AND
3 NEVER LEFT WITHOUT SHUTTING THEM.
2 4 FLUSHING PI PI 3/4" *EQUIPMENT WITH UOP "STD DWG 8-102, 103"
1 OIL SUPPLY 3/4" TYPE P A1A1
A2A1
3/4" 8. BLOCK OFF THE SAMPLE BY CLOSING VALVE 1 FROM THE EFFLUENT LINE. PERMIT THE CATALYST SAMPLING
"SNAP-ON" COUPLINGS 250# SS SAMPLE POT TO DEPRESSURE TO BLOWDOWN THROUGH VALVE 2 FROM THE TOP OF THE 3/4" 3/4"
CS
(ONE ON SAMPLE DEVICE, POT UNTIL THE PRESSURE IS ABOUT 3 BAR. THEN CLOSE VALVE 2.
ONE ON FLEXIBLE TUBING)
250# SS

3/4" 3/4" 3/4" (V) (UC)


QUICK CONNECT 9. OPEN VALVE 5. THEN CAUTIOUSLY OPEN VALVE 4 TO THE SAMPLE OUTLET POINT AND
FITTING FOR SAMPLE WITHDRAW ENOUGH LIQUID IN A BOTTLE TO CLEAR ANY OID SAMPLE OR FLUSHING OIL
FLEXIBLE ARMOURED TUBING SAMPLE RECEIVER
SAMPLE RETURN LINE FROM THE LINE. DISCARD THIS MATERIAL.
250# SS

STRAMMAN OR EQUAL RAW-TYPE HIGH PRESSURE


3/4"x1/2"
10. WITH A NEW BOTTLE, WITHDRAW THE SAMPLE NECESSARY FROM THE LAB. SAMPLING VALVE 300 RF. NITROGEN BOMB
PROCESS LINE
LOWER PRESSURE CONNECTION CAUTION : IF ALL LIQUID IS WITHDRAWN, CLOSE THE SAMPLE LINE IMMEDIATELY.
2" SC
11. CLOSE VALVES 4 AND 5. THEN CRACK OPEN VALVE 3 AT THE BOTTOM OF THE POT TO
OPERATING SEQUENCE SLOPS
PRESSURE THE REST OF THE SAMPLE TO BLOWDOWN. THEN CLOSE ALL VALVES. (V) (UC)
- NEPPLE VALVES CLOSED. DAA 100 DIAM 150 LONG
BASKET
- CONNNECT "SNAP-ON" COUPLINGS. 12. SHUT OFF THE COOLING WATER AND STEAM, WHENEVER USED.
- S.V.S. POSITION 1 : OFF SAMPLING PROCEDURE
- ANGLE VALVES OPEN 13. FLUSH THE SAMPLE SYSTEM WITH FLUSHING OIL. THIS IS DONE TO REMOVE HEAVY *EQUIPMENT WITH UOP "STD DWG 8-142"
- S.V.S. POSITION 2 : FLOW THROUGH BOMB "A" TO RETURN LINE FOR SAMPLE. 1. CHECK THAT ALL VALVES IN THE SAMPLING SYSTEM ARE CLOSED. MATERIAL THAT COULD COOL AND PLUG THE LINES IN THE SYSTEM. OPEN VALVE 6 TO
- S.V.S. POSITION 3 : SAMPLING COMPLETE SAMPLE IN BOMB "A" BRING FLUSHING OIL INTO THE SAMPLE POT. FLUSH ANY HEAVY OIL FROM THE SAMPLE
- ANGLE VALVES CLOSED 2. OPEN THE COOLING WATER LINE TO THE SAMPLE COOLER WIDE OPEN. OUTLET LINE BY OPENING VALVES 4 AND 5. THEN CLOSE VALVE 6 AND OPEN VALVE 3
- S.V.S. POSITION 4 : EVACUATION OF TUBING UP TO THE ANGLE VALVES BACK TO BOMB "B" TO PRESSURE THE FLUSHING OIL TO BLOWDOWN.
- DISCONNECT "SNAP-ON" COUPLINGS. 3. ADJUST THE TEMPERATURE USING STEAM IF TOO COLD.
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. GENERAL LEGEND (5/5)
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00001E 00
CAD FILE :
GENERAL NOTES GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
1. PLATFORM ACCESS TO BE PROVIDED FOR MANWAYS AND EQUIPMENT WHICH CANNOT BE DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
ACCESSED FROM GRADE. PERMANENT PLATFORMS ARE REQUIRED WHEN THE PLATFORM
STRUCTURAL SUPPORT MEMBERS ALLOW A CLEARANCE OF 2200 OR GREATER ABOVE GRADE. 2. DELETED.
TEMPORARY OR PORTABLE PLATFORMS ARE REQUIRED WHEN CLEARANCE BETWEEN PLATFORM
STRUCTURAL. SUPPORT MEMBERS AND GRADE WOULD BE LESS THAN 2200.

2. MATING PIPING/VESSEL FLANGES USED FOR INSTRUMENT CONNECTIONS ARE THE SAME
FLANGE CLASS AND FINISH AS THE FLANGES SPECIFIED FOR THE INSTRUMENTS. MESH BLANKET
VERTICAL = MIST ELIMINATOR
3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS SPECIFIED. HORIZONTAL = COALESCER

2:1 ELLIPTICAL
(WELDED)

MISCELLANEOUS DESIGNATIONS

DA AERATION POINT USING AIR


DG AERATION POINT USING GAS NOTES :
DN AERATION POINT USING NITROGEN
DS AERATION POINT USING STEAM

HEMISPHERICAL
LETTERS AT INDIVIDUAL VALVES DESIGNATE (WELDED)
FLUSH VORTEX BREAKER RAISED VORTEX BREAKER
A MONEL (ALLOY 400) TRIM (GREASE SEALED SEAT AND PACKING) P PLUGGED (HORIZONTAL VESSEL) (HORIZONTAL VESSEL)
B MONEL (ALLOY 400) VALVE (GREASE SEALED SEAT AND PACKING) RTSV ROTARY TIGHT SHUT-OFF VALVE
CC CABLE CONTROL S SAMPLE
CN SOLID ALLOY VALVE SS STAINLESS STEEL
GM GEAR OPERATED OR MOTORIZED VALVE ST STELLITE TRIM
GO GEAR OPERATED VALVE T MONEL (ALLOY 400) TRIM (TEFLON INSERT WITH GREASE SEALED PACKING)
H HASTELLOY TRIM X TYPE 316 STAINLESS STEEL TRIM VALVE
M MONEL (ALLOY 400) TRIM XN TYPE 316 STAINLESS STEEL TRIM VALVE IN COMPLIANCE WITH NACE MR0103
MN MONEL (ALLOY 400) TRIM, CARBON STEEL VALVE IN COMPLIANCE WITH NACE MR0103 XX VALVE CLOSED POSITION SWITCH
MN5 MONEL (ALLOY 400) TRIM, CARBON STEEL VALVE IN COMPLIANCE WITH NACE MR0175
MO MOTORIZED VALVE

2:1 ELLIPTICAL
SERVICE CODES FOR MEROX (FLANGED)
DISTRIBUTOR DISTRIBUTOR
ALM LUBRICATION OIL MIST (VERTICAL VESSEL) (HORIZONTAL VESSEL)
AML LEAN AMINE
AMR RICH AMINE
C CATALYST
CCC COLD CLEAN CONDENSATE
DSG SPENT CAUSTIC DRAIN

DISTRIBUTED CONTROL - SHARED DISPLAY SYMBOLS

FLANGED
FLUSH VORTEX BREAKER (VERTICAL VESSEL)
SHARED DISPLAY DEVICE WITH LIMITED ACCESS TO ADJUSTMENTS

OUTLET SCREEN (VERTICAL VESSEL W/SUPPORT MEDIUM)

INTERMEDIATE
BAFFLE BAFFLE
BODY FLANGE
(VERTICAL VESSEL) (HORIZONTAL VESSEL)

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. LEGEND AND INSTRUMENT IDENTIFICATION
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00002A 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
TYPICAL DETAIL OF PROCESS UNIT RELIEF HEADER TYPICAL DETAIL OF PIPING FOR CLOSED SAMPLING SYSTEMS DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
NOTE 3 2. DELETED.
NOTE 2
FREE
DRAINING LO
3/4"P
PRESSURE

1/2"
PICKUP LOCATE TEE IN 1/2" VENT TO
3/4"P
VERTICAL RUN ATMOSPHERE AT
OF PIPE SAFE LOCATION
NOTE 1 NOTE 1 NOTE 7
1/4"S

MIN
FUEL GAS HEAT TRACING AND NOTE 1
NOTE 6 NOTE 6 (CONTINUOUS PURGE) OBJECTIVE TEMPERATURE 3/4"
BY OTHERS (AS REQUIRED) VENT AND TEST
CONNECTION
2" 2" (BLANKOFF) NOTE 2
3/4"P
RO PRESSURE RELIEF TO PROCESS
TYPICAL DETAIL OF OPERATING UNIT KNOCKOUT DRUM OR
DETAIL "DT"
PRESSURE RELIEF VALVING FROM RELIEF VALVES FROM RELIEF VENTS TYPICAL DETAIL DETECTOR TUBE SAMPLE
INERT GAS REFINERY FLARE HEADER
PURGE (AS REQUIRED) (AS REQUIRED)

B1A1
(BLANKOFF)
FREE DRAINING FREE DRAINING
NOTES 3/4"P INERT GAS NOTES

BY CONTRACTOR
PURGE CONNECTION
NOTES :

MIN.

MIN.
1. PRESSURE RELIEF VALVE INLET ISOLATION VALVING (WHERE PERMITTED BY CODE) 1. SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE
SHALL BE LOCKED OPEN WHEN PRESSURE RELIEF VALVES ARE PLACED IN SHALL BE AS INDICATED AT THE SAMPLE POINT LOCATION ON THE PIPING
LO
OPERATION. IN SOUR SERVICE THE INLET BLOCK VALVE IS A BALL VALVE. AND INSTRUMENT DIAGRAM. WHEN HEAT TRACING IS REQUIRED, THE CLOSED 1. DELETED.
AT LOCATIONS WHERE PILOT OPERATED PRESSURE RELIEF VALVES WITH SAMPLING SYSTEM SHALL INCLUDE A HEATED ENCLOSURE.
MAKE CONNECTION FREE
REMOTE SENSING SPECIFIED. THE REMOTE SENSING LINE ISOLATION VALVE MAKE CONNECTION MAKE CONNECTION MIN. MIN.
AT START OF DRAINING 2. MAKE CONNECTION ON TOP OF PIPE.
SHALL ALSO BE LOCKED OPEN WHEN PLACED IN OPERATION. ON TOP OF PIPE ON TOP OF PIPE
HEADER
LOCATE VALVES STEM IN
2. PRESSURE RELIEF VALVE OUTLET ISOLATION VALVING (WHERE PERMITTED BY CODE) HORIZONTAL POSITION 3. VALVES AND PIPING INDICATED AT SAMPLING DETAILS SHALL BE OF THE SAME
SHALL BE LOCKED OPEN IN OPERATING MODE TO PREVENT PRESSURE BUILD-UP IN METALLURGY TYPE AND CLASS AS SHOWN ON THE PIPING AND INSTRUMENT
VALVE BODY. DIAGRAM.

3. ITEMS WITHIN ENVELOPE ONLY APPLY TO PILOT OPERATED PRESSURE RELIEF 4. AT LOCATIONS WHERE A CLASS BREAK IS INDICATED, THE CONTRACTOR
VALVES WITH REMOTE SENSING. SHALL INCLUDE PROPER CLASS BREAK AT THE SAMPLE ASSEMBLY.
CLASS BREAK SHALL BE OF SAME TYPE AS SHOWN ON THE PIPING
4. SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE AND INSTRUMENT DIAGRAM.
SHALL BE AS INDICATED AT THE PRESSURE RELIEF SERVICE DEPICTED ON
THE PIPING AND INSTRUMENT DIAGRAM.

5. VALVING LOCATED ON PRESSURE RELIEF VALVE INLET PIPING SHALL BE


OF THE SAME METALLURGY TYPE AND CLASS AS INDICATED AT SERVICE
CONNECTING POINT.

6. BYPASS LINE AROUND PRESSURE RELIEF VALVE IS FOR VENTING OF EQUIPMENT


TO FLARE AND IS NOT INTENDED TO BE A BACKUP FOR THE PRESSURE RELIEF
VALVE. BYPASS VALVES ARE NORMALLY CLOSED, BUT WILL NOT BE LOCKED CLOSED.

7. ITEMS WITHIN ENVELOPE ONLY APPLY TO PRESSURE RELIEF VALVES GOING


TO CLOSED SYSTEM.

MANIFOLD PIPING REQUIREMENTS FOR AIR COOLED ITEMS

FREE DRAINING TO TUBE BUNDLES INLET LINE INLET LINE PRIOR TO LAST
ELBOW MUST BE PERPENDICULAR
FREE DRAINING TO MANIFOLD MUST BE SAME SIZE AS INLET LINE TO RUN OF TEE
TUBE BUNDLES FREE
INLET LINE PRIOR TO
LAST ELBOW MUST BE DRAINING
PERPENDICULAR TO RUN
FREE DRAINING TO TUBE BUNDLES
INLET LINE OF TEE
INLET LINE INLET LINE PRIOR TO
LAST ELBOW MUST BE
FREE DRAINING TO TYPICAL (LINE PRIOR FREE PERPENDICULAR TO
TUBE BUNDLES TO ELBOW MUST BE TYPICAL (LINE PRIOR DRAINING
MAKE CONNECTION AT RUN OF TEE
MIDPOINT OF MANIFOLD PERPENDICULAR TO TO ELBOW MUST BE
RUN OF UPSTREAM PERPENDICULAR TO INLET LINE
TYPICAL (LINE PRIOR TEE) RUN OF DOWNSTREAM
FREE TO ELBOW MUST BE TYPICAL (MAKE CONNECTION TEE)
PERPENDICULAR TO FREE ON BOTTOM OF MANIFOLD) FREE
DRAINING
RUN OF DOWNSTREAM DRAINING DRAINING
TEE FREE DRAINING FREE
MAKE CONNECTION
TUBE BUNDLES DRAINING
ON BOTTOM OR SIDE MAKE CONNECTION
OF MANIFOLD AT ON BOTTOM OR SIDE
MIDPOINT OF MANIFOLD OF MANIFOLD AT FREE
TUBE BUNDLES MIDPOINT OF MANIFOLD DRAINING OUTLET FREE
TUBE BUNDLES LINE DRAINING
OUTLET LINE
OUTLET LINE
OUTLET LINE
MANIFOLD MUST BE SAME MANIFOLD MUST BE SAME FREE
SIZE AS OUTLET LINE SIZE AS OUTLET LINE FREE DRAINING DRAINING
FREE DRAINING
TYPE Y MANIFOLD
TYPE C MANIFOLD TYPE E MANIFOLD TYPE F MANIFOLD INLET AND OUTLET PIPING MUST BE SYMMETRICAL TO AND FROM COMMON TUBE
INLET PIPING MUST BE SYMMETRICAL FROM COMMON INLET TO TUBE INLET AND OUTLET PIPING MUST BE SYMMETRICAL TO AND FROM COMMON TUBE BUNDLE. BUNDLE. ALL TEES MUST BE FULL SIZE. ELBOWS MUST NOT BE REPLACED WITH TEES.
BUNDLE ALL TEES MUST BE FULL SIZE REDUCERS MUST BE ECCENTRIC; ALL TEES MUST BE FULL SIZE. ELBOWS MUST NOT BE REPLACED WITH TEES. REDUCERS MUST BE ECCENTRIC; FLAT ON BOTTOM FOR INLET PIPING, FLAT ON TOP
FLAT ON BOTTOM REDUCERS MUST BE ECCENTRIC; FLAT ON BOTTOM FOR INLET PIPING, FLAT ON TOP FOR OUTLET PIPING. LIMIT VELOCITIES TO 20 FT/SEC (6.1 M/SEC) MAX AND
FOR OUTLET PIPING. LIMIT VELOCITIES TO 20 FT/SEC (6.1 M/SEC) MAX AND 10 FT/SEC (3.0 M/SEC) MIN FROM TUBE BUNDLE
10 FT/SEC (3.0 M/SEC) MIN FROM TUBE BUNDLE OUTLET TO COMMON JUNCTION AT OUTLET.
OUTLET TO COMMON JUNCTION AT OUTLET.

TYPE D MANIFOLD : TO BE DETERMINED BY CONTRACTOR

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. GENERAL DETAILS AND NOTES
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00002B 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

PACKAGE
FROM AIR DRYER
DRY PLANT AIR
206-00082 7538
LINE NO. "A"

3/4"

T-A06T1
MSV
FC-7
"D" SHELL AND
LINING
NOTE 4 OF REGENERATOR
LINE NO. "B"
3/4"
2" CATALYST
ADDITION
NOTES :
LINE NO. "C" 1. ALL PIPING AND EQUIPMENT FURNISHED AS PART OF THE STEAM GENERATION SYSTEM SHALL BE
IN ACCORDANCE WITH THE REQUIREMENTS OF THE ASME BOILER AND PRESSURE VESSEL CODE,
3/4"
SECTION 1.
B1A2 FC-7
3/4" 2. AS AN ALTERNATE TO TEE'S, PROVIDE LONG RADIUS BENDS IN CATALYST FILLING AND
WITHDRAWAL LINES, CATALYST MAKEUP LINE AND HOPPER LOADING LINES.
DETAIL "D" 3. PIPING AND EQUIPMENT SHOULD FOLLOW STREAMLINE DESIGN TO AVOID BRIDGING, BLOCKING AND
FRESH CATALYST ADDITION CONNECTION
SETTLING OF CATALYST.
4. STEM SHALL BE IN THE UPWARD VERTICAL POSITION.
P&ID NO. LINE NO. "A" LINE NO. "B" LINE NO. "C" MSV TAG NO. "D" 5. FI MUST BE READABLE FROM VALVE.
206-00063 3/4"-AP-210068-T-A06T1-N 2"-P-210171-B1A2-N 3/4"-AP-210096-FC-7-N MSV-21703 6. TI MUST BE READABLE FROM VALVE.
7. DETAIL "BC" SEE DWG 206-00007.
8. BLAST CONNECTIONS ON LINE NO.D BETWEEN TT A~D DRY PLANT AIR CONNECTION SEE DETAIL TABLE
FOR NUMBER.
9. 3/4" BLAST CONNECTIONS APPROXIMATELY EVERY 4000 RUN OF CATALYST LINE.
10. MAKE CONNECTION ON TOP OF PIPE FOR HORIZONTAL RUN PIPING.

FI

A
NOTE 5
FI

B
FF LINE NO. "E"
FT PG
LINE NO. "A" - T-A06T1 FC-7 -
DRY PLANT AIR "DA"
7537 206-00082 T-A06T1 T-A06T1

FROM AIR DRYER 3" LINE NO. "B" FC-7 FC-7


PACKAGE #300 FF
TI
NOTE 6
B
TI MSV
SKIN
A
"J"
SHELL AND
SKIN TT NOTE 4 LINE NO. "G" NOTE 4 LINING
DETAIL DETAIL OF REGENERATOR
- "BC" "BC" 3/4" 3/4"
B1A2 FC-7
45˚C 45˚C NOTE 6
8" CATALYST LINE NO. "C"
FILLING AND
WITHDRAWAL NOTE 8, 9, 10
900
MSV LINE NO. "H"
LINE NO. "F"
LINE NO. "D" "I"
3/4"

3/4" 3/4"

15000 MIN.
MIN.
DETAIL "B"
CATALYST FILLING AND WITHDRAWAL CONNECTION

P&ID NO. LINE NO. "A" LINE NO. "B" LINE NO. "C" LINE NO. "D" LINE NO. "E" LINE NO. "F" LINE NO. "G" LINE NO. "H"
1 206-00063 3"-AP-210066-T-A06T1-N 3"-P-210004-FC-7-N 8"-P-210179-B1A2-PP 8"-P-210188-FC-7-PP 1"-AP-210187-T-A06T1-N 3/4"-P-210194-FC-7-PP 1"-P-210942-FC-7-PP 3/4"-P-210943-FC-7-PP
2 206-00063 3"-AP-210067-T-A06T1-N 3"-P-210007-FC-7-N 8"-P-210184-B1A2-PP 8"-P-210189-FC-7-PP 1"-AP-210192-T-A06T1-N 3/4"-P-210193-FC-7-PP 1"-P-210105-FC-7-PP 3/4"-P-210106-FC-7-PP

P&ID NO. MSV TAG NO. "I" MSV TAG NO. "J" FI TAG NO. FI TAG NO. FT TAG NO. TI TAG NO. TI TAG NO. TT TAG NO. PG TAG NO. DETAILS BLAST CONNECTION (BC) NOTE 8, 9, 10
1 206-00063 MSV-21704 MSV-21705 FI-21061A FI-21061B FT-21061 TI-21081A TI-21081B TT-21081 PG-21081GA REGENERATOR BOTTOM 20, 21 22, 23 24, 25 26, 27 28, 29 86, 87
2 206-00063 MSV-21706 MSV-21707 FI-21062A FI-21062B FT-21062 TI-21082A TI-21082B TT-21082 PG-21082GA REGENERATOR MID 44, 45 46, 47 34, 35 36, 37 48, 49

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 1
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00003 00
CAD FILE :
3/4" PRESSURE PICKUP CONNECTION TO PILOT 1/2" TO INSTRUMENT CONNECTIONS.
GENERAL NOTES :
"D" OPERATED PRESSURE RELIEF VALVES. CONNECTIONS SHALL HAVE A 1500 MIN VERTICAL RUN 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND

SLOPE (80 mm/m)

SLOPE (80 mm/m)


OR 1/2" TO INSTRUMENT CONNECTIONS. "D" ABOVE "DG" CONNECTION. (INSTRUMENT MUST BE LOCATED AT
CONNECTIONS SHALL HAVE A 1500 MIN VERTICAL RUN HIGHER ELEVATION THAN ITS HIGHEST "DG" CONNECTION)
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
ABOVE "DA" CONNECTION. (INSTRUMENT MUST BE LOCATED AT
HIGHER ELEVATION THAN ITS HIGHEST "DA" CONNECTION) 2. DELETED.
1/2" 1/2"

NOTE 8 NOTE 8

MIN MIN

3/4"x1/2"

3/4"x1/2"
B1A1
B1A1
"E" "E"
NOTE 5 NOTE 5
FO (FOR AIR) FO (FOR GAS)

NOTE 1

NOTE 1
3/4" NOTE 4 B1A1 T-A05T3 3/4" NOTE 4 B1A1 T-A03T1
3/4" INSTRUMENT AIR FOR "DA" POINTS 3/4" PURGE GAS FOR "DG" POINTS
NOTE 9 NOTE 10 3/4" NOTE 9 NOTE 10 3/4"
LOCKED OPEN AT "C" "B" "A" LOCKED OPEN AT "C" "B" "A"
CONNECTIONS FOR CONNECTIONS FOR
PILOT OPERATED NOTE 7 PILOT OPERATED NOTE 7
RELIEF VALVES RELIEF VALVES

3/4" 3/4"
NOTE 6 FREE NOTE 6 FREE
DRAINING DRAINING
PROVIDE 1800 OR MORE PROVIDE 1800 OR MORE
CLEARANCE AT THIS POINT CLEARANCE AT THIS POINT
TO ENABLE USE OF REAMER TO ENABLE USE OF REAMER
NOTES :
1. ALL PIPING AND EQUIPMENT FURNISHED AS PART OF THE STEAM GENERATION SYSTEM SHALL BE
MINIMUM STRAIGHT MINIMUM STRAIGHT IN ACCORDANCE WITH THE REQUIREMENTS OF THE ASME BOILER AND PRESSURE VESSEL CODE,
LENGTH PIPE LENGTH PIPE SECTION 1.
2. AS AN ALTERNATE TO TEE'S, PROVIDE LONG RADIUS BENDS IN CATALYST FILLING AND
"DA" POINTS "DG" POINTS
SHELL AND LINING PURGE CONNECTIONS FOR INSTRUMENT, ETC SHELL AND LINING PURGE CONNECTIONS FOR INSTRUMENT, ETC WITHDRAWAL LINES, CATALYST MAKEUP LINE AND HOPPER LOADING LINES.
(SEE UOP STD DWG 6-122) (SEE UOP STD DWG 6-122)
EQUIPMENT MISC CONNS AS STATED ON UOP P&ID EQUIPMENT MISC CONNS AS STATED ON UOP P&ID
3. PIPING AND EQUIPMENT SHOULD FOLLOW STREAMLINE DESIGN TO AVOID BRIDGING, BLOCKING AND
SETTLING OF CATALYST.
4. PIPE CLASS TO BE CONSISTENT WITH EQUIPMENT MISC CONNS AS STATED ON UOP P&ID.
5. HOLE SIZE OF ORIFICE TO BE 2 mm.
6. REDUCING FLANGE IS REQUIRED.
DA POINT LINE NUMBER TABLE DG POINT LINE NUMBER TABLE 7. THIS VALVE SHALL BE A SCREWED VALVE. THREAD TO MATCH PRESSURE TAP REAMER.
SEE UOP STANDARD DRAWING 6-122 AND 6-123.
P&ID NO. INSTRUMENT TAG INSTRUMENT AIR LINE NO. (A) KCS LINE NO. (B) LINE NO. (C) LINE NO. (D) LINE NO. (E) TO FO TAG NO. STR TAG NO. P&ID NO. INSTRUMENT TAG PURGE GAS LINE (A) LINE NO. (B) LINE NO. (C) LINE NO. (D) LINE NO. (E) TO FO TAG NO. STR TAG NO.
8. 1/2" SCREWED CAP AND DO NOT WELD. INSTALL PRESSURE GUAGES WHEN REQUIRED.
1 206-00003 PG-21081GA 3/4"-AI-210231-T-A05T3-N 3/4"-P-210107-B1A1-N 3/4"-P-210107-FC-7-N 1/2"-P-210885-B1A1-N DETAIL "B" FO-21011A STR-21701 1 206-00064 PDT-21924C LOW 3/4"-GD-210333-T-A03T1-N 3/4"-P-210470-B1A1-N 3/4"-P-210470-FC-8-N 1/2"-P-210091-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21021A STR-21757
9. AS REQUIRED FOR ADDITIONAL TRANSMITTER.
2 206-00003 PG-21082GA 3/4"-AI-210232-T-A05T3-N 3/4"-P-210108-B1A1-N 3/4"-P-210108-FC-7-N 1/2"-P-210886-B1A1-N DETAIL "B" FO-21011B STR-21702 2 206-00064 PDT-21924B LOW 3/4"-GD-210334-T-A03T1-N 3/4"-P-210471-B1A1-N 3/4"-P-210471-FC-8-N 1/2"-P-210092-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21021B STR-21758
3 206-00011 PG-21085G 3/4"-AI-210233-T-A05T3-N 3/4"-P-210109-B1A1-N 3/4"-P-210109-FC-7-N 1/2"-P-210887-B1A1-N DETAIL "J" FO-21012 STR-21703 3 206-00064 PDT-21020 LOW 3/4"-GD-210335-T-A03T1-N 3/4"-P-210472-B1A1-N 3/4"-P-210472-FC-8-N 1/2"-P-210093-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21021C STR-21759 10. STRAINER SHALL BE COMPLETE WITH 30 MESH STAINLESS STEEL SCREEN.
4 206-00055 PT-21001 3/4"-AI-210234-T-A05T3-N 3/4"-P-210110-B1A1-N 3/4"-P-210110-B1A2-N 1/2"-P-210052-B1A1-N P-210420 FO-21013A STR-21704 4 206-00064 PDT-21924A LOW 3/4"-GD-210336-T-A03T1-N 3/4"-P-210473-B1A1-N 3/4"-P-210473-FC-8-N 1/2"-P-210094-B1A1-N 1/2"-P-210889-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21021D STR-21760
5 206-00055 PT-21002 3/4"-AI-210235-T-A05T3-N 3/4"-P-210111-B1A1-N 3/4"-P-210111-B1A2-N 1/2"-P-210051-B1A1-N P-210419 FO-21013B STR-21705 5 206-00065 PT-21024 3/4"-GD-210337-T-A03T1-N 3/4"-P-210474-B1A1-N 3/4"-P-210474-FC-7-N 1/2"-P-210096-B1A1-N DC-21001 MISC CONN FO-21023 STR-21761
6 206-00055 PT-21057 3/4"-AI-210236-T-A05T3-N 3/4"-P-210112-B1A1-N 3/4"-P-210112-B1A2-N 1/2"-P-210050-B1A1-N FA-21001 MISC CONN FO-21013C STR-21706 6 206-00068 LT-21932A LOW 3/4"-GD-210338-T-A03T1-N 3/4"-P-210475-B1A1-N 3/4"-P-210475-FC-7-N 1/2"-P-210850-B1A1-N REACTOR RISER (FC-8) FO-21024A STR-21762
7 206-00056 PT-21058 3/4"-AI-210237-T-A05T3-N 3/4"-P-210113-B1A1-N 3/4"-P-210113-B1A2-N 1/2"-P-210053-B1A1-N FA-21002A MISC CONN FO-21014A STR-21707 7 206-00068 LT-21932A HIGH 3/4"-GD-210339-T-A03T1-N 3/4"-P-210476-B1A1-N 3/4"-P-210476-FC-7-N 1/2"-P-210851-B1A1-N DC-21001 MISC CONN FO-21024B STR-21763
8 206-00056 PT-21059 3/4"-AI-210238-T-A05T3-N 3/4"-P-210114-B1A1-N 3/4"-P-210114-B1A2-N 1/2"-P-210054-B1A1-N FA-21002B MISC CONN FO-21014B STR-21708 8 206-00068 LT-21005 LOW 3/4"-GD-210340-T-A03T1-N 3/4"-P-210477-B1A1-N 3/4"-P-210477-FC-7-N 1/2"-P-210852-B1A1-N DC-21001 MISC CONN FO-21024C STR-21764
9 206-00061 PDT-21015 HIGH 3/4"-AI-210239-T-A05T3-N 3/4"-P-210115-B1A1-N 3/4"-P-210115-B1A1-N 1/2"-P-210055-B1A1-N 1/2"-P-210888-B1A1-N BA-21001 MISC CONN FO-21015A STR-21709 9 206-00068 LT-21005 HIGH 3/4"-GD-210341-T-A03T1-N 3/4"-P-210478-B1A1-N 3/4"-P-210478-FC-7-N 1/2"-P-210853-B1A1-N DC-21001 MISC CONN FO-21024D STR-21765
10 206-00061 PDT-21010 LOW 3/4"-AI-210240-T-A05T3-N 3/4"-P-210116-B1A1-N 3/4"-P-210116-B1A1-N 1/2"-P-210057-B1A1-N BA-21001 MISC CONN FO-21015B STR-21710 10 206-00068 PDT-21039 LOW 3/4"-GD-210342-T-A03T1-N 3/4"-P-210479-B1A1-N 3/4"-P-210479-FC-7-N 1/2"-P-210854-B1A1-N DC-21001 MISC CONN FO-21024E STR-21766
11 206-00061 PDT-21909A LOW 3/4"-AI-210241-T-A05T3-N 3/4"-P-210071-B1A1-N 3/4"-P-210071-B1A1-N 1/2"-P-210058-B1A1-N BA-21001 MISC CONN FO-21015C STR-21711 11 206-00068 PT-21053 3/4"-GD-210343-T-A03T1-N 3/4"-P-210480-B1A1-N 3/4"-P-210480-FC-7-N 1/2"-P-210855-B1A1-N DC-21001 MISC CONN FO-21024F STR-21767
12 206-00061 PDT-21909B LOW 3/4"-AI-210242-T-A05T3-N 3/4"-P-210118-B1A1-N 3/4"-P-210118-B1A1-N 1/2"-P-210059-B1A1-N BA-21001 MISC CONN FO-21015D STR-21712 12 206-00068 DT-21013 LOW 3/4"-GD-210344-T-A03T1-N 3/4"-P-210481-B1A1-N 3/4"-P-210481-FC-7-N 1/2"-P-210856-B1A1-N DC-21001 MISC CONN FO-21024G STR-21768
13 206-00061 PDT-21909C LOW 3/4"-AI-210243-T-A05T3-N 3/4"-P-210119-B1A1-N 3/4"-P-210119-B1A1-N 1/2"-P-210060-B1A1-N BA-21001 MISC CONN FO-21015E STR-21713 13 206-00068 DT-21013 HIGH 3/4"-GD-210345-T-A03T1-N 3/4"-P-210482-B1A1-N 3/4"-P-210482-FC-7-N 1/2"-P-210857-B1A1-N DC-21001 MISC CONN FO-21024H STR-21769
14 206-00061 PDT-21913A LOW 3/4"-AI-210244-T-A05T3-N 3/4"-P-210120-B1A1-N 3/4"-P-210120-B1A1-N 1/2"-P-210061-B1A1-N BA-21001 MISC CONN FO-21015F STR-21714 14 206-00067 PDT-21930C HIGH 3/4"-GD-210346-T-A03T1-N 3/4"-P-210483-B1A1-N 3/4"-P-210483-FC-7-N 1/2"-P-210097-B1A1-N SPENT CATALYST STAND PIPE MISC CONN FO-21024J STR-21770
15 206-00061 PDT-21913B LOW 3/4"-AI-210245-T-A05T3-N 3/4"-P-210121-B1A1-N 3/4"-P-210121-B1A1-N 1/2"-P-210062-B1A1-N BA-21001 MISC CONN FO-21015G STR-21715 15 206-00067 PDT-21930B HIGH 3/4"-GD-210347-T-A03T1-N 3/4"-P-210484-B1A1-N 3/4"-P-210484-FC-7-N 1/2"-P-210098-B1A1-N SPENT CATALYST STAND PIPE MISC CONN FO-21024K STR-21771
16 206-00061 PDT-21913 LOW 3/4"-AI-210246-T-A05T3-N 3/4"-P-210122-B1A1-N 3/4"-P-210122-B1A1-N 1/2"-P-210063-B1A1-N BA-21001 MISC CONN FO-21015H STR-21716 16 206-00067 PDT-21038 HIGH 3/4"-GD-210348-T-A03T1-N 3/4"-P-210485-B1A1-N 3/4"-P-210485-FC-7-N 1/2"-P-210099-B1A1-N SPENT CATALYST STAND PIPE MISC CONN FO-21024L STR-21772
17 206-00062 PSV-21004A 3/4"-AI-210247-T-A05T3-N 3/4"-P-210123-B1A1-N 3/4"-P-210123-FC-8-N DC-21002 MISC CONN FO-21016A STR-21717 17 206-00067 PDT-21930A HIGH 3/4"-GD-210349-T-A03T1-N 3/4"-P-210486-B1A1-N 3/4"-P-210486-FC-7-N 1/2"-P-210100-B1A1-N SPENT CATALYST STAND PIPE MISC CONN FO-21024M STR-21773
18 206-00062 PSV-21004B 3/4"-AI-210248-T-A05T3-N 3/4"-P-210124-B1A1-N 3/4"-P-210124-FC-8-N DC-21002 MISC CONN FO-21016B STR-21718 18 206-00068 PDT-21042 LOW 3/4"-GD-210350-T-A03T1-N 3/4"-P-210487-B1A1-N 3/4"-P-210487-FC-7-N 1/2"-P-210858-B1A1-N DC-21001 MISC CONN FO-21024N STR-21774
19 206-00062 PSV-21004C 3/4"-AI-210249-T-A05T3-N 3/4"-P-210125-B1A1-N 3/4"-P-210125-FC-8-N DC-21002 MISC CONN FO-21016C STR-21719 19 206-00068 PDT-21042 HIGH 3/4"-GD-210351-T-A03T1-N 3/4"-P-210488-B1A1-N 3/4"-P-210488-FC-7-N 1/2"-P-210859-B1A1-N DC-21001 MISC CONN FO-21024P STR-21775
20 206-00062 PSV-21004D 3/4"-AI-210250-T-A05T3-N 3/4"-P-210126-B1A1-N 3/4"-P-210126-FC-8-N DC-21002 MISC CONN FO-21016D STR-21720 20 206-00068 LT-21932B LOW 3/4"-GD-210352-T-A03T1-N 3/4"-P-210489-B1A1-N 3/4"-P-210489-FC-7-N 1/2"-P-210860-B1A1-N DC-21001 MISC CONN FO-21024Q STR-21776
21 206-00062 PSV-21004E 3/4"-AI-210251-T-A05T3-N 3/4"-P-210127-B1A1-N 3/4"-P-210127-FC-8-N DC-21002 MISC CONN FO-21016E STR-21721 21 206-00068 LT-21932B HIGH 3/4"-GD-210353-T-A03T1-N 3/4"-P-210490-B1A1-N 3/4"-P-210490-FC-7-N 1/2"-P-210861-B1A1-N DC-21001 MISC CONN FO-21024R STR-21777
22 206-00062 PSV-21004F 3/4"-AI-210252-T-A05T3-N 3/4"-P-210128-B1A1-N 3/4"-P-210128-FC-8-N DC-21002 MISC CONN FO-21016F STR-21722 22 206-00068 LT-21932C LOW 3/4"-GD-210354-T-A03T1-N 3/4"-P-210469-B1A1-N 3/4"-P-210469-FC-7-N 1/2"-P-210862-B1A1-N DC-21001 MISC CONN FO-21024S STR-21778
23 206-00062 PSV-21004G 3/4"-AI-210254-T-A05T3-N 3/4"-P-210160-B1A1-N 3/4"-P-210160-FC-8-N DC-21002 MISC CONN FO-21016G STR-21723 23 206-00068 LT-21932C HIGH 3/4"-GD-210355-T-A03T1-N 3/4"-P-210492-B1A1-N 3/4"-P-210492-FC-7-N 1/2"-P-210863-B1A1-N DC-21001 MISC CONN FO-21024T STR-21779
24 206-00062 PDT-21016 LOW 3/4"-AI-210253-T-A05T3-N 3/4"-P-210129-B1A1-N 3/4"-P-210129-FC-8-N 1/2"-P-210064-B1A1-N DC-21002 MISC CONN FO-21016H STR-21724 24 206-00068 PDT-21041 3/4"-GD-210356-T-A03T1-N 3/4"-P-210493-B1A1-N 3/4"-P-210493-FC-7-N 1/2"-P-210864-B1A1-N DC-21001 MISC CONN FO-21024U STR-21780
25 206-00062 PDT-21016 HIGH 3/4"-AI-210255-T-A05T3-N 3/4"-P-210130-B1A1-N 3/4"-P-210130-FC-8-N 1/2"-P-210065-B1A1-N DC-21002 MISC CONN FO-21016I STR-21725 25 206-00068 LT-21006 LOW 3/4"-GD-210357-T-A03T1-N 3/4"-P-210494-B1A1-N 3/4"-P-210494-FC-7-N 1/2"-P-210865-B1A1-N 1/2"-P-210869-B1A1-N DC-21001 MISC CONN FO-21024V STR-21781
26 206-00062 PT-21017 3/4"-AI-210257-T-A05T3-N 3/4"-P-210131-B1A1-N 3/4"-P-210131-FC-8-N 1/2"-P-210066-B1A1-N DC-21002 MISC CONN FO-21016J STR-21726 26 206-00068 LT-21006 HIGH 3/4"-GD-210358-T-A03T1-N 3/4"-P-210495-B1A1-N 3/4"-P-210495-FC-7-N 1/2"-P-210866-B1A1-N DC-21001 MISC CONN FO-21024W STR-21782
27 206-00062 PDT-21039 HIGH 3/4"-AI-210259-T-A05T3-N 3/4"-P-210132-B1A1-N 3/4"-P-210132-FC-8-N 1/2"-P-210067-B1A1-N DC-21002 MISC CONN FO-21016K STR-21727 27 206-00068 DT-21012 LOW 3/4"-GD-210359-T-A03T1-N 3/4"-P-210496-B1A1-N 3/4"-P-210496-FC-7-N 1/2"-P-210867-B1A1-N DC-21001 MISC CONN FO-21024X STR-21783
28 206-00062 LT-21904A LOW 3/4"-AI-210263-T-A05T3-N 3/4"-P-210133-B1A1-N 3/4"-P-210133-FC-8-N 1/2"-P-210068-B1A1-N DC-21002 MISC CONN FO-21016L STR-21728 28 206-00068 DT-21012 HIGH 3/4"-GD-210360-T-A03T1-N 3/4"-P-210497-B1A1-N 3/4"-P-210497-FC-7-N 1/2"-P-210868-B1A1-N DC-21001 MISC CONN FO-21024Y STR-21784
29 206-00062 LT-21904B LOW 3/4"-AI-210264-T-A05T3-N 3/4"-P-210134-B1A1-N 3/4"-P-210134-FC-8-N 1/2"-P-210069-B1A1-N DC-21002 MISC CONN FO-21016M STR-21729 29 206-00072 PG-21052G 3/4"-GD-210361-T-A03T1-N 3/4"-P-210498-B1A2-N 3/4"-P-210498-FC-4-N 1/2"-P-210870-B1A1-N P-210491 FO-21025A STR-21785
30 206-00063 DT-21005 LOW 3/4"-AI-210265-T-A05T3-N 3/4"-P-210135-B1A1-N 3/4"-P-210135-FC-8-N 1/2"-P-210070-B1A1-N DC-21002 MISC CONN FO-21017A STR-21730 30 206-00072 PDT-21065 LOW 3/4"-GD-210362-T-A03T1-N 3/4"-P-210499-B1A2-N 3/4"-P-210499-FC-4-N 1/2"-P-210871-B1A1-N P-210006 FO-21025B STR-21786
31 206-00063 DT-21005 HIGH 3/4"-AI-210267-T-A05T3-N 3/4"-P-210136-B1A1-N 3/4"-P-210136-FC-8-N 1/2"-P-210095-B1A1-N DC-21002 MISC CONN FO-21017B STR-21731
32 206-00063 LT-21904A HIGH 3/4"-AI-210269-T-A05T3-N 3/4"-P-210137-B1A1-N 3/4"-P-210137-FC-8-N 1/2"-P-210072-B1A1-N DC-21002 MISC CONN FO-21017C STR-21732
33 206-00063 LT-21904B HIGH 3/4"-AI-210270-T-A05T3-N 3/4"-P-210138-B1A1-N 3/4"-P-210138-FC-8-N 1/2"-P-210073-B1A1-N DC-21002 MISC CONN FO-21017D STR-21733
34 206-00063 PDT-21018 HIGH 3/4"-AI-210271-T-A05T3-N 3/4"-P-210139-B1A1-N 3/4"-P-210139-FC-8-N 1/2"-P-210074-B1A1-N RECIRCULATION CATALYST STAND PIPE MISC CONN FO-21017E STR-21734
35 206-00063 PDT-21018 LOW 3/4"-AI-210273-T-A05T3-N 3/4"-P-210140-B1A1-N 3/4"-P-210140-FC-8-N 1/2"-P-210075-B1A1-N DC-21002 MISC CONN FO-21017F STR-21735
36 206-00063 PDT-21019 HIGH 3/4"-AI-210323-T-A05T3-N 3/4"-P-210141-B1A1-N 3/4"-P-210141-FC-8-N 1/2"-P-210076-B1A1-N RECIRCULATION CATALYST STAND PIPE MISC CONN FO-21017G STR-21736
37 206-00063 PDT-21019 LOW 3/4"-AI-210325-T-A05T3-N 3/4"-P-210142-B1A1-N 3/4"-P-210142-FC-8-N 1/2"-P-210077-B1A1-N DC-21002 MISC CONN FO-21017H STR-21737
38 206-00063 DT-21006 LOW 3/4"-AI-210275-T-A05T3-N 3/4"-P-210143-B1A1-N 3/4"-P-210143-FC-8-N 1/2"-P-210078-B1A1-N DC-21002 MISC CONN FO-21017I STR-21738
39 206-00063 DT-21006 HIGH 3/4"-AI-210277-T-A05T3-N 3/4"-P-210281-B1A1-N 3/4"-P-210281-FC-8-N 1/2"-P-210079-B1A1-N DC-21002 MISC CONN FO-21017J STR-21739
40 206-00063 PDT-21930A LOW 3/4"-AI-210279-T-A05T3-N 3/4"-P-210145-B1A1-N 3/4"-P-210145-FC-8-N 1/2"-P-210080-B1A1-N DC-21002 MISC CONN FO-21017K STR-21740
41 206-00063 PDT-21038 LOW 3/4"-AI-210281-T-A05T3-N 3/4"-P-210146-B1A1-N 3/4"-P-210146-FC-8-N 1/2"-P-210081-B1A1-N DC-21002 MISC CONN FO-21017L STR-21741
42 206-00063 PDT-21930C LOW 3/4"-AI-210283-T-A05T3-N 3/4"-P-210147-B1A1-N 3/4"-P-210147-FC-8-N 1/2"-P-210082-B1A1-N DC-21002 MISC CONN FO-21017M STR-21742
43 206-00063 PDT-21930B LOW 3/4"-AI-210285-T-A05T3-N 3/4"-P-210148-B1A1-N 3/4"-P-210148-FC-8-N 1/2"-P-210083-B1A1-N DC-21002 MISC CONN FO-21017N STR-21743
44 206-00063 DT-21923 LOW 3/4"-AI-210287-T-A05T3-N 3/4"-P-210149-B1A1-N 3/4"-P-210149-FC-8-N 1/2"-P-210084-B1A1-N DC-21002 MISC CONN FO-21017P STR-21744
45 206-00063 DT-21923 HIGH 3/4"-AI-210289-T-A05T3-N 3/4"-P-210150-B1A1-N 3/4"-P-210150-FC-8-N 1/2"-P-210085-B1A1-N 1/2"-P-210056-B1A1-N DC-21002 MISC CONN FO-21017Q STR-21745
46 206-00064 DT-21009 LOW 3/4"-AI-210291-T-A05T3-N 3/4"-P-210151-B1A1-N 3/4"-P-210151-FC-8-N 1/2"-P-210086-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21018A STR-21746
47 206-00064 PDT-21924A HIGH 3/4"-AI-210293-T-A05T3-N 3/4"-P-210152-B1A1-N 3/4"-P-210152-FC-8-N 1/2"-P-210087-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21018B STR-21747
48 206-00064 PDT-21924B HIGH 3/4"-AI-210295-T-A05T3-N 3/4"-P-210153-B1A1-N 3/4"-P-210153-FC-8-N 1/2"-P-210088-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21018C STR-21748
49 206-00064 PDT-21924C HIGH 3/4"-AI-210297-T-A05T3-N 3/4"-P-210154-B1A1-N 3/4"-P-210154-FC-8-N 1/2"-P-210089-B1A1-N 1/2"-P-210117-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21018D STR-21749
50 206-00064 PDT-21020 HIGH 3/4"-AI-210299-T-A05T3-N 3/4"-P-210155-B1A1-N 3/4"-P-210155-FC-8-N 1/2"-P-210090-B1A1-N REGENERATED CATALYST STAND PIPE MISC CONN FO-21018E STR-21750
51 206-00073 PG-21054G 3/4"-AI-210301-T-A05T3-N 3/4"-P-210156-B1A1-N 3/4"-P-210156-FC-8-N 1/2"-P-210873-B1A1-N FA-21006 GRID 1, MISC CONN FO-21019A STR-21751
52 206-00073 3/4"-AI-210303-T-A05T3-N 3/4"-P-210157-B1A1-N 3/4"-P-210157-FC-8-N 1/2"-P-210874-B1A1-N FA-21006 ABOVE GRID 3, MISC CONN FO-21019B STR-21752
53 206-00073 3/4"-AI-210305-T-A05T3-N 3/4"-P-210158-B1A1-N 3/4"-P-210158-FC-8-N 1/2"-P-210875-B1A1-N FA-21006 ABOVE GRID 5, MISC CONN FO-21019C STR-21753
54 206-00073 3/4"-AI-210307-T-A05T3-N 3/4"-P-210161-B1A1-N 3/4"-P-210161-FC-8-N 1/2"-P-210876-B1A1-N FA-21006 BELOW GRID 6, MISC CONN FO-21019D STR-21754

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 2
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00004 00
CAD FILE :
VENT AND LIQUID COLLECTION SYSTEM FOR
COMPRESSOR DISTANCE PIECE VENT GENERAL NOTES :
(ONE FOR EACH COMPRESSOR STAGE) 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
PIPE CLASS OF
CONNECTED PIPE 2. DELETED.
NOTE 2 NOTE 2

2" VENT TO LOCATION


3/4" AS DEPICTED AT
3/4" COMPRESSOR SERVICE
NOTE 3

H
PI PT
6" PIPE x 2'-6"(750) NOTE 1
3/4"

1'-0" (300)

2" LG-
R
FROM COMPRESSOR
DISTANCE PIECE VENT(S) NOTE 1
2" 3/4" GAUGE GLASS
FROM COMPRESSOR MUST BE READABLE NOTES :
DISTANCE PIECE DRAIN(S) FROM VALVE
1. HEAT TRACING AND OBJECTIVE TEMPERATURE TO BE SPECIFIED.
2. LOCKED OPEN. (DO NOT CLOSE UNTIL COMPRESSOR IS ISOLATED AND DEPRESSURIZED.)
3. NITROGEN PURGE.

3/4"
T-A60T1

2" T-A60T1

FREE
DRAINING

CDH

7381

DETAIL "KD"
A DISTANCE PIECE VENT AND DRAIN LIQUID COLLECTION POT
MAY ONLY BE SHARED AMONG MULTIPLE CYLINDERS OPERATING
IN PARALLEL FOR SAME STAGE OF COMPRESSION IN THE SAME
SERVICE FOR A SINGLE MACHINE
VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE
AND CLASS AS THE ASSOCIATED PIPING SHOWN AT THE COMPRESSOR.

VENT AND LIQUID COLLECTION SYSTEM FOR


COMPRESSOR PACKING VENT
(ONE FOR EACH COMPRESSOR STAGE)

PIPE CLASS OF
CONNECTED PIPE
NOTE 2 NOTE 2

2" PG VENT TO LOCATION


3/4" AS DEPICTED AT
3/4" COMPRESSOR SERVICE
NOTE 3

6" PIPE x 2'-6"(750) NOTE 1


3/4"

1'-0" (300)

2" LG-
R
FROM COMPRESSOR
PACKING VENT(S)
NOTE 1
3/4" GAUGE GLASS
MUST BE READABLE
FROM VALVE

3/4"
T-A60T1

2" T-A60T1

FREE
DRAINING

CDH

7381

DETAIL "KP"
A PACKING VENT AND DRAIN LIQUID COLLECTION POT
MAY ONLY BE SHARED AMONG MULTIPLE CYLINDERS OPERATING
IN PARALLEL FOR SAME STAGE OF COMPRESSION IN THE SAME
SERVICE FOR A SINGLE MACHINE
VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE
AND CLASS AS THE ASSOCIATED PIPING SHOWN AT THE COMPRESSOR.

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 3
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00005 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

SECL
VENDOR

NOTES :
LINE NO. "B"
1. VENDOR TO CONFIRM ORIFICE SIZE.
T-A03T1 T-A18T1
NITROGEN MIN 2. MINIMUM TO UTILITY RISERS.

LINE NO. "C"


206-00070 FC-7 (SPENT CATALYST 3. HOLE SIZE OF ORIFICE PLATE TO BE 2 mm.
FO
FROM NITROGEN NOTE 2 T-A18T1 STAND PIPE)
NOTE 3
RISER FC-8 (RECIRCULATION AND - 1" PTP
REGENERATED CATALYST
FREE STANDPIPE)
STEAM NOTE 2 DRAINING NOTE 1 PG
206-00069
175°C -
FROM 6.3 kg/cm2(G) 3/4" LINE NO. "E"
LINE NO. "A"
STEAM RISER
LINE NO. "D" FF
PT PI
TRV STEAM
CONDENSATE - -

1800
MIN
175°C

1"
MIN

SLIDE VALVE
PACKING GLAND 1" PTP

DETAIL "H"
PURGE TO SINGLE DISC SLIDE VALVE

P&ID NO. LINE NO. "A" LINE NO. "B" LINE NO. "C" LINE NO. "D" LINE NO. "E" FO TAG NO. PT TAG NO. PG TAG NO. DETAILS STR TAG NO. STP TAG NO.
1 206-00063 1"-VM-210527-T-A18T1-EC 1"-GI-210783-T-A03T1-N 3/4"-VM-210580-T-A18T1-EC 3/4"-CACBP-210623-T-A18T1-PP 1"-P-210164-FC-8-EC(ST) FO-21028A PT-21061 PG-21061 RECIRCULATION CATALYST STANDPIPE MISC CONN STR-21787 STP-21701
2 206-00063 1"-VM-210529-T-A18T1-EC 1"-GI-210098-T-A03T1-N 3/4"-VM-210581-T-A18T1-EC 3/4"-CACBP-210625-T-A18T1-PP 1"-P-210165-FC-8-EC(ST) FO-21028B PT-21062 PG-21062 RECIRCULATION CATALYST STANDPIPE MISC CONN STR-21788 STP-21702
3 206-00064 1"-VM-210030-T-A18T1-EC 1"-GI-210099-T-A03T1-N 3/4"-VM-210582-T-A18T1-EC 3/4"-CACBP-210627-T-A18T1-PP 1"-P-210166-FC-8-EC(ST) FO-21029 PT-21063 PG-21063 REGENERATED CATALYST STANDPIPE MISC CONN STR-21789 STP-21703
4 206-00067 1"-VM-210090-T-A18T1-EC 1"-GI-210097-T-A03T1-N 3/4"-VM-210583-T-A18T1-EC 3/4"-CACBP-210631-T-A18T1-PP 1"-P-210167-FC-7-EC(ST) FO-21030 PT-21064 PG-21064 SPENT CATALYST STANDPIPE MISC CONN STR-21790 STP-21704

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 4
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00006 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

P&ID NO. DETAILS LINE NO. "A" LINE NO. "B" P&ID NO. DETAILS LINE NO. "A" LINE NO. "B"
1 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210057-T-A06T1-N 3/4"-P-210442-B1A2-PP 44 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210253-T-A06T1-N 3/4"-P-210700-FC-7-PP
2 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210201-T-A06T1-N 3/4"-P-210440-B1A2-PP 45 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210254-T-A06T1-N 3/4"-P-210701-FC-7-PP
3 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210204-T-A06T1-N 3/4"-P-210441-B1A2-N 46 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210255-T-A06T1-N 3/4"-P-210702-FC-7-PP
4 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210203-T-A06T1-N 3/4"-P-210439-B1A2-N 47 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210256-T-A06T1-N 3/4"-P-210703-FC-7-PP
5 206-00057 BLAST CONN. FOR CATALYST WITHDRAWAL 3/4"-AP-210088-T-A06T1-N 3/4"-P-210437-B1A2-PP 48 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210257-T-A06T1-N 3/4"-P-210704-FC-7-PP
6 206-00057 BLAST CONN. FOR CATALYST WITHDRAWAL 3/4"-AP-210205-T-A06T1-N 3/4"-P-210291-B1A2-PP 49 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210258-T-A06T1-N 3/4"-P-210705-FC-7-PP
7 206-00063 BLAST CONN. FOR CATALYST WITHDRAWAL 3/4"-AP-210089-T-A06T1-N 3/4"-P-210292-B1A2-PP 50 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210259-T-A06T1-N 3/4"-P-210706-FC-7-PP
8 206-00063 BLAST CONN. FOR CATALYST WITHDRAWAL 3/4"-AP-210212-T-A06T1-N 3/4"-P-210293-B1A2-PP 51 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210260-T-A06T1-N 3/4"-P-210707-FC-7-PP
9 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210206-T-A06T1-N 3/4"-P-210294-B1A2-PP 52 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210261-T-A06T1-N 3/4"-P-210708-FC-7-PP
10 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210086-T-A06T1-N 3/4"-P-210295-B1A2-PP 53 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210262-T-A06T1-N 3/4"-P-210709-FC-7-PP
11 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210208-T-A06T1-N 3/4"-P-210296-B1A2-PP 54 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210263-T-A06T1-N 3/4"-P-210710-FC-7-PP
12 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210207-T-A06T1-N 3/4"-P-210297-B1A2-PP 55 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210264-T-A06T1-N 3/4"-P-210711-FC-7-PP
13 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210222-T-A06T1-N 3/4"-P-210332-FC-7-PP 56 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210265-T-A06T1-N 3/4"-P-210712-B1A2-N

T-A06T1-N B1A2-PP OR FC-7-PP


14 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210223-T-A06T1-N 3/4"-P-210333-FC-7-PP 57 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210266-T-A06T1-N 3/4"-P-210713-B1A2-N NOTES :
MIN. 15 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210224-T-A06T1-N 3/4"-P-210334-FC-7-PP 58 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210267-T-A06T1-N 3/4"-P-210714-B1A2-N 1. MINIMUM TO UTILITY RISERS.
DRY PLANT AIR 3/4" 3/4"
16 206-00063 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210225-T-A06T1-N 3/4"-P-210335-B1A2-PP 59 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210268-T-A06T1-N 3/4"-P-210715-B1A2-N
206-00082 2. PROVIDE 1800 OR MORE CLEARANCE THIS POINT TO ENABLE USE OF REAMER.
17 206-00063 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210226-T-A06T1-N 3/4"-P-210336-B1A2-PP 60 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210269-T-A06T1-N 3/4"-P-210716-B1A2-N
FROM FLUFFING 3. MINIMUM LENGTH STRAIGHT PIPE.
18 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210227-T-A06T1-N 3/4"-P-210337-B1A2-PP 61 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210270-T-A06T1-N 3/4"-P-210717-B1A2-N
AIR COMPRESSOR
LINE NO.A LINE NO.B 19 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210228-T-A06T1-N 3/4"-P-210338-B1A2-PP 62 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210271-T-A06T1-N 3/4"-P-210718-B1A2-N 4. THIS VLAVE SHALL BE A SCREWED VALVE AND THREAD TO MATCH PRESSURE TAP REAMER.
45° SEE UOP STANDARD DRAWING 6-122 AND 6-123.
20 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210229-T-A06T1-N 3/4"-P-210339-FC-7-PP 63 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210272-T-A06T1-N 3/4"-P-210719-B1A2-N
NOTE 5, 6
21 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210230-T-A06T1-N 3/4"-P-210340-FC-7-PP 64 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210273-T-A06T1-N 3/4"-P-210720-B1A2-N 5. BEND 9D.
22 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210231-T-A06T1-N 3/4"-P-210341-FC-7-PP 65 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210274-T-A06T1-N 3/4"-P-210721-B1A2-N 6. DIRECTION OF BENDING FOR EACH BLAST CONNECTION TO BE SPECIFIED ON EACH POINT.
DETAIL "BC" 23 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210232-T-A06T1-N 3/4"-P-210342-FC-7-PP 66 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210275-T-A06T1-N 3/4"-P-210722-B1A2-N
BLAST CONNECTION FOR CATALYST LOADING / UNLOADING 24 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210233-T-A06T1-N 3/4"-P-210343-FC-7-PP 67 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210276-T-A06T1-N 3/4"-P-210723-B1A2-N
25 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210234-T-A06T1-N 3/4"-P-210344-FC-7-PP 68 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210277-T-A06T1-N 3/4"-P-210724-B1A2-N
26 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210235-T-A06T1-N 3/4"-P-210345-FC-7-PP 69 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210278-T-A06T1-N 3/4"-P-210725-B1A2-N
27 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210236-T-A06T1-N 3/4"-P-210346-FC-7-PP 70 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210279-T-A06T1-N 3/4"-P-210726-B1A2-N
28 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210237-T-A06T1-N 3/4"-P-210347-FC-7-PP 71 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210280-T-A06T1-N 3/4"-P-210727-B1A2-N
29 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210238-T-A06T1-N 3/4"-P-210348-FC-7-PP 72 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210281-T-A06T1-N 3/4"-P-210728-B1A2-N
30 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210239-T-A06T1-N 3/4"-P-210349-B1A2-PP 73 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210282-T-A06T1-N 3/4"-P-210729-B1A2-N
31 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210240-T-A06T1-N 3/4"-P-210350-B1A2-PP 74 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210283-T-A06T1-N 3/4"-P-210730-B1A2-N
32 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210241-T-A06T1-N 3/4"-P-210351-B1A2-PP 75 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210284-T-A06T1-N 3/4"-P-210731-B1A2-N
33 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210242-T-A06T1-N 3/4"-P-210352-B1A2-PP 76 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210285-T-A06T1-N 3/4"-P-210732-B1A2-N
34 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210243-T-A06T1-N 3/4"-P-210353-FC-7-PP 77 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210286-T-A06T1-N 3/4"-P-210733-B1A2-N
35 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210244-T-A06T1-N 3/4"-P-210354-FC-7-PP 78 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210287-T-A06T1-N 3/4"-P-210734-B1A2-N
36 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210245-T-A06T1-N 3/4"-P-210355-FC-7-PP 79 206-00057 BLAST CONN. FOR CATALYST LOADING 3/4"-AP-210288-T-A06T1-N 3/4"-P-210735-B1A2-N
37 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210246-T-A06T1-N 3/4"-P-210356-FC-7-PP 80 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210289-T-A06T1-N 3/4"-P-210736-B1A2-N
38 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210247-T-A06T1-N 3/4"-P-210357-B1A2-PP 81 206-00057 BLAST CONN. FOR CATALYST UNLOADING 3/4"-AP-210290-T-A06T1-N 3/4"-P-210737-B1A2-N
39 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210248-T-A06T1-N 3/4"-P-210358-B1A2-PP 82 206-00056 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210291-T-A06T1-N 3/4"-P-210738-B1A2-PP
40 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210249-T-A06T1-N 3/4"-P-210359-B1A2-PP 83 206-00056 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210292-T-A06T1-N 3/4"-P-210739-B1A2-PP
41 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210250-T-A06T1-N 3/4"-P-210360-B1A2-PP 84 206-00056 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210293-T-A06T1-N 3/4"-P-210740-B1A2-PP
42 206-00063 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210251-T-A06T1-N 3/4"-P-210361-B1A2-PP 85 206-00056 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210294-T-A06T1-N 3/4"-P-210741-B1A2-PP
43 206-00063 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210252-T-A06T1-N 3/4"-P-210362-B1A2-PP 86 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210295-T-A06T1-N 3/4"-P-210742-FC-7-PP
87 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210296-T-A06T1-N 3/4"-P-210743-FC-7-PP
88 206-00003 BLAST CONN. FOR DC-21002 LOADING 3/4"-AP-210297-T-A06T1-N 3/4"-P-210744-B1A2-PP
89 206-00003 BLAST CONN. FOR DC-21002 UNLOADING 3/4"-AP-210298-T-A06T1-N 3/4"-P-210745-B1A2-PP
90 206-00063 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210391-T-A06T1-N 3/4"-P-210391-B1A2-PP
91 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210392-T-A06T1-N 3/4"-P-210392-FC-7-PP
92 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210393-T-A06T1-N 3/4"-P-210393-FC-7-PP
RISER
FROM PLANT AIR
PLANT AIR
STEAM RISER
STEAM

FROM 6.3 kg/cm2(G)

93 206-00011 BLAST CONN. FOR CATALYST TRANSFER TO HOPPER 3/4"-AP-210394-T-A06T1-N 3/4"-P-210394-FC-7-PP


206-00069

206-00070

LINE NO. A

NOTE 1
LINE NO. B
T-A06T1
T-A18T1

P&ID NO. DETAILS LINE NO. "A" LINE NO. "B" LINE NO. "C" PG TAG NO.
1 206-00063 GG-UPSTREAM OF SPE-21007A 1-1/2"-AP-210101-T-A06T1-N 1-1/2"-VM-210536-T-A18T1-EC PG-21019GA
2 206-00063 GG-UPSTREAM OF SPE-21007B 1-1/2"-AP-210102-T-A06T1-N 1-1/2"-VM-210538-T-A18T1-EC 1-1/2"-P-210202-FC-8-PP PG-21019GB
PG 3 206-00063 GG-DOWNSTREAM OF SPE-21007A 1-1/2"-AP-210103-T-A06T1-N 1-1/2"-VM-210540-T-A18T1-EC 1-1/2"-P-210203-FC-8-PP PG-21019GC
- 4 206-00063 GG-DOWNSTREAM OF SPE-21007B 1-1/2"-AP-210104-T-A06T1-N 1-1/2"-VM-210542-T-A18T1-EC 1-1/2"-P-210204-FC-8-PP PG-21019GD
T-A18T1
FC-8

LINE NO. "C"

3/4"

NOTE 4

NOTE 3

NOTE 2
DETAIL "GG"
BLAST CONNECTION

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 5
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00007 00
CAD FILE :
FIC GENERAL NOTES :
- 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
MIN
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
PG FF FF
FV FT
- 1 PLANT AIR FOR REGENERATED
3 2 CATALYST STANDPIPE
- -
PLANT AIR
206-00070
1-1/2"x1" FC 1-1/2"x1" 2"x1-1/2" #300 2"x1-1/2"
1" FROM PLANT

3/4"

3/4"
FC-8 B2A1 AIR RISER
NOTE 3
1"

B2A1 T-A06T1
FO #1 4
NOTE 4 FC-8 B2A1 T-A06T1
2 FO
3/4" 8

1-1/2" 7
FC-8 T-A18T1 6 5
NOTE 2

206-00069
NOTES :
1-1/2" STEAM FROM
6.3 kg/cm2(G) 1. MINIMUM LENGTH STRAIGHT PIPE.
NOTE 1 STEAM RISER
NOTE 3
2. PROVIDE 1800 OR MORE CLEARANCE THIS POINT TO ENABLE USE OF REAMER.
3. MINIMUM TO UTILITY RISERS.
SHELL AND LINING DETAIL "A" 4. THIS VALVE SHALL BE A SCREWED VALVE AND THREAD TO MATCH PRESSURE TAP REAMER.
STANDPIPE SEE UOP STANDARD DRAWING 6-122 AND 6-123.
FLUIDIZATION AND BLAST
DETAIL "A" STANDPIPE FLUIDIZATION LINE NUMBER TABLE
REGENERATED CATALYST STANDPIPE NOZZLE ASSOCIATED WITH LINE
(SEE DRAWING NO. 206-00064 FOR NOZZLE LOCATIONS)

P&ID NO. LINE "1" LINE "2" LINE "3" LINE "4" LINE "5" LINE "6" LINE "7" LINE "8" FO #1 TAG NO. FV TAG NO. FT TAG NO. FIC TAG NO. PG TAG NO. STR TAG NO.
C05 206-00064 1-1/2"-AP-210105-T-A06T1-N 1-1/2"-P-210205-B2A1-N 1-1/2"-P-210206-FC-8-EC 3/4"-AP-210113-T-A06T1-N 3/4"-P-210207-B2A1-N 3/4"-P-210206-FC-8-EC 1-1/2"-VM-210550-T-A18T1-EC 3/4"-P-210209-FC-8-EC FO-21033 FV-21063 FT-21063 FIC-21063 PG-21003 STR-21791

FIC

MIN 1" TO OTHER


FLUIDIZATION TAPS

PG FF FF
FV FT PLANT AIR FOR REGENERATED
- 40 CATALYST STANDPIPE
43 FO #1 42 41
- -
6 FO
PLANT AIR
206-00070
1-1/2"x1" 1-1/2"x1" FC 1-1/2"x1" 2"x1-1/2" #300 2"x1-1/2"
1" FROM PLANT

3/4"

3/4"
FC-8 B2A1 AIR RISER
NOTE 3
1"

B2A1 T-A06T1
FO #2 44
NOTE 4 FC-8 B2A1 T-A06T1
2 FO
3/4" 3/4"

1"
NOTE 2 47 46 45

TO OTHER
NOTE 1 FLUIDIZATION TAPS

DETAIL "AA"
STANDPIPE
SHELL AND LINING
FLUIDIZATION
DETAIL "AA" STANDPIPE FLUIDIZATION LINE NUMBER TABLE
REGENERATED CATALYST STANDPIPE NOZZLE ASSOCIATED WITH LINE
(SEE DRAWING NO. 206-00064 FOR NOZZLE LOCATIONS)

P&ID NO. LINE "40" LINE "41" LINE "42" LINE "43" LINE "44" LINE "45" LINE "46" LINE "47" FO #1 TAG NO. FO #2 TAG NO. PG TAG NO. FV TAG NO. FT TAG NO. FIC TAG NO. STR TAG NO.
C14-1 206-00064 1"-P-210214-B2A1-N 1"-P-210226-FC-8-PP 3/4"-AP-210038-T-A06T1-N 3/4"-P-210238-B2A1-N 3/4"-P-210250-FC-8-N FO-21034A FO-21035A PG-21022GA STR-21792
1 C14-2 206-00064 1-1/2"-AP-210126-T-A06T1-N 1-1/2"-P-210210-B2A1-N 1"-P-210215-B2A1-N 1"-P-210227-FC-8-PP 3/4"-AP-210126-T-A06T1-N 3/4"-AP-210140-T-A06T1-N 3/4"-P-210239-B2A1-N 3/4"-P-210251-FC-8-N FO-21034B FO-21035B PG-21022GB FV-21065 FT-21065 FIC-21065 STR-21793
C14-3 206-00064 1"-P-210216-B2A1-N 1"-P-210228-FC-8-PP 3/4"-AP-210143-T-A06T1-N 3/4"-P-210240-B2A1-N 3/4"-P-210252-FC-8-N FO-21034C FO-21035C PG-21022GC STR-21794
C14-4 206-00064 1"-P-210217-B2A1-N 1"-P-210229-FC-8-PP 3/4"-AP-210701-T-A06T1-N 3/4"-P-210241-B2A1-N 3/4"-P-210253-FC-8-N FO-21034D FO-21035D PG-21022GD STR-21795
2 C14-5 206-00064 1-1/2"-AP-210692-T-A06T1-N 1-1/2"-P-210211-B2A1-N 1"-P-210218-B2A1-N 1"-P-210230-FC-8-PP 3/4"-AP-210692-T-A06T1-N 3/4"-AP-210704-T-A06T1-N 3/4"-P-210242-B2A1-N 3/4"-P-210254-FC-8-N FO-21034E FO-21035E PG-21022GE FV-21066 FT-21066 FIC-21066 STR-21796
C14-6 206-00064 1"-P-210219-B2A1-N 1"-P-210231-FC-8-PP 3/4"-AP-210707-T-A06T1-N 3/4"-P-210243-B2A1-N 3/4"-P-210255-FC-8-N FO-21034F FO-21035F PG-21022GF STR-21797
C14-7 206-00064 1"-P-210220-B2A1-N 1"-P-210232-FC-8-PP 3/4"-AP-210719-T-A06T1-N 3/4"-P-210244-B2A1-N 3/4"-P-210256-FC-8-N FO-21034G FO-21035G PG-21022GG STR-21798
3 C14-8 206-00064 1-1/2"-AP-210710-T-A06T1-N 1-1/2"-P-210212-B2A1-N 1"-P-210221-B2A1-N 1"-P-210233-FC-8-PP 3/4"-AP-210710-T-A06T1-N 3/4"-AP-210722-T-A06T1-N 3/4"-P-210245-B2A1-N 3/4"-P-210257-FC-8-N FO-21034H FO-21035H PG-21022GH FV-21067 FT-21067 FIC-21067 STR-21799
C14-9 206-00064 1"-P-210222-B2A1-N 1"-P-210234-FC-8-PP 3/4"-AP-210725-T-A06T1-N 3/4"-P-210246-B2A1-N 3/4"-P-210258-FC-8-N FO-21034J FO-21035J PG-21022GJ STR-21800
C14-10 206-00064 1"-P-210223-B2A1-N 1"-P-210235-FC-8-PP 3/4"-AP-210737-T-A06T1-N 3/4"-P-210247-B2A1-N 3/4"-P-210259-FC-8-N FO-21034K FO-21035K PG-21022GK STR-21801
4 C14-11 206-00064 1-1/2"-AP-210728-T-A06T1-N 1-1/2"-P-210213-B2A1-N 1"-P-210224-B2A1-N 1"-P-210236-FC-8-PP 3/4"-AP-210728-T-A06T1-N 3/4"-AP-210740-T-A06T1-N 3/4"-P-210248-B2A1-N 3/4"-P-210260-FC-8-N FO-21034L FO-21035L PG-21022GL FV-21068 FT-21068 FIC-21068 STR-21802
C14-12 206-00064 1"-P-210225-B2A1-N 1"-P-210237-FC-8-PP 3/4"-AP-210743-T-A06T1-N 3/4"-P-210249-B2A1-N 3/4"-P-210261-FC-8-N FO-21034M FO-21035M PG-21022GM STR-21803

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 6
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00008 00
CAD FILE :
NOTE 5
FY FIC HY
206-00068 11271
GENERAL NOTES :
- - - TSL
FROM TI-21045 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
ZSO ZSC DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
XY RESET
IS XHS
- - S 2. DELETED.
NOTE 7
MIN FIC IS HS
IA
- FF - DE
PG FF FT ZSO ZSC
FV REMOTE XV
- - SELECTOR NITROGEN FOR SPENT
21 - - ATM
- #1 CATALYST STANDPIPE
MIN
1-1/2" 1-1/2" 2"x1-1/2" 2"x1-1/2" NITROGEN
206-00070 6251
1-1/2"x1" FC 1-1/2"x1" #300 FO FROM NITROGEN
1" T-A18T1-EC T-A03T1-N

3/4"

3/4"
FC-7 T-A18T1 RISER
#300

MIN
29 20 NOTE 3
FT
1" ZSO ZSC
-
FO #1 - -
2 FO FC-7 T-A18T1
25
3/4"
ZSO ZSC
24 XV
23 22 - -
1-1/2" #2
FC-7 T-A18T1
NOTE 2 1-1/2" MP STEAM NOTES :
206-00069 8085 206-00069 11267 1. MINIMUM LENGTH STRAIGHT PIPE.
FC FROM STEAM RISER
1-1/2" STEAM FROM 2. PROVIDE 1800 OR MORE CLEARANCE THIS POINT TO ENABLE USE OF REAMER.
6.3 kg/cm2(G)
STEAM RISER 26 27 NOTE 3 3. MINIMUM TO UTILITY RISERS.
DETAIL "N"
NOTE 1 EC PP
NOTE 3 STANDPIPE
FLUIDIZATION AND BLAST
4. THIS VALVE SHALL BE A SCREWED VALVE AND THREAD TO MATCH PRESSURE TAP REAMER.
CACBP SEE UOP STANDARD DRAWING 6-122 AND 6-123.
DETAIL 'N' STANDPIPE FLUIDIZATION LINE NUMBER TABLE T
SPENT CATALYST STANDPIPE NOZZLE ASSOCIATED WITH LINES 206-00627B 5. RELATED FUNCTION OS AS BELOW.
SHELL AND LINING (SEE DRAWING NO. 206-00067 FOR NOZZLE LOCATIONS) TSL-21045 ACTIVATED.
28 - XV-21934 TO BE OPENED.
- XV-21935 TO BE CLOSED.
- FIC-21064A TO BE SET FOR NITROGEN.
P&ID NO. LINE "20" LINE "21" LINE "22" LINE "23" LINE "24" LINE "25" LINE "26" LINE "27" LINE "28" LINE "29" TSL-21045 DEACTIVATED.
- XV-21934 TO BE CLOSED.
D03 206-00067 1-1/2"-GI-210370-T-A03T1-N 1-1/2"-P-210373-FC-7-EC 3/4"-VM-210381-T-A18T1-EC 3/4"-P-210290-FC-7-EC 1-1/2"-VM-210549-T-A18T1-EC 1-1/2"-P-210262-FC-7-EC 1-1/2"-VM-210551-T-A18T1-EC 3/4"-VM-210552-T-A18T1-EC 3/4"-CACBP-210552-T-A18T1-PP 1-1/2"-VM-210383-T-A18T1-EC - XV-21935 TO BE OPENED.
- FIC-21064B TO BE SET FOR STEAM.
6. RELATED FUNCTION OS AS BELOW.
FO #1 TAG NO. PG TAG NO. FV TAG NO. FT TAG NO. FIC TAG NO. FY TAG NO. STR TAG NO. XV #1 TAG NO. ZSO #1 TAG NO. ZSC #1 TAG NO. XV #2 TAG NO. ZSO #2 TAG NO. ZSC #2 TAG NO. XY TAG NO. XHS TAG NO. HS TAG NO. HY TAG NO. INTERLOCK NO. STP NO. TSL-21045 ACTIVATED.
D03 FO-21039 PG-21041 FV-21064 FT-21064A/B FIC-21064A/B FY-21064 STR-21807 XV-21934 ZSO-21934 ZSC-21934 XV-21935 ZSO-21935 ZSC-21935 XY-21934 XHS-21934 HS-21021 HY-21021 IS-21006 STP-21041 -XV-21973 / 20976 / 21978 TO BE OPENED.
- XV-21974 / 21977 / 21979 TO BE CLOSED.
-FIC-21070A / 21071A / 21072A TO BE SET FOR NITROGEN.
NOTE 6 TSL-21045 DEACTIVTED.
SW
FY FIC HY -XV-21973 / 21976 / 21978 TO BE CLOSED.
206-00068 - XV-21974 / 21977 / 21979 TO BE OPENED.
- - - TSL
FROM TI-21045 - FIC-21070B/21071B/21072B TO BE SET FOR STEAM.
ZSO ZSC
RESET
XY IS XHS 7. RESET SWITCH TO BE LOCATED NEAR THE DEDICATED ON-OFF VALVE.
- - S
NOTE 7
MIN 1" TO OTHER IS HS
FLUIDIZATION TAPS FIC
IA
- FF - DE
PG FF FT ZSO ZSC
FV REMOTE XV
- - SELECTOR NITROGEN FOR SPENT
52 - - ATM
FO #1 51 - #1 CATALYST STANDPIPE
6 FO MIN
NITROGEN
#300
206-00070
2"x1-1/2" FC 2"x1-1/2" FO FROM NITROGEN
2"x1" 1-1/2" T-A18T1-EC T-A03T1-N

3/4"

3/4"
FC-7 T-A18T1 RISER
#300

MIN
FT 50 NOTE 3
1-1/2" ZSO ZSC
-
- -
FO #2 53
NOTE 4 2 FO FC-7 T-A18T1
3/4" 3/4"
ZSO ZSC XV
#2
1" - -

NOTE 2 55 54 MIN
2" MP STEAM
206-00069
DETAIL "NN" FC FROM STEAM RISER
STANDPIPE
FLUIDIZATION
3/4" TO OTHER 56 NOTE 3
DETAIL 'NN' STANDPIPE FLUIDIZATION LINE NUMBER TABLE
NOTE 1 FLUIDIZATION TAPS
SPENT CATALYST STANDPIPE NOZZLE ASSOCIATED WITH LINES
(SEE DRAWING NO. 206-00067 FOR NOZZLE LOCATIONS)

SHELL AND LINING

P&ID NO. LINE "50" LINE "51" LINE "52" LINE "53" LINE "54" LINE "55" LINE "56"
D04-1 206-00067 1"-VM-210395-T-A18T1-EC 1"-P-210263-FC-7-EC 3/4"-VM-210404-T-A18T1-EC 3/4"-P-210272-FC-7-EC
1 D04-2 206-00067 2"-GI-210393-T-A03T1-N 1"-VM-210397-T-A18T1-EC 1"-P-210264-FC-7-EC 3/4"-VM-210403-T-A18T1-EC 3/4"-VM-210407-T-A18T1-EC 3/4"-P-210273-FC-7-EC 2"-VM-210555-T-A18T1-EC
D04-3 206-00067 1"-VM-210399-T-A18T1-EC 1"-P-210265-FC-7-EC 3/4"-VM-210410-T-A18T1-EC 3/4"-P-210274-FC-7-EC
D04-4 206-00067 1"-VM-210766-T-A18T1-EC 1"-P-210266-FC-7-EC 3/4"-VM-210773-T-A18T1-EC 3/4"-P-210275-FC-7-EC
2 D04-5 206-00067 2"-GI-210764-T-A03T1-N 1"-VM-210768-T-A18T1-EC 1"-P-210267-FC-7-EC 3/4"-VM-210772-T-A18T1-EC 3/4"-VM-210776-T-A18T1-EC 3/4"-P-210276-FC-7-EC 2"-VM-210554-T-A18T1-EC
D04-6 206-00067 1"-VM-210770-T-A18T1-EC 1"-P-210268-FC-7-EC 3/4"-VM-210779-T-A18T1-EC 3/4"-P-210277-FC-7-EC
D04-7 206-00067 1"-VM-210784-T-A18T1-EC 1"-P-210269-FC-7-EC 3/4"-VM-210791-T-A18T1-EC 3/4"-P-210278-FC-7-EC
3 D04-8 206-00067 2"-GI-210782-T-A03T1-N 1"-VM-210786-T-A18T1-EC 1"-P-210270-FC-7-EC 3/4"-VM-210790-T-A18T1-EC 3/4"-VM-210794-T-A18T1-EC 3/4"-P-210279-FC-7-EC 2"-VM-210553-T-A18T1-EC
D04-9 206-00067 1"-VM-210788-T-A18T1-EC 1"-P-210271-FC-7-EC 3/4"-VM-210797-T-A18T1-EC 3/4"-P-210280-FC-7-EC

FO #1 TAG NO. FO #2 TAG NO. PG TAG NO. FV TAG NO. FT TAG NO. FIC TAG NO. STR TAG NO. XV #1 TAG NO. ZSO #1 TAG NO. ZSC #1 TAG NO. XV #2 TAG NO. ZSO #2 TAG NO. ZSC #2 TAG NO. XY TAG NO. XHS TAG NO. HS TAG NO. HY TAG NO. FY TAG NO. INTERLOCK NO.
D04-1 FO-21040A FO-21041A PG-21040GA STR-21810
1 D04-2 FO-21040B FO-21041B PG-21040GB FV-21070 FT-21070A/B FIC-21070A/B STR-21811 XV-21973 ZSO-21973 ZSC-21973 XV-21974 ZSO-21974 ZSC-21973 XY-21973 XHS-21973 HY-21022 FY-21070
D04-3 FO-21040C FO-21041C PG-21040GC STR-21812
D04-4 FO-21040D FO-21041D PG-21040GD STR-21813
2 D04-5 FO-21040E FO-21041E PG-21040GE FV-21071 FT-21071A/B FIC-21071A/B STR-21814 XV-21976 ZSO-21976 ZSC-21976 XV-21977 ZSO-21977 ZSC-21976 XY-21976 XHS-21976 HS-21021 HY-21023 FY-21071 IS-21006
D04-6 FO-21040F FO-21041F PG-21040GF STR-21815
D04-7 FO-21040G FO-21041G PG-21040GG STR-21816
3 D04-8 FO-21040H FO-21041H PG-21040GH FV-21072 FT-21072A/B FIC-21072A/B STR-21817 XV-21978 ZSO-21978 ZSC-21978 XV-21979 ZSO-21979 ZSC-21979 XY-21978 XHS-21978 HY-21024 FY-21072
D04-9 FO-21040J FO-21041J PG-21040GJ STR-21818

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 7
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00009 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

STEAM

FROM STEAM RISER


206-00070

206-00069
1" NITROGEN FOR SPENT CATALYST STANDPIPE
1" PLANT AIR FOR REGENERATED CATALYST
STANDPIPE
1-1/2" STEAM FROM NOTES :

NOTE 2
NOTE 2 6.3 kg/cm2(G)
STEAM RISER 1. LOCATE MANIFOLD ABOVE STANDPIPE CONNECTION.
2. MINIMUM TO UTILITY RISERS.
3. MINIMUM LENGTH STRAIGHT PIPE.

LINE NO. "D" 4. PROVIDE 1800 OR MORE CLEARANCE THIS POINT TO ENABLE USE OF REAMER.
LINE NO. "A" PG 5. PROVIDE 600 CLEARANCE FOR SAMPLING CONTAINER.
- 6. SEE DETAIL ON DWG. 206-00020E.
11352
NOTE 1 7. DELETED.
LINE NO. "G" LINE NO. "H" CACBP
T
T-A03T1 (NITROGEN) 206-00627C
T-A06T1 (PLANT AIR) T-A18T1
FC-7 (REACTOR) FC-7 (REACTOR)
NOTE 1 NOTE 1
FC-8 (REGENERATOR) FC-8 (REGENERATOR)

NOTE 1 NOTE 1 NOTE 1

LINE NO. "C"


NOTE 1

LINE NO. "E"

LINE NO. "B"


FO
NOTE 1
- LINE NO. "F"
2 FO

NOTE 7
3/4" MIN
MIN
1"
1" SAMPLE
NOTE 5
SC
NOTE 3

TYPE R
NOTE 6

NOTE 4
DETAIL "C"
STANDPIPE BLAST AND SAMPLE CONNECTION

P&ID NO. LINE NO. "A" LINE NO. "B" LINE NO. "C" LINE NO. "D" LINE NO. "E" LINE NO. "F" LINE NO. "G" LINE NO. "H" DETAILS FO TAG NO. PG TAG NO. STR TAG NO. SC TAG NO. STP NO.
1 206-00064 1"-AP-210149-T-A06T1-N 1"-P-210282-FC-8-PP 1"-P-210284-FC-8-PP 1-1/2"-VM-210480-T-A18T1-EC 1-1/2"-P-210286-FC-8-PP 1-1/2"-P-210288-FC-8-PP - - REGENERATED CATALYST STANDPIPE FO-21036 PG-21024G STR-21819 SC-21002 -
2 206-00067 1"-GI-210416-T-A03T1-N 1"-P-210283-FC-7-PP 1"-P-210285-FC-7-PP 1-1/2"-VM-210562-T-A18T1-EC 1-1/2"-P-210287-FC-7-PP 1-1/2"-P-210289-FC-7-PP 3/4"-VM-217533-T-A18T1-EC 3/4"-CACBP-217533-T-A18T1-PP SPENT CATALYST STANDPIPE FO-21037 PG-21009 STR-21820 SC-21003 STP-21036

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 8
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00010 00
CAD FILE :
UA
COMMON GENERAL NOTES :
21004 TROUBLE
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
XIC
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
CYCLES
/DAY 21016 2. DELETED.

XIC ZLL
CYCLES
DURATION 21017 21907

HS IS NOTE 3

FROM AIR DRYER


PACKAGE
DRY PLANT AIR
PACKAGE
FROM AIR DRYER
DRY PLANT AIR
START

206-00082 6250
206-00082A 6246
SWITCH 21022A 21002

HS
STOP
SWITCH 21022B

FIC

21074
NOTES :
1-1/2"-AP-210151-T-A06T1-N

1. 3/4" BLAST CONNECTIONS APPROXIMATELY EVERY 4000 mm RUN OF CATALYST LINE.

2"-AP-210153-T-A06T1-N
MAKE CONNECTION ON TOP OF PIPE.

FT
FF
PG
2. STEM SHALL BE IN THE VERTICAL UPWARD POSITION.

1"-AP-210155-T-A06T1-N

1"-AP-210163-T-A06T1-N

1"-AP-210157-T-A06T1-N

1"-AP-210159-T-A06T1-N

1"-AP-210160-T-A06T1-N

1"-AP-210165-T-A06T1-N
FV FF 3. REFER TO CAUSE & EFFECT DIAGRAM FROM DETAILS.
21074 21085G
21074 4. SEE DETAIL "DA" ON DRAWING 206-00004.
"DA-3"
2"x1" 2"x1" 5. HOLE SIZE OF ORIFICE PLATE TO BE 2mm.
NOTE 4
FC 6. DETAIL "BC" SEE DWG 206-00007.
#300
1" STR STR
21821 7. TOTAL 6 BLAST CONNECTIONS ARE CONNECTED TO FINNED PIPING.
H 21822
1" BC-51 BC-52 BC-53 BC-54 BC-55 BC-91

2"-P-210308-FC-7-PP
TI T-A06T1-N FC-7-PP
21083A NOTE 5 NOTE 5

T-A06T1-N H FO FO
TI
TI FC-7-PP 21076 21077
21084A
21083B
SHELL AND
S S

1"

1"
TI LINING
TT
1-1/2"-P-210331-FC-7-PP 21084B XY XY
21083 TT
21908B 21908A
MIN

21084

1"-P-210307-FC-7-PP

1"-P-210306-FC-7-PP
1"-P-210305-FC-7-PP
T-A06T1-N T-A06T1-N T-A06T1-N
20 METERS MIN 1"-P-210301-FC-7-PP
SKIN FC-7-PP ZSL FC-7-PP FC-7-PP
FF
TE SKIN FF 1"-P-210302-FC-7-PP
TE 21907 NOTE 2 NOTE 2
XV MSV
21083 45° 45° 45° 45° 45° 45° 3/4" MSV 3/4"
MIN 21084 21907 21702
45° 45°
1"x3/4"
21701 1"x3/4"
DETAIL DETAIL DETAIL DETAIL DETAIL DETAIL
"BC-92" "BC-93" "BC-50" "BC-15" "BC-14" "BC-13" 4"-P-210190-FC-7-PP

4"-P-210178-B1A2-PP NOTE 1, 6 FC
B1A2
FINNED PIPING
MSC SEE DETAIL UOP SPT TYPE 1-1
4" CATALYST FC-7 NOTE 3 3/4"-P-210303-FC-7-PP
NOTE 1, 6, 7 PROJECT SPECIFICATION 801 21701 FO
WITHDRAWAL LINE 21701 3/4" 3/4"
21075
3/4"-P-210304-FC-7-PP 3/4" 3/4"

FC-7-PP
T-A06T1-N
DRY PLANT AIR
3/4"-AP-210161-T-A06T1-N
206-00081 6249
FROM AIR DRYER
PACKAGE
MIN

DETAIL "J"
CATALYST WITHDRAWAL CONNECTION
(SEE UOP PROJECT SPECIFICATION 801.)

REGENERATOR CATALYST START-UP REGENERATOR REGENERATED REACTOR CATALYST ACCELERATOR ZONE ACCELERATOR ZONE
DISTANCE TO REGENERATOR CYCLONE INLET CATALYST DENSITY COMPENSATED LEVEL CLEARANCE BELOW REACTOR CYCLONE VELOCITY-RAW VELOCITY-STARTUP
FLAPPER VALVES SUPERFICIAL VELOCITY VELOCITY CIRCULATION RATE CATALYST LEVEL VSS TOP OF WINDOW INLET VELOCITY OIL MODE NAPHTHA MODE
H H H H
XI XI XI XI XI XI XI XI XI
21018 21019 21020 21021 21022 21023 21024 21025A 21025B
L L L

X X X X X X X X X

XY XY XY XY XY XY XY XY XY
21018 21019 21020 21021 21022 21023 21024 21025A 21025B

FOR INPUTS SEE UOP PROJECT SPECIFICATION 623

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 9
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00011 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
B2A2 T-B04T1

3"-P-210540-B2A2-EC 3"-VM-210566-T-B04T1-EC ATOMIZING STEAM

3/4"

1-1/2" TO OTHER TORCH


OIL SPRAY ASSEMBLIES
60

B2A2 T-B04T1

1-1/2"-P-210541-B2A2-EC 1-1/2"-VM-210575-T-B04T1-EC PURGE STEAM

3/4"

1" TO OTHER TORCH


OIL SPRAY ASSEMBLIES
61
NOTES :
1" TO OTHER TORCH 1. FURNISHED WITH TORCH OIL SPRAY ASSEMBLY.
OIL SPRAY ASSEMBLIES 66°C
63 2. LOCATED AT GRADE.
3. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
1" MANIFOLD PURGE STEAM
1-1/2" ATOMIZING STEAM 4. PG MUST BE READABLE FROM CONTROL VALVE.
5. FI MUST BE READABLE FROM CONTROL VALVE.
1" CONCENTRIC 6. LOW FLOW SIGNAL OPENS THIS VALVE FIRST.
SLEEVE PURGE
62 60 61 7. LOW FLOW SIGNAL OPENS THIS VALVE LAST.
VALVE
EC(ST) POSITION 8. CONTROL VALVE BODY TYPE IS ECCENTRIC DISC.
EC FAILURE FV PG
CRIT
9. REFER TO DETAIL "A".
STR STR STR ZLL XA
21080G
21073B
- STR #3 - - STR #2 FY
21940 21940
NOTE 2, 8
NOTE 1 STR #1 NOTE 1 NOTE 1 21073B FC DETAIL "A"
3/4" 3/4" 3/4" 3"

FO #2 HANDWHEEL NOTE 4
FO IS
FO FO 21001
-
EIS FY 100%
FO #3 - - 1"
PG ZSL NOTE 5 21073A

VALVE OPENING
FO #1
EC
EC(ST

FO 21076G 21940
FF
3B 3A
XV FV
FI 07 07
-21 -21
STR #4 HANDWHEEL
NOTE 1 -
66°C FO #4 21940 21073A
21073 FV FV
NOTE 7 SPLIT
NOTE 2 FC FC 2"x1" RANGE 3/4"-VM-217530-T-B04T1-EC
2"-P-210800-B2A2-EC(ST) NOTE 2,3 2"x1" FF 11353
RETRACTABLE 4" NPS 1" FT FIC NOTE 9
STUFFING 3/4" STR TYPE 1-1
NOZZLE TIP GATE VALVE PI MUST BE
BOX - 63
NOTE 2
21073 21073 3/4"-CACBP-217530-T-A18T1-PP CACBP
READABLE FROM T 206-00627D 0% 50% 100%
CONTROL VALVE
NOTE 6
SHELL AND FURNISHED WITH 2"-P-210800-B2A2-EC(ST)
LINING TORCH OIL SPRAY ASSEMBLY 1-1/2"-VM-210575-T-B04T1-EC STP
66°C CONTROLLER OUTPUT
21018
IS

3"-VM-210566-T-B04T1-EC
21001

2"-ACP-210606-B2A2-EC(ST)
3/4" 3/4"
MP STEAM
B2A2 66°C 66°C B2A2
B2A1 30°C H2A2

30°C VM
3/4" 3/4"
206-00615
2"-ACP-211013-H2A2-EC(ST)
4637
RAW OIL FROM HEAVY CYCLE OIL FROM
2"-P-211011-B2A1-EC(ST) RAW OIL PUMPS AT HEAVY CYCLE OIL CIRCULATION
MAIN COLUMN SECTION PUMPS AT MAIN COLUMN SECTION

FROM GA-21101A/B

FROM GA-21104A/B
HEAVY CYCLE OIL
4337 206-00102

4306 206-00120
DETAIL "L"
TORCH OIL CONNECTIONS
RAW OIL

DETAIL 'L' TORCH OIL CONNECTIONS LINE NUMBER TABLE


TORCH OIL NOZZLE ASSOCIATED WITH LINES
(SEE UOP PROJECT DRAWING 9038069-327-31,32-A1 FOR NOZZLE LOCATIONS)

NO. P&ID NO. LINE "60" LINE "61" LINE "62" LINE "63" FO #1 TAG NO. FO #2 TAG NO. FO #3 TAG NO. FO #4 TAG NO. STR #1 TAG NO. STR #2 TAG NO. STR #3 TAG NO. STR #4 TAG NO.
1 B24-1 206-00063 1-1/2"-P-210310-B2A2-EC(ST) 1"-P-210317-B2A2-EC 1"-P-210324-B2A2-EC 1"-P-210801-B2A2-EC(ST) FO-21043A FO-21044A FO-21045A FO-21046A STR-21823 STR-21824 STR-21825 STR-21826
2 B24-2 206-00063 1-1/2"-P-210311-B2A2-EC(ST) 1"-P-210318-B2A2-EC 1"-P-210325-B2A2-EC 1"-P-210802-B2A2-EC(ST) FO-21043B FO-21044B FO-21045B FO-21046B STR-21827 STR-21828 STR-21829 STR-21830
3 B24-3 206-00063 1-1/2"-P-210312-B2A2-EC(ST) 1"-P-210319-B2A2-EC 1"-P-210326-B2A2-EC 1"-P-210803-B2A2-EC(ST) FO-21043C FO-21044C FO-21045C FO-21046C STR-21831 STR-21832 STR-21833 STR-21834
4 B24-4 206-00063 1-1/2"-P-210313-B2A2-EC(ST) 1"-P-210320-B2A2-EC 1"-P-210327-B2A2-EC 1"-P-210804-B2A2-EC(ST) FO-21043D FO-21044D FO-21045D FO-21046D STR-21835 STR-21836 STR-21837 STR-21838
5 B24-5 206-00063 1-1/2"-P-210314-B2A2-EC(ST) 1"-P-210321-B2A2-EC 1"-P-210328-B2A2-EC 1"-P-210805-B2A2-EC(ST) FO-21043E FO-21044E FO-21045E FO-21046E STR-21839 STR-21840 STR-21841 STR-21842
6 B24-6 206-00063 1-1/2"-P-210315-B2A2-EC(ST) 1"-P-210322-B2A2-EC 1"-P-210329-B2A2-EC 1"-P-210806-B2A2-EC(ST) FO-21043F FO-21044F FO-21045F FO-21046F STR-21843 STR-21844 STR-21845 STR-21846
7 B24-7 206-00063 1-1/2"-P-210316-B2A2-EC(ST) 1"-P-210323-B2A2-EC 1"-P-210330-B2A2-EC 1"-P-210807-B2A2-EC(ST) FO-21043G FO-21044G FO-21045G FO-21046G STR-21847 STR-21848 STR-21849 STR-21850

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 10
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00012 00
CAD FILE :
GENERAL NOTES :
EMERGENCY SHUT DOWN VALVE DETAIL
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

P&ID REPRESENTATION ACTUAL DETAIL

OPEN CLOSE
DETAIL INSTRUMENT TAG NO.
ZIO ZIC HSO HSC TAG NO. P&ID NO.
HSO HSC ZSO ZSC ZIO ZIC HL HS XS
MOV-21936 (NOTE 1, 2) R2B-P3-206-02-A-DTI-00205 HSO-21936B HSC-21936B ZSO-21936 ZSC-21936 ZIO-21936A ZIC-21936A HL-21936A HS-21936 XS-21936
MOV-21938 (NOTE 1, 2) R2B-P3-206-02-A-DTI-00205 HSO-21938B HSC-21938B ZSO-21938 ZSC-21938 ZIO-21938A ZIC-21938A HL-21938A HS-21938 XS-21938
MOV-21939 (NOTE 1, 2) R2B-P3-206-02-A-DTI-00206 HSO-21939B HSC-21939B ZSO-21939 ZSC-21939 ZIO-21939A ZIC-21939A HL-21939A HS-21939 XS-21939
MOV-21942 (NOTE 1, 2) R2B-P3-206-02-A-DTI-00206 HSO-21942B HSC-21942B ZSO-21942 ZSC-21942 ZIO-21942A ZIC-21942A HL-21942A HS-21942 XS-21942
HS MOV-21948 (NOTE 1, 2) R2B-P3-206-02-A-DTI-00414 HSO-21948B HSC-21948B ZSO-21948 ZSC-21948 ZIO-21948A ZIC-21948A HL-21948A HS-21948 XS-21948
MOV-21950 (NOTE 1, 2) R2B-P3-206-02-A-DTI-00414 HSO-21950B HSC-21950B ZSO-21950 ZSC-21950 ZIO-21950A ZIC-21950A HL-21950A HS-21950 XS-21950
IS
NOTES :
IS LOCAL/REMOTE
1. LOCAL OPERATION MUST BE POSSIBLE FROM SAFE LOCATION.
HL LOCAL PUSH BUTTON PANEL SHALL BE LOCATED, AS BELOW
XS ZSO ZSC
- FOR MINIMUM REQUIREMENT : 12 M,
AND MANDANTORY REQUIREMENT
- FOR MAXIMUM REQUIREMENT : 30 M,
M
MOV MOV AND RECOMMENDED, IT CAN BE ADJUSTED TO ENSURE FIRE SAFE ZONE,
DISTANCE IS BASED ON THE PROTECTED EQUIPMENT.
2. MOV SHOULD BE LOCATED AT IN-OUT OF COMPRESSORS WITH FIRE PROOFING, AND ITS PUSH BUTTON
SHOULD BE LOCATED OUTSIDE OF FIRE ZONE, DISTANCE IS BASED ON THE PROTECTED EQUIPMENT.
3. HAND SWITCH TO BE LOCATED OUTSIDE OF FIRE ZONE, AND DISTANCE IS BASED ON THE PROTECTED
EQUIPMENT.
4. REFER TO DETAIL A FOR MOV ACTUATOR OPERATION BOARD.

DETAIL "A"
EMERGENCY SHUT DOWN VALVE DETAIL (TYPE D)

ZLO
LCD
DISPLAY
P&ID REPRESENTATION ACTUAL DETAIL
ZLC

OPEN CLOSE
HS XS
ZIO ZIC HSO HSC

-HS : OPEN / CLOSE SELECTOR SWITCH FOR LOCAL OPERATION


NOTE 3 -XS : LOCAL / REMOTE SELECTOR SWITCH
HS
-ZLO : OPEN STATUS LAMP
IS -ZLC : CLOSE STATUS LAMP

IS LOCAL/REMOTE DETAIL INSTRUMENT TAG NO.


TAG NO. P&ID NO.
HL HSO HSC ZSO ZSC ZIO ZIC HL HS XS
XS ZSO ZSC
MOV-21949 (NOTE 1) R2B-P3-206-02-A-DTI-00118 HSO-21949B HSC-21949B ZSO-21949 ZSC-21949 ZIO-21949A ZIC-21949A HL-21949A HS-21949 XS-21949
MOV-21951 (NOTE 1) R2B-P3-206-02-A-DTI-00118 HSO-21951B HSC-21951B ZSO-21951 ZSC-21951 ZIO-21951A ZIC-21951A HL-21951A HS-21951 XS-21951
MOV MOV MOV-21955 (NOTE 1) R2B-P3-206-02-A-DTI-00118 HSO-21955B HSC-21955B ZSO-21955 ZSC-21955 ZIO-21955A ZIC-21955A HL-21955A HS-21955 XS-21955
M

TYPE D

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. EMERGENCY SHUTDOWN VALVE DETAIL A
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00013 00
CAD FILE :
GENERAL NOTES :
EMERGENCY SHUTDOWN VALVE(EBV) DETAIL (TYPE D) 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

P&ID REPRESENTATION ACTUAL DETAIL TABLE


NOTE 2, 3, 4

VALVE BYPASS TO INSTRUMENT TAG NO.


OPEN/ ACTIVATED CONFIRMATION ACTIVATE FAULT OF TAG NO. P&ID NO. TYPE
CLOSE IN FIELD CLOSED SOLENOID SOLENOID A HS (A/B/C/D) HL (A/B) ZLC ZLO ZL ZSC ZSO ZS PA (A/B/C) PSV PG PS (A/B/C) XY (A/B)
HS-21901A
HS HL ZLO PA PA I HS-21901B HL-21901A ZLC-21901A ZLO-21901A PA-21901A PS-21901A XY-21901A
EBV-21901 R2B-P3-206-02-A-DTI-00101 D ZLC-21901B ZLO-21901B ZL-21901 ZSC-21901 ZSO-21901 ZS-21901 PA-21901B PSV-21901 PG-21901 PS-21901B
HS-21901C HL-21901B XY-21901B
C A C C A ZLC-21901C ZLO-21901C PA-21901C PS-21901C
HS-21901D
HS-21902A
HS-21902B HL-21902A ZLC-21902A ZLO-21902A PA-21902A PS-21902A XY-21902A
IS I EBV-21902 R2B-P3-206-02-A-DTI-00120 D ZLC-21902B ZLO-21902B ZL-21902 ZSC-21902 ZSO-21902 ZS-21902 PA-21902B PSV-21902 PG-21902 PS-21902B
HS-21902C HL-21902B XY-21902B
HS-21902D ZLC-21902C ZLO-21902C PA-21902C PS-21902C NOTES :
HS-21904A 1. LOCAL OPERATION MUST BE POSSIBLE FROM SAFE LOCATION.
HS-21904B HL-21904A ZLC-21904A ZLO-21904A PA-21904A PS-21904A XY-21904A LOCAL PUSH BUTTON PANEL SHALL BE LOCATED, AS BELOW
EBV-21904 R2B-P3-206-02-A-DTI-00121 D ZLC-21904B ZLO-21904B ZL-21904 ZSC-21904 ZSO-21904 ZS-21904 PA-21904B PSV-21904 PG-21904 PS-21904B
HS-21904C HL-21904B XY-21904B - FOR MINIMUM REQUIREMENT : 12 M,
HS-21904D ZLC-21904C ZLO-21904C PA-21904C PS-21904C AND MANDANTORY REQUIREMENT
EBV PUSH BUTTON IN CCR - FOR MAXIMUM REQUIREMENT : 30 M,
HS-21905A
21XXX HS-21905B HL-21905A ZLC-21905A ZLO-21905A PA-21905A PS-21905A XY-21905A AND RECOMMENDED, IT CAN BE ADJUSTED TO ENSURE FIRE SAFE ZONE,
EBV-21905 R2B-P3-206-02-A-DTI-00128 D ZLC-21905B ZLO-21905B ZL-21905 ZSC-21905 ZSO-21905 ZS-21905 PA-21905B PSV-21905 PG-21905 PS-21905B DISTANCE IS BASED ON THE PROTECTED EQUIPMENT.
EBV OPEN CLOSED HS-21905C HL-21905B XY-21905B
HS-21905D ZLC-21905C ZLO-21905C PA-21905C PS-21905C
CLOSE VALVE VALVE 2. AIR BOTTLE SHALL PROVIDE AIR FOR AT LEAST 2 CLOSE-OPEN CYCLES.
HS HL ZLC ZL PA HS-21906A
HS-21906B HL-21906A ZLC-21906A ZLO-21906A PA-21906A PS-21906A XY-21906A 3. 24 VDC POWER MUST BE INCLUDED PERMANENTLY FROM THE SOURCE FOR POWER.
EBV-21906 R2B-P3-206-02-A-DTI-00122 D ZLC-21906B ZLO-21906B ZL-21906 ZSC-21906 ZSO-21906 ZS-21906 PA-21906B PSV-21906 PG-21906 PS-21906B
D B C B HS ZLO ZLC HS-21906C HL-21906B XY-21906B
ZLC-21906C ZLO-21906C PA-21906C PS-21906C 4. SIGNALS MAY CHANGE ACCORDING TO THE EQUIPMENT PROVIDER.
HS-21906D
PARTIAL ACTIVATED CLOSED VALVE IN FAULT OF B
HS-21910A 5. FIRE SAFE VALVE ACCORDING TO ET-204-PEMEX-2019, ACTUATOR AND INSTRUMENTS (I.E. SOLENOID
TEST IN CCR VALVE TEST MODE SOLENOID B HL-21910A ZLC-21910A ZLO-21910A PA-21910A PS-21910A XY-21910A VALVE, MANUAL DEVICES, FILTER-REGULATOR, ETC...) SHALL BE PROTECTED BY THERMAL INSULATED
EBV-21910 R2B-P3-206-02-A-DTI-00215 D HS-21910B
ZLC-21910B ZLO-21910B ZL-21910 ZSC-21910 ZSO-21910 ZS-21910 PA-21910B PSV-21910 PG-21910 PS-21910B BOX OR EQUIVALENT. VALVE AND RELATED HARDWIRE TO BE DESIGNED AND SUPPLIED PER
HS-21910C HL-21910B XY-21910B
HS-21910D ZLC-21910C ZLO-21910C PA-21910C PS-21910C ET-204-PEMEX-2019.
HS-21913A FIREPROOFING IS NOT CONSIDERED FOR BELOW EBVS AS THEY ARE NOT INSTALLED IN FIRE ZONE.
IS HS-21913B HL-21913A ZLC-21913A ZLO-21913A PA-21913A PS-21913A XY-21913A - EBV-21902
EBV-21913 R2B-P3-206-02-A-DTI-00119 D ZLC-21913B ZLO-21913B ZL-21913 ZSC-21913 ZSO-21913 ZS-21913 PA-21913B PSV-21913 PG-21913 PS-21913B - EBV-21904
HS-21913C HL-21913B XY-21913B
HS-21913D ZLC-21913C ZLO-21913C PA-21913C PS-21913C - EBV-21917
SIS
SIS VENDOR'S SCOPE HS-21919A
HS-21919B HL-21919A ZLC-21919A ZLO-21919A PA-21919A PS-21919A XY-21919A
EBV-21919 R2B-P3-206-02-A-DTI-00213 D ZLC-21919B ZLO-21919B ZL-21919 ZSC-21919 ZSO-21919 ZS-21919 PA-21919B PSV-21919 PG-21919 PS-21919B
HS-21919C HL-21919B XY-21919B
HS-21919D ZLC-21919C ZLO-21919C PA-21919C PS-21919C
HS-21921A
HS-21921B HL-21921A ZLC-21921A ZLO-21921A PA-21921A PS-21921A XY-21921A
EBV-21921 R2B-P3-206-02-A-DTI-00229 D ZLC-21921B ZLO-21921B ZL-21921 ZSC-21921 ZSO-21921 ZS-21921 PA-21921B PSV-21921 PG-21921 PS-21921B
HS-21921C HL-21921B XY-21921B
HS-21921D ZLC-21921C ZLO-21921C PA-21921C PS-21921C
LOCAL CONTROL PANNEL OF EBV-XXX "LCP-XXX"
HS-21922A
HS-21922B HL-21922A ZLC-21922A ZLO-21922A PA-21922A PS-21922A XY-21922A
EBV-21922 R2B-P3-206-02-A-DTI-00230 D ZLC-21922B ZLO-21922B ZL-21922 ZSC-21922 ZSO-21922 ZS-21922 PA-21922B PSV-21922 PG-21922 PS-21922B
NOTE 1 HS-21922C HL-21922B XY-21922B
HS-21922D ZLC-21922C ZLO-21922C PA-21922C PS-21922C
HS-21928A
JUNCTION HS-21928B HL-21928A ZLC-21928A ZLO-21928A PA-21928A PS-21928A XY-21928A
EBV-21928 R2B-P3-206-02-A-DTI-00217 D ZLC-21928B ZLO-21928B ZL-21928 ZSC-21928 ZSO-21928 ZS-21928 PA-21928B PSV-21928 PG-21928 PS-21928B
HS-21928C HL-21928B XY-21928B
BOX HS-21928D ZLC-21928C ZLO-21928C PA-21928C PS-21928C
HS-21985A
HS-21985B HL-21985A ZLC-21985A ZLO-21985A PA-21985A PS-21985A XY-21985A
ZSC ZSO ZS EBV-21985 R2B-P3-206-02-A-DTI-00403 D ZLC-21985B ZLO-21985B ZL-21985 ZSC-21985 ZSO-21985 ZS-21985 PA-21985B PSV-21985 PG-21985 PS-21985B
HS-21985C HL-21985B XY-21985B
HS-21985D ZLC-21985C ZLO-21985C PA-21985C PS-21985C

EBV HS-21986A
HS-21986B HL-21986A ZLC-21986A ZLO-21986A PA-21986A PS-21986A XY-21986A
EBV-21986 R2B-P3-206-02-A-DTI-00408 D ZLC-21986B ZLO-21986B ZL-21986 ZSC-21986 ZSO-21986 ZS-21986 PA-21986B PSV-21986 PG-21986 PS-21986B
HS-21986C HL-21986B XY-21986B
HS-21986D ZLC-21986C ZLO-21986C PA-21986C PS-21986C
HS PS XY PS XY PS HS-21987A
A A A B B C HS-21987B HL-21987A ZLC-21987A ZLO-21987A PA-21987A PS-21987A XY-21987A
EBV-21987 R2B-P3-206-02-A-DTI-00411 D ZLC-21987B ZLO-21987B ZL-21987 ZSC-21987 ZSO-21987 ZS-21987 PA-21987B PSV-21987 PG-21987 PS-21987B
HS-21987C HL-21987B XY-21987B
EMERGENCY BLOCK VALVE HS-21987D ZLC-21987C ZLO-21987C PA-21987C PS-21987C
EBV
CLOSE
s s HS-21988A
HS-21988B HL-21988A ZLC-21988A ZLO-21988A PA-21988A PS-21988A XY-21988A
EBV-21988 R2B-P3-206-02-A-DTI-00412 D ZLC-21988B ZLO-21988B ZL-21988 ZSC-21988 ZSO-21988 ZS-21988 PA-21988B PSV-21988 PG-21988 PS-21988B
4 2 4 2 4 2 HS-21988C HL-21988B XY-21988B
5 3 5 3 5 3 HS-21988D ZLC-21988C ZLO-21988C PA-21988C PS-21988C
1 1 1

ZLO
SAL
A
ATM ATM ATM ATM
VALVE
OPEN

PSV
ZLC
A

VALVE
CLOSED

CONFIGURATION 2002D
PG
FU

AIR TANK
BACKUP

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. EMERGENCY SHUTDOWN VALVE DETAIL B
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00013A 00
CAD FILE :
GENERAL NOTES :
ON-OFF / DEPRESSURIZING VALVE DETAIL
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
TYPE 1-1 TYPE 1-2

SINGLE ACTING ON-OFF VALVE _ SIS P&ID PRESENTATION SINGLE ACTING ON-OFF VALVE _ SIS P&ID PRESENTATION

RESET RESET
XHS XHS ZIC ZIO
NOTE 1 NOTE 1

IS IS
IS IS
ZIC ZIO

S A S B
XV
S A S B
XV NOTES :
1. RESET SWITCH TO BE LOCATED NEAR THE DEDICATED ON-OFF VALVE.
IA ZSC ZSO IA ZSC ZSO
DE DE FC/FO DE DE FC/FO

ATM ATM

FC/FO FC/FO
TSO TSO

TYPE 2-1 TYPE 2-2

SINGLE ACTING ON-OFF VALVE _ DCS P&ID PRESENTATION SINGLE ACTING ON-OFF VALVE _ DCS P&ID PRESENTATION

ZIC ZIO

I I
I I

ZIC ZIO
XV XV
S
S

ATM IA ATM IA
DE FC/FO DE FC/FO
ZSC ZSO ZSC ZSO

FC/FO FC/FO
TSO TSO

DETAIL INSTRUMENT TAG NO.


TAG NO. P&ID NO. TYPE FAIL POSITION
SOLENOID "A" SOLENOID "B" XHS (RESET) ZSC ZSO ZIC ZIO
XV-21907 R2B-P3-206-02-A-DTI-00011 1-1 FC XY-21907A XY-21907B - ZSL-21907 - ZLL-21907 -
XV-21940 R2B-P3-206-02-A-DTI-00012 1-1 FC XY-21940A XY-21940B - ZSL-21940 - ZLL-21940
XV-21930 R2B-P3-206-02-A-DTI-00058A 1-1 FC XY-21930A XY-21930B XHS-21930 ZSC-21930 ZSO-21930 ZIC-21930 ZIO-21930
XV-21911 R2B-P3-206-02-A-DTI-00061A 1-1 FC XY-21911A XY-21911B - - - - -
XV-21912 R2B-P3-206-02-A-DTI-00061A 1-2 FC XY-21912A XY-21912B - ZSL-21912 ZSH-21912 - -
XV-21915 R2B-P3-206-02-A-DTI-00061A 1-1 FC XY-21915A XY-21915B - - - - -
XV-21916 R2B-P3-206-02-A-DTI-00061A 1-2 FC XY-21916A XY-21916B - ZSL-21916 ZSH-21916 - -
XV-21924 R2B-P3-206-02-A-DTI-00061A 1-2 FO XY-21924A XY-21924B - ZSL-21924 ZSH-21924 - -
XV-21925 R2B-P3-206-02-A-DTI-00061A 1-2 FO XY-21925A XY-21925B - ZSL-21925 ZSH-21925 - -
XV-21927 R2B-P3-206-02-A-DTI-00064 1-1 FC XY-21927A XY-21927B - ZSL-21927 - ZLL-21927 -
XV-21937 R2B-P3-206-02-A-DTI-00065 1-1 FC XY-21937A XY-21937B - ZSL-21937 - ZLL-21937 -
XV-21929A R2B-P3-206-02-A-DTI-00066 1-1 FC ZSL-21929A - ZLL-21929A -
XY-21929A XY-21929B -
XV-21929B R2B-P3-206-02-A-DTI-00066 1-1 FO - ZSH-21929B - ZLH-21929B
XV-21923 R2B-P3-206-02-A-DTI-00078A 1-1 FC XY-21923A XY-21923B XHS-21923 ZSC-21923 ZSO-21923 ZIC-21923 ZIO-21923
XV-21945 R2B-P3-206-02-A-DTI-00115A 1-1 FC XY-21945A XY-21945B XHS-21945 ZSC-21945 ZSO-21945 ZIC-21945 ZIO-21945
XV-21914 R2B-P3-206-02-A-DTI-00130A 1-1 FC XY-21914A XY-21914B XHS-21914 ZSC-21914 ZSO-21914 ZIC-21914 ZIO-21914
XV-21932 R2B-P3-206-02-A-DTI-00206B 1-1 FC XY-21932A XY-21932B XHS-21932 ZSC-21932 ZSO-21932 ZIC-21932 ZIO-21932
XV-21933 R2B-P3-206-02-A-DTI-00234A 1-1 FC XY-21933A XY-21933B XHS-21933 ZSC-21933 ZSO-21933 ZIC-21933 ZIO-21933
XV-21941A R2B-P3-206-02-A-DTI-00402 1-1 FC XY-21941AA XY-21941AB XHS-21941A ZSC-21941A ZSO-21941A ZIC-21941A ZIO-21941A
XV-21941B R2B-P3-206-02-A-DTI-00402 1-1 FC XY-21941BA XY-21941BB XHS-21941B ZSC-21941B ZSO-21941B ZIC-21941B ZIO-21941B
XV-21943 R2B-P3-206-02-A-DTI-00407 1-1 FC XY-21943A XY-21943B XHS-21943 ZSC-21943 ZSO-21943 ZIC-21943 ZIO-21943
XV-21501 R2B-P3-206-02-A-DTI-00501 2-1 FC XY-21501 ZSC-21501 ZSO-21501 ZIC-21501 ZIO-21501
XV-21920 R2B-P3-206-02-A-DTI-00205 1-2 FO XY-21920A XY-21920B XHS-21920 ZSC-21920 ZSO-21920 ZIC-21920 ZIO-21920
XV-21926 R2B-P3-206-02-A-DTI-00206 1-2 FO XY-21926A XY-21926B XHS-21926 ZSC-21926 ZSO-21926 ZIC-21926 ZIO-21926
XV-21918 R2B-P3-206-02-A-DTI-00414 1-2 FO XY-21918A XY-21918B XHS-21918 ZSC-21918 ZSO-21918 ZIC-21918 ZIO-21918
XV-21952A R2B-P3-206-02-A-DTI-00226 1-1 FC XY-21952AA XY-21952AB XHS-21952A ZSC-21952A ZSO-21952A ZIC-21952A ZIO-21952A
XV-21952B R2B-P3-206-02-A-DTI-00226 1-1 FC XY-21952BA XY-21952BB XHS-21952B ZSC-21952B ZSO-21952B ZIC-21952B ZIO-21952B

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. ON-OFF VALVE DETAIL
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00014 00
CAD FILE :
DETAIL "CDR" DETAIL "CVDR" GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

NOTE 2 NOTE 2 2. DELETED.


NOTE 3 NOTE 3 "C"
NOTE 4 NOTE 4
FREE DRAINING

2'-0"
(600)
FREE DRAINING

MIN.
NOTE 7 NOTE 9

NOTE 8

"C"

MIN.
3/4"
NOTE 1
NOTE 6

3/4" NOTE 10 3/4" NOTE 7


3/4" "C" NOTE 11
"A"
NOTE 13
NOTE 1, 2 3/4" 3/4"
NOTES :
"A" 1. UTILITY CONNECTION.
NOTE 1 2. THE REQUIREMENTS FOR INSULATION OR HEAT TRACING AND HEAT TRACING OBJECTIVE
3/4" TEMPERATURE IS INDICATED AT THE INDIVIDUAL SERVICE.
NOTE 6 3. VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS INDICATED
AT THE INDIVIDUAL SERVICE SPECIAL VALVE TRIM REQUIREMENTS INDICATED AT INDIVIDUAL
CONTROL VALVE LEVEL AND PUMP ASSEMBLIES SHALL ALSO APPLY TO VENT AND DRAIN ASSEMBLY
3/4" NOTE 10 3/4"
FREE DRAINING

NOTE 11 VALVING.
"B" "A" 3/4" "D"
4. LIGHT WEIGHT LINES(--------------------------) INDICATE ITEMS WHICH ARE DEPICTED ON THE P&ID
NOTE 13 AT THE INDIVIDUAL SERVICE
NOTE 1, 2 HEAVY WEIGHT LINES(--------------------------) INDICATE ITEMS WHICH ARE IN ADDITION TO THE ITEMS
DEPICTED AT THE INDIVIDUAL SERVICE.
5. CLOSED DRAIN HEADER (DEFAULT) OR AS INDICATED INTEXT AT THE INDIVIDUAL SERVICE.
6. LOCATE AT LOW POINT.
DAC
7. CONTROL VALVE BYPASS REQUIRED ONLY WHEN INDICATED AT INDIVIDUAL CONTROL VALVE SERVICE.
8. MAKE CONNECTION ON TOP OF PIPE.

FREE DRAINING
NOTE 5 "B"
9. RELIEF HEADER (DEFAULT), VENT HEADER OR AS INDICATED IN TEXT AT THE INDIVIDUAL SERVICE.
10. THIS VALVE WHICH IS SHOWN AT THE INDIVIDUAL SERVICE IS TO BE HARD PIPED TO CLOSED VENT OR
DRAIN HEADER AS INDICATED IN THE RESPECTIVE DETAIL AND NOT PLUGGED.
11. ADDITIONAL CONNECTION FOR PROCESS FLUID RECOVERY.
12. DELETED.

DAC 13. HEAT TRACING TO BE APPLIED ACCORDING TO THE CONNECTED PROCESS LINES.

NOTE 5

DETAIL "CDR"
TAG NO. P&ID NO. PROCESS LINE (A) CLOSED DRAIN LINE (B) RECOVERY DESTINATION RECOVERY HEADER P&ID RECOVERY LINE (C)
FV-21223 R2B-P3-206-02-A-DTI-00225 3/4"-P-212240-B2A1-N 3/4"-DAC-212238-T-A60T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212238-B1A2-NACE-N
FV-21222 R2B-P3-206-02-A-DTI-00223 3/4"-P-212241-B1A1-N 3/4"-DAC-212239-T-A60T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212239-B1A2-NACE-N

DETAIL "CVDR"
TAG NO. P&ID NO. PROCESS LINE (A) CLOSED DRAIN LINE (B) FLARE VENT LINE (C) RECOVERY DESTINATION RECOVERY HEADER P&ID RECOVERY LINE (D)
FV-21139 R2B-P3-206-02-A-DTI-00126 3/4"-AAM-211005-B1A2-NACE-N 3/4"-DAC-211340-T-A60T1-N 3/4"-DBP-211340-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211340-B1A2-NACE-N
LV-21126 R2B-P3-206-02-A-DTI-00129 3/4"-AAM-211003-B1A2-NACE-N 3/4"-DAC-211241-T-A60T1-N 3/4"-DBP-211241-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211241-B1A2-NACE-N
FV-21127 R2B-P3-206-02-A-DTI-00117 3/4"-P-211111-B2A2-NACE-N 3/4"-DAC-211242-T-A60T1-N 3/4"-DBP-211242-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211242-B1A2-NACE-N
FV-21143 R2B-P3-206-02-A-DTI-00131 3/4"-P-211108-B1A2-NACE-N 3/4"-DAC-211443-T-A60T1-N 3/4"-DBP-211443-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211443-B1A2-NACE-N
FV-21142 R2B-P3-206-02-A-DTI-00131 3/4"-P-211106-B2A2-NACE-N 3/4"-DAC-211444-T-A60T1-N 3/4"-DBP-211444-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211444-B1A2-NACE-N
FV-21203 R2B-P3-206-02-A-DTI-00202 3/4"-AAM-211004-B1A2-NACE-N 3/4"-DAC-212045-T-A60T1-N 3/4"-DBP-212045-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211120-B1A2-NACE-N
LV-21205 R2B-P3-206-02-A-DTI-00210 3/4"-P-212118-B2A2-NACE-N 3/4"-DAC-212046-T-A60T1-N 3/4"-DBP-212046-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212084-B1A2-NACE-N
FV-21208 R2B-P3-206-02-A-DTI-00210 3/4"-P-212018-B2A2-NACE-N 3/4"-DAC-212047-T-A60T1-N 3/4"-DBP-212047-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212047-B1A2-NACE-N
LV-21210 R2B-P3-206-02-A-DTI-00213 3/4"-AAM-212001-B2A2-NACE-N 3/4"-DAC-212148-T-A60T1-N 3/4"-DBP-212148-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212148-B1A2-NACE-N
FV-21212 R2B-P3-206-02-A-DTI-00214 3/4"-P-212022-B2A2-NACE-N 3/4"-DAC-212149-T-A60T1-N 3/4"-DBP-212149-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212149-B1A2-NACE-N
FV-21213 R2B-P3-206-02-A-DTI-00214 3/4"-P-212021-B2A2-NACE-N 3/4"-DAC-212150-T-A60T1-N 3/4"-DBP-212150-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212150-B1A2-NACE-N
LV-21214 R2B-P3-206-02-A-DTI-00216 3/4"-P-212054-B2A2-NACE-N 3/4"-DAC-212151-T-A60T1-N 3/4"-DBP-212151-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212151-B1A2-NACE-N
FV-21217 R2B-P3-206-02-A-DTI-00218 3/4"-P-212035-B2A2-NACE-N 3/4"-DAC-212152-T-A60T1-N 3/4"-DBP-212152-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212152-B1A2-NACE-N
FV-21234 R2B-P3-206-02-A-DTI-00217 3/4"-P-212024-B2A2-NACE-N 3/4"-DAC-212353-T-A60T1-N 3/4"-DBP-212353-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212353-B1A2-NACE-N
LV-21216 R2B-P3-206-02-A-DTI-00219 3/4"-ACL-212002-B2A2-NACE-N 3/4"-DAC-212154-T-A60T1-N 3/4"-DBP-212154-T-A63T1-N LEAN GAS KO DRUM DRAIN R2B-P3-206-02-A-DTI-00222 3/4"-ACL-212154-B1A2-NACE-N
LV-21220 R2B-P3-206-02-A-DTI-00226 3/4"-P-212049-B2A1-EC 3/4"-DAC-212255-T-A60T1-N 3/4"-DBP-212255-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212255-B1A2-NACE-N
FV-21011 R2B-P3-206-02-A-DTI-00064 3/4"-P-211117-B2A2-NACE-N 3/4"-DAC-210001-T-A60T1-N 3/4"-DBP-210001-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-210031-B1A2-NACE-N

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL REVIEWED
Infraestructura de DBNR
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL SIMA REVIEW

A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL Desarrollo, S.A. de C.V. CONTROL VALVE VENT & DRAIN SYSTEM DETAIL
APPROVAL
ISSUE FOR CONSTRUCTION
ASOCIADOS CONSTRUCTORES
0 11 Jun 21 YDC KHL APPROVED DBNR S.A. DE C.V.

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
00 AS BUILT 30 Sep 23 YDC KHL
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00015 00
CAD FILE :
DETAIL "LVDR" DETAIL "LAVDR" GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

NOTE 2
NOTE 3 FREE DRAINING FREE DRAINING

2'-0"

2'-0"
(600)

(600)
MIN.

MIN.
NOTE 5

FREE

FREE
DRAINING

DRAINING
NOTE 12 NOTE 19 NOTE 19

"D" NOTE 18 "D" NOTE 18


3/4" NOTE 15, 29
3/4" NOTE 10 3/4" NOTE 10
NOTE 12

NOTE 12 3/4" NOTE 15, 29 3/4"


3/4" NOTE 1
NOTE 15 3/4" NOTE 1
3/4" NOTE 23
3/4" NOTE 14 NOTE 23 NOTE 14
NOTE 14 PIPING
PIPING INSTRUMENT
INSTRUMENT
PIPING
3/4"
PIPING
NOTES :
INSTRUMENT PIPING
3/4" 1. UTILITY CONNECTION.
INSTRUMENT NOTE 16 INSTRUMENT
NOTE 13
NOTE 16 NOTE 16 NOTE 13
2. THE REQUIREMENTS FOR INSULATION OR HEAT TRACING AND HEAT TRACING OBJECTIVE
TEMPERATURE IS INDICATED AT THE INDIVIDUAL SERVICE.
A A C A C
3. VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS INDICATED
B B D B D AT THE INDIVIDUAL SERVICE. SPECIAL VALVE TRIM REQUIREMENTS INDICATED AT INDIVIDUAL
NOTE 16 CONTROL VALVE LEVEL AND PUMP ASSEMBLIES SHALL ALSO APPLY TO VENT AND DRAIN
NOTE 16 ASSEMBLY VALVING.

NOTE 16 NOTE 13 NOTE 16 4. DELETED.


NOTE 16 INSTRUMENT INSTRUMENT
PIPING PIPING 5. DO NOT SEAL WELD THREADED PIPING WHERE IT IS ATTACHED TO THE LEVEL INSTRUMENT.
3/4" INSTRUMENT
3/4" INSTRUMENT
3/4" INSTRUMENT
NOTE 14 NOTE 14 6. CLOSED DRAIN HEADER (DEFAULT) OR AS INDICATED INTEXT AT THE INDIVIDUAL SERVICE.
PIPING PIPING PIPING
3/4" 3/4" 7. LOCATE AT LOW POINT.
FREE DRAINING FREE DRAINING FREE DRAINING 8. DELETED.
NOTE 7 NOTE 21 FREE DRAINING NOTE 7
3/4"
"C" 9. DELETED.
3/4" NOTE 15
NOTE 10 3/4" NOTE 15, 29 NOTE 10 10. NOT REQUIRED FOR NON-CLOSED VENT AND/OR DRAIN.
NOTE 12 3/4" "A" 3/4" 3/4" "A" 3/4"
"B" "B" 11. DELETED.
FREE DRAINING NOTE 12 FREE DRAINING 12. THREADED CAP (DO NOT SEAL WELD).
FREE DRAINING 3/4" NOTE 6 3/4" 13. PROVIDE ONE FOR EACH GAUGE/MAGNETIC INDICATOR.

DAC NOTE 1 14. 3/4" CONNECTION FOR OTHER GAUGE GLASSED/MAGNETIC INDICATORS (AS REQUIRED).
NOTE 14 NOTE 1

3/4"
3/4" NOTE 15, 29 15. ADDITIONAL VALVE FOR DOUBLE BLOCK IS REQUIRED FOR ASME FLANGE CLASS 900, 1500, AND 2000,
AND IT IS OPTIONAL FOR ASME FLANGE CLASS 150, 300, AND 600.
"C"
16. REDUCER AND DIRECTION AS REQUIRED.
NOTE 12 DDA DAA
17. DELETED.
18. MAKE CONNECTION ON TOP OF PIPE.
19. RELIEF HEADER (DEFAULT), VENT HEADER OR AS INDICATED IN TEXT AT THE INDIVIDUAL SERVICE.
20. DETAILS OF EXTERNAL DISPLACEMENT, OTHER CHAMBER TYPE LEVEL INSTRUMENT CONNECTIONS,
GAUGE GLASS AND MAGNETIC INDICATOR CONNECTIONS REFER UOP DRAWING 9039068-120-10.
DETAIL "LVDR" DETAIL "LAVDR"
21. ADDITIONAL CONNECTION FOR PROCESS FLUID RECOVERY.
EQUIP. NO. INST. TAG NO. P&ID NO. PROCESS LINE (A) CLOSED DRAIN LINE (B) RECOVERY LINE (C) RECOVERY DESTINATION RECOVERY HEADER P&ID FLARE VENT LINE (D) EQUIP. NO. INST. TAG NO. P&ID NO. PROCESS LINE (A) OPEN DRAIN LINE (B) AMINE DRAIN (C) FLARE VENT LINE (D)
LG/LT-21124 R2B-P3-206-02-A-DTI-00128 3/4"-P-211910-B1A2-NACE-N 3/4"-DAC-211260-T-A60T1-N 3/4"-P-211260-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DBP-211260-T-A63T1-N DA-21501 LG-21501/LT-21502 R2B-P3-206-02-A-DTI-00501 3/4"-MDEAR-215900-T-A72T1-N 3/4"-DAA-216347-T-A60T1-N 3/4"-DDA-215126-T-A09T1-N 3/4"-DAP-215101-T-A63T1-N 22. DELETED.
FA-21102
LG/LT-21126/LT-21127 R2B-P3-206-02-A-DTI-00128 3/4"-AAM-211911-B1A2-NACE-N 3/4"-DAC-211261-T-A60T1-N 3/4"-P-211261-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DBP-211261-T-A63T1-N FA-21501 LG/LT-21503 R2B-P3-206-02-A-DTI-00501 3/4"-CAM-215901-B1A2-NACE-N 3/4"-DAA-216362-T-A60T1-N 3/4"-DDA-215224-T-A09T1-N 3/4"-DAP-215103-T-A63T1-N 23. HEAT TRACING TO BE APPLIED ACCORDING TO THE CONNECTED PROCESS LINES.
FA-21201 LG-21203/LT-21202/LT-21958A/B/C R2B-P3-206-02-A-DTI-00203 3/4"-APR-212901-B1A2-NACE-N 3/4"-DAC-212062-T-A60T1-N 3/4"-P-212082-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DBP-212062-T-A63T1-N FA-21502 LG/LT-21504 R2B-P3-206-02-A-DTI-00503 3/4"-MDEAR-215902-T-A09T1-N 3/4"-DAA-215015-T-A60T1-N - 3/4"-DAP-215104-T-A63T1-N
24. LIGHT WEIGHT LINES( ) INDICATE ITEMS WHICH ARE DEPICTED ON THE
FA-21202 LG-21204/LT-21205/LT-21959A/B/C R2B-P3-206-02-A-DTI-00209 3/4"-P-212902-B1A2-NACE-N 3/4"-DAC-212066-T-A60T1-N 3/4"-P-212096-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DAP-212066-T-A63T1-N FA-21503 LG/LT-21505 R2B-P3-206-02-A-DTI-00504 3/4"-MDEAR-215201-T-A66T1-PP 3/4"-DAA-216361-T-A60T1-N 3/4"-DDA-215058-T-A09T1-N 3/4"-DAP-215105-T-A63T1-N P&ID AT THE INDIVIDUAL SERVICE
LG-21206A/B/LT-21208 R2B-P3-206-02-A-DTI-00213 3/4"-P-212906-B2A2-NACE-N 3/4"-DAC-212070-T-A60T1-N 3/4"-P-212090-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DAP-212070-T-A63T1-N HEAVY WEIGHT LINES( ) INDICATE ITEMS WHICH ARE IN ADDITION TO THE
FA-21204
LG-21207/LT-21210/LT-21207 R2B-P3-206-02-A-DTI-00213 3/4"-AAM-212904-B2A2-NACE-N 3/4"-DAC-212171-T-A60T1-N 3/4"-P-212171-B2A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DAP-212171-T-A63T1-N ITEMS DEPICTED AT THE INDIVIDUAL SERVICE.
LG-21211/LT-21214 R2B-P3-206-02-A-DTI-00215 3/4"-P-212908-B1A2-NACE-N 3/4"-DAC-212172-T-A60T1-N 3/4"-P-212172-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DAP-212172-T-A63T1-N
DA-21201 25. FOR MAGNETIC INDICATORS PROVIDE UNION FOR THREADED PIPE ONLY, USE FLANGES
LG-21209/LT-21212 R2B-P3-206-02-A-DTI-00215 3/4"-P-212907-B1A2-NACE-N 3/4"-DAC-212156-T-A60T1-N 3/4"-P-212156-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DAP-212175-T-A63T1-N FOR SOCKET WELD PIPING.
DA-21202 LG-21213/LT-21216 R2B-P3-206-02-A-DTI-00219 3/4"-ACL-212907-B1A2-NACE-N 3/4"-DAC-212173-T-A60T1-N 3/4"-ACL-212173-B1A2-NACE-N LEAN GAS KO DRUM DRAIN R2B-P3-206-02-A-DTI-00222 3/4"-DAP-212173-T-A63T1-N
26. GAUGE VALVE.
FA-21205 LG-21215/LT-21218/LT-21213 R2B-P3-206-02-A-DTI-00222 3/4"-ACL-212909-B1A2-NACE-N 3/4"-DAC-212174-T-A60T1-N 3/4"-ACL-212174-B1A2-NACE-N LEAN GAS KO DRUM DRAIN R2B-P3-206-02-A-DTI-00222 3/4"-DAP-212174-T-A63T1-N
DS-21201 LG-21229/LT-21220 R2B-P3-206-02-A-DTI-00226 3/4"-P-212911-B2A1-EC 3/4"-DAC-212275-T-A60T1-N 3/4"-P-212275-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DAP-212275-T-A63T1-N 27. MINIUM DISTANCE TO DRAIN CONNECTION.
DF-21201 LG-21217/LT-21222 R2B-P3-206-02-A-DTI-00229 3/4"-P-212913-B2A1-EC 3/4"-DAC-212276-T-A60T1-N 3/4"-P-212276-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DAP-212276-T-A63T1-N 28. PROVIDE UNION FOR THREADED PIPED ONLY. USE FLANGES FOR SOCKET WELD PIPING.
FA-21206 LG-21227/LT-21226 R2B-P3-206-02-A-DTI-00230 3/4"-AAM-212912-B1A1-N 3/4"-DAC-212277-T-A60T1-N 3/4"-LPG-212277-B1A2-NACE-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-DAP-212277-T-A63T1-N 29. IN MUTIPLE LEVEL TRANSMITTERS CASE, COMMON VENT AND DRAIN VALVE CAN BE APPLIED
INSTEAD OF INDIVIDUAL VALVES.

EXTERNAL DISPLACEMENT AND OTHER CHAMBER TYPE LEVEL INSTRUMENT CONNECTIONS NOTE 2, 5 GAUGE GLASS AND MAGNETIC INDICATOR CONNECTIONS NOTE 2, 5

B A A A
C C C C

NOTE 28 NOTE 28 NOTE 25 NOTE 25 NOTE 25 NOTE 25


NOTE 26 NOTE 26
NOTE 26 NOTE 26

AS REQUIRED
AS REQUIRED AS REQUIRED
AS REQUIRED

NOTE 26 NOTE 26
NOTE 27 NOTE 26 NOTE 26
NOTE 28 NOTE 27 NOTE 28 NOTE 27 NOTE 27
NOTE 25 NOTE 25 NOTE 25 NOTE 25

B B B B D D D D

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL REVIEWED
Infraestructura de DBNR
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL SIMA REVIEW

A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL Desarrollo, S.A. de C.V. LEVEL INSTRUMENT VENT & DRAIN DETAIL
APPROVAL
ISSUE FOR CONSTRUCTION
ASOCIADOS CONSTRUCTORES
0 11 Jun 21 YDC KHL APPROVED DBNR S.A. DE C.V.

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
00 AS BUILT 30 Sep 23 YDC KHL
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00016 00
CAD FILE :
DETAIL "PD" DETAIL "PV" DETAIL "PVD" GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
NOTE 6 NOTE 6 2. DELETED.
NOTE 2 "C"
NOTE 3 NOTE 8
NOTE 4

FREE DRAINING
FREE DRAINING FREE DRAINING

FREE DRAINING
2'-0"

2'-0"
(600)

(600)
MIN.

MIN.
"E"
NOTE 7 3/4" NOTE 13 NOTE 13
NOTE 11 3/4" 3/4"
NOTE 17, 21 NOTE 12 NOTE 12
"A" NOTE 19

NOTE 2 NOTE 2
MIN.

3/4" NOTE 3 NOTE 3


"S" 3/4" NOTE 5 NOTE 4 NOTE 4
NOTE 1, 18, 20 NOTE 8 NOTE 8

NOTE 14 NOTE 7 3/4" NOTE 7


NOTE 11 3/4"
NOTE 18 NOTE 11 NOTES :
NOTE 17 NOTE 17 1. UTILITY CONNECTION.
3/4" NOTE 1 NOTE 1
"
3/4

2. THE REQUIREMENTS FOR INSULATION OR HEAT TRACING AND HEAT TRACING AND HEAT TRACING
3/4" 3/4" OBJECTIVE TEMPERATURE IS INDICATED AT THE INDIVIDUAL SERVICE.

MIN.

MIN.
NOTE 15
3/4" 3/4"
NOTE 5 3. VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS INDICATED
NOTE 9 3/4" AT THE INDIVIDUAL SERVICE SPECIAL VALVE TRIM REQUIREMENTS INDICATED AT INDIVIDUAL
NOTE 18 NOTE 18 CONTROL VALVE LEVEL AND PUMP ASSEMBLIES SHALL ALSO APPLY TO VENT AND DRAIN
NOTE 15
ASSEMBLY VALVING.
3/4" 4. LIGHT WEIGHT LINES( ) INDICATE ITEMS WHICH ARE DEPICTED ON THE
NOTE 16 NOTE 14 NOTE 14 P&ID AT THE INDIVIDUAL SERVICE
NOTE 11
"R" HEAVY WEIGHT LINES( ) INDICATE ITEMS WHICH ARE IN ADDITION TO THE
NOTE 18 ITEMS DEPICTED AT THE INDIVIDUAL SERVICE.
1" 3/4" 5. REQUIRED FOR NON-SELF VENTING PUMPS.

"
3/4
2" 6. VENT FROM SEAL SUPPORT SYSTEM WHEN REQUIRED BY API PLAN 23 PER UOP 501 SPECIFICATION.
NOTE 19 NOTE 15
"A" 7. PUMP SUCTION.
NOTE 9 8. PUMP DISCHARGE.
9. PUMP CASING DRAIN.
10. CLOSED DRAIN HEADER (DEFAULT) OR AS INDICATED INTEXT AT THE INDIVIDUAL SERVICE.
11. LOCATE AT LOW POINT.
2" 2" 12. MAKE CONNECTION ON TOP OF PIPE.
"D"
13. RELIEF HEADER (DEFAULT) VENT HEADER OR AS INDICATED IN TEXT AT THE INDIVIDUAL SERVICE.
FREE DRAINING

"C" "D" 2" "A" 3/4" 14. "T" OR "Y" TYPE STRAINER (AS REQUIRED).
"E"
"B"
"B" 15. REQUIRED FOR "Y" TYPE STRAINERS.
16. VALVE FURNISHED WITH PUMP.
17. THIS VALVE WHICH IS SHOWN AT THE INDIVIDUAL SERVICE IS TO BE HARD PIPED TO CLOSED VENT OR
DRAIN HEADER AS INDICATED IN THE RESPECTIVE DETAIL AND NOT PLUGGED.
206-00635 3/4" 18. LOCATED AT THE HIGHEST POINT.
206-00635 3/4"
NOTE 10 DAA
DAA 19. HEAT TRACING TO BE APPLIED ACCORDING TO THE CONNECTED PROCESS LINES.

FREE DRAINING
"C" "D" 20. VALVE END TYPE TO BE BLIND FLANGE.

"B" 21. DELETED.

206-00635
DAA
NOTE 10

DETAIL "PD" DETAIL "PV" DETAIL "PVD"


TAG NO. P&ID NO. DRAIN MANIFOLD LINE (A) CLOSED DRAIN LINE (B) OPEN DRAIN LINE (C) BASE PLATE DRAIN LINE (D) "R" "S" TAG NO. P&ID NO. VENT MANIFOLD LINE (A) BASE PLATE (B) FLARE VENT & SEAL VENT LINE (C) TAG NO. P&ID NO. DRAIN MANIFOLD LINE (A) CLOSED DRAIN LINE (B) OPEN DRAIN LINE (C)
GA-21001A R2B-P3-206-02-A-DTI-00078 - - 1/2"-DAA-210130-T-A60T1-N 2"-DAA-210132-T-A60T1-N 2"X1/2" - GA-21401A R2B-P3-206-02-A-DTI-00405 3/4"-P-210941-B2A1-N 2"-DAA-214013-T-A60T1-N 3/4"-DBP-214529-T-A63T1-N BP-21201A R2B-P3-206-02-A-DTI-00204 3/4"-APR-210921-B1A2-NACE-N 3/4"-DAC-212186-T-A60T1-N 3/4"-DAA-212186-T-A60T1-N
GA-21001B R2B-P3-206-02-A-DTI-00078 - - 1/2"-DAA-210131-T-A60T1-N 2"-DAA-210133-T-A60T1-N 2"X1/2" - GA-21401B R2B-P3-206-02-A-DTI-00405 3/4"-P-210949-B2A1-N 2"-DAA-214014-T-A60T1-N 3/4"-DBP-214528-T-A63T1-N BP-21201B R2B-P3-206-02-A-DTI-00204 3/4"-APR-210922-B1A2-NACE-N 3/4"-DAC-212187-T-A60T1-N 3/4"-DAA-212187-T-A60T1-N
GA-21101A R2B-P3-206-02-A-DTI-00102 2"-P-210902-B2A1-EC(ST) 2"-DAC-211132-T-A60T1-N 2"-DAA-211132-T-A60T1-N 2"-DAA-211136-T-A60T1-N 2"X3/4" - GA-21402A R2B-P3-206-02-A-DTI-00409 3/4"-P-210950-B2A1-N 2"-DAA-214015-T-A60T1-N 3/4"-DBP-214930-T-A63T1-N
GA-21101B R2B-P3-206-02-A-DTI-00102 2"-P-210903-B2A1-EC(ST) 2"-DAC-211133-T-A60T1-N 2"-DAA-211133-T-A60T1-N 2"-DAA-211137-T-A60T1-N 2"X3/4" - GA-21402B R2B-P3-206-02-A-DTI-00409 3/4"-P-210944-B2A1-N 2"-DAA-214016-T-A60T1-N 3/4"-DBP-214931-T-A63T1-N TAG NO. P&ID NO. BASE PLATE DRAIN LINE (D) FLARE VENT LINE (E)
GA-21104A R2B-P3-206-02-A-DTI-00120 2"-ACP-210909-H2A2-EC(ST) 2"-DAC-211439-T-A60T1-N 2"-DAA-211439-T-A60T1-N 2"-DAA-211441-T-A60T1-N 2"X3/4" - GA-21403A R2B-P3-206-02-A-DTI-00410 3/4"-P-210945-B2A1-N 2"-DAA-214017-T-A60T1-N 3/4"-DBP-214032-T-A63T1-N BP-21201A R2B-P3-206-02-A-DTI-00204 3/4"-DAA-212188-T-A60T1-N 3/4"-DBP-212186-T-A63T1-N
GA-21104B R2B-P3-206-02-A-DTI-00120 2"-ACP-210910-H2A2-EC(ST) 2"-DAC-210073-T-A60T1-N 2"-DAA-211440-T-A60T1-N 2"-DAA-211442-T-A60T1-N 2"X3/4" - GA-21403B R2B-P3-206-02-A-DTI-00410 3/4"-P-210946-B2A1-N 2"-DAA-214018-T-A60T1-N 3/4"-DBP-214033-T-A63T1-N BP-21201B R2B-P3-206-02-A-DTI-00204 3/4"-DAA-212189-T-A60T1-N 3/4"-DBP-212187-T-A63T1-N
GA-21105A R2B-P3-206-02-A-DTI-00121 2"-ACL-210911-B2A1-EC 2"-DAC-211541-T-A60T1-N 2"-DAA-211541-T-A60T1-N 2"-DAA-211543-T-A60T1-N 2"X3/4" - GA-21404A R2B-P3-206-02-A-DTI-00413 3/4"-P-210947-B2A1-N 2"-DAA-214019-T-A60T1-N 3/4"-DBP-214334-T-A63T1-N
GA-21105B R2B-P3-206-02-A-DTI-00121 2"-ACL-210912-B2A1-EC 2"-DAC-211542-T-A60T1-N 2"-DAA-211542-T-A60T1-N 2"-DAA-211544-T-A60T1-N 2"X3/4" - GA-21404B R2B-P3-206-02-A-DTI-00413 3/4"-P-210948-B2A1-N 2"-DAA-214020-T-A60T1-N 3/4"-DBP-214335-T-A63T1-N
GA-21106A R2B-P3-206-02-A-DTI-00123 2"-ACL-210913-B2A1-EC 2"-DAC-211678-T-A60T1-N 2"-DAA-211678-T-A60T1-N 2"-DAA-211680-T-A60T1-N 2"X3/4" -
GA-21106B R2B-P3-206-02-A-DTI-00123 2"-ACL-210914-B2A1-EC 2"-DAC-211679-T-A60T1-N 2"-DAA-211679-T-A60T1-N 2"-DAA-211681-T-A60T1-N 2"X3/4" - DETAIL "PV"
GA-21202A R2B-P3-206-02-A-DTI-00202 2"-AAM-210915-B1A1-N 2"-DAC-212280-T-A60T1-N 2"-DAA-212280-T-A60T1-N 2"-DAA-212282-T-A60T1-N 2"X1/2" - TAG NO. P&ID NO. "D" PUMP CASING DRAIN (E)
GA-21202B R2B-P3-206-02-A-DTI-00202 2"-AAM-210916-B1A1-N 2"-DAC-212281-T-A60T1-N 2"-DAA-212281-T-A60T1-N 2"-DAA-212283-T-A60T1-N 2"X1/2" - GA-21401A R2B-P3-206-02-A-DTI-00405 - 3/4"-DAA-212521-T-A60T1-N
GA-21206A R2B-P3-206-02-A-DTI-00221 2"-ACL-210917-B2A1-N 2"-DAC-212682-T-A60T1-N 2"-DAA-212682-T-A60T1-N 2"-DAA-212684-T-A60T1-N 2"X1/2" - GA-21401B R2B-P3-206-02-A-DTI-00405 - 3/4"-DAA-212522-T-A60T1-N
GA-21206B R2B-P3-206-02-A-DTI-00221 2"-ACL-210918-B2A1-N 2"-DAC-212683-T-A60T1-N 2"-DAA-212683-T-A60T1-N 2"-DAA-212685-T-A60T1-N 2"X1/2" - GA-21402A R2B-P3-206-02-A-DTI-00409 - 3/4"-DAA-212523-T-A60T1-N
GA-21208A R2B-P3-206-02-A-DTI-00232 2"-LPG-210919-B2A1-N 2"-DAC-212884-T-A60T1-N 2"-DAA-212884-T-A60T1-N 2"-DAA-212886-T-A60T1-N 2"X3/4" - GA-21402B R2B-P3-206-02-A-DTI-00409 - 3/4"-DAA-212524-T-A60T1-N
GA-21208B R2B-P3-206-02-A-DTI-00232 2"-LPG-210920-B2A1-N 2"-DAC-212885-T-A60T1-N 2"-DAA-212885-T-A60T1-N 2"-DAA-212887-T-A60T1-N 2"X3/4" - GA-21403A R2B-P3-206-02-A-DTI-00410 3/4"X1/2" 3/4"-DAA-212525-T-A60T1-N
GA-21209A R2B-P3-206-02-A-DTI-00234 - - 1/2"-DAA-212888-T-A60T1-N 2"-DAA-212890-T-A60T1-N 2"X1/2" - GA-21403B R2B-P3-206-02-A-DTI-00410 3/4"X1/2" 3/4"-DAA-212526-T-A60T1-N
GA-21209B R2B-P3-206-02-A-DTI-00234 - - 1/2"-DAA-212889-T-A60T1-N 2"-DAA-212891-T-A60T1-N 2"X1/2" - GA-21404A R2B-P3-206-02-A-DTI-00413 - 3/4"-DAA-212527-T-A60T1-N
GA-21404B R2B-P3-206-02-A-DTI-00413 - 3/4"-DAA-212528-T-A60T1-N

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW

A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V. PUMP VENT & DRAIN DETAIL - 1
APPROVAL
ISSUE FOR DESIGN
ASOCIADOS CONSTRUCTORES
A3 10 Feb 21 YDC KHL APPROVED DBNR S.A. DE C.V.

0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00017 00
CAD FILE :
DETAIL "PDR" DETAIL "PVDR" GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
"G" NOTE 6

NOTE 2
"E"
NOTE 3
NOTE 8
NOTE 4 FREE DRAINING

FREE DRAINING

2'-0"
(600)
MIN.
NOTE 13
NOTE 7 3/4"
NOTE 12
NOTE 11 3/4"
NOTE 17
NOTE 1
3/4"
NOTE 2
MIN.

3/4" NOTE 3
NOTE 4
NOTE 19 NOTE 8

NOTE 14
NOTE 11 NOTE 7 NOTE 20 3/4" NOTES :
NOTE 11 1. DELETED.
3/4" NOTE 17 2. THE REQUIREMENTS FOR INSULATION OR HEAT TRACING AND HEAT TRACING AND HEAT TRACING
NOTE 1 OBJECTIVE TEMPERATURE IS INDICATED AT THE INDIVIDUAL SERVICE.
"
3/4

3/4" 3. VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS INDICATED

MIN.
NOTE 15
3/4" AT THE INDIVIDUAL SERVICE SPECIAL VALVE TRIM REQUIREMENTS INDICATED AT INDIVIDUAL
3/4" NOTE 5 CONTROL VALVE LEVEL AND PUMP ASSEMBLIES SHALL ALSO APPLY TO VENT AND DRAIN
NOTE 9 ASSEMBLY VALVING.
NOTE 19
4. LIGHT WEIGHT LINES( ) INDICATE ITEMS WHICH ARE DEPICTED ON THE
NOTE 16 P&ID AT THE INDIVIDUAL SERVICE
"R" NOTE 14 HEAVY WEIGHT LINES( ) INDICATE ITEMS WHICH ARE IN ADDITION TO THE
NOTE 11 ITEMS DEPICTED AT THE INDIVIDUAL SERVICE.
5. REQUIRED FOR NON-SELF VENTING PUMPS. REFER THE BELLOW TABLE WHETHER APPLICABLE OR NOT.
3/4"
6. VENT FROM SEAL SUPPORT SYSTEM WHEN REQUIRED BY API PLAN 23 PER UOP 501 SPECIFICATION.

"
3/4
2"
7. PUMP SUCTION.
NOTE 15
8. PUMP DISCHARGE.
"A"
NOTE 9 9. PUMP CASING DRAIN.
3/4" "G" 10. CLOSED DRAIN HEADER (DEFAULT) OR AS INDICATED INTEXT AT THE INDIVIDUAL SERVICE.
NOTE 18 NOTE 1
"E" 3/4" NOTE 16 11. LOCATE AT LOW POINT.
12. MAKE CONNECTION ON TOP OF PIPE.
3/4" 13. RELIEF HEADER (DEFAULT) VENT HEADER OR AS INDICATED IN TEXT AT THE INDIVIDUAL SERVICE.
2" NOTE 18 14. "T" OR "Y" TYPE STRAINER (AS REQUIRED).
3/4" "F"
"A" 15. REQUIRED FOR "Y" TYPE STRAINERS.
2" 2"
3/4" 16. VALVE FURNISHED WITH PUMP.
3/4"
FREE DRAINING

17. THIS VALVE WHICH IS SHOWN AT THE INDIVIDUAL SERVICE IS TO BE HARD PIPED TO CLOSED VENT OR
"B" "C" "D" NOTE 1
DRAIN HEADER AS INDICATED IN THE RESPECTIVE DETAIL AND NOT PLUGGED.
18. ADDITIONAL CONNECTION FOR PROCESS FLUID RECOVERY.
19. DELETED.
20. HEAT TRACING TO BE APPLIED ACCORDING TO THE CONNECTED PROCESS LINES.
2" 2"
21. PROVIDE TWO 3/4", 300# RF CONNECTION ON THE CASING VENT.
206-00635

FREE DRAINING
DAA 22. DELETED.
"B" "C" "D"
NOTE 10

206-00635
NOTE 10 DAA

DETAIL "PDR" DETAIL "PVDR"


TAG NO. P&ID NO. DRAIN MANIFOLD LINE (A) CLOSED DRAIN LINE (B) OPEN DRAIN LINE (C) CASING CASING
TAG NO. P&ID NO. DRAIN MANIFOLD LINE (A) CLOSED DRAIN LINE (B) OPEN DRAIN LINE (C) PUMP PLATE DRAIN LINE (D) FLARE VENT LINE (E) RECOVERY DESTINATION RECOVERY HEADER P&ID RECOVERY LINE (F)
GA-21207A R2B-P3-206-02-A-DTI-00225 2"-P-210923-B2A1-N 2"-DAC-212788-T-A60T1-N 2"-DAA-212788-T-A60T1-N VENT LINE DRAIN SIZE (G)
GA-21207B R2B-P3-206-02-A-DTI-00225 2"-P-210924-B2A1-N 2"-DAC-212789-T-A60T1-N 2"-DAA-212789-T-A60T1-N GA-21107A R2B-P3-206-02-A-DTI-00119 2"-NAPS-210925-B1A1-EC 2"-DAC-211743-T-A60T1-N 2"-DAA-211743-T-A60T1-N 2"-DAA-211745-T-A60T1-N 2"-DBP-211743-T-A63T1-N HEAVY NAPHTHA RETURN R2B-P3-206-02-A-DTI-00119 3/4"-NAPS-211743-B1A1-N X 3/4"
GA-21107B R2B-P3-206-02-A-DTI-00119 2"-NAPS-210926-B1A1-EC 2"-DAC-211744-T-A60T1-N 2"-DAA-211744-T-A60T1-N 2"-DAA-211746-T-A60T1-N 2"-DBP-211744-T-A63T1-N HEAVY NAPHTHA RETURN R2B-P3-206-02-A-DTI-00119 3/4"-NAPS-211744-B1A1-N X 3/4"
GA-21108A R2B-P3-206-02-A-DTI-00129 2"-AAM-210927-B1A2-NACE-N 2"-DAC-211890-T-A60T1-N 2"-DAA-211890-T-A60T1-N 2"-DAA-211892-T-A60T1-N 3/4"-DBP-211890-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211890-B1A2-NACE-N X 1/2"
GA-21108B R2B-P3-206-02-A-DTI-00129 2"-AAM-210928-B1A2-NACE-N 2"-DAC-211891-T-A60T1-N 2"-DAA-211891-T-A60T1-N 2"-DAA-211893-T-A60T1-N 3/4"-DBP-211891-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211891-B1A2-NACE-N X 1/2"
GA-21109A R2B-P3-206-02-A-DTI-00130 2"-P-210929-B1A2-NACE-N 2"-DAC-211992-T-A60T1-N 2"-DAA-211992-T-A60T1-N 2"-DAA-211994-T-A60T1-N 3/4"-DBP-211992-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211992-B1A2-NACE-N X 3/4"
GA-21109B R2B-P3-206-02-A-DTI-00130 2"-P-210930-B1A2-NACE-N 2"-DAC-211993-T-A60T1-N 2"-DAA-211993-T-A60T1-N 2"-DAA-211995-T-A60T1-N 3/4"-DBP-211993-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211993-B1A2-NACE-N X 3/4"
GA-21110A (NOTE 21) R2B-P3-206-02-A-DTI-00131 2"-P-210931-B2A2-NACE-N 2"-DAC-211094-T-A60T1-N 2"-DAA-211094-T-A60T1-N 2"-DAA-211090-T-A60T1-N 3/4"-DBP-211094-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211105-B1A2-NACE-N 3/4"
GA-21110B (NOTE 21) R2B-P3-206-02-A-DTI-00131 2"-P-210932-B2A2-NACE-N 2"-DAC-211095-T-A60T1-N 2"-DAA-211095-T-A60T1-N 2"-DAA-211091-T-A60T1-N 3/4"-DBP-211095-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-211095-B1A2-NACE-N 3/4"
TAG NO. RECOVERY DESTINATION RECOVERY HEADER P&ID BASE PLATE DRAIN LINE (D) RECOVERY LINE (E) "R" "S" "T" GA-21201A R2B-P3-206-02-A-DTI-00210 2"-P-210933-B2A2-NACE-N 2"-DAC-212196-T-A60T1-N 2"-DAA-212196-T-A60T1-N 2"-DAA-212198-T-A60T1-N 3/4"-DBP-212196-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212196-B1A2-NACE-N X 3/4"
GA-21207A MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 2"-DAA-212790-T-A60T1-N 3/4"-P-212788-B1A2-NACE-N 2"x3/4" - - GA-21201B R2B-P3-206-02-A-DTI-00210 2"-P-210934-B2A2-NACE-N 2"-DAC-212197-T-A60T1-N 2"-DAA-212197-T-A60T1-N 2"-DAA-212199-T-A60T1-N 3/4"-DBP-212197-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212198-B1A2-NACE-N X 3/4"
GA-21207B MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 2"-DAA-212791-T-A60T1-N 3/4"-P-212789-B1A2-NACE-N 2"x3/4" - - GA-21203A R2B-P3-206-02-A-DTI-00214 2"-P-210935-B2A2-NACE-N 2"-DAC-212398-T-A60T1-N 2"-DAA-212398-T-A60T1-N 2"-DAA-212400-T-A60T1-N 3/4"-DBP-212398-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212398-B1A2-NACE-N X 3/4"
GA-21203B R2B-P3-206-02-A-DTI-00214 2"-P-210936-B2A2-NACE-N 2"-DAC-212399-T-A60T1-N 2"-DAA-212399-T-A60T1-N 2"-DAA-212401-T-A60T1-N 3/4"-DBP-212399-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212399-B1A2-NACE-N X 3/4"
GA-21204A R2B-P3-206-02-A-DTI-00216 2"-P-210937-B2A2-NACE-N 2"-DAC-212415-T-A60T1-N 2"-DAA-212419-T-A60T1-N 2"-DAA-212417-T-A60T1-N 3/4"-DBP-212415-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212415-B1A2-NACE-N X 3/4"
GA-21204B R2B-P3-206-02-A-DTI-00216 2"-P-210938-B2A2-NACE-N 2"-DAC-212416-T-A60T1-N 2"-DAA-212416-T-A60T1-N 2"-DAA-212418-T-A60T1-N 3/4"-DBP-212416-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212416-B1A2-NACE-N X 3/4"
GA-21205A R2B-P3-206-02-A-DTI-00217 2"-P-210939-B2A2-NACE-N 2"-DAC-212517-T-A60T1-N 2"-DAA-212517-T-A60T1-N 2"-DAA-212519-T-A60T1-N 3/4"-DBP-212517-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212517-B1A2-NACE-N X 3/4"
GA-21205B R2B-P3-206-02-A-DTI-00217 2"-P-210940-B2A2-NACE-N 2"-DAC-212518-T-A60T1-N 2"-DAA-212518-T-A60T1-N 2"-DAA-212520-T-A60T1-N 3/4"-DBP-212518-T-A63T1-N MAIN COLUMN RECEIVER R2B-P3-206-02-A-DTI-00132 3/4"-P-212518-B1A2-NACE-N X 3/4"

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL REVIEWED
Infraestructura de DBNR
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL SIMA REVIEW

A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL Desarrollo, S.A. de C.V. PUMP VENT & DRAIN DETAIL - 2
APPROVAL
ISSUE FOR CONSTRUCTION
ASOCIADOS CONSTRUCTORES
0 11 Jun 21 YDC KHL APPROVED DBNR S.A. DE C.V.

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
00 AS BUILT 30 Sep 23 YDC KHL
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00017A 00
CAD FILE :
B1A1 B1A1
FREE FREE FREE FREE GENERAL NOTES :
DRAINING DRAINING DRAINING DRAINING 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
LO LO 2. DELETED.
NOTE 1 NOTE 1

FREE DRAINING

FREE DRAINING
FREE DRAINING FREE DRAINING

MIN.

MIN.
600

600
NOTE 7

NOTE 4 NOTE 4
SIZE BY SIZE BY
CONTRACTOR CONTRACTOR

LO LO
3/4" MS-1
NOTE 5 FO N NOTE 5 FO

PI H PI H

SEAL SEAL NOTES :


POT H POT H
LI LI 1. VENT FROM OTHER SEAL POT(S) (AS REQUIRED).
L 3/4" L 2. DRAIN FROM OTHER SEAL POT(S) (AS REQUIRED).
3. BY CONTRACTOR.
MS-1

MS-1

MS-1

MS-1
4. MAKE CONNECTION ON TOP OF PIPE.
5. FURNISHED WITH PUMP.
CWR CWS OWS CWR CWS 6. DRAIN DESTINATION IS INDICATED ON P&ID AT EACH INDIVIDUAL PUMP SERVICE.
FREE DRAINING FREE DRAINING 7. RELIEF HEADER (DEFAULT) VENT HEADER OR AS INDICATED IN TEXT AT THE INDIVIDUAL SERVICE.
FREE DRAINING

FREE DRAINING
NOTE 2 NOTE 2
B1A1

B1A1
CDI
NOTE 6

DETAIL "TA" DETAIL "TC" DETAIL "TH"


UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL SEAL QUENCH SYSTEM VALVES AND PIPING SHALL BE OF THE SAME UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL BE OF
BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP

B1A1 B1A1 B1A1


FREE FREE FREE FREE FREE FREE
DRAINING DRAINING DRAINING DRAINING DRAINING DRAINING

LO LO LO
NOTE 1 NOTE 1 NOTE 1

FREE DRAINING
FREE DRAINING

FREE DRAINING
FREE DRAINING FREE DRAINING FREE DRAINING

MIN.
600
MIN.

TO STRIPPER
600

RECEIVER
(SIZE BY
CONTRACTOR)
NOTE 4 NOTE 4
SIZE BY SIZE BY SIZE BY
CONTRACTOR CONTRACTOR CONTRACTOR

LO LO LO

NOTE 5 FO NOTE 5 FO NOTE 5 FO

PI H PI H PI H

SEAL SEAL SEAL


POT POT POT H
LI H LI H LI
L L L

MS-1

MS-1
MS-1

MS-1

MS-1

MS-1

CWR CWS CWR CWS CWR CWS


FREE DRAINING FREE DRAINING

FREE DRAINING
FREE DRAINING

NOTE 2 NOTE 2

B1A1
B1A1

SSU SSU

DETAIL "TL" DETAIL "TP" DETAIL "TS"


UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL BE OF UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL BE OF
BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL REVIEWED
Infraestructura de DBNR
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL SIMA REVIEW

A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL TYPICAL
APPROVAL
ISSUE FOR CONSTRUCTION
ASOCIADOS CONSTRUCTORES
0 11 Jun 21 YDC KHL APPROVED DBNR S.A. DE C.V.

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL REV


M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
00 AS BUILT 30 Sep 23 YDC KHL
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018 00
CAD FILE :
11-61 (OH) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

SECL
VENDOR

FO
"A"

PLUGGED NOTES :
INLET 1. CHECK VALVE IS REQUIRED ONLY FOR GA-21206A/B.
PUMP NO. P&ID NO. FO NO. "A"
SEAL 1 GA-21001A R2B-P3-206-02-A-DTI-00078 FO-21051A
2 GA-21001B R2B-P3-206-02-A-DTI-00078 FO-21051B
3 GA-21202A R2B-P3-206-02-A-DTI-00202 FO-21251A
4 GA-21202B R2B-P3-206-02-A-DTI-00202 FO-21251B
5 GA-21209A R2B-P3-206-02-A-DTI-00234 FO-21252A
PLUGGED 6 GA-21209B R2B-P3-206-02-A-DTI-00234 FO-21252B
OUTLET

11-52-61 (OH)

LI H PI H

PT
"D" PUMP NO. P&ID NO. VENT LINE "A" VENT DESTINATION SAE LINE "B' RAE LINE "C PT NO. "D" FO NO. "E" LG NO. 'F" LT NO. "G"
FO SIGHT GLASS NO. "H"
TO PUMP VENT
"E" 1 GA-21206A R2B-P3-206-02-A-DTI-00221 3/4"-DBP-210917-T-A63T1-N R2B-P3-206-02-A-DTI-00628 2"-SAE-217003-T-A01T1-N 2"-RAE-217003-T-A01T1-N PT-21252A FO-21254A LG-21252A LT-21252A SGL-21852A
MANIFOLD
NOTE 1 OR FLARE 2 GA-21206B R2B-P3-206-02-A-DTI-00221 3/4"-DBP-210918-T-A63T1-N R2B-P3-206-02-A-DTI-00628 2"-SAE-217004-T-A01T1-N 2"-RAE-217004-T-A01T1-N PT-21252B FO-21254B LG-21252B LT-21252B SGL-21852B
3 GA-21402A R2B-P3-206-02-A-DTI-00409 3/4"-DBP-214930-T-A63T1-N R2B-P3-206-02-A-DTI-00017 2"-SAE-217013-T-A01T1-N 2"-RAE-217013-T-A01T1-N PT-21456A FO-21466A LG-21456A LT-21456A SGL-21858A
"A" 4 GA-21402B R2B-P3-206-02-A-DTI-00409 3/4"-DBP-214931-T-A63T1-N R2B-P3-206-02-A-DTI-00017 2"-SAE-217014-T-A01T1-N 2"-RAE-217014-T-A01T1-N PT-21456B FO-21466B LG-21456B LT-21456B SGL-21858B
5 GA-21403A R2B-P3-206-02-A-DTI-00410 3/4"-DBP-214032-T-A63T1-N R2B-P3-206-02-A-DTI-00017 2"-SAE-217015-T-A01T1-N 2"-RAE-217015-T-A01T1-N PT-21457A FO-21467A LG-21457A LT-21457A SGL-21859A
6 GA-21403B R2B-P3-206-02-A-DTI-00410 3/4"-DBP-214033-T-A63T1-N R2B-P3-206-02-A-DTI-00017 2"-SAE-217016-T-A01T1-N 2"-RAE-217016-T-A01T1-N PT-21457B FO-21467B LG-21457B LT-21457B SGL-21859B
REFILL
"J" 7 GA-21404A R2B-P3-206-02-A-DTI-00413 3/4"-DBP-214334-T-A63T1-N R2B-P3-206-02-A-DTI-00017 2"-SAE-217048-T-A01T1-N 2"-RAE-217048-T-A01T1-N PT-21473A FO-21476A LG-21467A LT-21467A SGL-21878A
SAE
8 GA-21404B R2B-P3-206-02-A-DTI-00413 3/4"-DBP-214335-T-A63T1-N R2B-P3-206-02-A-DTI-00017 2"-SAE-217049-T-A01T1-N 2"-RAE-217049-T-A01T1-N PT-21473B FO-21476B LG-21467B LT-21467B SGL-21878B
CSO "B" 206-00623
DP
LT LG SGL
"G" "F" "H"
"J"
RAE PUMP NO. FO NO. "I" "J"
"C" 206-00624
1 GA-21206A FO-21253A 2"x1/2"
FO 2 GA-21206B FO-21253B 2"x1/2"
"I" 3/4" 3 GA-21402A FO-21461A 2"x1/2"
DRAIN 4 GA-21402B FO-21461B 2"x1/2"
5 GA-21403A FO-21462A 2"x1/2"
6 GA-21403B FO-21462B 2"x1/2"
PLUGGED 7 GA-21404A FO-21477A 2"x1/2"
INLET 8 GA-21404B FO-21477B 2"x1/2"

SEAL

PLUGGED
OUTLET

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (1/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018A 00
CAD FILE :
23-61 (OH) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

SECL
VENDOR

"E"
SAE
CSO "A" 206-00623

NOTES :
TG PUMP NO. P&ID NO. SAE LINE "A" RAE LINE "B' TG NO. "C" SIGHT GLASS NO. "D" "E"
1. THIS COOLING WATER BRANCH LINE IS ONLY FOR GA-21109A.
"C" SGL 1 GA-21601A R2B-P3-206-02-A-DTI-00613 2"-SAE-216004-T-A01T1-N 2"-RAE-216004-T-A01T1-N TG-21651A SGL-21854A 2"x3/4"
"D" 2 GA-21601B R2B-P3-206-02-A-DTI-00613 2"-SAE-216005-T-A01T1-N 2"-RAE-216005-T-A01T1-N TG-21651B SGL-21854B 2"x3/4"
"E"
RAE
"B" 206-00624

3/4"
PLUGGED
INLET

SEAL

PLUGGED
OUTLET

11-53A-61 (OH)

LI H PI

L L

PT
"D"
PCV
"E"
GI
NOTE 1 "A" 206-00620
206-000130B 9196
TO TGA-21109A PUMP NO. P&ID NO. GI LINE NO. "A" SAE LINE "B' RAE LINE "C" PT NO. "D" PCV NO. "E" LG NO. "F" LT NO. "G" SIGHT GLASS NO. "H" FO NO. "I" "J"
1 GA-21604A R2B-P3-206-02-A-DTI-00607 3/4"-GI-217009-T-A03T1-N 2"-SAE-217017-T-A01T1-N 2"-RAE-217017-T-A01T1-N PT-21658A PCV-21655A LG-21658A LT-21658A SGL-21860A FO-21663A 2"x1/2"
2 GA-21604B R2B-P3-206-02-A-DTI-00607 3/4"-GI-217010-T-A03T1-N 2"-SAE-217018-T-A01T1-N 2"-RAE-217018-T-A01T1-N PT-21658B PCV-21655B LG-21658B LT-21658B SGL-21860B FO-21663B 2"x1/2"
REFILL
"J" 3 GA-21605A R2B-P3-206-02-A-DTI-00606 3/4"-GI-217011-T-A03T1-N 2"-SAE-217019-T-A01T1-N 2"-RAE-217019-T-A01T1-N PT-21659A PCV-21656A LG-21659A LT-21659A SGL-21861A FO-21664A 2"x1/2"
SAE
4 GA-21605B R2B-P3-206-02-A-DTI-00606 3/4"-GI-217012-T-A03T1-N 2"-SAE-217020-T-A01T1-N 2"-RAE-217020-T-A01T1-N PT-21659B PCV-21656B LG-21659B LT-21659B SGL-21861B FO-21664B 2"x1/2"
CSO "B" 206-00623
DP 5 GA-21109A R2B-P3-206-02-A-DTI-00130 3/4"-GI-217019-T-A03T1-N 2"-SAE-217001-T-A01T1-N 2"-RAE-217001-T-A01T1-N PT-21151A PCV-21153A LG-21151A LT-21151A SGL-21851A FO-21153A 2"x3/4"
LT LG SGL 6 GA-21109B R2B-P3-206-02-A-DTI-00130 3/4"-GI-217020-T-A03T1-N 2"-SAE-217002-T-A01T1-N 2"-RAE-217002-T-A01T1-N PT-21151B PCV-21153B LG-21151B LT-21151B SGL-21851B FO-21153B 2"x1/2"
"G" "F" "H"
"J" RAE
"C" 206-00624

3/4"
DRAIN
NOTE 1
9197 206-000130B
FROM TGA-21109A
FO
"I" PLUGGED
INLET

SEAL

PLUGGED
OUTLET

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (2/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018B 00
CAD FILE :
23-52-61(OH) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

LI H PI H 2. DELETED.

SECL
VENDOR

PT
PLUGGED SGL
INLET "E" FO
"K" TO PUMP VENT
"F"
MANIFOLD
TG OR FLARE PUMP NO. P&ID NO. VENT LINE. "A" VENT DESTINATION SAE LINE "B' RAE LINE "C"
"J" 1 GA-21106A R2B-P3-206-02-A-DTI-00123 3/4"-DBP-210913-T-A63T1-N R2B-P3-206-02-A-DTI-00628 2"-SAE-217021-T-A01T1-N 2"-RAE-217021-T-A01T1-N
"A"
2 GA-21106B R2B-P3-206-02-A-DTI-00123 3/4"-DBP-210914-T-A63T1-N R2B-P3-206-02-A-DTI-00628 2"-SAE-217022-T-A01T1-N 2"-RAE-217022-T-A01T1-N

REFILL
"L"
PLUGGED SAE
OUTLET "B" 206-00623
DP
LT LG SGL
"H" "G" "I"
PUMP NO. PT NO. "E" FO NO. "F" LG NO. "G" LT NO. "H" SIGHT GLASS NO. "I" TG NO. "J" SIGHT GLASS NO. "K" "L"
"L"
RAE 1 GA-21106A PT-21160A FO-21165A LG-21160A LT-21160A SGL-21862A TG-21153A SGL-21865A 2"x1"
"C" 206-00624 2 GA-21106B PT-21160B FO-21165B LG-21160B LT-21160B SGL-21862B TG-21153B SGL-21865B 2"x1"

DRAIN
SEAL

53B-61 (OH)

PI

PG
"E"

FOR N2
CHARGING
BLADDER
ACCUMULATOR
PT
"C"
STR
"F" FOR PUMP NO. P&ID NO. SAE LINE. "A" RAE LINE "B' PT NO. "C" PG NO. "E" STRAINER NO. "F" SIGHT GLASS NO. "G" TG NO. "H" "I"
FILLING
1 GA-21201A R2B-P3-206-02-A-DTI-00210 2"-SAE-217050-T-A01T1-N 2"-RAE-217050-T-A01T1-N PT-21279A PG-21281A STR-21873A SGL-21884A TG-21270A 2"x3/4"
2 GA-21201B R2B-P3-206-02-A-DTI-00210 2"-SAE-217051-T-A01T1-N 2"-RAE-217051-T-A01T1-N PT-21279B PG-21281B STR-21873B SGL-21884B TG-21270B 2"x3/4"
3 GA-21205A R2B-P3-206-02-A-DTI-00217 2"-SAE-217029-T-A01T1-N 2"-RAE-217029-T-A01T1-N PT-21264A PG-21254A STR-21852A SGL-21869A TG-21260A 2"x3/4"
4 GA-21205B R2B-P3-206-02-A-DTI-00217 2"-SAE-217030-T-A01T1-N 2"-RAE-217030-T-A01T1-N PT-21264B PG-21254B STR-21852B SGL-21869B TG-21260B 2"x3/4"
PLUGGED "I"
SAE 5 GA-21207A R2B-P3-206-02-A-DTI-00225 2"-SAE-217005-T-A01T1-N 2"-RAE-217005-T-A01T1-N PT-21253A PG-21255A STR-21865A SGL-21853A TG-21266A 2"x3/4"
INLET
"A" 206-00623 6 GA-21207B R2B-P3-206-02-A-DTI-00225 2"-SAE-217006-T-A01T1-N 2"-RAE-217006-T-A01T1-N PT-21253B PG-21255B STR-21865B SGL-21853B TG-21266B 2"x3/4"

TG
"H" SGL
"G"
PLUGGED
OUTLET "I"
RAE
"B" 206-00624

SEAL

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (3/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018C 00
CAD FILE :
11-52-61 (BB) 23-52-61 (BB) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

LI H PI H PI H 2. DELETED.

PI H PT
"D"
PLUGGED FO
INLET "E" SECL
TO PUMP VENT
NOTE 1 MANIFOLD VENDOR

"A" PT
PLUGGED SGL
INLET "D" FO
"E" "J"
REFILL
"P" TG "S"
SAE DBP
PLUGGED 206-00623 "I"
DP "B" 206-00628
H OUTLET SGL
LI LT LG
"G" "F" "H"
L
"P"
RAE
REFILL NOTES :
"K"
PLUGGED SAE 1. CHECK VALVE IS REQUIRED ONLY FOR GA-21208A/B.
"C" 206-00624
OUTLET DP "B" 206-00623
FO LT LG SGL
"I" "G" "F" "H"
DRAIN "K"
RAE
"C" 206-00624

DRAIN/
NDE SEAL NDE SEAL REFILL

PI H PT
"J"
PLUGGED FO
INLET "K"

PT
PLUGGED "L" FO SGL
INLET "R"
"M"
REFILL
TG
PLUGGED "Q"
OUTLET DP
LI H LT LG SGL
"M" "L" "N"
L REFILL
PLUGGED
OUTLET
DP
FO LT LG SGL
"O" "O" "N" "P"
DRAIN

DRAIN/
DE SEAL DE SEAL REFILL

LI H

PUMP NO. P&ID NO. VENT LINE. "A" VENT DESTINATION SAE LINE "B' RAE LINE "C" PUMP NO. P&ID NO. SAE LINE "B' RAE LINE "C"
1 GA-21208A R2B-P3-206-02-A-DTI-00232 3/4"-DBP-217034-T-A63T1-N R2B-P3-206-02-A-DTI-00628 2"-SAE-217046-T-A01T1-N 2"-RAE-217046-T-A01T1-N 1 GA-21105A R2B-P3-206-02-A-DTI-00121 2"-SAE-217035-T-A01T1-N 2"-RAE-217035-T-A01T1-N
2 GA-21208B R2B-P3-206-02-A-DTI-00232 3/4"-DBP-217035-T-A63T1-N R2B-P3-206-02-A-DTI-00628 2"-SAE-217047-T-A01T1-N 2"-RAE-217047-T-A01T1-N 2 GA-21105B R2B-P3-206-02-A-DTI-00121 2"-SAE-217036-T-A01T1-N 2"-RAE-217036-T-A01T1-N
3 GA-21401A R2B-P3-206-02-A-DTI-00405 3/4"-DBP-214529-T-A63T1-N R2B-P3-206-02-A-DTI-00017 2"-SAE-217011-T-A01T1-N 2"-RAE-217011-T-A01T1-N
4 GA-21401B R2B-P3-206-02-A-DTI-00405 3/4"-DBP-214528-T-A63T1-N R2B-P3-206-02-A-DTI-00017 2"-SAE-217012-T-A01T1-N 2"-RAE-217012-T-A01T1-N

PUMP NO. PT NO. "D" FO NO. "E" LG NO. "F" LT NO. "G" SIGHT GLASS NO. "H" FO NO. "I" PUMP NO. PT NO. "D" FO NO. "E" LG NO. "F" LT NO. "G" SIGHT GLASS NO. "H" TG NO. "I" SIGHT GLASS NO. "J" "K"
1 GA-21208A PT-21276A FO-21256A LG-21254A LT-21254A SGL-21881A FO-21257A 1 GA-21105A PT-21185A FO-21169A LG-21175A LT-21175A SGL-21890A TG-21167A SGL-21892A 2"x1-1/2"
2 GA-21208B PT-21276B FO-21256B LG-21254B LT-21254B SGL-21881B FO-21257B 2 GA-21105B PT-21185B FO-21169B LG-21175B LT-21175B SGL-21890B TG-21167B SGL-21892B 2"x1-1/2"
3 GA-21401A PT-21455A FO-21460A LG-21455A LT-21455A SGL-21857A FO-21463A
4 GA-21401B PT-21455B FO-21460B LG-21455B LT-21455B SGL-21857B FO-21463B

PUMP NO. PT NO. "J" FO NO. "K" LG NO. "L" LT NO. "M" SIGHT GLASS NO. "N" FO NO. "O" "P" PUMP NO. PT NO. "L" FO NO. "M" LG NO. "N" LT NO. "O" SIGHT GLASS NO. "P" TG NO. "Q" SIGHT GLASS NO. "R" DBP LINE "S"
1 GA-21208A PT-21278A FO-21258A LG-21255A LT-21255A SGL-21883A FO-21259A 2"x3/4" 1 GA-21105A PT-21187A FO-21171A LG-21177A LT-21177A SGL-21896A TG-21169A SGL-21894A 3/4"-DBP-217030-T-A63T1-N
2 GA-21208B PT-21278B FO-21258B LG-21255B LT-21255B SGL-21883B FO-21259B 2"x3/4" 2 GA-21105B PT-21187B FO-21171B LG-21177B LT-21177B SGL-21896B TG-21169B SGL-21894B 3/4"-DBP-217031-T-A63T1-N
3 GA-21401A PT-21458A FO-21464A LG-21458A LT-21458A SGL-21888A FO-21465A 2"x3/4"
4 GA-21401B PT-21458B FO-21464B LG-21458B LT-21458B SGL-21888B FO-21465B 2"x3/4"

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (4/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018D 00
CAD FILE :
32-53B-61 (OH) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

SECL
PI PI VENDOR

L L

PG PG
"F" "F"

FOR N2 FOR N2 NOTES :


CHARGING CHARGING
1. DELETED.
BLADDER "Y" BLADDER "Y"
SAE SAE
ACCUMULATOR ACCUMULATOR 2. DELETED.
PT "A" 206-00623 PT "A" 206-00623
"D" "D"
STR STR
"G" "G"
"Q" "Q"

PUMP PUMP
SGL BEARING SGL BEARING
"R" "R"

TG TG
"I" SGL "I" SGL
"Q" "Q"
"H" "H"
"Y" "Y"
RAE RAE
"B" 206-00624 "B" 206-00624
TG PG TG PG
"O" "J" SGL STR "O" "J" SGL STR
"P" "M" "P" "M"
"N" EXTERNAL "N" EXTERNAL
FLUSHING FLUSHING
"C" (MAIN : HCO) "C" (MAIN : HCO)
PLUGGED PLUGGED
INLET INLET
SEAL SEAL
EXTERNAL EXTERNAL
FLUSHING FLUSHING
"E" (BACK-UP: RAW OIL) "E" (BACK-UP: RAW OIL)

PLUGGED PLUGGED
OUTLET OUTLET

PUMP NO. P&ID NO. SAE LINE. "A" RAE LINE "B' EXTERNAL FLUSHING NO. "C' EXTERNAL FLUSHING NO. "E" PUMP NO. P&ID NO. SAE LINE. "A" RAE LINE "B' EXTERNAL FLUSHING NO. "C' EXTERNAL FLUSHING NO. "E"
1 GA-21102A R2B-P3-206-02-A-DTI-00107 2"-SAE-217037-T-A01T1-N 2"-RAE-217037-T-A01T1-N 1"-P-211503-H2A2-EC(ST) 1"-P-211507-B2A1-EC(ST) 1 GA-21103A R2B-P3-206-02-A-DTI-00115 2"-SAE-217039-T-A01T1-N 2"-RAE-217039-T-A01T1-N 1"-P-211510-H2A2-EC(ST) 1"-P-211500-B2A1-EC(ST)
2 GA-21102B R2B-P3-206-02-A-DTI-00107 2"-SAE-217038-T-A01T1-N 2"-RAE-217038-T-A01T1-N 1"-P-211504-H2A2-EC(ST) 1"-P-211508-B2A1-EC(ST) 2 GA-21103B R2B-P3-206-02-A-DTI-00115 2"-SAE-217040-T-A01T1-N 2"-RAE-217040-T-A01T1-N 1"-P-211511-H2A2-EC(ST) 1"-P-211501-B2A1-EC(ST)
3 GA-21103C R2B-P3-206-02-A-DTI-00116 2"-SAE-217041-T-A01T1-N 2"-RAE-217041-T-A01T1-N 1"-P-211512-H2A2-EC(ST) 1"-P-211502-B2A1-EC(ST)

PUMP NO. PT NO. "D" PG NO. "F" STRAINER NO. "G" SIGHT GLASS NO. "H" TG NO. "I" PG NO. "J" STRAINER NO. "M" "N" TG NO. "O" SIGHT GLASS NO. "P"
1 GA-21102A PT-21167A PG-21157A STR-21853A SGL-21584A TG-21161A PG-21155A STR-21855A 1"x3/4" TG-21159A SGL-21585A PUMP NO. PT NO. "D" PG NO. "F" STRAINER NO. "G" SIGHT GLASS NO. "H" TG NO. "I" PG NO. "J" STRAINER NO. "M" "N" TG NO. "O" SIGHT GLASS NO. "P"
2 GA-21102B PT-21167B PG-21157B STR-21853B SGL-21584B TG-21161B PG-21155B STR-21855B 1"x3/4" TG-21159B SGL-21585B 3 GA-21103A PT-21584A PG-21162A STR-21854A SGL-21583A TG-21164A PG-21156A STR-21856A 1"x3/4" TG-21163A SGL-21582A
4 GA-21103B PT-21584B PG-21162B STR-21854B SGL-21583B TG-21164B PG-21156B STR-21856B 1"x3/4" TG-21163B SGL-21582B
5 GA-21103C PT-21584C PG-21162C STR-21854C SGL-21583C TG-21164C PG-21156C STR-21856C 1"x3/4" TG-21163C SGL-21582C
PUMP NO. "Q" SIGHT GLASS NO. "R"
1 GA-21102A 1-1/2"x3/4" SGL-21586A
2 GA-21102B 1-1/2"x3/4" SGL-21586B PUMP NO. "Q" SIGHT GLASS NO. "R"
3 GA-21103A 1-1/2"x3/4" SGL-21590A
4 GA-21103B 1-1/2"x3/4" SGL-21587B
5 GA-21103C 1-1/2"x3/4" SGL-21587C

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (5/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018E 00
CAD FILE :
53B-61 (BB) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
PI PI 2. DELETED.

L L

PG PG
"E" "E" SECL
VENDOR

FOR N2 FOR N2
CHARGING CHARGING
BLADDER BLADDER
ACCUMULATOR ACCUMULATOR
PT PT
"C" "C"
STR STR
FOR FOR
"F" "F"
FILLING FILLING

PLUGGED "I" PLUGGED "I"


SAE SAE
INLET INLET LC
"A" 206-00623 "A" 206-00623

TG TG
"G" SGL "G" SGL SGL
LC "H" LC "H" "H"
PLUGGED PLUGGED
"I" "I"
OUTLET RAE OUTLET RAE
"B" 206-00624 "B" 206-00624

PG PG
"L" "L"

FOR N2 FOR N2
NDE SEAL CHARGING NDE SEAL CHARGING
BLADDER BLADDER
ACCUMULATOR ACCUMULATOR
PI PT PI PT
"J" "J"
L STR L STR
FOR FOR
"M" FILLING "M" FILLING

PLUGGED PLUGGED
INLET INLET LC

TG TG
"N" SGL "N" SGL SGL
"O" "H" "O"
PLUGGED PLUGGED
OUTLET OUTLET

DE SEAL DE SEAL

PUMP NO. P&ID NO. SAE LINE. "A" RAE LINE "B' PT NO. "C" PG NO. "E" STRAINER NO. "F" TG NO. "G"
PUMP NO. P&ID NO. SAE LINE. "A" RAE LINE "B' PT NO. "C" PG NO. "E" STRAINER NO. "F" TG NO. "G"
1 GA-21101A R2B-P3-206-02-A-DTI-00102 2"-SAE-217033-T-A01T1-N 2"-RAE-217033-T-A01T1-N PT-21184A PG-21159A STR-21869A TG-21166A
2 GA-21101B R2B-P3-206-02-A-DTI-00102 2"-SAE-217034-T-A01T1-N 2"-RAE-217034-T-A01T1-N PT-21184B PG-21159B STR-21869B TG-21166B 1 GA-21104A R2B-P3-206-02-A-DTI-00120 2"-SAE-217042-T-A01T1-N 2"-RAE-217042-T-A01T1-N PT-21171A PG-21192A STR-21871A TG-21170A
3 GA-21110A R2B-P3-206-02-A-DTI-00131 2"-SAE-217031-T-A01T1-N 2"-RAE-217031-T-A01T1-N PT-21165A PG-21196A STR-21867A TG-21171A 2 GA-21104B R2B-P3-206-02-A-DTI-00120 2"-SAE-217043-T-A01T1-N 2"-RAE-217043-T-A01T1-N PT-21171B PG-21192B STR-21871B TG-21170B
4 GA-21110B R2B-P3-206-02-A-DTI-00131 2"-SAE-217032-T-A01T1-N 2"-RAE-217032-T-A01T1-N PT-21165B PG-21196B STR-21867B TG-21171B
5 GA-21203A R2B-P3-206-02-A-DTI-00214 2"-SAE-217044-T-A01T1-N 2"-RAE-217044-T-A01T1-N PT-21275A PG-21269A STR-21861A TG-21262A PUMP NO. SIGHT GLASS NO. "H" "I" PT NO. "J" PG NO. "L" STRAINER NO. "M" TG NO. "N" SIGHT GLASS NO. "O"
6 GA-21203B R2B-P3-206-02-A-DTI-00214 2"-SAE-217045-T-A01T1-N 2"-RAE-217045-T-A01T1-N PT-21275B PG-21269B STR-21861B TG-21262B
3 GA-21104A SGL-21874A 2"x1-1/2" PT-21172A PG-21188A STR-21872A TG-21180A SGL-21877A
7 GA-21204A R2B-P3-206-02-A-DTI-00216 2"-SAE-217027-T-A01T1-N 2"-RAE-217027-T-A01T1-N PT-21263A PG-21251A STR-21851A TG-21263A
4 GA-21104B SGL-21874B 2"x1-1/2" PT-21172B PG-21188B STR-21872B TG-21180B SGL-21877B
8 GA-21204B R2B-P3-206-02-A-DTI-00216 2"-SAE-217028-T-A01T1-N 2"-RAE-217028-T-A01T1-N PT-21263B PG-21251B STR-21851B TG-21263B

PUMP NO. SIGHT GLASS NO. "H" "I" PT NO. "J" PG NO. "L" STRAINER NO. "M" TG NO. "N" SIGHT GLASS NO. "O"
1 GA-21101A SGL-21889A 2"x1" PT-21186A PG-21186A STR-21870A TG-21168A SGL-21891A
2 GA-21101B SGL-21889B 2"x1" PT-21186B PG-21186B STR-21870B TG-21168B SGL-21891B
3 GA-21110A SGL-21870A 2"x1" PT-21166A PG-21190A STR-21868A TG-21181A SGL-21871A
4 GA-21110B SGL-21870B 2"x1" PT-21166B PG-21190B STR-21868B TG-21181B SGL-21871B
5 GA-21203A SGL-21880A 2"x1" PT-21277A PG-21273A STR-21863A TG-21264A SGL-21882A
6 GA-21203B SGL-21880B 2"x1" PT-21277B PG-21273B STR-21863B TG-21264B SGL-21882B
7 GA-21204A SGL-21868A 2"x1" PT-21266A PG-21277A STR-21866A TG-21267A SGL-21897A
8 GA-21204B SGL-21868B 2"x1" PT-21266B PG-21277B STR-21866B TG-21267B SGL-21897B
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (6/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018F 00
CAD FILE :
23-53A-61 (OH) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

SECL
VENDOR

TG SGL
LC "J" "K"

PI PT
"D" PCV
L
PLUGGED "E"
INLET

GI
"A" 206-00620

REFILL
"O"
SAE
PLUGGED "B" 206-00623
H DP SGL
LI OUTLET LT LG
"G" "F" "H"
L
"O"
RAE
"C" 206-00624

DRAIN

SEAL

PUMP NO. P&ID NO. GI LINE NO. "A" SAE LINE NO. "B' RAE LINE NO. "C" PT NO. "D" PCV NO. "E" LG NO. "F" LT NO. "G" SIGHT GLASS NO. "H" "O" TG NO. "J" SIGHT GLASS NO. "K"
1 GA-21107A R2B-P3-206-02-A-DTI-00119 3/4"-GI-217023-T-A03T1-N 2"-SAE-217023-T-A01T1-N 2"-RAE-217023-T-A01T1-N PT-21164A PCV-21152A LG-21161A LT-21161A SGL-21863A 2"x1" TG-21155A SGL-21864A
2 GA-21107B R2B-P3-206-02-A-DTI-00119 3/4"-GI-217024-T-A03T1-N 2"-SAE-217024-T-A01T1-N 2"-RAE-217024-T-A01T1-N PT-21164B PCV-21152B LG-21161B LT-21161B SGL-21863B 2"x1" TG-21155B SGL-21864B

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (7/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018G 00
CAD FILE :
11-53A (NON-API) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

LI H PI

L L

SECL
VENDOR
PT
"D"

PCV
"E"
GI
"A" 206-00620

REFILL
"J" PUMP NO. P&ID NO. GI LINE NO. "A" SAE LINE "B' RAE LINE "C" PT NO. "D" PCV NO. "E" LG NO. "F" LT NO. "G" SIGHT GLASS NO. "H" FO NO. "I" "J"
SAE
"B" 206-00623 1 GA-21108A R2B-P3-206-02-A-DTI-00129 3/4"-GI-217001-T-A03T1-N 2"-SAE-217009-T-A01T1-N 2"-RAE-217009-T-A01T1-N PT-21154A PCV-21151A LG-21154A LT-21154A SGL-21856A FO-21159A 2" x 1/2"
DP SGL 2 GA-21108B R2B-P3-206-02-A-DTI-00129 3/4"-GI-217002-T-A03T1-N 2"-SAE-217010-T-A01T1-N 2"-RAE-217010-T-A01T1-N PT-21154B PCV-21151B LG-21154B LT-21154B SGL-21856B FO-21159B 2" x 1/2"
LT LG
"G" "F" "H"
"J" RAE
"C" 206-00624
FO
"I"
DRAIN

SEAL

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (8/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018H 00
CAD FILE :
53A-61 (VS) GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

PI PT SECL
"D" VENDOR
L PCV
"E"

GI
LI H
"A" 206-00620
L

REFILL
"I"
SAE
"B" 206-00623
DP SGL
LT LG PUMP NO. P&ID NO. GI LINE NO. "A" SAE LINE "B' RAE LINE "C PT NO. "D" PCV NO. "E" LG NO. "F" LT NO. "G" SIGHT GLASS NO. "H" "I"
"G" "F" "H"
1 GA-21603A R2B-P3-206-02-A-DTI-00609 3/4"-GI-217021-T-A03T1-N 2"-SAE-217052-T-A01T1-N 2"-RAE-217052-T-A01T1-N PT-21680A PCV-21661A LG-21670A LT-21670A SGL-21885A 2"x1/2"
"I" 2 GA-21603B R2B-P3-206-02-A-DTI-00609 3/4"-GI-217022-T-A03T1-N 2"-SAE-217053-T-A01T1-N 2"-RAE-217053-T-A01T1-N PT-21680B PCV-21661B LG-21670B LT-21670B SGL-21885B 2"x1/2"
RAE
"C" 206-00624 3 GA-21608A R2B-P3-206-02-A-DTI-00505 3/4"-GI-217025-T-A03T1-N 2"-SAE-217056-T-A01T1-N 2"-RAE-217056-T-A01T1-N PT-21582A PCV-21563A LG-21572A LT-21572A SGL-21887A 2"x1/2"
4 GA-21608B R2B-P3-206-02-A-DTI-00505 3/4"-GI-217026-T-A03T1-N 2"-SAE-217057-T-A01T1-N 2"-RAE-217058-T-A01T1-N PT-21582B PCV-21563B LG-21572B LT-21572B SGL-21887B 2"x1/2"

DRAIN PLUGGED
INLET

DISCHARGE
PLUGGED
OUTLET

SUCTION

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. PUMP SEAL DETAILS (9/9)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018I 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
HH HH HH HH HH
IS TI H TI H HH
TI H TI H IS
"K" "A" "B" "C" "D" "K"

MMS MMS

TE TE TE TE
"A" "B" "C" "D"

MOTOR BEARING (DE) MOTOR BEARING (NDE)

MOTOR
MOTOR WINDING
TEMPERATURE DETECTOR

TE TE TE TE TE TE
"E" "F" "G" "H" "I" "J"

MCC

DE NDE XS TAG NO XS TAG NO


TE (BEARING RTD) TE (WINDING RTD)
PUMP NO. H
A B C D E F G I J K L
1 GA-21101A TE-21164A TE-21164B TE-21164C TE-21164D TE-21164E TE-21164F TE-21164G TE-21164H TE-21164I TE-21164J IS-21105 XS-21962
2 GA-21101B TE-21165A TE-21165B TE-21165C TE-21165D TE-21165E TE-21165F TE-21165G TE-21165H TE-21165I TE-21165J IS-21105 XS-21963
3 GA-21103B TE-21585BA TE-21585BB TE-21584BA TE-21584BB TE-21584BE TE-21584BF TE-21584BG TE-21584BH TE-21584BI TE-21584BJ IS-21101 XS-21978
4 GA-21103C TE-21585CA TE-21585CB TE-21584CA TE-21584CB TE-21584CE TE-21584CF TE-21584CG TE-21584CH TE-21584CI TE-21584CJ IS-21102 XS-21979
3 GA-21104A TE-21166A TE-21166B TE-21166C TE-21166D TE-21166E TE-21166F TE-21166G TE-21166H TE-21166I TE-21166J IS-21106 XS-21964
3 GA-21104B TE-21167A TE-21167B TE-21167C TE-21167D TE-21167E TE-21167F TE-21167G TE-21167H TE-21167I TE-21167J IS-21106 XS-21965
3 GA-21105A TE-21168A TE-21168B TE-21168C TE-21168D TE-21168E TE-21168F TE-21168G TE-21168H TE-21168I TE-21168J IS-21108 XS-21966
3 GA-21105B TE-21169A TE-21169B TE-21169C TE-21169D TE-21169E TE-21169F TE-21169G TE-21169H TE-21169I TE-21169J IS-21108 XS-21967
3 GA-21110A TE-21183A TE-21183B TE-21183C TE-21183D TE-21183E TE-21183F TE-21183G TE-21183H TE-21183I TE-21183J IS-21109 XS-21968
3 GA-21110B TE-21184A TE-21184B TE-21184C TE-21184D TE-21184E TE-21184F TE-21184G TE-21184H TE-21184I TE-21184J IS-21109 XS-21969
3 GA-21203A TE-21260A TE-21260B TE-21260C TE-21260D TE-21260E TE-21260F TE-21260G TE-21260H TE-21260I TE-21260J IS-21202 XS-21970
3 GA-21203B TE-21261A TE-21261B TE-21261C TE-21261D TE-21261E TE-21261F TE-21261G TE-21261H TE-21261I TE-21261J IS-21202 XS-21971
3 GA-21204A TE-21262A TE-21262B TE-21262C TE-21262D TE-21262E TE-21262F TE-21262G TE-21262H TE-21262I TE-21262J IS-21203 XS-21972
3 GA-21204B TE-21263A TE-21263B TE-21263C TE-21263D TE-21263E TE-21263F TE-21263G TE-21263H TE-21263I TE-21263J IS-21203 XS-21973
3 GA-21208A TE-21264A TE-21264B TE-21264C TE-21264D TE-21264E TE-21264F TE-21264G TE-21264H TE-21264I TE-21264J IS-21207 XS-21974
3 GA-21208B TE-21265A TE-21265B TE-21265C TE-21265D TE-21265E TE-21265F TE-21265G TE-21265H TE-21265I TE-21265J IS-21207 XS-21975

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
C.M.G.B
2 ISSUE FOR CONSTRUCTION 30 Sep 23 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
REVIEWED
Infraestructura de DBNR
SIMA REVIEW
E.A.M.V Desarrollo, S.A. de C.V. MACHINE MONITORING SYSTEM(MMS) FOR PUMPS
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
C.A.G.D COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00018J 2
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

NOTES :
1. DELETED.
2. DELETED.
CL CL
3. GUAGE GLASS MUST BE READABLE FROM VALVE.
MIN.
4. PROVIDE ADEQUATE STIFFENING.
5. FROM LOW POINT DRAIN.

NOTE 4
3/4"

LG T

300
TIGHT ANCHOR 3/4"

NOTE 4 NOTE 3
NOTE 4
1"
"F"
NOTE 5 NOTE 5 EC(ST)
N
"E" "D"
"A"
SPECIAL PWHT

B1A2-NACE B1A2-NACE
SPECIAL PWHT SPECIAL PWHT
T-A60T1 T-A60T1
"B" "C"

DAA DAC
206-00635 206-00633

DETAIL "CLD"

DETAIL OF DRAIN CONNECTION IN LOW POINTS OF WET GAS COMPRESSOR SUCTION LINES.
AT LEAST ONE MUST BE BETWEEN EACH COMPRESSOR SHUTOFF VALVE AND COMPRESSOR NOZZLE
VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE COMPRESSOR.

P&ID NO. LINE NO. "A" LINE NO. "B" LINE NO. "C" LINE NO. "D" (SUCTION LINE) LINE NO. "E" (DISCHARGE LINE) LINE NO. "F" LG TAG NO.
1 206-00205 3"-P-212914-B1A2-NACE-N 3"-DAA-212914-T-A60T1-N 3"-DAC-212914-T-A60T1-N 3"-P-212916-B1A2-NACE-N 3"-P-212918-B2A2-NACE-N 1"-P-212001-B1A2-NACE-EC(ST) LG-21205
2 206-00206 2"-P-212915-B1A2-NACE-N 2"-DAA-212915-T-A60T1-N 2"-DAC-212915-T-A60T1-N 2"-P-212917-B1A2-NACE-N 2"-P-212919-B2A2-NACE-N 1"-P-212011-B1A2-NACE-EC(ST) LG-21206

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. UNIT SPECIFIC DETAILS AND NOTES 11
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00019 00
CAD FILE :
TYPE A TYPE B GENERAL NOTES :
NON HAZARDOUS AND LOW TEMPERATURE LIQUID SAMPLE LOW TEMPERATURE GAS OR FLASHING LIQUID OR HAZARDOUS LIQUID SAMPLE 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
(TEMPERATURE < 50°C) (TEMPERATURE < 50°C) 2. DELETED.

NOTE 3, 13, 16 NOTE 3, 13, 16 SECL


3/4" NOTE 2 3/4" NOTE 3, 13, 16 3/4" NOTE 2 3/4" NOTE 3, 13, 16
VENDOR

MIN.

MIN.

MIN.

MIN.
DELTA P DEVICE DELTA P DEVICE
COLD LIQUID LINE
NOTE 5 NOTE 5 NOTE 5 NOTE 5

3/4"x1/2" 3/4"x1/2"
NOTE 13 NOTE 13
NOTE 14 NOTE 14

NOTES :
1. FOR OPERATING PRESSURE UNDER 125KG/CM2G USE SWAGELOCK QUICK-CONNECTS.
1/2"
STEMS : SS-QT8-5-8PM
BODIES : SS-QT8-8-8PM
OR EQUAL.
FOR OPERATING PRESSURE ABOVE 125KG/CM2G USE SWAGELOCK QUICK-CONNECTS.
3/4" x 1/4" 1/2" NEEDLE VALVE 1/2"

MAX. 300 mm
STEMS : SS-QT2-5-4PM
BODIES : SS-QT2-8-4PM
1/2" 3/4"x1/2" "A" OR EQUAL.
TO FLARE
NOTE 9 2. DELTA P DEVICE IS ANY DEVICE OR INSTRUMENT THAT CREATES A PRESSURE DROP TO ENSURE
MIN.

MIN.

MIN.
1/4" A SUFFICIENT FLOW THROUGH THE LOOP. SAMPLE INLET AND RETURN CONNECTIONS MUST HAVE A
1/4" NIPPLE PG MINIMUM PRESSURE DIFFERENTIAL OF 10 PSI (0.7KG/CM2) TO MAINTAIN FLOW THROUGH SAMPLE
NOTE 15 "B" CYLINDER.
3. USE DOUBLE BLOCK FOR ANY CLASS 900# LINES OR HIGHER AND FOR H2 OR H2S SERVICES FOR
1/2" x 1/4" 1/2" x 1/4" ANY CLASS 600# LINES OR HIGHER.
"A" 3/4" NOTE 6, 7
FLEXIBLE HOSE 4. FOR OPERATING PRESSURE UNDER 125KG/CM2G USE WHITEY 304L-HDF4-300 SAMPLE BOTTLE OR
EQUAL FOR OPERATING PRESSURE 125KG/CM2G AND ABOVE USE XXS 304L PIPE CYLINDER.
5. TAKE SAMPLE CONNECTION FROM TOP HORIZONTAL LINE.
300 CC EVACUATED (VACUUM)
6. ALL SAMPLING BOMBS SHOWN ON THIS PID SHOULD BE EQUIPPED WITH BLOCK VALVES ON EACH SIDE.
OR NITROGEN PURGED 1/4" SWAGELOCK QUICK-CONNECT
DAA SAMPLE CONTAINER FITTING OR EQUAL 7. A SUPPORT FOR THE CYLINDER "BOMB" SHALL BE FORESEEN.
NOTE 4 NOTE 1
206-00635 8. SAMPLING SYSTEM LENGTH MUST BE MINIMUM TO LIMIT THE PRODUCT LOST WHEN FLUSHING.
9. ROUTE TO APPROPRIATE FLARE HEADER (DAP/DBP) AS REQUIRED.
FLARE CONNECTION IS NOT REQUIRED FOR WATER SERVICE LIKE CONDENSATE.
EQUIPMENT WITH UOP "A" TYPE
10. SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE SHALL BE AS INDICATED
AT THE SAMPLE POINT LOCATION ON THE PIPING AND INSTRUMENT DIAGRAM. WHEN HEAT TRACING
IS REQUIRED. THE CLOSED SAMPLING SYSTEM SHALL INCLUDE A HEATED ENCLOSURE.
11. VALVES AND PIPING INDICATED AT SAMPLING DETAILS SHALL BE OF THE SAME METALLURGY TYPE AND
CLASS AS SHOWN ON THE PIPING AND INSTRUMENT DIAGRAM.
12. AT LOCATIONS WHERE A CLASS BREAK IS INDICATED. THE CONTRACTOR SHALL INCLUDE PROPER
CLASS BREAK AT THE SAMPLE ASSEMBLY. CLASS BREAK SHALL BE OF SAME TYPE AS SHOWN ON THE
PIPING AND INSTRUMENT DIAGRAM.
13. DEPICTED ON THE P&ID AT THE INDIVIDUAL SERVICE.
ITEM TYPE P&ID NO. TO OPEN DRAIN LINE "A" ITEM TYPE P&ID NO. TO FLARE "A" PG NO. "B"
14. IN ADDITION TO THE ITEMS DEPICTED AT THE INDIVIDUAL SERVICE INCLUDING FLARE / DRAIN / UTILITY
SC-21110 A R2B-P3-206-02-A-DTI-00124 3/4"-P-218046-T-A60T1-N SC-21109 B R2B-P3-206-02-A-DTI-00117 3/4"-DBP-218001-T-A63T1-N PG-21838 LINES.
SC-21111 A R2B-P3-206-02-A-DTI-00125 3/4"-P-218047-T-A60T1-N SC-21112 B R2B-P3-206-02-A-DTI-00129 3/4"-DBP-218002-T-A63T1-N PG-21839
15. BEVEL ALL OPEN ENDS OF SAMPLE CONNECTIONS AT A 45° ANGLE WITH 75MM MINIMUM EXTENSION.
SC-21503 A R2B-P3-206-02-A-DTI-00502 3/4"-P-218054-T-A60T1-N SC-21202 B R2B-P3-206-02-A-DTI-00213 3/4"-DAP-218003-T-A63T1-N PG-21840
SC-21206 B R2B-P3-206-02-A-DTI-00223 3/4"-DAP-218004-T-A63T1-N PG-21841 16. LINE NUMBER TO BE SPECIFIED ON THE DEDICATED DRAWING.
SC-21505 B R2B-P3-206-02-A-DTI-00504 3/4"-DAP-211853-T-A63T1-N PG-21848 17. LIGHT WEIGHT LINES( ) INDICATE ITEMS WHICH ARE DEPICTED ON THE
SC-21403 B R2B-P3-206-02-A-DTI-00407 3/4"-DAP-218010-T-A63T1-N PG-21810 P&ID AT THE INDIVIDUAL SERVICE
HEAVY WEIGHT LINES( ) INDICATE ITEMS WHICH ARE IN ADDITION TO THE
SC-21404 B R2B-P3-206-02-A-DTI-00407 3/4"-DAP-218011-T-A63T1-N PG-21811
ITEMS DEPICTED AT THE INDIVIDUAL SERVICE.
SC-21406 B R2B-P3-206-02-A-DTI-00408 3/4"-DAP-218012-T-A63T1-N PG-21812
SC-21407 B R2B-P3-206-02-A-DTI-00413 3/4"-DAP-218013-T-A63T1-N PG-21813
SC-21408 B R2B-P3-206-02-A-DTI-00416 3/4"-DAP-218014-T-A63T1-N PG-21814
SC-21409 B R2B-P3-206-02-A-DTI-00410 3/4"-DAP-218015-T-A63T1-N PG-21815
SC-21501 B R2B-P3-206-02-A-DTI-00501 3/4"-DAP-211851-T-A63T1-N PG-21846
SC-21502 B R2B-P3-206-02-A-DTI-00501 3/4"-DAP-211852-T-A63T1-N PG-21847
SC-21504 B R2B-P3-206-02-A-DTI-00503 3/4"-DAP-218016-T-A63T1-N PG-21816

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. SAMPLING CONNECTION POINT DETAILS (1/5)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00020A 00
CAD FILE :
TYPE D TYPE E GENERAL NOTES :
LOW TEMPERATURE GAS OR FLASHING LIQUID OR HAZARDOUS LIQUID SAMPLE NON HAZARDOUS AND HIGH TEMPERATURE LIQUID SAMPLE 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
(TEMPERATURE < 50°C) (TEMPERATURE > 50°C) 2. DELETED.

SECL
3/4" NOTE 3, 17 3/4" NOTE VENDOR
3,14,17
MIN.

MIN.
HOT LIQUID LINE

NOTE 5 NOTE 5
PERSONNEL
PROTECTION

3/4"x1/2" 3/4"x1/2"
NOTE 13 NOTE 14
NOTE 14 NOTE 15
1/2" "E" RAE
206-00624
NOTES :
1. FOR OPERATING PRESSURE UNDER 125KG/CM2G USE SWAGELOCK QUICK-CONNECTS.
1/2" 3/4"
STEMS : SS-QT8-5-8PM
NOTE 7 3/4" BODIES : SS-QT8-8-8PM
"D" SAE
206-00623 OR EQUAL.
1/2" FOR OPERATING PRESSURE ABOVE 125KG/CM2G USE SWAGELOCK QUICK-CONNECTS.
1/2" NEEDLE VALVE STEMS : SS-QT2-5-4PM
BODIES : SS-QT2-8-4PM
1/2" 3/4"x1/2" "A" TG OR EQUAL.
TO FLARE
NOTE 10 "F" 2. DELTA P DEVICE IS ANY DEVICE OR INSTRUMENT THAT CREATES A PRESSURE DROP TO ENSURE
MIN.

MIN. A SUFFICIENT FLOW THROUGH THE LOOP. SAMPLE INLET AND RETURN CONNECTIONS MUST HAVE A
PG MINIMUM PRESSURE DIFFERENTIAL OF 10 PSI (0.7KG/CM2) TO MAINTAIN FLOW THROUGH SAMPLE

3/4"
"B" T-A63T1 CYLINDER.
1/2"
T-A60T1
"C" 3. USE DOUBLE BLOCK FOR ANY CLASS 900# LINES OR HIGHER AND FOR H2 OR H2S SERVICES FOR
1/2" x 1/4" 1/2" x 1/4" ANY CLASS 600# LINES OR HIGHER.
NOTE 6, 8 1/2"x1/4" 4. FOR OPERATING PRESSURE UNDER 125KG/CM2G USE WHITEY 304L-HDF4-300 SAMPLE BOTTLE OR
FLEXIBLE HOSE
EQUAL FOR OPERATING PRESSURE 125KG/CM2G AND ABOVE USE XXS 304L PIPE CYLINDER.
5. TAKE SAMPLE CONNECTION FROM TOP HORIZONTAL LINE.
1/4"
300 CC EVACUATED (VACUUM)
DAC 1/4" NIPPLE 6. ALL SAMPLING BOMBS SHOWN ON THIS PID SHOULD BE EQUIPPED WITH BLOCK VALVES ON EACH SIDE.
OR NITROGEN PURGED 1/4" SWAGELOCK QUICK-CONNECT
SAMPLE CONTAINER FITTING OR EQUAL 206-00638 NOTE 16 7. THE COOLING BOX SHALL BE INTERNALLY COVERED WITH "EPOXY" THE COIL SHALL BE TUBING SPEC
NOTE 4 NOTE 1 OR SS.

"B" "C" 3/4" 8. A SUPPORT FOR THE CYLINDER "BOMB" SHALL BE FORESEEN.
9. SAMPLING SYSTEM LENGTH MUST BE MINIMUM TO LIMIT THE PRODUCT LOST WHEN FLUSHING.
EQUIPMENT WITH UOP "B" TYPE
10. ROUTE TO APPROPRIATE FLARE HEADER (DAP/DBP) AS REQUIRED.
FLARE CONNECTION IS NOT REQUIRED FOR WATER SERVICE LIKE CONDENSATE.
11. SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE SHALL BE AS INDICATED
AT THE SAMPLE POINT LOCATION ON THE PIPING AND INSTRUMENT DIAGRAM. WHEN HEAT TRACING
DAA DAA
IS REQUIRED. THE CLOSED SAMPLING SYSTEM SHALL INCLUDE A HEATED ENCLOSURE.
206-00635 206-00635
12. VALVES AND PIPING INDICATED AT SAMPLING DETAILS SHALL BE OF THE SAME METALLURGY TYPE AND
CLASS AS SHOWN ON THE PIPING AND INSTRUMENT DIAGRAM.
13. AT LOCATIONS WHERE A CLASS BREAK IS INDICATED. THE CONTRACTOR SHALL INCLUDE PROPER
CLASS BREAK AT THE SAMPLE ASSEMBLY. CLASS BREAK SHALL BE OF SAME TYPE AS SHOWN ON THE
ITEM TYPE P&ID NO. TO FLARE "A" PG NO. "B" TO DRAIN "C" ITEM TYPE P&ID NO. TO DRAIN "B" TO DRUM "C" FROM SAE "D" TO RAE "E" TG NO. "F"
PIPING AND INSTRUMENT DIAGRAM.
SC-21113 D R2B-P3-206-02-A-DTI-00128 3/4"-DBP-218017-T-A63T1-N PG-21817 3/4"-DAC-218062-T-A60T1-N SC-21005 E R2B-P3-206-02-A-DTI-00074 3/4"-DAA-218027-T-A60T1-N 3/4"-DAA-218053-T-A60T1-N 3/4"-SAE-218027-T-A01T1-N 3/4"-RAE-218027-T-A01T1-N TG-21801 14. DEPICTED ON THE P&ID AT THE INDIVIDUAL SERVICE.
SC-21201 D R2B-P3-206-02-A-DTI-00213 3/4"-DAP-218018-T-A63T1-N PG-21818 - SC-21006 E R2B-P3-206-02-A-DTI-00074 3/4"-DAA-218028-T-A60T1-N 3/4"-DAA-218054-T-A60T1-N 3/4"-SAE-218028-T-A01T1-N 3/4"-RAE-218028-T-A01T1-N TG-21802
15. IN ADDITION TO THE ITEMS DEPICTED AT THE INDIVIDUAL SERVICE INCLUDING FLARE / DRAIN / UTILITY
SC-21203 D R2B-P3-206-02-A-DTI-00219 3/4"-DAP-218019-T-A63T1-N PG-21819 - SC-21103 E R2B-P3-206-02-A-DTI-00110 3/4"-DAA-218029-T-A60T1-N 3/4"-DAA-218055-T-A60T1-N 3/4"-SAE-218029-T-A01T1-N 3/4"-RAE-218029-T-A01T1-N TG-21803 LINES.
SC-21204 D R2B-P3-206-02-A-DTI-00222 3/4"-DAP-218020-T-A63T1-N PG-21820 3/4"-DAC-218063-T-A60T1-N SC-21104 E R2B-P3-206-02-A-DTI-00110 3/4"-DAA-218030-T-A60T1-N 3/4"-DAA-218056-T-A60T1-N 3/4"-SAE-218030-T-A01T1-N 3/4"-RAE-218030-T-A01T1-N TG-21804
16. BEVEL ALL OPEN ENDS OF SAMPLE CONNECTIONS AT A 45° ANGLE WITH 75MM MINIMUM EXTENSION.
SC-21401 D R2B-P3-206-02-A-DTI-00401 3/4"-DAP-218026-T-A63T1-N PG-21826 3/4"-DAC-218064-T-A60T1-N SC-21105 E R2B-P3-206-02-A-DTI-00111 3/4"-DAA-218031-T-A60T1-N 3/4"-DAA-218057-T-A60T1-N 3/4"-SAE-218031-T-A01T1-N 3/4"-RAE-218031-T-A01T1-N TG-21805
SC-21106 E R2B-P3-206-02-A-DTI-00111 3/4"-DAA-218032-T-A60T1-N 3/4"-DAA-218058-T-A60T1-N 3/4"-SAE-218032-T-A01T1-N 3/4"-RAE-218032-T-A01T1-N TG-21806 17. LINE NUMBER TO BE SPECIFIED ON THE DEDICATED DRAWING.
SC-21107 E R2B-P3-206-02-A-DTI-00112 3/4"-DAA-218033-T-A60T1-N 3/4"-DAA-218059-T-A60T1-N 3/4"-SAE-218033-T-A01T1-N 3/4"-RAE-218033-T-A01T1-N TG-21807 18. LIGHT WEIGHT LINES( ) INDICATE ITEMS WHICH ARE DEPICTED ON THE
SC-21108 E R2B-P3-206-02-A-DTI-00112 3/4"-DAA-218034-T-A60T1-N 3/4"-DAA-218060-T-A60T1-N 3/4"-SAE-218034-T-A01T1-N 3/4"-RAE-218034-T-A01T1-N TG-21808 P&ID AT THE INDIVIDUAL SERVICE
HEAVY WEIGHT LINES( ) INDICATE ITEMS WHICH ARE IN ADDITION TO THE
ITEMS DEPICTED AT THE INDIVIDUAL SERVICE.

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. SAMPLING CONNECTION POINT DETAILS (2/5)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00020B 00
CAD FILE :
TYPE F TYPE G GENERAL NOTES :
NON HAZARDOUS AND HIGH TEMPERATURE AND HIGH POUR POINT HIGH TEMPERATURE GAS OR FLASHING LIQUID SAMPLE 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
(TEMPERATURE > 50°C) (TEMPERATURE > 50°C) 2. DELETED.

MIN.

SECL
1" NOTE 3/4" NOTE VENDOR
2,14,17 2,14,17

MIN.
MIN.
HOT LIQUID LINE

NOTE 4 NOTE 4
PERSONNEL
T-B03T1
PROTECTION
MIN.
3/4"x1/2"
ALA "F" NOTE 14
206-00630 NOTE 15
1" EC(ST) "D" RAE
206-00624
NOTES :
1"x1/2" 1. FOR OPERATING PRESSURE UNDER 125KG/CM2G USE SWAGELOCK QUICK-CONNECTS.
NOTE 14 3/4"
STEMS : SS-QT8-5-8PM
NOTE 7 3/4" BODIES : SS-QT8-8-8PM
NOTE 15 "C" SAE
206-00623 OR EQUAL.
1/2" "E" RAE 1/2" FOR OPERATING PRESSURE ABOVE 125KG/CM2G USE SWAGELOCK QUICK-CONNECTS.
206-00624 STEMS : SS-QT2-5-4PM
BODIES : SS-QT2-8-4PM
3/4" TG OR EQUAL.
NOTE 7
VB "H" 1/2" 1/2" 3/4" "D" SAE "E" 2. USE DOUBLE BLOCK FOR ANY CLASS 900# LINES OR HIGHER AND FOR H2 OR H2S SERVICES FOR
206-00617 206-00623 ANY CLASS 600# LINES OR HIGHER.
1/2" 1/2" DEPRESSURE LINE
3. FOR OPERATING PRESSURE UNDER 125KG/CM2G USE WHITEY 304L-HDF4-300 SAMPLE BOTTLE OR

MAX. 300 mm
EQUAL FOR OPERATING PRESSURE 125KG/CM2G AND ABOVE USE XXS 304L PIPE CYLINDER.
1/2" 3/4"x1/2" "A"

NOTE 9
TG 4. TAKE SAMPLE CONNECTION FROM TOP HORIZONTAL LINE.

MIN.
TO FLARE
"I" 1/2" NEEDLE VALVE NOTE 10 5. BEVEL ALL OPEN ENDS OF SAMPLE CONNECTIONS AT 45' ANGLE WITH 75MM MINIMUM EXTENSION.
PG 6. ALL SAMPLING BOMBS SHOWN ON THIS PID SHOULD BE EQUIPPED WITH BLOCK VALVES ON EACH SIDE.

MIN.
1/2" "F" 7. THE COOLING BOX SHALL BE INTERNALLY COVERED WITH "EPOXY" THE COIL SHALL BE TUBING SPEC
1/2" 3/4"x1/2" "A" OR SS.
TO FLARE 1/2"x1/4" 1/2"x1/4" 8. A SUPPORT FOR THE CYLINDER "BOMB" SHALL BE FORESEEN.
MIN.

NOTE 10
NOTE 6, 8
1/2"x1/4" FLEXIBLE HOSE 9. SAMPLING SYSTEM LENGTH MUST BE MINIMUM TO LIMIT THE PRODUCT LOST WHEN FLUSHING.
10. ROUTE TO APPROPRIATE FLARE HEADER (DAP/DBP) AS REQUIRED.
1/4" FLARE CONNECTION IS NOT REQUIRED FOR WATER SERVICE LIKE CONDENSATE.
300 CC EVACUATED (VACUUM)
1/4" NIPPLE OR NITROGEN PURGED 1/4" SWAGELOCK QUICK-CONNECT 11. SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE SHALL BE AS INDICATED
SAMPLE CONTAINER FITTING OR EQUAL AT THE SAMPLE POINT LOCATION ON THE PIPING AND INSTRUMENT DIAGRAM. WHEN HEAT TRACING
NOTE 5, 16
NOTE 3 NOTE 1 IS REQUIRED. THE CLOSED SAMPLING SYSTEM SHALL INCLUDE A HEATED ENCLOSURE.
FROM 12. VALVES AND PIPING INDICATED AT SAMPLING DETAILS SHALL BE OF THE SAME METALLURGY TYPE AND
"B" "C" 1/2" OTHER "B" CLASS AS SHOWN ON THE PIPING AND INSTRUMENT DIAGRAM.
DRAIN "G" EQUIPMENT WITH UOP "B" TYPE
(WITH SAMPLE COOLER) 13. AT LOCATIONS WHERE A CLASS BREAK IS INDICATED. THE CONTRACTOR SHALL INCLUDE PROPER
CLASS BREAK AT THE SAMPLE ASSEMBLY. CLASS BREAK SHALL BE OF SAME TYPE AS SHOWN ON THE
PIPING AND INSTRUMENT DIAGRAM.
14. DEPICTED ON THE P&ID AT THE INDIVIDUAL SERVICE.
DAA DAA DAA 15. IN ADDITION TO THE ITEMS DEPICTED AT THE INDIVIDUAL SERVICE INCLUDING FLARE / DRAIN / UTILITY
206-00635 206-00635 206-00635 LINES.
16. PROVIDE CLEARANCE AND ACCESS FOR DRUM.
17. LINE NUMBER TO BE SPECIFIED ON THE DEDICATED DRAWING.
18. LIGHT WEIGHT LINES( ) INDICATE ITEMS WHICH ARE DEPICTED ON THE
P&ID AT THE INDIVIDUAL SERVICE
HEAVY WEIGHT LINES( ) INDICATE ITEMS WHICH ARE IN ADDITION TO THE
ITEM TYPE TO FLARE "A" TO OPEN DRAIN "B" TO OPEN DRAIN "C" ITEM TYPE TO FLARE "A" TO OPEN DRAIN "B" FROM SAE "C" TO RAE "D" ITEMS DEPICTED AT THE INDIVIDUAL SERVICE.
P&ID NO. P&ID NO.
19. LINE & VALVE SIZE ARE NOT SAME WITH GENERAL & LEGEND DWG 206-00001E AS THE PROCESS LINE
SC-21114 F R2B-P3-206-02-A-DTI-00115 3/4"-DBP-218039-T-A63T1-N 3/4"-DAA-218039-T-A60T1-N 3/4"-DAA-218061-T-A60T1-N SC-21001 G R2B-P3-206-02-A-DTI-00061A 3/4"-DBP-218040-T-A63T1-N 3/4"-DAA-218040-T-A60T1-N 3/4"-SAE-218040-T-A01T1-N 3/4"-RAE-218040-T-A01T1-N MATERIAL IS H2A4. (MINIMUM 1")
NOTE 19 SC-21004 G R2B-P3-206-02-A-DTI-00073 3/4"-DBP-218041-T-A63T1-N 3/4"-DAA-218041-T-A60T1-N 3/4"-SAE-218041-T-A01T1-N 3/4"-RAE-218041-T-A01T1-N
SC-21208 G R2B-P3-206-02-A-DTI-00229 3/4"-DBP-218045-T-A63T1-N 3/4"-DAA-218045-T-A60T1-N 3/4"-SAE-218045-T-A01T1-N 3/4"-RAE-218045-T-A01T1-N

ITEM FROM SAE "D" TO RAE "E" FLUSHING OIL LINE "F" LP STEAM LINE "H" TG NO. "I"
SC-21114 3/4"-SAE-218039-T-A01T1-N 3/4"-RAE-218039-T-A01T1-N 1"-ALA-218039-T-B03T1-N 3/4"-VB-218039-T-A18T1-EC TG-21813
NOTE 19 ITEM TYPE P&ID NO. TG NO. "E" PG NO. "F" FROM DRAIN "G"
SC-21001 G R2B-P3-206-02-A-DTI-00061A TG-21814 PG-21827 -
SC-21004 G R2B-P3-206-02-A-DTI-00073 TG-21815 PG-21828 1/2"-DAA-210084-T-A60T1-N
SC-21208 G R2B-P3-206-02-A-DTI-00229 TG-21819 PG-21832 -

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. SAMPLING CONNECTION POINT DETAILS (3/5)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00020C 00
CAD FILE :
TYPE H TYPE K GENERAL NOTES :
NON HAZARDOUS AND HIGH TEMPERATURE LIQUID SAMPLE HIGH TEMPERATURE GAS OR FLASHING LIQUID SAMPLE 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
(TEMPERATURE > 50°C) (TEMPERATURE > 50°C) 2. DELETED.

SECL
3/4" NOTE 3,14,18 HIGH SPEC 3/4" NOTE 3/4"
3/4" NOTE NOTE 3,14,18
NOTE 2 3,14,18 NOTE 2 VENDOR
3,14,18

MIN.

MIN.

MIN.
MIN.
DELTA P DEVICE HOT LIQUID LINE DELTA P DEVICE

NOTE 5 NOTE 5 NOTE 5

EC(ST)

3/4"x1/2"
NOTE 14 NOTE 14
NOTE 15 NOTE 15
1/2" "E" RAE 1/2" "D" RAE
NOTES :

MIN.
206-00624 206-00624
1. FOR OPERATING PRESSURE UNDER 125KG/CM2G USE SWAGELOCK QUICK-CONNECTS.
3/4" 3/4"
NOTE 7 STEMS : SS-QT8-5-8PM
3/4" NOTE 7 3/4" BODIES : SS-QT8-8-8PM
"D" SAE "C" SAE
206-00623 206-00623 OR EQUAL.
1/2" 1/2" FOR OPERATING PRESSURE ABOVE 125KG/CM2G USE SWAGELOCK QUICK-CONNECTS.
STEMS : SS-QT2-5-4PM
BODIES : SS-QT2-8-4PM
TG TG OR EQUAL.
"F" "E" 2. DELTA P DEVICE IS ANY DEVICE OR INSTRUMENT THAT CREATES A PRESSURE DROP TO ENSURE
A SUFFICIENT FLOW THROUGH THE LOOP. SAMPLE INLET AND RETURN CONNECTIONS MUST HAVE A
1/2"
MINIMUM PRESSURE DIFFERENTIAL OF 10 PSI (0.7KG/CM2) TO MAINTAIN FLOW THROUGH SAMPLE
1/2" CYLINDER.
1/2" 3/4"x1/2" "A" 3/4"x1/2" 3. USE DOUBLE BLOCK FOR ANY CLASS 900# LINES OR HIGHER AND FOR H2 OR H2S SERVICES FOR
TO FLARE ANY CLASS 600# LINES OR HIGHER.
NOTE 10
MIN.

1/2" x 1/4" 3/4"x1/2" 4. FOR OPERATING PRESSURE UNDER 125KG/CM2G USE WHITEY 304L-HDF4-300 SAMPLE BOTTLE OR
1/2" 3/4"x1/2" "A"
TO FLARE EQUAL FOR OPERATING PRESSURE 125KG/CM2G AND ABOVE USE XXS 304L PIPE CYLINDER.

MIN.

MIN.
1/2" NEEDLE VALVE
NOTE 10 5. TAKE SAMPLE CONNECTION FROM TOP HORIZONTAL LINE.
1/4"
1/4" NIPPLE PG 6. ALL SAMPLING BOMBS SHOWN ON THIS PID SHOULD BE EQUIPPED WITH BLOCK VALVES ON EACH SIDE.
1/2"x1/4"
NOTE 16, 17 "F" 7. THE COOLING BOX SHALL BE INTERNALLY COVERED WITH "EPOXY" THE COIL SHALL BE TUBING SPEC
NOTE 6, 8
FLEXIBLE HOSE 1/2"x1/4" OR SS.
8. A SUPPORT FOR THE CYLINDER "BOMB" SHALL BE FORESEEN.
"B" "C" 3/4"
300 CC EVACUATED (VACUUM) 9. SAMPLING SYSTEM LENGTH MUST BE MINIMUM TO LIMIT THE PRODUCT LOST WHEN FLUSHING.
OR NITROGEN PURGED 1/4" SWAGELOCK QUICK-CONNECT
10. ROUTE TO APPROPRIATE FLARE HEADER (DAP/DBP) AS REQUIRED.
SAMPLE CONTAINER FITTING OR EQUAL FLARE CONNECTION IS NOT REQUIRED FOR WATER SERVICE LIKE CONDENSATE.
NOTE 3 NOTE 1
11. SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE SHALL BE AS INDICATED
"B" AT THE SAMPLE POINT LOCATION ON THE PIPING AND INSTRUMENT DIAGRAM. WHEN HEAT TRACING
DAA DAA
IS REQUIRED. THE CLOSED SAMPLING SYSTEM SHALL INCLUDE A HEATED ENCLOSURE.
206-00635 206-00635 EQUIPMENT WITH UOP "A" TYPE 12. VALVES AND PIPING INDICATED AT SAMPLING DETAILS SHALL BE OF THE SAME METALLURGY TYPE AND
(WITH SAMPLING COOLER) CLASS AS SHOWN ON THE PIPING AND INSTRUMENT DIAGRAM.
13. AT LOCATIONS WHERE A CLASS BREAK IS INDICATED. THE CONTRACTOR SHALL INCLUDE PROPER
CLASS BREAK AT THE SAMPLE ASSEMBLY. CLASS BREAK SHALL BE OF SAME TYPE AS SHOWN ON THE
DAA PIPING AND INSTRUMENT DIAGRAM.
206-00635 14. DEPICTED ON THE P&ID AT THE INDIVIDUAL SERVICE.
15. IN ADDITION TO THE ITEMS DEPICTED AT THE INDIVIDUAL SERVICE INCLUDING FLARE / DRAIN / UTILITY
LINES.
16. BEVEL ALL OPEN ENDS OF SAMPLE CONNECTIONS AT A 45° ANGLE WITH 75MM MINIMUM EXTENSION.
17. PROVIDE CLEARANCE AND ACCESS FOR DRUM.

ITEM TYPE P&ID NO. TO FLARE "A" TO OPEN DRAIN "B" TO OPEN DRAIN "C" FROM SAE "D" TO RAE "E" TG NO. "F" ITEM TYPE P&ID NO. TO FLARE "A" TO OPEN DRAIN "B" FROM SAE "C" TO RAE "D" TG NO. "E" PG NO. "F" 18. LINE NUMBER TO BE SPECIFIED ON THE DEDICATED DRAWING.

SC-21101 H R2B-P3-206-02-A-DTI-00102 3/4"-DBP-218051-T-A63T1-N 3/4"-DAA-218051-T-A60T1-N 3/4"-P-218057-T-A60T1-N 3/4"-SAE-218051-T-A01T1-N 3/4"-RAE-218051-T-A01T1-N TG-21825 SC-21207 K R2B-P3-206-02-A-DTI-00232 3/4"-DAP-218048-T-A63T1-N 3/4"-DAA-218048-T-A60T1-N 3/4"-SAE-218048-T-A01T1-N 3/4"-RAE-218048-T-A01T1-N TG-21822 PG-21835 19. LIGHT WEIGHT LINES( ) INDICATE ITEMS WHICH ARE DEPICTED ON THE
P&ID AT THE INDIVIDUAL SERVICE
SC-21102 H R2B-P3-206-02-A-DTI-00108 3/4"-DBP-218052-T-A63T1-N 3/4"-DAA-218052-T-A60T1-N 3/4"-P-218058-T-A60T1-N 3/4"-SAE-218052-T-A01T1-N 3/4"-RAE-218052-T-A01T1-N TG-21826 SC-21402 K R2B-P3-206-02-A-DTI-00405 3/4"-DAP-218049-T-A63T1-N 3/4"-DAA-218049-T-A60T1-N 3/4"-SAE-218049-T-A01T1-N 3/4"-RAE-218049-T-A01T1-N TG-21823 PG-21836
HEAVY WEIGHT LINES( ) INDICATE ITEMS WHICH ARE IN ADDITION TO THE
SC-21405 K R2B-P3-206-02-A-DTI-00407 3/4"-DAP-218050-T-A63T1-N 3/4"-DAA-218050-T-A60T1-N 3/4"-SAE-218050-T-A01T1-N 3/4"-RAE-218050-T-A01T1-N TG-21824 PG-21837 ITEMS DEPICTED AT THE INDIVIDUAL SERVICE.

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. SAMPLING CONNECTION POINT DETAILS (4/5)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00020D 00
CAD FILE :
TYPE R GENERAL NOTES :
CATALYST SAMPLING 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

VALVE

1" PIPE
MINIMIZE VERTICAL RUN LENGTH SECL
TOP PIPE CAP HOLE FOR THERMAL EXPANSION VENDOR
(1-9/16" (40 mm) HOLE DIA)
1" WRAP PIPE WITH CERAMIC FIBER BLANKET
NOTE 4 NOTE 1 INSULATION AND INSERT INTO THE PIPE CAP HOLE
PIPE CAP
NOTE 4 NOTE 2
HINGED DOOR FOR
INTERNAL ACCESS 8" PIPE

8" VENT TO SAFE LOCATION


CATALYST SAMPLE CONTAINER :
1 LITER VOLUME (TYPICAL) NOTES :
APPROXIMATELY 4" (100 mm)
FROM TOP OF CATALYST SAMPLE PERFORATED PLATE WITH 1. DEPICTED ON THE P&ID AT THE INDIVIDUAL SERVICE.
CONTAINER TO BOTTOM OF 1" PIPE 1/4" (6 mm) DIA HOLES
2. IN ADDITION TO THE ITEMS DEPICTED AT THE INDIVIDUAL SERVICE.
3. LIGHT WEIGHT LINES( ) INDICATE ITEMS WHICH ARE DEPICTED ON THE P&ID
PIPE CAP VENT GASES TO AT THE INDIVIDUAL SERVICE
SAFE LOCATION HEAVY WEIGHT LINES( ) INDICATE ITEMS WHICH ARE IN ADDITION TO THE ITEMS
1" PIPE DEPICTED AT THE INDIVIDUAL SERVICE.
2" PIPE (FREE DRAINING, 4. TEE+CAP TO BE INSTALLED AT THE POINT WHERE THE DIRECTION OF THE PIPE CHANGES FOR
DO NOT USE 90 ELBOWS) CATALYST LINE.
BAG FILTER
WELDING NECK FLANGES
WELDING NECK FLANGES

1" PIPE
OVERFLOW DRUM
SEE DETAILS REMOVABLE DRUM LID

METALLURGY : KILLED CARBON STEEL

ITEM TYPE P&ID NO. VENT LINE


SC-21002 R R2B-P3-206-02-A-DTI-00064 1"-V-210008-T-A18T1-N
SC-21003 R R2B-P3-206-02-A-DTI-00067 1"-V-210009-T-A18T1-N

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL REVIEWED
Infraestructura de DBNR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL SIMA REVIEW

1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL Desarrollo, S.A. de C.V. SAMPLING CONNECTION POINT DETAILS (5/5)
APPROVAL
AS BUILT
ASOCIADOS CONSTRUCTORES
00 30 Sep 23 YDC KHL APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00020E 00
CAD FILE :
DETAIL "CD" DETAIL "CV" DETAIL "CVD" GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

PROCESS 2. DELETED.
PIPE CLASS B1A1
LINE # L1

DBP
NOTE 1 PROCESS 206-00628
FREE DRAINING

FREE DRAINING
PIPE CLASS B1A1 NOTE 2
LINE # L1
NOTE 1
UTILITY DBP

MIN.
3/4" CONNECTION 206-00628
LOW POINT FREE DRAINING

FREE DRAINING
NOTE 2
3/4"
LINE SAME AS PROCESS
LINE # 3/4" NOTE 3 NOTE 1

MIN.
UTILITY 3/4"
CONNECTION LOW POINT

3/4" 3/4"
3/4"
NOTES :
LINE SAME AS PROCESS 1. CONTROL VALVE BYPASS REQUIRED ONLY WHEN INDICATED AT INVIVIDUAL CONTROL VALVE SERVICE.
PROCESS LINE # 3/4" NOTE 3 LINE SAME AS
3/4" PROCESS UTILITY 2. SHALL BE AT LEAST 600 MM ABOVE FLARE HEADER.

MIN.
PIPE CLASS UTILITY
3/4" LINE # CONNECTION
LINE # L2 LOW POINT CONNECTION 3. THIS VALVE WHICH IS SHOWN AT THE INDIVIDUAL SERVICE IS TO BE HARD PIPED TO CLOSED VENT
FREE DRAINING

OR DRAIN HEADER AS INDICATED IN THE RESPECTIVE DETAIL AND NOT PLUGGED.


3/4" 3/4"

3/4" LINE SAME AS PROCESS


PROCESS UTILITY
CONNECTION PIPE CLASS
LINE #
UTILITY LINE # L2

FREE DRAINING
CONNECTION
-

TO DRAIN HEADER

TO DRAIN HEADER

SHOWN ON OTHER MECHANICAL FLOW DIAGRAMS. SHOWN ON OTHER MECHANICAL FLOW DIAGRAMS. SHOWN ON OTHER MECHANICAL FLOW DIAGRAMS.
HEAT TRACE AND INSULATE. HEAT TRACE AND INSULATE. HEAT TRACE AND INSULATE.

HEAT TRACING SPECIAL


TAG NO. TYPE P&ID NO. LINE NUMBER (L1) P&ID NO. LINE NUMBER (L2) DESTINATION P&ID NO. OBJECTIVE VALVE
TEMPERATURE TRIM
FV-21307 CD 206-00310 NONE NONE 3/4"-DDA-213812-B1A2-NACE-N AMINE DRAIN HEADER 206-00332 NONE XN
FV-21313 CD 206-00318 NONE NONE 3/4"-DAC-213864-B1A1-PWHT-N CLOSED DRAIN HEADER 206-00332A NONE NONE
LV-21324 CD 206-00323 NONE NONE 3/4"-DAC-213865-B1A1-PWHT-N CLOSED DRAIN HEADER 206-00332A NONE NONE
PV-21310 CV 206-00315 3/4"-DBP-213976-B1A1-N 206-00331 NONE NONE 206-00332 NONE NONE
LV-21306 CVD 206-00309 3/4"-DBP-213972-B1A1-N 206-00331 3/4"-DDA-213811-B1A2-NACE-N AMINE DRAIN HEADER 206-00332 NONE XN
PDV-21305 CVD 206-00311 3/4"-DBP-213973-B1A1-N 206-00331 3/4"-DDA-213813-B1A2-NACE-N AMINE DRAIN HEADER 206-00332 NONE XN
LV-21309 CVD 206-00311 3/4"-DBP-213974-B1A1-N 206-00331 3/4"-DDA-213814-B1A2-NACE-N AMINE DRAIN HEADER 206-00332 NONE XN
PDV-21306 CVD 206-00313 3/4"-DBP-213975-B1A1-N 206-00331 3/4"-DSG-213832-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 20 C NONE

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. MEROX MODULE DETAIL - 1
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00021A 00
CAD FILE :
DETAIL "LD" DETAIL "LVD" EXTERNAL DISPLACEMENT AND OTHER CHAMBER TYPE LEVEL INSTRUMENT CONNECTIONS GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

NOTE 11 NOTE 11
PROCESS
PIPE CLASS LINE # L2
TOP-BOTTOM TOP-SIDE SIDE-SIDE SIDE-BOTTOM
(TB) (TS) (SS) (SB)
DBP
3/4" 3/4" 206-00628
FREE DRAINING

FREE DRAINING
NOTE 12

NOTE 12
NOTE 7 A A A A
NOTE 1

NOTE 10
3/4" 3/4"
NOTE 13
NOTE 13 NOTE 4
IF REQUIRED IF REQUIRED NOTE 4
A C
NOTE 11 3/4"
B D UTILITY
CONNECTION
IF REQUIRED 3/4"
NOTE 6 SAME LINE #
3/4"
AS VESSEL TRIM #
3/4" NOTES :
NOTE 5 NOTE 8 NOTE 13 NOTE 13 NOTE 8
LOW POINT NOTE 8 NOTE 8 1. PROVIDE ONE FOR EACH DISPLACEMENT LEVEL TRANSMITTER LISTED.
3/4" NOTE 4 NOTE 4
2. DO NOT SEAL WELD THREADED PIPING WHERE IT IS ATTACHED TO THE LEVEL INSTRUMENT.
SAME LINE # B B
B B 3. MAKE CONNECTION ON TOP OF PIPE.
AS VESSEL TRIM #
IF REQUIRED IF REQUIRED 4. PROVIDE FLANGE FOR SOCKET WELD PIPE ONLY. USE UNIONS FOR THREADED PIPING.
3/4"
3/4" 5. 3/4" CONNECTION FOR OTHER GAUGE GLASSES/MAGNETIC INDICATORS OR LEVEL TRANSMITTERS.
A C GAUGE GLASS AND MAGNETIC INDICATOR CONNECTIONS (AS REQUIRED)
NOTE 11 B D 6. PROVIDE ONE FOR EACH GAUGE GLASS/MAGNETIC INDICATOR.

UTILITY IF REQUIRED 7. FOR VENT OR DRAIN DETAILS, SEE THE TABLE BELOW.
FREE DRAINING

CONNECTION 3/4" NOTE 6 8. MINIMUM DISTANCE TO DRAIN CONNECTION.


PROCESS
PIPE CLASS 3/4" 9. NOT REQUIRED WHEN NO DISPLACEMENT LEVEL TRANSMITTERS ARE PRESENT.
3/4"
LINE # L2 NOTE 5 SUPPLIED C C C C 10. SHALL BE AT LEAST 600 MM ABOVE FLARE HEADER.
3/4" LOW POINT WITH GAUGE
GLASS (TYP.) 11. THREADED CAP (DO NOT SEAL WELD).
SAME LINE # NOTE 14 NOTE 14 NOTE 14 NOTE 14 12. MINIMUM DISTANCE TO NEAREST FITTING.
DAC AS VESSEL TRIM # NOTE 13 NOTE 13 NOTE 13 NOTE 13
206-00638 13. NOT REQUIRED FOR NON-CLOSED VENT AND OR DRAIN.
3/4" 14. FOR MAGNETIC INDICATORS PROVIDE UNION FOR THEADED PIPE ONLY USE FLANGES FOR SOCKET
TO DRAIN HEADER 3/4" LG LG LG LG
WELD PIPING.
NOTE 11
AS REQUIRED AS REQUIRED
UTILITY

FREE DRAINING
CONNECTION
PROCESS
PIPE CLASS 3/4"
AS REQUIRED
LINE # L2 NOTE 14 NOTE 14 NOTE 14 NOTE 14
NOTE 13 NOTE 13 NOTE 13 NOTE 13

XXXX
XXX D D D D

TO DRAIN HEADER

CONNECTION TYPE HEAT TRACING SPECIAL


LT LG P&ID NO. SYSTEM OBJECTIVE VALVE
LT LG LINE NO. (L1) P&ID NO. LINE NO. (L2) DESTINATION P&ID NO.
TAG NO. TAG NO. TYPE TEMPERATURE TRIM
LT-21302A/B LG-M-21302 206-00301 LVD S/B S/S 3/4"-DBP-213963-B1A1-PWHT-N 206-00331 3/4"-DSG-213861-B1A1-EC(ET) SPENT CAUSTIC DRAIN 206-00332 20 C NONE
LT-21306A/B LG-M-21306 206-00309 LVD S/B S/S 3/4"-DBP-213964-B1A1-PWHT-N 206-00331 3/4"-DDA-213807-B1A2-NACE-N AMINE DRAIN HEADER 206-00332 NONE XN
LT-21960 NONE 206-00309 LVD S/B NONE NONE 206-00331 3/4"-DDA-213808-B1A2-NACE-N AMINE DRAIN HEADER 206-00332 NONE XN
LT-21309A/B LG-M-21309 206-00311 LVD S/B S/S 3/4"-DBP-213966-B1A1-PWHT-N 206-00331 3/4"-DDA-213809-B1A2-NACE-N AMINE DRAIN HEADER 206-00332 NONE XN
LT-21974 NONE 206-00311 LVD T/B NONE NONE 206-00331 3/4"-DDA-213810-B1A2-NACE-N AMINE DRAIN HEADER 206-00332 NONE XN
LT-21963 NONE 206-00313 LVD S/B NONE NONE 206-00331 3/4"-DSG-213828-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 20 C NONE
LT-21311A/B LG-M-21311 206-00313 LVD S/B S/S 3/4"-DBP-213969-B1A1-PWHT-N 206-00331 3/4"-DSG-213829-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 20 C NONE
LT-21962 NONE 206-00313 LVD S/B NONE 3/4"-DBP-213970-B1A1-PWHT-N 206-00331 3/4"-DSG-213830-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 20 C NONE
LT-21314 LG-M-21314 206-00313 LVD S/B S/S 3/4"-DBP-213971-B1A1-N 206-00331 3/4"-DSG-213831-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 20 C NONE
LT-21967 LG-M-21317 206-00320 LD S/S S/S NONE NONE 3/4"-DAC-213862-B1A1-N CLOSED DRAIN HEADER 206-00332A NONE NONE
LT-21319A/B LG-T-21362 206-00322 LD T/B S/S NONE NONE 3/4"-DAC-213856-B1A1-N CLOSED DRAIN HEADER 206-00332A NONE NONE
LT-21322A/B LG-T-21363 206-00322 LD T/B S/S NONE NONE 3/4"-DAC-213857-B1A1-N CLOSED DRAIN HEADER 206-00332A NONE NONE
LT-21968 NONE 206-00322 LD T/S NONE NONE NONE 3/4"-DAC-213858-B1A1-N CLOSED DRAIN HEADER 206-00332A NONE NONE
LT-21969 NONE 206-00323 LD S/S NONE NONE NONE 3/4"-DAC-213863-B1A1-N CLOSED DRAIN HEADER 206-00332A NONE NONE
LT-21971 NONE 206-00323 LD T/B NONE NONE NONE 3/4"-DAC-213859-B1A1-N CLOSED DRAIN HEADER 206-00332A NONE NONE
LT-21324A/B LG-M-21324 206-00323 LD T/B NONE NONE NONE 3/4"-DAC-213860-B1A1-N CLOSED DRAIN HEADER 206-00332A NONE NONE

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. MEROX MODULE DETAIL - 2
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00021B 00
CAD FILE :
DETAIL "PD" DETAIL "PV" GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

FREE DRAINING

FREE DRAINING

2'-0"
(600)
NOTE 2

MIN.
NOTE 3
NOTE 6 NOTE 8 NOTE 13
NOTE 4
NOTE 12
3/4"

NOTE 7 3/4"
NOTE 11 3/4" SECL
NOTE 17 BY VENDOR
3/4"

NOTE 2
MIN.

3/4" NOTE 3
NOTE 1 3/4" NOTE 5
NOTE 4
NOTE 6 NOTE 8

3/4" NOTES :
NOTE 14 NOTE 7 3/4" 1. VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN ON THE
MECHANICAL FLOW DIAGRAM.
NOTE 11
2. DRAIN VALVE AND TERMINATION FLANGE PROVIDED BY PUMP VENDOR.
NOTE 17
3/4" 3. SHALL BE AT LEAST 600 MM ABOVE FLARE HEADER.
"
3/4

4. REQUIRED FOR NON-SELF VENTING PUMPS.

MIN.
NOTE 15
3/4" 5. REQUIRED FOR "Y" TYPE STRAINERS.
3/4" NOTE 5
NOTE 9 6. THE REQUIREMENTS FOR INSULATION OR HEAT TRACING AND HEAT TRACING AND HEAT TRACING
3/4" NOTE 15 OBJECTIVE TEMPERATURE IS INDICATED AT THE INDIVIDUAL SERVICE.
3/4"
NOTE 16 2" NOTE 1 NOTE 14

"
3/4
3/4"
NOTE 19 NOTE 1
3/4"
NOTE 9

3/4"
NOTE 16 2"
NOTE 1
3/4"
FREE DRAINING

DAA DAA
206-00635 206-00635
NOTE 10

FLARE (DBP) DRAIN BASE PLATE DRAIN (DAA)


HEAT TRACING
ITEM SPEC
P&ID NO. TYPE LINE NUMBER LINE NUMBER LINE NUMBER OBJECTIVE
NUMBER P&ID NO. DESTINATION P&ID NO. P&ID NO. VALVE TRIM
TEMPERATURE
LINE NUMBER (L1) LINE NUMBER (L2) LINE NUMBER (L3) LINE NUMBER (L4) LINE NUMBER (L5)
GA-21301A 206-00312 PD NONE NONE NONE 3/4"-DDA-213803-B2A2-NACE-N 3/4"-DDA-213804-B1A2-NACE-N AMIN DRAIN HEADER 206-00332 2"-DAA-213876-B1A1-N 206-00332A NONE XN
GA-21301B 206-00312 PD NONE NONE NONE 3/4"-DDA-213805-B2A2-NACE-N 3/4"-DDA-213806-B1A2-NACE-N AMIN DRAIN HEADER 206-00332 2"-DAA-213877-B1A1-N 206-00332A NONE XN
GA-21302A 206-00314 PD NONE NONE NONE 3/4"-DSG-213820-B2A1-PWHT-EC(ET) 3/4"-DSG-213821-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 2"-DAA-213878-B1A1-N 206-00332A 20°C NONE
GA-21302B 206-00314 PD NONE NONE NONE 3/4"-DSG-213822-B2A1-PWHT-EC(ET) 3/4"-DSG-213823-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 2"-DAA-213879-B1A1-N 206-00332A 20°C NONE
GA-21303A 206-00302 PD NONE NONE NONE 3/4"-DSG-213842-B1A1-PWHT-EC(ET) 3/4"-DSG-213843-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 2"-DAA-213880-B1A1-N 206-00332A 20°C NONE
GA-21303B 206-00302 PD NONE NONE NONE 3/4"-DSG-213844-B1A1-PWHT-EC(ET) 3/4"-DSG-213845-B1A1-PWHT-EC(ET) SPENT CAUSTIC DRAIN HEADER 206-00332 2"-DAA-213881-B1A1-N 206-00332A 20°C NONE
GA-21304A 206-00306 PD NONE NONE NONE 3/4"-DSG-213846-B2A1-PWHT-N 3/4"-DSG-213847-B1A1-PWHT-N SPENT CAUSTIC DRAIN HEADER 206-00332 2"-DAA-213882-B1A1-N 206-00332A NONE NONE
GA-21304B 206-00306 PD NONE NONE NONE 3/4"-DSG-213848-B2A1-PWHT-N 3/4"-DSG-213849-B1A1-PWHT-N SPENT CAUSTIC DRAIN HEADER 206-00332 2"-DAA-213883-B1A1-N 206-00332A NONE NONE
GA-21305A 206-00315 PV 3/4"-DBP-213951-B2A1-N 3/4"-DBP-213952-B1A1-N 206-00331 NONE NONE NONE NONE 2"-DAA-213884-B1A1-N 206-00332A NONE NONE
GA-21305B 206-00315 PV 3/4"-DBP-213953-B2A1-N 3/4"-DBP-213954-B1A1-N 206-00331 NONE NONE NONE NONE 2"-DAA-213885-B1A1-N 206-00332A NONE NONE
GA-21306A 206-00319 PD NONE NONE NONE 3/4"-DSG-213850-B2A1-PWHT-N 3/4"-DSG-213851-B1A1-PWHT-N SPENT CAUSTIC DRAIN HEADER 206-00332 2"-DAA-213886-B1A1-N 206-00332A NONE NONE
GA-21306B 206-00319 PD NONE NONE NONE 3/4"-DSG-213852-B2A1-PWHT-N 3/4"-DSG-213853-B1A1-PWHT-N SPENT CAUSTIC DRAIN HEADER 206-00332 2"-DAA-213887-B1A1-N 206-00332A NONE NONE

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. MEROX MODULE DETAIL - 3
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00021C 00
CAD FILE :
CLOSED SAMPLING SYSTEM DETAILS GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
TYPE A TYPE B DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

B1A1 PROCESS B1A1 PROCESS


LINE # L4 PROCESS LINE # L4 PROCESS
DBP NO POCKET DBP NO POCKET
206-00628 PG PG

LINE # L3

LINE # L3
FREE DRAINING LO FREE DRAINING FREE DRAINING LO FREE DRAINING
NOTE 3

PROCESS OUT PROCESS IN


PIPE CLASS PIPE CLASS

3/4" LINE # L1 3/4"

NOTES :

MANIFOLD

MANIFOLD
NOTE 1 1. SAMPLE INLET AND RETURN CONNECTIONS MUST HAVE A MINIMUM PRESSURE DIFFERENTIAL OF
NOTE 2 NOTE 2
10 PSI (0.7 kg/cm^2) TO MAINTAIN FLOW THROUGH SAMPLE CYLINDER.
2. SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE SHALL BE AS INDICATED
AT THE SAMPLE POINT LOCATION ON THE PIPING AND INSTRUMENT DIAGRAM.
WHEN HEAT TRACING IS REQUIRED.
PROCESS LINE THE CLOSED SAMPLING SYSTEM SHALL INCLUDE A HEATED ENCLOSURE.
PROCESS LINE
3. SHALL BE AT LEAST 600 mm ABOVE FLARE HEADER.
3/4" LINE # L2 3/4" 3/4" LINE # L1 3/4"

CLOSED SAMPLING SYSTEM, FLOW THROUGH TO PROCESS TYPE CLOSED SAMPLING SYSTEM, FLOW THROUGH TO PROCESS TYPE
PACKAGED EQUIPMENT LIMITS PACKAGED EQUIPMENT LIMITS
SHOWN ON THE P&ID SHOWN ON THE P&ID
HEAT TRACE AND INSULATE HEAT TRACE AND INSULATE

SAMPLE POINT MAY BE PROCESS LINE PROCESS LINE


LOCATED AT CONTROL
VALVE ASSEMBLY, PUMP
OR OTHER EQUIPMENT
WHERE ADEQUATE NOTE 2 NOTE 2
PRESSURE DIFFERENTIAL
CAN BE OBTAINED
TYPE A TYPE B
SN- * SN- *

SAMPLE NUMBER SAMPLE NUMBER

TYPE A SAMPLE CONNECTION AS INDICATED ON P&ID TYPE B SAMPLE CONNECTION AS INDICATED ON P&ID

VENT (DBP)
HEAT SPECIAL
SAMPLE NO. P&ID NO. TYPE SAMPLE SUPPLY LINE NO. (L1) SAMPLE RETURN LINE NO. (L2) PG NO.
LINE NO. (L3) LINE NO. (L4) P&ID NO. TRACE T VALVE TRIM

1 SN-21301 206-00309 B 3/4"-LPG-213014-B2A1-N - 3/4"-LPG-213019-B2A1-N 3/4"-DBP-213977-B1A1-N 206-00331 PG-21387 NONE NONE


2 SN-21302 206-00309 B 3/4"-LPG-213015-B2A2NACE-N - 3/4"-LPG-213020-B2A2NACE-N 3/4"-DBP-213978-B1A1-N 206-00331 PG-21388 NONE XN
3 SN-21303 206-00309 A 3/4"-AMR-213072-B2A2NACE-N 3/4"-AMR-213073-B2A2NACE-N 3/4"-AMR-213074-B2A2NACE-N 3/4"-DBP-213979-B1A1-N 206-00331 PG-21389 NONE NONE
4 SN-21305 206-00312 A 3/4"-AAM-213256-B2A2NACE-N 3/4"-AAM-213257-B2A2NACE-N 3/4"-AAM-213258-B2A2NACE-N 3/4"-DBP-213980-B1A1-N 206-00331 PG-21390 NONE XN
5 SN-21306 206-00311 B 3/4"-LPG-213016-B2A2NACE-N - 3/4"-LPG-213021-B2A2NACE-N 3/4"-DBP-213981-B1A1-N 206-00331 PG-21391 NONE XN
6 SN-21308 206-00313 B 3/4"-LPG-213017-B2A1PWHT-N - 3/4"-LPG-213022-B2A1PWHT-N 3/4"-DBP-213982-B1A1-N 206-00331 PG-21392 NONE NONE
7 SN-21310 206-00315 A 3/4"-LPG-213018-B2A1-N 3/4"-LPG-213023-B2A1-N 3/4"-LPG-213024-B2A1-N 3/4"-DBP-213983-B1A1-N 206-00331 PG-21393 NONE NONE
8 SN-21311 206-00318 A 3/4"-WO-213313-B2A1-N 3/4"-WO-213314-B2A1-N 3/4"-WO-213315-B2A1-N 3/4"-DBP-213984-B1A1-N 206-00331 PG-21394 NONE NONE
9 SN-21312 206-00321 A 3/4"-DSO-213343-B1A1-N 3/4"-DSO-213358-B1A1-N 3/4"-DSO-213359-B1A1-N 3/4"-DBP-213985-B1A1-N 206-00331 PG-21395 NONE NONE
10 SN-21314 206-00322 B 3/4"-V-213390-M1A1-N - 3/4"-V-213394-M1A1-N 3/4"-DBP-213986-B1A1-N 206-00331 PG-21396 NONE NONE

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. MEROX MODULE DETAIL - 4
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00021D 00
CAD FILE :
API SEAL FLUSH PIPING PLANS 11/52 AND COOLING WATER PLAN M API SEAL PLAN 11 / 61
MOTOR DETAIL (GA-21305A/B) GENERAL NOTES :
(OVERHUNG TYPE PUMPS) (OVERHUNG TYPE PUMPS) 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

DBP
FREE DRAINING LO FREE DRAINING 206-00628 BY UOP

PI H BY PUMP / SEAL VENDOR TAH TI RTD RTD TI TAH


B1A1
FREE DRAINING LINE # L3 LINE # L4 A/B A/B
BY UOP 300#
BY PUMP/SEAL VENDOR TAH TI RTD RTD TI TAH
FF
PT PG A/B A/B

FO DRIVE END NON-DRIVE END


LO

FO(B)
3/4" NPT 3/4" NPT

FILL MCC TE RTD TE RTD MCC


CONNECTION INNER
3/4" NPT SEAL SEAL SPARE
CAVITY
3/4" NPT MCC TE RTD TE RTD MCC
FO(A) LG
SPARE

MCC TE RTD TE RTD MCC


FF
3/4" NPT LT LI H
SPARE
L
INNER OUTER NC 3/4" NPT
SEAL SEAL SEAL
CAVITY 3/4"x1/2" 3/4"x1/2"

3/4" NPT DAA


FG LINE # L6 206-00635
FREE DRAINING

SAE
FREE DRAINING LINE # L1 206-00623
3/4"

LINE # L5
RAE
DAC LINE # L2 206-00624

PLAN 11/52 PROJECT TAG NUMBERS


EQUIPMENT
P&ID NO. COOLING WATER SUPPLY (SAE) COOLING WATER RETURN (RAE) SEAL POT DRAIN (DBP) SEAL POT DRAIN (DAC) WATER DRAIN (DAA)
ITEM NUMBER FO(A) NO. FO(B) NO. LT NO. PG NO. PT NO. PI NO. LG NO. FG NO.
LINE NUMBER (L1) DWG NO. LINE NUMBER (L2) DWG NO. LINE NUMBER (L3) LINE NUMBER (L4) DWG NO. LINE NUMBER (L5) DWG NO. LINE NUMBER (L6) DWG NO.
GA-21305A 206-00315 3/4"-SAE-213733-MS1-N 206-00333 3/4"-RAE-213763-MS1-N 206-00333 3/4"-DBP-213959-B1A1-N 3/4"-DBP-213960-B1A1-N 206-00331 3/4"-DAC-213854-B1A1-N 206-00332 3/4"-DAA-213888-B1A1-N 206-00332 FO-21364A FO-21364B LT-21361A PG-21386A PT-21363A PI-21363A LG-21363A FG-21362A
GA-21305B 206-00315 3/4"-SAE-213734-MS1-N 206-00333 3/4"-RAE-213764-MS1-N 206-00333 3/4"-DBP-213961-B1A1-N 206-00331 3/4"-DAC-213855-B1A1-N 206-00332 3/4"-DAA-213889-B1A1-N 206-00332 FO-21365A FO-21365B LT-21361B PG-21386B PT-21363B PI-21363B LG-21363B FG-21362B

PLAN 11/61 PROJECT TAG NUMBERS


EQUIPMENT
P&ID NO. FO NUMBER
ITEM NUMBER
GA-21301A 206-00312 FO-21370A
GA-21301B 206-00312 FO-21370B

PROJECT TAG NUMBERS


EQUIPMENT
P&ID NO.
ITEM NUMBER TE NO. TT NO. TI NO.

GA-21305A 206-00315 TE-21305A TE-21306A TE-21307A TE-21308A TT-21305A TT-21306A TT-21307A TT-21308A TI-21305A TI-21306A TI-21307A TI-21308A
GA-21305B 206-00315 TE-21305B TE-21306B TE-21307B TE-21308B TT-21305B TT-21306B TT-21307B TT-21308B TI-21305B TI-21306B TI-21307B TI-21308B

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. MEROX MODULE DETAIL - 5
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00021E 00
CAD FILE :
API SEAL FLUSH PIPING PLANS 11/55
GENERAL NOTES :
(OVERHUNG TYPE PUMPS) 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

FI H PI TI H 2. DELETED.
21300 21300
L L

BY UOP
BY PUMP/SEAL VENDOR BY SEAL VENDOR
FO 1"x3/4" LINE #L1 1"x1/2" FF 1"x1/2"
FIT
PT FF TE FF TT

BLOCK/ 21300 PCV 21300 21300


BLEED 21300
3/4" VALVE
1-1/2"-AGL-213200-M2A1-N 1-1/2"-150RF

300# 1-1/2"
SEAL 3/4"
SEAL BOX LINE SPLIT TO
CAVITY EACH PUMP

3/4"
COOLING 8433
WATER OUTLET RS 1-1/2"x1" LO LINE # L3 RAE
206-00333
NOTES :
1" 1"-SAE-213751-MS1-N 1. BACK FLUSH VAVLE. BACKWASH WATER TO BE ROUTED TO THE GROUND.
MOTOR 300#
FAULT RUNNING STOP STOP START FROM MCC
H EA-21360 8493 2. BYPASS LINE TO BE USED TO MAINTAIN FLOW FROM EITHER GA-21310A/B WHEN THE PROCESS PUMPS
XA XL HS HS HS 1-1/2"x1" (GA-21302A/B,GA-21303A/B,GA-21304A/B,GA-21306A/B) ARE ISOLATED FROM THE PLAN 55 SEAL SYSTEM
COOLING RS LINE # L4 SAE
O FOR MAINTENANCE.
FF 21310A 21310A 3/4"NPT WATER INLET 206-00333
H A 1-1/2" 1"
3/4" PT PI

LINE # L2

1"
SECL 300#
3/4" L BY VENDOR NOTE 1
HSP-21310A PG
LINE SPLIT FROM 2"-AGL-213201-M2A1-N BLOCK/ 21300A FA-21360
3/4"
EACH PUMP M BLEED
VALVE
1-1/2"x1" 1-1/2"
NOTE 2 FIT 2"x1-1/2"
21370 3"x1-1/2"
RETURN
FROM SEAL 5 GALLON
MGA-21310A 1-1/2" ACCUMULATOR

MOTOR : 3.73 kW
FLOW : 6.81 m3 / hr
300# PRESSURE : 3.02 kg / cm2(g)
2" MAIN PUMP GA-21310A

MOTOR
FAULT RUNNING STOP STOP START FROM MCC
H
XA XL HS HS HS
O
FF FILTER 21310B 21310B
PDI H PDT A 3/4"
21300 21300 FG-21360B F F FG-21360A SECL
BY VENDOR
FILL
FB-21360 HSP-21310B PG
BLOCK/ 21300B
M BLEED
VALVE
LG TG
1-1/2"x1" 1-1/2"
21300 21300
9337
TANK LT FF 3"x1-1/2"
AS
206-00334 21300
3" MGA-21310B

3/4"
3/4"-AS-213756-B1A1-N
MOTOR : 3.73 kW (5HP)
FLOW : 6.81 m3 / hr
PRESSURE : 3.02 kg / cm2(g)
AUXILIARY PUMP GA-21310B

SKID
1-1/2"

LI H
2"-DAA-213890-B1A1-N 21300 2"-DAA-213891-B1A1-N
L

DAA DAA
206-00332A 206-00332A
8435 9356

PLAN 11/55 PROJECT TAG NUMBERS


ITEM SUPPLY RETURN COOLING WATER SUPPLY (SAE) COOLING WATER SUPPLY (RAE)
P&ID NO. FO NO. FIT NO. FI NO. PT NO. PI NO.
NUMBER LINE NUMBER (L1) LINE NUMBER (L2) LINE NUMBER (L3) P&ID NO. LINE NUMBER (L4) P&ID NO.
GA-21302A 206-00314 1"-AGL-213202-M1A1-N 3/4"-AGL-213210-M1A1-N FO-21368A FIT-21368A FI-21368A PT-21368A PI-21368A
GA-21302B 206-00314 1"-AGL-213203-M1A1-N 3/4"-AGL-213211-M1A1-N FO-21368B FIT-21368B FI-21368B PT-21368B PI-21368B
GA-21303A 206-00302 1"-AGL-213204-M1A1-N 3/4"-AGL-213212-M1A1-N FO-21366A FIT-21366A FI-21366A PT-21366A PI-21366A
GA-21303B 206-00302 1"-AGL-213205-M1A1-N 3/4"-AGL-213213-M1A1-N FO-21366B FIT-21366B FI-21366B PT-21366B PI-21366B
1-1/2"-RAE-213748-MS1-N 206-00333 1-1/2"-SAE-213748-MS1-N 206-00333
GA-21304A 206-00306 1"-AGL-213206-M1A1-N 3/4"-AGL-213214-M1A1-N FO-21367A FIT-21367A FI-21367A PT-21367A PI-21367A
GA-21304B 206-00306 1"-AGL-213207-M1A1-N 3/4"-AGL-213215-M1A1-N FO-21367B FIT-21367B FI-21367B PT-21367B PI-21367B
GA-21306A 206-00319 1"-AGL-213208-M1A1-N 3/4"-AGL-213216-M1A1-N FO-21369A FIT-21369A FI-21369A PT-21369A PI-21369A
GA-21306B 206-00319 1"-AGL-213209-M1A1-N 3/4"-AGL-213217-M1A1-N FO-21369B FIT-21369B FI-21369B PT-21369B PI-21369B

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW

00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V. MEROX MODULE DETAIL - 6
ASOCIADOS CONSTRUCTORES APPROVAL
APPROVED DBNR S.A. DE C.V.

REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00021F 00
CAD FILE :
GENERAL NOTES :
FI FQI 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
B.L 21100 21100 DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
NOTE 1
UNIT 21000 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
MIN. FF FF
TI PT PI FT
21100 21186 21186 21100
L

3/4"
HYDROTREATED
10" 10" 10" 10" 10"x8" 10"x8" 10" GAS OIL
DESULFURIZED GAS OIL 10"-P-211202-T-B60T1-EC(ST) 10"-P-211002-B1A1-EC(ST)
EC 2962 206-00101
FROM HDTGO UNIT
206-P-I-001 TO FA-21101
ST

3/4"

3/4"

3/4"
10"

T-B60T1 B1A1
MIN. FF
TI PT PI
T-A31T1 B1A1 21101 21187 21187
NOTES :

3/4"
HYDROTREATED
12"x8" 8" 8" GAS OIL 1. BATTERY LIMIT VALVE TO BE ACCESSIBLE AT GRADE OR PLATFORM.
HYDROTREATED GAS OIL 8"-P-211530-B1A1-EC(ST)
FROM STORAGE EC 2963 206-00101 2. DELETED.
(TV-90340/TV-90341/TV-90342) 206-P-I-002 TO FA-21101
ST 3. THE VALVES CAN BE SWITCHED OVER WHEN ALTER CASE.

3/4"
FF
TI PT PI
MIN. 21129 21188 21188

DECANTED OIL 4" 4" 6"x4" 6"x4" DECANTED OIL


4"-P-211604-B2A1-EC(ST)
TO STORAGE EC 206-00108 2964
(TV-90310/TV-90311) 206-P-O-001 FROM EA-21103A/B
ST

3/4"
H FF
TI PT PI
MIN. 21118 21189 21189

4"x3" 3" 3" 6"x3" 6"x3" HOT DECANTED OIL


HOT DECANTED OIL 3"-P-211048-B2A1-EC(ST)
EC 206-00108 2965
TO PCR UNIT #600
206-P-O-002 FROM EA-21101A/B
ST

3/4"
H FF
TI PT PI
MIN. 21153 21190 21190

6" 6" LIGHT CYCLE OIL


LIGHT CYCLE OIL 6"-ACL-211026-B4A1-PP
206-00124 2966
TO HDDI UNIT
206-P-O-003 FROM EC-21101
3/4" 3/4"

H FF
TI PT PI
MIN. 21120 21120 21120

LIGHT CYCLE OIL


6"x4" 6" 6" 6"-ACL-211028-B4A1-N
FOR FLUSHING
TO STORAGE
(TV-90360/TV-90361) 206-P-O-018
3/4" 3/4"

FF NOTE 3
TI PT PI
MIN. 21154 21191 21191

LIGHT CYCLE OIL 6" 6" NOTE 3 LIGHT CYCLE OIL


6"-ACL-211017-B4A1-N
TO STORAGE 206-00125 2972
(TV-90370/TV-90371) 206-P-O-004 FROM EC-21101
3/4" 3/4"

FF
TI PT PI
MIN. 21163 21163 21163

4"x3" 3" 3" 6"x3" 6"x3" LIGHT CYCLE OIL


LIGHT CYCLE OIL 3"-ACL-211025-B4A1-PP
206-00124 8518
TO PTRG UNIT
206-P-O-017 FROM EC-21101
3/4" 3/4"

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL BATTERY LIMITS -PROCESS (1/4)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00051 00
CAD FILE :
GENERAL NOTES :
PI FI 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
B.L 21192 21145 DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
NOTE 1
UNIT 21000 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
FF FF
TI PT FT
MIN. 21180 21192 21145
PHENOLIC SOUR
4" 4" 6"x4" 6"x4" WATER
PHENOLIC SOUR WATER 4"-AAM-211013-B1A2-NACE-N
206-00129 2974
TO PRA UNIT SPECIAL PWHT
206-P-O-005 #300 FROM GA-21108AB

3/4"
PI FI
21193 21150

FF FF
TI PT FT
T-B03T1 B2A1
MIN. 21182 21193 21150
NOTES :
NAPHTHA 1. BATTERY LIMIT VALVE TO BE ACCESSIBLE AT GRADE OR PLATFORM.
NAPHTHA 4" 4"-P-211203-B2A1-N 4" 6"x4" 6"x4" 4"-P-211113-B1A1-N
FROM STORAGE 2973 206-00131 2. DELETED.
(FOR START-UP) #300 NNF
206-P-I-003 B2A1 B1A1 TO GA-21110AB 3. VALVE CAN BE CLOSED WHEN OFF SPEC. NAPHTHA CASE.

3/4"
PI FI FQI
21289 21210 21210 NAPHTHA
2"-P-211114-B1A1-N
10505 206-00053
NNF
TO EA-21304

FF FF
TI PT FT
MIN. 21241 21289 21210

4"x3" 3" 3" 3" 6"x3" 6"x3" 3" 3" LPG


LPG 3"-P-212015-B2A1-N
2976 206-00211
FROM REF UNIT
206-P-I-004 TO FA-21204

3/4"
3/4"

3/4"
3"

PI FI FQI
21290 21221 21221

FF FF
TI PT FT
MIN. 21240 21290 21221

10" 10" TREATED DRY GAS


TREATED DRY GAS 10"-GD-216001-T-A03T1-N
206-00622 8323
TO FUEL GAS HEADER
206-P-O-006 #300 FROM FUEL GAS
3/4"

HEADER
PI
21291

FF
TI PT
MIN. 21291 21291

NAPHTHA 12"x10" 10" 10" NOTE 3 NAPHTHA


10"-P-212041-B1A1-N
TO STORAGE 206-00223 2979
(TV-90440/90441) 206-P-O-007 FROM EA-21208AB
3/4"

OFF SPEC NAPHTHA


10"-P-212041-B1A1-N
10506 206-00510
NNF
TO STORAGE
(BY OTHERS)
TI
A14NT1 B1A1-PWHT
MIN. 21308

3" 3" 6"x3" 6"x3" SPENT CAUSTIC


20°C 3"-SG-213002-B1A1-PWHT-EC(ST)
SPENT CAUSTIC
EC 206-00300 2980
TO RADAS UNIT WISI
206-P-O-008 FROM GA-21303AB
ST
3/4"

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL BATTERY LIMITS -PROCESS (2/4)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00052 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

B.L

NOTE 1
UNIT 21000

LEAN AMINE
T-B34T1 T-B65T1 3"-MDEA-213001-T-B65T1-PP
FF PP 2996 206-00300
TI PT PI FT FI TO EA-21301
MIN. 21322 21390 21390 21321 21321
L L

4" 4" 6"x4" 6"x4" LEAN AMINE


LEAN AMINE 4"-MDEA-212499-T-B65T1-PP
PP 2995 206-00502
FROM URA UNIT
206-P-I-006 TO EA-21502

3/4"
NOTES :
1. BATTERY LIMIT VALVE TO BE ACCESSIBLE AT GRADE OR PLATFORM.
2. DELETED.
3. SHP UNIT BYPASS.
T-B31T1 B2A1
FF 4. VALVE CAN BE OPENED, WHEN HDN UNIT SHUTDOWN CASE.
TI PT PI
5. ON-SPEC C4+ OR OFF-SPEC C4+ IS SENT TO TANKAGE AREA THROUGH THIS LINE.
MIN. 21304 21391 21391 IT WILL BE DISTINGUISHED AS ON-OFF SPEC IN TANKAGE AREA AND STORED INTO EACH TANK.
HYDROTREATED (TE-90820, TE-90821, TE-90822, TE90823 / ONE TANK WILL BE USED AS OFF-SPEC TANK).
HEAVY 2" 2" 3"x2" 6"x3" 6"x3" 3"x2" HEAVY NAPHTHA
2"-NAPS-213001-B2A1-N
NAPHTHA (WASH OIL) 6108 206-00300
FROM HDN UNIT 206-P-I-007 TO EA-21304

3/4"
2" NAPHTHA
2"-P-211114-B1A1-N
206-00052 10505
NOTE 4 NNF FROM STORAGE
B2A1 B1A1
FF
MIN. TI H PT PI
21409 21476 21476

3/4"
C4 (BUTANE-BUTYLENES MIX) C4
TO STORAGE 6" 6" 6"-P-214004-B2A1-N
206-00401 2993
(TE-90820/TE-90821/ NNF
TE90822/TE-90823) NOTE 5 206-P-O-011 FROM EA-21404

3/4"
H FF
MIN. TI PT PI
21445 21435 21435
3/4"

C4 (BUTANE-BUTYLENES MIX) 6" 6" 6"-P-214161-B2A1-N


TO ALKY UNIT NOTE 3 NNF
206-P-O-016
3/4"

H FF FF
MIN. TI PT PI FT FI FQI
21443 21477 21477 21401 21401 21401
3/4"

C4 (BUTANE-BUTYLENES MIX) 6" 6" 6" 6"x4" 6"x4" 6" C4


6"-P-214003-B2A1-N
TO FEED SURGE DRUM 206-00401 2994
AT PH UNIT 206-P-O-012 FROM EA-21404
3/4"

3/4"

3/4"
6"

FF
MIN. TI PT PI FI FI FQI
21320 21320 21320 21320A 21320 21320
41˚C
3/4"

VENT 2" 2" 3"x2" 6"x3" 6"x3" 3"x2" FF 41˚C VENT


FT 2"-V-213004-M1A1-EC(ST)
TO MAIN FRACTIONATOR
EC 206-00300 6086
REBOILER HEATER 2"x3/4" 21320
FIREBOX AT ALKY UNIT 206-P-O-013 2"x3/4" FROM VENT TANK
ST

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL BATTERY LIMITS -PROCESS (3/4)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00053 00
CAD FILE :
B.L
NOTE 1
FF
GENERAL NOTES :
UNIT 21000
MIN. TI PT PI 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
21411 21478 21478 DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
T-B60T1 B2A1
2. DELETED.

3/4"
4" 4" 6"x4" 6"x4" C3 STREAM
C3 STREAM 4"-P-214025-B2A1-N 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
2999 206-00407
FROM PCR UNIT
206-P-I-008 TO DF-21402

3/4"
FF
MIN. TI PT PI
21412 21479 21479
T-B03T1 B2A1

3/4"
C3 STREAM C3 STREAM
FROM STORAGE 4" 4" 6"x4" 6"x4" 4"-P-214026-B2A1-N
3000 206-00407
(TE-90810/TE-90811/
TE-90812/TE-90813) 206-P-I-009 TO DF-21402

3/4"
FF NOTES :
MIN. TI PT PI
1. BATTERY LIMIT VALVE TO BE ACCESSIBLE AT GRADE OR PLATFORM.
21293 21293 21293
2. DELETED.

3/4"
RICH OIL 3. ON-SPEC PROPANE OR OFF-SPEC PROPANE IS SENT TO TANKAGE AREA THROUGH THIS LINE.
RICH OIL 4" 4" 6"x4" 6"x4" 4"-P-212211-T-B73T1-N IT WILL BE DISTINGUISHED AS ON-OFF SPEC IN TANKAGE AREA AND STORED INTO EACH TANK.
10507 206-00220
FROM PTRG UNIT (TE-90710, TE-90711, TE-90712 / ONE TANK WILL BE USED AS OFF-SPEC TANK).
206-P-I-011 TO EA-21204A/B

3/4"
4. ON-SPEC PROPYLENE OR OFF-SPEC PROPYLENE IS SENT TO TANKAGE AREA THROUGH THIS LINE.
IT WILL BE DISTINGUISHED AS ON-OFF SPEC IN TANKAGE AREA AND STORED INTO EACH TANK.
(TE-90700, TE-90701, TE-90702, TE-90703 / ONE TANK WILL BE USED AS OFF-SPEC TANK).

FF
MIN. TI PT PI
21444 21480 21480

3/4"
PROPANE PRODUCT 4" 4" 6"x4" 6"x4" PROPANE PRODUCT
4"-P-214071-B2A1-N
TO STORAGE 206-00410 3001
(TE-90710/TE-90711/TE-90712) NOTE 3 206-P-O-014 FROM GA-21403AB

3/4"
FF
MIN. TI PT PI
21428 21475 21475
PROPANE/PROPYLE

3/4"
PROPANE/PROPYLENE NE
TO STORAGE 6" 6" 6"-P-214202-B2A1-N
206-00405 10508
(TE-90810/TE-90811/
TE-90812/TE-90813) 206-P-O-019 FROM GA-21401

3/4"
FF
MIN. TI FT FI FQI
21425 21421 21421 21421
PROPYLENE
3/4"

PRODUCT PROPYLENE PRODUCT


6"x4" 4" 4" 6"x4" 6"x4" 4" 4" 4"-P-214072-B2A1-N
TO STORAGE
206-00416 3002
(TE-90700/TE-90701/ NOTE 4
TE-90702/TE-90703) 206-P-O-015 FROM DT-21401
3/4"

3/4"

3/4"
4"

T-A14T1 B1A1-PWHT FF FF
TI PT PI FT FI FQI
MIN. 21324 21324 21324 21324 21324 21324

3" 3" 6"x3" 6"x3" 20% CAUSTIC


20% CAUSTIC 3"-SC-213001-B1A1-PWHT-N
6107 206-00300
FROM UTOS
206-P-I-010 #300 TO CAUSTIC
3/4"

INJECTION PUMP

SIGNAL
205-00028 7531 206-00101 7526
TO HDTGO UNIT FROM FA-21101

SIGNAL
7534 7320 206-00323
FROM ALKYL PLUS TO XV-21972A/B
UNIT

SIGNAL
7535 206-00402 4752
TO SHU FROM LIC-21400

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL BATTERY LIMITS -PROCESS (4/4)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00054 00
CAD FILE :
TO ATMOSPHERE
10"-V-210700-T-A18T1-N
AT SAFE LOCATION BY-21001 FG-21002 FA-21001 SPE-21011 GENERAL NOTES :
SIL CATALYST HOPPER STEAM JET EJECTOR FRESH CATALYST STORAGE HOPPER DUST CONTROL UNIT FRESH CATALYST STORAGE HOPPER FRESH CATALYST ADDITION SYSTEM 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
21005 NOTE 9 DESIGN CAPACITY (MOTIVE STEAM) 1268.8 kg/hr DESIGN CAPACITY 1.135 m^3/hr ID 6000 mm DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DESIGN CAPACITY (SUCTION FLUID) 662 kg/hr DP 4.6 kg/cm^2g TL-TL 19600 mm
SILENCER DP 15.5 kg/cm^2g DT 10 C / 343 C DP 7.21 kg/cm^2g / F.V @ 343 °C
13 DRIP DT 343 C MATERIAL KCS DT 10 C / 343 C
2. DELETED.
3/4"-DAA-210002-T-A60T1-PP 8"-P-210375-T-B04T1-PP MATERIAL SA106 INSULATION N MATERIAL KCS
INSULATION PP TRIM B2A1 INSULATION N 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
PG
BY-21001 TRIM B1A2 / T-B04T1 TRIM B1A2 EQUILIBRIUM
STEAM CAPACITY 610.73 m^3
21003G CATALYST DUST
SEPARATOR 8"-P-210174-B1A2-PP 8"-P-210174-B1A2-PP
STR TO GRADE 206-00056 3517
3550 21027 9868 NOTE 1 FROM FA-21002A/B

3/4"
3" 2"

8"
VM 3"-VM-210421-T-B04T1-EC 2"-VM-210422-T-B04T1-EC 1"-AI-210110-T-A05T3-N AI SECL
4P6 4P6 PG
206-00615 SET @ 4.57 kg/cm^2g 206-00621C VENDOR
SET @ 4.57 kg/cm^2g 21004G

3/4
FRESH CATALYST

"
PSV NOTE 18 8"-P-210168-B1A2-PP
PSV

8"-P-210173-B1A2-PP
NOTE 15 NOTE 15 PP 206-00057 3518
6"-V-210660-T-A06T1-N 21001A

1"
TO ATMOSPHERE 6"-V-210087-T-A06T1-N 21001B TO ATMOSPHERE FROM CATALYST
AT SAFE LOCATION FREE DRAINING NOTE 11 AT SAFE LOCATION FREE DRAINING NOTE 11 3/4" HANDLING

INSTRUMENT AIR
NOTE 9

206-00055D 9867

8"
SEP T-A06T1 FACILITIES
T-A06T1

9838 206-00055D
8"x4" 8"x4"
21001 B1A2 B1A2 3/4" 6"x4" DRY PLANT AIR
3/4" MSV 4"-P-210405-B1A2-N
S 3519 206-00056
2"-CACBP-210607-T-B04T1-EC LC S LO 21016
NOTE 20 TO FA-21002B

8"
8"
FP FP 4"
FG-21002 4"-P-210406-B1A2-N
8"-P-210400-B1A2-N NOTES :
3549 FF FREE DRAINING 1. DO NOT TRAP OR POCKET THIS LINE.
STP DRY PLANT AIR
CACBP 2"-CACBP-210608-T-A18T1-PP LI 4"-P-210404-B1A2-N
T
21001 NOTE 16 3/4" 3520 206-00056 2. FOR FUTURE ADDITIVE HOPPER.
206-00627C 21001A "DA-6" FF H
FO FF PT PI TO FA-21002A 3. LOCATE NEAR ADDITIVE ADDITION CONNECTION.
T-A18T1 T-B04T1 LI LT
21001 21057 21057
T-A05T3 B1A2 21001 21001 4. LOCATE AT GRADE.

6"
6"-P-210403-B1A1-N B1A2
3532 3/4"-P-210463-B1A2-N 8" NOTE 5
RADAR 2" B1A1 5. GAUGING HATCH MUST BE ACCESSIBLE FROM PLATFORM.
AI 3/4"-AI-210196-T-A05T3-N 3/4" 3/4" 3/4" A01 8" 4"
206-00621C 8" 6. DELETED.
2"x3/4" 2" J01 P01
3/4"-P-210414-B1A2-N C01 10" U01 H01 I01 NOTE 4
STR G01 30" 7. MAKE CONNECTION ON TOP OF PIPE.
#300 PG
21001 8. FG-21002 IS DIRECTLY CONNECTED WITH FA-21001.
NOTE 8 21005G
9. BY EJECTOR VENDOR.
FF

3"-P-210403-B1A1-N
PIC PT 10. DELETED.
21003 21003 11. SEE DETAIL ON DWG 206-00002.

6"
HLL=15700 mm 12. ADDITIVE ADDITION (BLANK OFF).
LLL=3900 mm 3/4"
FF PV 13. DELETED.
NOTE 4

6"x3"
21003
14. SIGHT FLOW INDICATOR.
FA-21001

NOTE 4
15. 13 MM WEEP HOLE.

#300
FC

3"
3"
16. REFER TO DRAWING NO. 206-00004.

4"x3"
AIR 17. BEND 9D.
24" ID 3/4" 2"-P-210460-B1A1-N
4"-P-210402-B1A1-N 3999 206-00061 18. TEE+CAP TO BE INSTALLED AT THE POINT WHERE THE DIRECTION OF THE PIPE CHANGES FOR
NNF CATALYST LINE.
MW TO AND FROM MAIN
M02 AIR BLOWER

4"
B1A1 19. AS AN ALTERNATE TO TEE'S, PROVIDE LONG RADIUS BENDS IN CATALYST FILLING AND
MSV DISCHARGE LINE WITHDRAWAL LINES, CATALYST MAKEUP LINE AND HOPPER LOADING LINES.
T-A06T1
T-A06T1 B1A2 21001 8" B1A2 T-A06T1
N03 SCREEN 3" 20. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00055D.
NOTE 19 F03
3/4"-AP-210093-T-A06T1-N 3/4" 3/4"-P-210412-B1A2-N 3/4" 3/4"-P-210407-B1A2-N 3/4" 3/4"-AP-210372-T-A06T1-N 21. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00055B.
2"

4"-AP-210044-T-A06T1-N
8"

W03 NOTE 4
NOTE 19 T-A06T1 B1A1
3/4" 3/4"-P-210408-B1A2-N 3/4" 3/4" 3/4"-AP-210073-T-A06T1-N
3/4" 3/4" 3/4"-P-210413-B1A2-N

2"
3/4"-AP-210371-T-A06T1-N

4"
MSV
8"-P-210451-B1A2-N MSV 21023
MSV 3/4"-P-210409-B1A2-N 3/4" 3/4" 3/4"-AP-210373-T-A06T1-N
21003 21002
3/4"-AP-210056-T-A06T1-N 3/4" 3/4"-P-210416-B1A2-N 3/4" 10"
O03 3/4"-P-210410-B1A2-N 3/4" 3/4" 3/4"-AP-210085-T-A06T1-N 1"x3/4" 2"x1" 4"x2"
8"

SFT
1"x3/4" 3/4"-AP-210037-T-A06T1-N 3/4" 3/4"-P-210415-B1A2-N 3/4" 3/4" 3/4" 3/4"-AP-210374-T-A06T1-N
21001 3/4"-P-210411-B1A2-N 2"-AP-210051-T-A06T1-N

2"

8"
1"-AP-210221-T-A06T1-N
206-00055A 9843 8"-P-210451-B1A2-N MSV DRY PLANT AIR
MSV 4"-AP-210044-T-A06T1-N

2"-P-210172-B1A2-N
9845 206-00055B 9846 206-00055B 21004 21015 206-00082A 7233
1"-AP-210220-T-A06T1-N FROM FA-21008
206-00055A 9844

3/4"
SPE-21011 MSV

VERTICAL
1" 1"
206-00055A 9842 NOTE 21 21005
DRY PLANT AIR

8"-P-210169-B1A2-N
3/4" 1"-AP-210053-T-A06T1-N
1"-AP-210054-B1A2-N T-A06T1 B1A2 4194 206-00056
2"

B1A2 T-A06T1
TO FA-21002A

1500 mm
3/4" 3/4" NOTE 17
3/4"-AP-210039-T-A06T1-N 3/4"-P-210418-B1A2-N

MIN.
1"-AP-210037-T-A06T1-N

PI 2"-P-210171-B1A2-N SGL DRY PLANT AIR


FIC 21082 1"-AP-210055-T-A06T1-N
21002 5507 206-00056
21002
FF FF NOTE 14 TO FA-21002B
FT FF PG PT 3/4"
FV NOTE 17
T-A06T1 B1A2 MSV 45°
2"

21002 21002G 21002


21002 NOTE 16 21006
4" 4" 8"x6" FRESH CATALYST
4"-P-210466-B1A2-N 6" "DA-5" 8"-P-210169-B1A2-N
4195 206-00056
#300 4"x3" FO 6"x3" 6"-P-210419-B1A2-N
H TO DC-21002
3" PI NOTE 7
4"-AP-210034-T-A06T1-N

#300 21001
L
2"-P-210171-B1A2-N
FIC
NOTE 12
21001 FF
FF FF PG PT 1-
FT FV 1/2
21001G 21001 NOTE 17 "
T-A06T1 B1A2 21001 21001 45° 45°
NOTE 16
1-1/2" FRESH CATALYST
3/4"
1-1/2" 1-1/2"-P-210421-B1A2-N 2"x1-1/2" 2"x1-1/2" 1-1/2" 2" 2"-P-210420-B1A2-N "DA-4" 2"-P-210171-B1A2-N 2"-P-210171-B1A2-N
4196 206-00063
#300 1-1/2"x1" FO 2"x1" NOTE 7 NOTE 19 TO DC-21002
1"
3/4"

3/4"

#300
7232 206-00082A

1"
FROM FA-21008
DRY PLANT AIR

NOTE 3
1-1/2"-P-210422-B1A2-N 1-1/2"
NOTE 2
BLANKOFF
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL FRESH CATALYST STORAGE HOPPER
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00055 00
CAD FILE :
SPE-21011 GENERAL NOTES :
FRESH CATALYST ADDITION SYSTEM 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DP 17.2 kg/cm^2g
DT / 100 C
CAPA
2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

SECL
VENDOR

NOTES :
1. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00055B.

SPE-21011
FOR RELOAD PURGE DRY PLANT AIR
NOTE 1 1"-AP-210221-T-A06T1-N
206-00055B 9857 206-00055 9843

FOR AUTO RELOAD DRY PLANT AIR


1"-AP-210220-T-A06T1-N
206-00055B 9856 206-00055 9844

DRY PLANT AIR


1"-AP-210054-B1A2-N 1"
9842 206-00055 9855 206-00055B

10415
3/4"-AI-210002-T-A05T3-N AI
206-00055B 10300
3/4" 206-00621C

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL DETAIL OF SPE-21011 (1/2)
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00055A 00
CAD FILE :
SPE-21011-EJ01 SPE-21011-FA01
EDUCTOR VESSEL GENERAL NOTES :
DESIGN CAPACITY (MOTIVE STEAM) BY VENDOR ID 1524 mm
DESIGN CAPACITY (SUCTION FLUID) BY VENDOR TL-TL 3051 mm
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DP BY VENDOR OP 5.6 kg/cm^2g DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DT BY VENDOR DP 10.5 kg/cm^2g / FV
MATERIAL C.S OT 82 C 2. DELETED.
INSULATION BY VENDOR DT -28 C / 121 C
TRIM BY VENDOR MATERIAL SA-516 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
INSULATION N
TRIM B1A2
FRESH CATALYST
1-1/2X2-1/2 1-1/2X2-1/2 2-1/2"-V-218811-T-A06T1-N 206-00055 9845
SET @ 8.78 kg/cm^2g 3"-V-218810-T-A06T1-N SET @ 8.78 kg/cm^2g FROM FA-21001
PSV PSV SECL

8"x2"
XV 21677A 21677B VENDOR
21677D AT SAFE AT SAFE
PLC
LOCATION LOCATION
3"x2-1/2" 3"x2-1/2"
NOTE 10 NOTE 10 DRY PLANT AIR

3/4"x1/2"
XY IA XV 1"-AP-218801-B1A2-N
XY 206-00055A 9857
S PG 21677H 21677H 2"x1"
21677D 3/4" NOTE 4 3/4" NOTE 4
21677E

NOTE 5
XV XV
IA

LO

LC

2"-P-218801-B1A2-N
S
3/4" PLC 21677H NOTE 5
21677F PLC XV
1-1/2"-P-218804-B1A2-N XY IA 21677K PLC
SMF AIR
RESERVOIR
SPE-21011-FA02 21677F NOTES :
S
1. IT IS ADVISABLE FOR THE REFINER TO INSTALL A SWING TYPE CHECK VALVE IN THIS LINE JUST BEFORE
3/4" PDG XY IT TIES INTO THE MAIN LINE TO THE REGENERATOR. THIS WILL PREVENT CATALYST AND ADDITIVES
NOTE 7

2"-P-218813-B1A2-N
S
21677 21677K FROM OHER LOADERS FROM PACKING THE PIPING WHEN THIS LOADER IS NOT IN USE.
L H
2. FLEXIBLE HOSE SHOULD BE RUN IN THE HORIZONTAL DIRECTION.

NOTE 6
IA NOTE 5
FL 3. ALL INSTRUMENT TUBING AND TUBING FITTINGS SHALL BE 316SS-SWAGELOK DOUBLE FERRULE.
3"-V-218808-B1A2-N FO 1-1/2"-P-218804-B1A2-N PG
XV 21677D 4. ALL VALVES OPEN TO ATMOSPHERE REQUIRES PLUGS.
21678A XV 2"-P-218807-B1A2-N XV
21677D NOTE 8 21677F 5. BUCKET VALVE.
21677K
3"x2"

2"x1-1/2" DRY PLANT AIR 6. EVERLASTING VALVE. STRAIGHT THRU.

2"x1-1/2"
2"-P-218803-B1A2-N 1"-P-218802-B1A2-N 1"-AP-218802-B1A2-N
206-00055A 9856 7. HIGH POINT.

3"x2"
PI PT NOTE 2 NOTE 2 SGL 2"x1" FC
2"x1" 8. LOW POINT.
21677 21677 21011A

2"x1-1/2"
XV PLC
N5 N4 9. FIELD FLEX HOSE TUBING INSTALLATION FROM THE CONTROLLER TO THE LOADER BULK HEAD PLATE
21677C
PLC N1 N3 TO BE PROVIDED BY SECL.
2"x1-1/2" N2
XY 10. 13 MM WEEP HOLE.
SPE-21011-EJ01 S
21677C SPE21011-LCP-001
IA
SPE-21011-FA01 SERIAL NO : 2GE0322SPA
2"-P-218808-B1A2-N

FO IMS INTERCAT CONTROLLER XL


N6
21678B CLASS 1 DIVISION 2 21678
XV
21677C COMMON ALARM
1-1/2"x1" 1-1/2"x1"
XV
21677E HS
1"-AP-218804-B1A2-N

HMI 21680D
NOTE 9 INCREASE
PG 1-1/2"
21677A HS
XV WE-01 WE-02 WE-03
21680E
DRY PLANT AIR 21677G WE WE WE
1"-AP-218803-B1A2-N PLC HS HS HS DECREASE
9855 206-00055A XY 21677A 21677B 21677C
NOTE 2 21677G S PG 21680A 21680B 21680C
21677C INSTRUMENT AIR
RESUME/ HISTORY ALARM
XV 206-00055A 10300
IA SUSPEND SELECT ACCEPT
21677G
WEIGH CELL JUNCTION BOX
1"-AP-218805-B1A2-N 1"-P-218815-B1A2-N HS HS HS XL HS
1" 21681A 21680F 21680H 21677 21681B
NOTE 5
XV
AP P TECH HS MANUAL AUTO MANUAL MANUAL
N7 21677A
PLC SERVICE AUTOMATION RELOAD OVERRIDE OVERRIDE
WE WE WE 21680J

XV 21677A 21677B 21677C ACTIVATE HS HS HS


XY PLC PLC PLC
21677A SHUTDOWN
S 21681G 21681C 21681D
3/4"-AP-218806-B1A2-N 21677A
1"x3/4" TUBING TUBING XV PRESSURE SMALL LARGE VENT
IA CONTROL VENT & EDUCTOR
3/4" 21677J
PLC
XV XY HS HS
SPE-21011-FG01 21677B S 21681E 21681F
PLC 21677J
4
TE

XY IA CARRIER CAT
NO

21677B VORTEX AIR RELOAD


S COOLER
SGL SOLENOIDS
21011B XY-21677A, XY-21677B, XY-21677C, XY-21677D,
XY-21677E, XY-21677F, XY-21677G, XY-21677H, XY-21677K
NOTE 6

FL

XV MODBUS TCP TO DCS


1-1/2"-P-218805-B1A2-N

21677B INCOMING
XA
POWER
XA XA LAH WI WI FQI WI PI 21680A FAILURE

PG 21680C 21680D 21678 21680 21681 21678 21682 21677


XA COMMON
21677B PURGE LOADER LODAER SET POINT SET POINT TOTAL CURRENT LOADER
FAIL ON/OFF HIGH LEVEL WRITE READ ADDITION WEIGHT PRESSURE 21680B ALARM
HARDWIRED
AP P LINE FOR DAY AAS DIGITAL
HARDWIRED DCS
1" 2"x1" 2"-P-218806-B1A2-N XL ADDITION TO DCS HS
2"-AP-218805-B1A2-N ANALOG ACTIVATE
SETPOINT
TO DCS 21679D 21682 SHUTDOWN
2" (WRITE)

SGL
21011C 2" FRESH CATALYST
2"-P-218806-B1A2-N
9846 206-00055
2" NOTE 2 TO DC-21002

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL DETAIL OF SPE-21011 (2/2)
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00055B 00
CAD FILE :
FG-21002
GENERAL NOTES :
FG-21002-FA01
FRESH CATALYST STORAGE HOPPER DUST CONTROL UNIT 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
FRESH CATALYST HOPPER GAS ACCUMULATOR TANK DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DESIGN CAPACITY 1.135 m^3/hr ID 324 mm
DP 4.6 kg/cm^2g Z PURGE
TL-TL 1213 mm 2. DELETED.
DT 10 C / 343 C OP 6.5 kg/cm^2g
MATERIAL KCS DP 10.5 kg/cm^2g
INSULATION N TUBING 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
OT 48 C
TRIM B2A1 T-A05T3 DT 10 C / 80 C

1"
MATERIAL Killed Carbon Steel
PDCV INSULATION N
TRIM T-A06T1
21198A FG-21002-LCP01
INSTRUMENT AIR 1" 1"
1"-AI-218560-T-A05T3-N SECL
9867 206-00055
1" VENDOR

3/4"
NOTE 2

3/4"
1"

1"

1"

1"
T-A05T3
TUBING

1"-AI-218556-T-A05T3-N
NOTES :
1. MINIMUM DISTANCE BETWEEN XV VALVES & GAS ACCUMULATOR.
OPEN/CLOSE 2. INSTRUMENT AIR MANIFOLD 4" PIPE X 1000 mm LONG.
ZIC COMMAND
3. FRESH CATALYST HOPPER (FA-21001) IS DIRECT CONNECTED TO FRESH CATALYST
21196D XS XS XS XS STORAGE HOPPER DUST CONTROL UNIT (FG-21002).
XS
21196D 21196C 21196B 21196A 21196A 4. COMMUNICATION BETWEEN PLC AND DCS IS PROVIDED OVER NETWORK CABLES AND IS RESPONSIBILITY
XL ZIO
OF CONTRACTOR.
21196D 21196D
ZIC
21196C
XY
21196D ZIC ZIO XL ZIO
21196D 21196D 21196C 21196C
ZIC

S
XY 21196B
ZSC ZSO 21196C ZIC ZIO XL ZIO
21196D 21196D
XV 21196C 21196C 21196B 21196B
B2A1 T-A06T1 21196D ZIC

S
2" 21196A
XY 2"-AI-218555-T-A06T1-N
2" 2" ZSC ZSO 21196B NOTE 1
ZIC ZIO XL ZIO
FC 21196C 21196C
3/4"

XV 21196B 21196B 21196A 21196A


B2A1 T-A06T1 21196C

S
2" 2"-AI-218554-T-A06T1-N
XY
2" 2" ZSC ZSO 21196A NOTE 1
ZIC ZIO LCP INSTRUMENTATION
FC 21196B 21196B
3/4"

XV 21196A 21196A
B2A1 T-A06T1 21196B

S
2"
2"-AI-218558-B2A1-N 2"-AI-218553-T-A06T1-N HS HS
2"-AI-218581-B2A1-N

2"-AI-218551-B2A1-N

2" 2" ZSC ZSO NOTE 1 21199G 21199G


FC 21196A 21196A
3/4"

XV
B2A1 T-A06T1 21196A OPEN/CLOSE XA HS HS
2"

1"-V-218559-T-A06T1-N
2"-AI-218557-B2A1-N 2"-AI-218552-T-A06T1-N COMMAND 21199B 21199H 21199H

2" 2" NOTE 1


FC
3/4"

PI PI JI HS HS
21197B 21197B 21199C 21199J 21199J
D3 D2 L L
D4 2" 2"

1"-AI-218556-T-A05T3-N
R1 2" #300 #300 D1

1"
2" #300 2" START HAS HS HS
HUMID AIR #300 COMMAND
B P2 PT 21199D 21199K 21199K
206-00055 9838 8" 2" 21197B 2" 2" 2" 2" 1" 1"
TO BY-21001 G1 G2 G3 G4 V R2
XSP HSP HS HS
2"
P3 21199F 21199E 21199L 21199L
H NOTE 4 H
PDT PDI PDI PDCV FG-21002-FA01 STOP
4" COMMAND
21197A 21197A 21197A 21198B M1
1" NOTE 4
4"
F
1" 1" 1" M2 LOSS OF PAL PAL JI HAS HSP
1"-AI-218556-T-A06T1-N PURGE 21199A 21199A 21199C 21199D 21199E
P1 H
T-A05T3 T-A06T1 FO
2"
21198C

3/4"
FG-21002
A
30"

NOTE 3

FRESH CATALYST HOPPER


FA-21001

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESGIN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL DETAIL OF FG-21002
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00055D 00
CAD FILE :
EQUILIBRIUM
CATALYST
FG-21003A / B FA-21002A / B PP
8"-P-210177-B1A2-PP
206-00057 4716
GENERAL NOTES :
EQUILIBRIUM CATALYST STORAGE HOPPER DUST CONTROL UNIT EQUILIBRIUM CATALYST STORAGE HOPPER 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
3/4" FROM HANDLING
DESIGN CAPACITY 1.135 m^3/hr ID 6600 mm FACILITY DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

8"
DP 4.6 kg/cm^2g TL-TL 19600 mm
DT 10 C / 343 C DP 7.27 kg/cm^2g / F.V@343 C 4"-P-210177-B1A2-PP 2. DELETED.
MATERIAL KCS DT 10 C / 343 C
MSV
INSULATION N MATERIAL KCS 21007 EQUILIBRIUM 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
TRIM B2A1 INSULATION N CATALYST
TRIM B1A2 8"-P-210176-B1A2-PP
PP 206-00057 4715
MSV 3/4" FROM HANDLING
FACILITY

8"
21008
DRY PLANT AIR NOTE 11, 12, 13
4"-P-210405-B1A2-N 4" 45° SECL
3519 206-00055 "BC-82~85"
VENDOR
FROM DRY PLANT
AIR HEADER
DRY PLANT AIR
4"-P-210404-B1A2-N 4"
3520 206-00055
FROM DRY PLANT

4"
AIR HEADER

MIN.
CATALYST DUST 4" SPENT CATALYST
8"-P-210174-B1A2-PP 8"-P-210175-B1A2-PP 4"-P-210178-B1A2-PP
206-00055 3517 PP 206-00057 4718
NOTE 3 NOTE 3
TO BY-21001 4P6 4P6 FROM DC-21002
SET @ 4.57 kg/cm^2g SET @ 4.57 kg/cm^2g
MIN.
NOTES :

8"

8"
PSV PG PSV
PG

8"-P-210174-B1A2-PP
21002 21003 1. MAKE CONNECTION ON TOP OF PIPE.
TO ATMOSPHERE 6"-V-210661-T-A06T1-N 21006G TO ATMOSPHERE 6"-V-210662-T-A06T1-N 21007G
AT SAFE LOCATION NOTE 6 FREE DRAINING NOTE 5 AT SAFE LOCATION NOTE 6 FREE DRAINING NOTE 5 2. GAUGING HATCH MUST BE ACCESSIBLE FROM PLATFORM.
T-A06T1-N T-A06T1-N 3. DO NOT TRAP OR POCKET THIS LINE.
8"x4" 8"x4"

9841 206-00056B
B1A2-PP

9847 206-00056D
3/4" B1A2-PP 3/4" 4. DELETED.

S S 5. SEE DETAIL ON DWG. 206-00002.


LO 9850 LO
NOTE 14 NOTE 15 6. 13mm WEEP HOLE.

8"

8"
FP INSTRUMENT AIR FP 9863
1" 1"-AI-210111-T-A05T3-N AI INSTRUMENT AIR
FG-21003A 206-00056B 9849 FG-21003B 1" 1"-AI-210112-T-A05T3-N AI
206-00056D 9862
7. REFER TO DRAWING NO. 206-00004.
206-00621C
8"-P-210436-B1A2-PP 206-00621C
8"-P-210435-B1A2-PP 8. BEND 9D.
FF FREE DRAINING FF FREE DRAINING
LI LI 9. DELETED.
21002A NOTE 7 21003A NOTE 7
FF "DA-8" 10. AS AN ALTERNATE TO TEE'S, PROVIDE LONG RADIUS BENDS IN CATALYST FILLING AND
FF "DA-7" FF H LI LT FF H WITHDRAWAL LINES, CATALYST MAKEUP LINE AND HOPPER LOADING LINES.
FO LI LT PT PI FO PT PI
T-A05T3 B1A2 21002 21002 21002 21058 21058 T-A05T3 B1A2 21003 21003 21003 21059 21059 11. 3/4"BLAST CONNECTION APPROXIMATELY EVERY 4000 RUN OF CATALYST LINE.
9334 RADAR RADAR
NOTE 2 3/4" 3/4" 3/4" 2"x3/4" NOTE 2 12. MAKE CONNECTION ON TOP OF PIPE.
AI 3/4"-AI-210198-T-A05T3-N 3/4" 3/4" 3/4" 2"x3/4" 4"
A01 A01 4"
13. DETAIL "BC", SEE DWG 206-00007.
206-00621C 2" 8" 8" G01 J01 P01 I01 2" 8" 8" G01J01 I01
P01 8"
STR
C01 U01 10" 42" H01 8" STR C01
3/4"-P-210434-B1A2-PP #300
U01
10" 42" H01 14. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00056B.
3/4"-P-210433-B1A2-PP #300 21003
21002 15. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00056D.
9335
AI 3/4"-AI-210200-T-A05T3-N
206-00621C

HLL=15700 mm HLL=15700 mm
FA-21002A LLL=3900 mm FA-21002B LLL=3900 mm

M02 M02
24" ID 24" ID

MW MW

SCREEN SCREEN
MSV T-A06T1 B1A2 MSV
T-A06T1 B1A2
21009 N03 21012 N03
3/4" 3/4"-P-210423-B1A2-PP 3/4" 3/4" 3/4"-P-210428-B1A2-PP 3/4"
4" 4"
1"x3/4" 1"x3/4"

1"-AP-210055-T-A06T1-N
O03 O03
10" 10"
SFT 1"x3/4" SFT
1"x3/4" 3/4" 3/4" 3/4"-P-210424-B1A2-PP 3/4" 3/4" 3/4"-P-210429-B1A2-PP
21002 21003

3/4" 3/4"-P-210425-B1A2-PP 3/4" 3/4" 3/4"-P-210430-B1A2-PP 3/4"

8"
8"

MSV MSV
3/4" 3/4" 21010 3/4" 3/4" 21013
3/4"-P-210426-B1A2-PP 3/4"-P-210431-B1A2-PP
DRY PLANT AIR MSV MSV
1"-AP-210053-T-A06T1-N
4194 206-00055 21011 21014
FROM DRY PLANT 1"x3/4" 3/4" 1"x3/4" 3/4" 3/4"
3/4" 3/4"-P-210427-B1A2-PP 3/4"-P-210432-B1A2-PP
AIR HEADER
8"

8"

VERTICAL
VERTICAL

1500 mm

1500
MIN.

MIN.
8"-P-210181-B1A2-PP
8"-P-210180-B1A2-PP

DRY PLANT AIR


1"-AP-210055-T-A06T1-N 1"-AP-210055-T-A06T1-N
5507 206-00055
FROM DRY PLANT
AIR HEADER NOTE 8 NOTE 8
45° 45°
FRESH CATALYST CATALYST
8"-P-210169-B1A2-N 8"-P-210169-B1A2-PP 8"-P-210169-B1A2-PP
4195 206-00055 4694 206-00057
FROM FA-21001 TO DC-21002
NOTE 1 NOTE 1

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL EQUILIBRIUM CATALYST STORAGE HOPPERS
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00056 00
CAD FILE :
FG-21003A
GENERAL NOTES :
FG-21003A-FA01
EQUILIBRIUM CATALYST STORAGE HOPPER DUST CONTROL UNIT 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
EQUILI BRIUM CATALYST HOPPER GAS ACCUMULATOR TANK DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DESIGN CAPACITY 1.135 m^3/hr ID 406 mm
DP 4.6 kg/cm^2g Z PURGE
TL-TL 1213 mm 2. DELETED.
DT 10 C / 343 C OP 6.5 kg/cm^2g
MATERIAL KCS DP 10.5 kg/cm^2g
INSULATION N TUBING 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
OT AMB
40 C
TRIM B2A1 T-A05T3 DT 10 C / 80 C
MATERIAL KCS
Killed Carbon Steel
PDCV INSULATION N
TRIM T-A06T1
21471A FG-21003A-LCP01
INSTRUMENT AIR
1"-AI-218570-T-A05T3-N SECL
9849 206-00056
1" 1" 1" VENDOR

3/4"
NOTE 2

3/4"
1"

1"

1"

1"
T-A05T3
TUBING

1"-AI-218566-T-A05T3-N
NOTES :
1. MINIMUM DISTANCE BETWEEN XV VALVES & GAS ACCUMULATOR.
2. INSTRUMENT AIR MANIFOLD 4" PIPE X 1000 mm LONG.
ZIC
3. EQUILIBRIUM CATALYST HOPPER A (FA-21002A) IS DIRECT CONNECTED TO EQUILIBRIUM CATALYST
21469D XS XS XS HOPPER DUST CONTROL UNIT A (FG-21003A).
XS
21469D 21469C 21469B 21469A 4. COMMUNICATION BETWEEN PLC AND DCS IS PROVIDED OVER NETWORK CABLES NOT INDIVIDUAL
XL ZIO
SIGNAL WIRING AND IS RESPONSIBILITY OF CONTRACTOR.
21469D 21469D
ZIC
XY 21469C
21469D ZIC ZIO XL ZIO
21469D 21469D 21469C 21469C
ZIC

S
21469B
ZSC ZSO
XY ZIC ZIO XL ZIO
21469D 21469D
XV 21469C 21469C 21469C 21469B 21469B
B2A1 T-A06T1 21469D ZIC

S
3" 21469A
XY 3"-AI-218565-T-A06T1-N
3" FC ZSC ZSO 21469B NOTE 1
ZIC ZIO XL ZIO
3" 21469C 21469C
3/4"

XV 21469B 21469B 21469A 21469A


B2A1 T-A06T1 21469C

S
3"
XY 3"-AI-218564-T-A06T1-N
3" FC ZSC ZSO 21469A NOTE 1
ZIC ZIO LCP INSTRUMENTATION
3" 21469B 21469B
3/4"

XV 21469A 21469A
B2A1 T-A06T1 21469B

S
3"
3"-AI-218568-B2A1-N 3"-AI-218563-T-A06T1-N HS HS
3"-AI-218582-B2A1-N

3"-AI-218561-B2A1-N

3" FC ZSC ZSO NOTE 1 21472G 21472G


3" 21469A 21469A
3/4"

XV
B2A1 T-A06T1 21469A OPEN/CLOSE XA HS HS
3"

1"-V-218569-T-A06T1-N
3"-AI-218567-B2A1-N 3"-AI-218562-T-A06T1-N COMMAND 21472B 21472H 21472H

3" FC NOTE 1
3"
3/4"

PI PI JI HS HS
21470B 21470B 21472C 21472J 21472J
D3 D2 L L
D4 3" 3" D1

1"-AI-218566-T-A05T3-N
3"
R1 #300 #300 #300 3"

1"
2" START HAS HS HS
HUMID AIR #300
B PT COMMAND 21472D 21472K 21472K
P2
206-00056 9841 8" 2" 21470B 3" 3" 3" 3" 1" 1"
TO BY-21001 G1 G2 G3 G4 V R2
XSP HSP HS HS
2"
P3 21472F 21472E 21472L 21472L
H H
PDT PDI NOTE 4 PDI PDCV FG-21003A-FA01 STOP
4" COMMAND
21470A 21470A 21470A 21471B M1
1" NOTE 4
4"
F
1" 1" 1" M2 LOSS OF PAL PAL JI HAS HSP
P1 1"-AI-218566-T-A06T1-N H PURGE 21472A 21472A 21472C 21472D 21472E
FO
2" T-A05T3 T-A06T1
21471C

3/4"
FG-21003A
A
42"

NOTE 3

FRESH CATALYST HOPPER


FA-21002A

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESGIN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL DETAIL OF FG-21003A
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00056B 00
CAD FILE :
FG-21003B
GENERAL NOTES :
FG-21003B-FA01
EQUILIBRIUM CATALYST STORAGE HOPPER DUST CONTROL UNIT 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
EQUILI BRIUM CATALYST HOPPER GAS ACCUMULATOR TANK DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DESIGN CAPACITY 1.135 m^3/hr ID 406 mm
DP 4.6 kg/cm^2g Z PURGE
TL-TL 1213 mm 2. DELETED.
DT 10 C / 343 C OP 6.5 kg/cm^2g
MATERIAL KCS DP 10.5 kg/cm^2g
INSULATION N TUBING 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
OT 40 C
TRIM B2A1 T-A05T3 DT 10 C / 80 C

1"
MATERIAL Killed Carbon Steel
PDCV INSULATION N
TRIM T-A06T1
21471G FG-21003B-LCP01
INSTRUMENT AIR
1"-AI-218580-T-A05T3-N SECL
9862 206-00056
1" 1" 1" VENDOR

3/4"
NOTE 2

3/4"
1"

1"

1"

1"
T-A05T3
TUBING

1"-AI-218576-T-A05T3-N
NOTES :
1. MINIMUM DISTANCE BETWEEN XV VALVES & GAS ACCUMULATOR.
2. INSTRUMENT AIR MANIFOLD 4" PIPE X 1000 mm LONG.
ZIC
3. EQUILIBRIUM CATALYST HOPPER B (FA-21002B) IS DIRECT CONNECTED TO EQUILIBRIUM CATALYST
21469H XS XS XS HOPPER DUST CONTROL UNIT B (FG-21003B).
21469G 21469F 21469E 4. COMMUNICATION BETWEEN PLC AND DCS IS PROVIDED OVER NETWORK CABLES NOT INDIVIDUAL
XS XL ZIO
SIGNAL WIRING AND IS RESPONSIBILITY OF CONTRACTOR.
21469H 21469H 21469H
ZIC
21469G

XY ZIC ZIO XL ZIO


21469H 21469H 21469H 21469G 21469G
ZIC
21469F
ZSC ZSO
S
XY ZIC ZIO XL ZIO
21469H 21469H
XV 21469G 21469G 21469G 21469F 21469F
21469H ZIC
B2A1 T-A06T1
3" 21469E 3"-AI-218575-T-A06T1-N
FC ZSC ZSO NOTE 1

S
3" XY ZIC ZIO XL ZIO
3" 21469G 21469G
3/4"

XV 21469F 21469F 21469F 21469E 21469E

B2A1 T-A06T1 21469G


3"
3"-AI-218574-T-A06T1-N
FC ZSC ZSO NOTE 1

S
3" XY ZIC ZIO
3" 21469F 21469F LCP INSTRUMENTATION
3/4"

XV 21469E 21469E 21469E

B2A1 T-A06T1 21469F


3" 3"-AI-218578-B2A1-N 3"-AI-218573-T-A06T1-N HS HS
3"-AI-218583-B2A1-N

3"-AI-218371-B2A1-N

FC ZSC ZSO NOTE 1 21472U 21472U

S
3"
3" 21469E 21469E
3/4"

XV
B2A1 T-A06T1 21469E OPEN/CLOSE XA HS HS

1"-V-218579-T-A06T1-N
3" 3"-AI-218577-B2A1-N 3"-AI-218572-T-A06T1-N COMMAND 21472P 21472V 21472V

3" FC NOTE 1
3"
3/4"

PI PI JI HS HS
21470D 21470D 21472Q 21472W 21472W
D3 D2 L L
D4 3" 3" D1

1"-AI-218576-T-A05T3-N
R1 3" #300

1"
#300 3"
2" #300 START HAS HS HS
HUMID AIR #300
B PT COMMAND 21472R 21472X 21472X
P2
206-00056 9847 8" 2" 21470D 3" 3" 3" 3" 1" 1"
TO BY-21001 G1 G2 G3 G4 V R2
XSP HSP HS HS
2"
P3 21472T 21472S 21472Y 21472Y
H NOTE 4 H
PDT PDI PDI PDCV FG-21003B-FA01 STOP
4" COMMAND
21470C 21470C 21470C 21471H M1
1" NOTE 4
4"
F
1" 1" 1" M2 LOSS OF PAL PAL JI HAS HSP
1"-AI-218576-T-A06T1-N PURGE 21472N 21472N 21472Q 21472R 21472S
P1 H
FO
2" T-A05T3 T-A06T1
21471J

3/4"
FG-21003B
A
42"

NOTE 3

FRESH CATALYST HOPPER


FA-21002B

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL DETAIL OF FG-21003B
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00056D 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

45° 45° NOTE 9


SPENT CATALYST DETAIL DETAIL
4"-P-210178-B1A2-PP "BC-6" "BC-5"
206-00056 4718 PP
TO FA-21002A/B
NOTE 1, 7, 14 NOTE 1, 7, 14

NOTE 6
NOTES :
SPENT CATALYST 1. 3/4" BLAST CONNECTIONS APPROXIMATELY EVERY 4000 RUN OF CATALYST LINE.
NOTE 9 4"-P-210178-B1A2-PP 206-00063 5155 2. INSTALL REMOVABLE SPOOL PIECE FOR REMOVING CATALYST (BLANKOFF WHEN NOT IS USE)
FROM DC-21002 3. CATALYST FILLING AND WITHDRAWAL.
NOTE 9 4. DELETED.
PG
CATALYST 5. CATALYST TO/FROM HANDLING FACILITIES.
8"-P-210168-B1A2-PP 21014G
206-00055 3518 PP 6. CATALYST WITHDRAWAL.
TO FA-21001 7. MAKE CONNECTION ON TOP OF PIPE.
1-1/2" 1-1/2" DRY PLANT AIR
1-1/2"-AP-210439-T-A06T1-N
206-00082A 11588 8. BEND 9D.
FROM FA-21008 9. TEE+CAP TO BE INSTALLED AT THE POINT WHERE THE DIRECTION OF THE PIPE CHANGES FOR
EQUILIBRIUM B1A2 T-A06T1 CATALYST LINE.
CATALYST
8"-P-210176-B1A2-PP PG 10. AS AN ALTERNATE TO TEE'S PROVIDE LONG RADIUS BENDS IN CATALYST FILLING AND
206-00056 4715 PP WITHDRAWAL LINES, CATALYST MAKEUP LINE AND HOPPER LOADING LINES.
21008G
TO FA-21002B
11. PRESSURIZED AIR CONNECTION.
DRY PLANT AIR 12. TRANSFER AIR CONNECTION.

1-1/2"-AP-210440-B1A2-N
1-1/2" 1-1/2"-AP-210438-T-A06T1-N
206-00082A 8130 13. CATALYST AND DRY PLANT AIR LINE TO BE EXTENDED NEAR THE TRAIN
EQUILIBRIUM
FROM FA-21008 STATION FOR CONNECTING TO TRAIN HOPPER CAR.
CATALYST
8"-P-210177-B1A2-PP B1A2 T-A06T1
206-00056 4716 PP HHC 14. DETAIL "BC", SEE DWG 206-00007.
TO FA-21002A 21006 15. FOR ALTER CASE CONNECTION. (TRUCK, ETC.)
1-1/2"-AP-210062-T-A06T1-N 1-1/2"-AP-210062-B1A2-N
NOTE 11, 13
8"-P-210168-B1A2-PP

1-1/2"-P-210438-B1A2-N
1-1/2"
T-A06T1 B1A2
NOTE 12, 13
1-1/2"
1-1/2"-AP-210063-B1A2-N HHC
MI 21007
PP

N. N
"
3/4
MIN.

45°
MSV
45° 45° 45° 45° 45° 45° HHC
8"

MSV MIN. 21025 MIN. 4"-P-210182-B1A2-N


3/4" DETAIL DETAIL DETAIL DETAIL DETAIL DETAIL 21002
21017 NOTE 8 "BC-3" "BC-4" "BC-56~71" "BC-56~71" "BC-72~79" "BC-72~79" 8" 8"-P-210182-B1A2-N 8"x4"
MSV NOTE 11
300 300
21020 45° 300 45° MSV NOTE 13 TRAIN HOPPER CAR 1 1/2"
NOTE 1, 7, 14 NOTE 1, 7, 14 NOTE 1, 7, 14 NOTE 1, 7, 14 3/4" NOTE 1, 7, 14 NOTE 1, 7, 14 3/4"
21018 FLEXIBLE METAL
IL HOSE
° TA 1"
45 DE C-8 8"
-P
"B 14 -2
8"-P-210179-B1A2-PP

7, 10
1, 55
5-B MI 1-1/2"
TE N.
2-N

NO 1A NOTE 12
2-N
1A
3-B

MI 4"
18

0 N.
10

30 BY CONTRACTOR BY PTI
-2

°
-P

45 NOTE 5
N.
8"

MI

L M
TAI 0" 21 SV 8"
DE C-8 02
6
"B 8"
N. x6
MI 14 3/4 "
NOTE 8 7, "
1,
8"-P-210169-B1A2-PP
NOTE 8 TE
NOTE 2 NO NOTE 15
EQUILIBRIUM
CATALYST 8"-P-210169-B1A2-PP CATALYST
45° 8"-P-210179-B1A2-PP
8" 8"
4694 206-00056 PP 5199 206-00063
FROM FA-21001, MIN. MSV MIN. MSV TO/FROM DC-21002
FA-21002A/B 3/4" 3/4"
21021 21022

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL EQUILIBRIUM CATALYST STORAGE HOPPERS (2/2)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00057 00
CAD FILE :
GB-21001 GENERAL NOTES :
MAIN AIR BLOWER 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DESIGN CAPACITY 350703 nm^3/hr DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DIFF. PRESSURE 2.85 kg/cm^2
DRIVER POWER 20929 kW 2. DELETED.
MATERIAL
3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

SECL
VENDOR

10082 206-00058A

NOTES :
1. DELETED.
10081 206-00058A 2. PROVIDE BLOWER LINE BLIND FOR START UP. (FACILITIES FOR INSTALLATION.
REMOVAL, HANDLING AND STORAGE OF BLIND SHALL BE PROVIDED.)
3. ANTISURGE SIGNAL OPENS CONTROL VALVE.
4. NOT TO EXCEED 150 METERS TOTAL EQUIVALENT LENGTH OF PIPE. LARGER SIZE REQUIRED IF GREATER
LENGTH.
IS IS
21051 21001 5. INSTALL IN HORIZONTAL LINE.
TI PI
INSTRUMENT 6. DELETED.
21735 21735 IS NOTE 8
AIR
21052 7. DELETED.
8. REFER TO CAUSE&EFFECT DIAGRAM FOR DETAILS.
SPE ZI
21008 21008 9. DELETED.
TI TI TI PI PI PI CCC
21735A 21735B 21735C 21735A 21735B 21735C 10. DELETED.
11. DELETED.

S
CCC CCC CCC CCC CCC CCC
DE
XY 12. DELETED.
ZT
21905 21008 13. MINIMUM FROM MAIN AIR BLOWER DISCHARGE.
TT TT TT PT PT PT PG TI NOTE 5, 18, 22
21735A 21735B 21735C 21735A 21735B 21735C 21081G 21004 14. DELETED.
SPE
15. DELETED.
21008
56"x48" AIR 16. DELETED.
56"-P-210002-B1A1-PP
PP PP 5253 206-00059 17. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00058B~00058P.
NOTE 19 56"
NOTE 13 NOTE 2 TO BA-21001
18. MAX CLOSING TIME OF CHECK VALVE : 1 SEC.

2"
NOTE 4
19. MAX ENCLOSED VOLUME (INCLUDING ALL BRANCHES TO BLOW OFF VALVES) IS 21.8m³.

36"-P-210032-B1A1-PP
NOTE 21 20. 1/2" NPT WELDOLET WITH PLUG FOR PRESSURE MEASUREMENTS (ONLY TEMPORARY).
21. 3/4" NPT WELDOLET WITH PLUG FOR TEMPERATURE MEASUREMENTS (ONLY TEMPORARY).
22. "HIGH" ACTIVE CLOSING ASSIST IN CASE OF SURGE.
NOTE 20 23. HS-21904E CONSIST OF 3 CONTACTS (HS-21904EA/EB/EC).

44"
48"-P-210002-B1A1-PP 44"x28" 36"x20"

TO XV-21728

TO XV-21729
206-00058I 10084

206-00058I 10083
8992 206-00058H

GB-21001
NOTE 17 BLOWER
ALARMS
XA CRIT
21002

9887 206-00058H

NOTE 23
NOTE 8
HS IS HA CRIT
21904E 21007 21904
BLOWER
STOP
HL
21904E

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058 00
CAD FILE :
DRAIN SIL
3/4"-DAA-210024-T-A60T1-PP SIL NOTE 8 GENERAL NOTES :
11713 206-00078A P 21001 21009
1-P HIC 4"-V-210500-T-A06T1-N 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
TO SIL-21001 DRAIN H H 60T 3/4"-CACBP-217435-T-A18T1-PP
FI PI T-A 21004 DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
LINE
0001- TO ATMOSPHERE 3/4"-DAA-210033-T-A60T1-N 11380 FI PI 3/4"-CACBP-217436-T-A18T1-PP 11382
21024 21005 -21 AT SAFE LOCATION CACBP 21026 21026 CACBP 2. DELETED.
L XA CRIT AA
IS HS "-D
3/4 4"-V-210594-T-A18T1-PP 206-00627E 206-00627E
21930 21007 21930B AT GRADE 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
NOTE 1 T-A18T1-PP T-A18T1-PP T-A18T1-PP
T-D61T1-EC T-A18T1-PP FF FF
FF H AT GRADE T-B04T1-EC T-B04T1-EC
FT PT TI PG T-B04T1-EC T TI FT PT T

4"
STR

2"
14"-VA-210595-T-D61T1-EC 21024 21005 21002 L 21082G XV STP 21024 21026 21026 STP

TO FIC-21720
206-00058H 11504
21004 L

FROM OIL MIST FAN


STR 21023 21025 3/4"-VM-217436-T-B04T1-EC
3119 21930

10098 206-00058L
NOTE 3 HP STEAM 3/4"-VM-217435-T-B04T1-EC SECL
14" TYPE 1-1 14"x12" 21030 9013
VA MP STEAM 6"x4" 6"
9000 206-00058D 6"-VM-210594-T-B04T1-EC VM VENDOR
206-00614 FC 206-00058M 9015
NOTE 2 206-00615
1"-VA-217420-T-D61T1-EC TSO 2J3

3"
1"

3/4"
TT TT TT

2"-V-210019-T-A18T1-PP
1"-VA-217421-T-D61T1-EC 14" 10775 206-00058D PSV SET @ 8.7 kg/cm^2g 1"
21908A 21908B 21908C

3"
T T NOTE 2 21006B 4"x3" 4"-V-210020-T-A18T1-PP
T-D61T1-EC T-D61T1-EC TO ATMOSPHERE

TSLL
STP STP 10776 206-00058D #300 FREE DRAINING AT SAFE LOCATION
T-A18T1-PP 11379
T-A18T1-PP 8578
21038 #150 PP NOTE 5
21037
CACBP CACBP 10777 206-00058D 6"x2" EC
2J3
1"-CACBP-217421-T-A18T1-PP 206-00627E 206-00627E 3/4" PSV SET @ 8.7 kg/cm^2g
1"-CACBP-217420-T-A18T1-PP
7333 21006A 4"x3" 4"-V-210023-T-A18T1-PP TO ATMOSPHERE
1-1/2" 1-1/2" 1-1/2" MP STEAM
VM 1-1/2"-VM-210002-T-B04T1-EC
9001 206-00058E LC #300 FREE DRAINING AT SAFE LOCATION NOTES :
PP

6"
206-00615 EC FP #150 PP NOTE 5 1. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
3/4" EA 11378
EC 6"x2" EC

6"-VB-210007-T-A18T1-EC

6"-VB-210008-T-A18T1-EC
9003
GB-21001 2. MINIMUM FROM NOZZLE.

2"
1" 1" 1" MP STEAM 3/4" CACBP
VM 1"-VM-210003-T-B04T1-EC
9002 206-00058E NOTE 7 206-00627C 3. TEMPERATURE TRANSMITTER TO BE LOCATED MAXIMUM 6 m FROM STEAM INLET.
206-00615 PP
EC 3/4"-CACBP-217422-T-A18T1-PP 4. DELETED.
3/4"

T
8580 TG PG LO STP
1/2" PLANT AIR 5. 13 mm WEEP HOLE.

6"
AP 1"-AP-210030-T-A06T1-N 1" 1"x1/2" 21029 21087 FP 21042
9004 206-00058K 6. DELETED.
206-00619D 3/4"-VB-217540-T-A18T1-EC
9012 7. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00058B~00058P.
LP STEAM 8"
8"-VB-210004-T-A18T1-EC 8" VB
1/2" PLANT AIR 9014 206-00058M 8. GB-21001 PERFORMANCE TO BE CONTROLLED BASED ON THE SETTING POINT INPUT BY OPERATOR.
1/2"-AP-210032-T-A06T1-N 1/2" NOTE 2 206-00617B
11583 206-00058B 3/4"-VB-217437-T-A18T1-EC 3/4"-VB-217438-T-A18T1-EC
3/4" STP STP
COOLING WATER 21022 21024
8582 T
RETURN EC 3/4"-CACBP-217437-T-A18T1-PP T
EC
RAE 3"-RAE-210005-T-A01T1-N 11381 11383
206-00058E 9005 PP PP
206-00624 3"x2" CACBP CACBP
COOLING WATER 206-00627C 3/4"-CACBP-217438-T-A18T1-PP 206-00627C
8581
SUPPLY
SAE 3"-SAE-210001-T-A01T1-N
9006 206-00058E LEAK OFF
206-00623 3"x2" 3"-DAA-210090-T-A60T1-N
11179 206-00058M
9007 COOLING WATER
RETURN
RAE 4"-RAE-210006-T-A01T1-N
206-00058L 9008
206-00624 3"-V-210017-T-A18T1-N
9050 206-00058E AT SAFE LOCATION
9009 COOLING WATER
SUPPLY 206-00635A
SAE 4"-SAE-210002-T-A01T1-N DAA
9010 206-00058L
206-00623 GB-21001 SPE-21020
9019
VENDOR VENDOR
10082 206-00058 10101 206-00058H EXHAUST STEAM
FROM TI-21735 3033 x 1132
9023 206-00058C 3106 206-00078
10081 206-00058 10102 206-00058H TO SPE-21020
FROM PI-21735
CONDENSATE
10087 206-00060 10103 206-00058H 4"-CLIBP-210001-T-A18T1-PP
9035 206-00058G 9036 206-00078
FROM PT-21008 TO PI-21008
TO SURFACE
10086 206-00060 10104 206-00058H CONDENSER FLASH
FROM FT-21005 TO FI-21005 BOX
10085 206-00060 10105 206-00058H CONDENSATE
1"-CLIBP-210002-T-A18T1-PP
FROM TT-21006 TO TI-21006 10089 206-00058G 10106 206-00078
8579 TO SURFACE
AI 1"-AI-210001-T-A05T3-N 1" INSTRUMENT AIR CONDESER FLASH
11153 206-00058I
206-00621C BOX
TO XV-21728
10909
AI 1"-AI-210005-T-A05T3-N 1" INSTRUMENT AIR
11152 206-00058I
206-00621C
TO XV-21729
11154
AI 3/4"-AI-210003-T-A05T3-N
3/4"x1/2" 1/2" INSTRUMENT AIR
10907 206-00058L
206-00621C
TO TV-21751
10911
AI 3/4"-AI-210004-T-A05T3-N 3/4"x1/4" 1/4" INSTRUMENT AIR 1-1/2"-DAA-210092-T-A60T1-N
11151 206-00058E 11408 206-00058L
206-00621C
TO PV-21724

CASING
PSV-21740
DISCHARGE

FROM GB-21001
FILTER

FILTER

FROM GLAND
CONDENSER

FROM GLAND
CONDENSER

FROM GLAND
CONDENSER

FROM GLAND
CONDENSER

FROM GLAND
CONDENSER
FROM INTAKE

FROM INTAKE

FROM SPE-21010

FROM TGB-21001

FROM TGB-21001
DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN
1-1/2"-DAA-210091-T-A60T1-N
206-00058H 11501

206-00058I 10099

206-00058E 11589

206-00058E 11590

206-00058E 11587
206-00058H 8996

206-00058E 9045

206-00058E 9042

206-00058E 9043

206-00058E 9047

206-00058E 9039

206-00058E 9020

206-00058H 8993
3/4"x1/2" 11406 206-00058L
3/4"-DAA-210026-T-A60T1-N
1"-DAA-210029-T-A60T1-N
1"-DAA-210019-T-A60T1-N

206-00635A 206-00635A
1"-DAA-210030-T-A60T1-N

1"-DAA-210022-T-A60T1-N
DAA DAA
11544 10619
1-1/2"x3/4"
1"-DAA-210023-T-A60T1-N

2"-DAA-210003-T-A60T1-N

1"-DAA-210093-T-A60T1-N
1"-DAA-210027-T-A60T1-N

1"-DAA-210028-T-A60T1-N

1"-DAA-210094-T-A60T1-N

1"-DAA-210025-T-A60T1-N

1/2"-DAA-210031-T-A60T1-N
206-00635A 11642
206-00635A 11643
206-00635A 11548

206-00635A 206-00635A
DAA DAA
10100 11618
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER BATTERY LIMIT
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058A 00
CAD FILE :
TGB-21001 GENERAL NOTES :
MAIN AIR BLOWER STEAM TURBINE 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
STEAM FLOWRATE 98000 kg/hr DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
MATERIAL ASTM A356
2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

MMS MMS MMS


COMMON COMMON COMMON SECL
TRIP TRIP TRIP MMS
COMMON VENDOR
IS IS IS TRIP
21052 21052 21052 IS
21052

TSHH TSHH TSHH


21720 21721 21722 TSHH
2oo3 MMS 2oo2 MMS 2oo2 MMS 21723
NOTES :
TSHH

TSHH

TSHH

TSHH

TSHH

TSHH

TSHH

TSHH

TSHH
2oo2 MMS
1. INACTIVE.
HH HH HH HH HH HH HH HH HH 2. ACTIVE.
TI H TI H TI H TI H TI H TI H TI H TI H TI H
3. ALL SIGNALS ARE AVAILABLE VIA MODBUS TCP/IP TO DCS.
21720A 21720B 21720C 21721A 21721B 21722A 21722B 21723A 21723B

HH HH HH HH HH HH HH HH HH
TY H TY H TY H TY H TY H TY H TY H TY H TY H
21720A 21720B 21720C 21721A 21721B 21722A 21722B 21723A 21723B
MMS MMS MMS MMS MMS MMS MMS MMS MMS

TE TE TE TE TE TE TE TE TE
21720A 21720B 21720C 21721A 21721B 21722A 21722B 21723A 21723B
DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX

STEAM TURBINE
NOTE 1 NOTE 2 TGB-21001

1/2"-AP-218201-150-N

CPL

KEYPHASOR PLANT AIR


206-00058A 11583
ZE ZE XE VE VE VE VE
21720A 21720B 21720 21720X 21720Y 21721X 21721Y

ZT ZT XT VT VT VT VT
21720A 21720B 21720 21720X 21720Y 21721X 21721Y

HH HH HH HH HH HH
ZY H ZY H XY VY H VY H VY H VY H
21720A L L
21720B LL 21720 21720X 21720Y 21721X 21721Y
LL
MMS MMS MMS MMS MMS MMS MMS

HH HH HH HH HH HH
ZI H ZI H VI H VI H VI H VI H
21720A L 21720B L 21720X 21720Y 21721X 21721Y
ZSHH

ZSHH
ZSLL

ZSLL

LL LL
VSHH

VSHH

VSHH

VSHH
ZSHHLL VSHH VSHH
21720 21720 21721
2oo2 1oo2 MMS 1oo2 MMS

IS IS IS MMS
COMMON
21051 21052 MMS 21052 TRIP
MMS COMMON
COMMON TRIP
TRIP
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-BEARING STEAM TURBINE
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058B 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.


TRIP SIGNALS SIS-PLC < >PLC
H H
XI HS ST CMD ON ST CMD OFF
21721 21721
L L HSH HSL
MFC OUT MFC IN IS IS 21722 21723 IS SECL
21051 21051 21051 VENDOR
UY H IS IS IS
21721 L 21052 21052 21051
STEAM TURBINE
MULTIFUNCTIONAL
CONTROLLER IS USHH
STEAM 21052 21725
TURBINE IS ZI ZT
SCV
MULTIFUNCTION 21010 21721A 21721A HH
L 21721A
CONTROLLER TDI H
CONTROLLER & ZY ZY 21726 L
START UP RAMP) USHH USHH USHH USHH USHH USHH
21721A 21721A LL
21724A 21724B 21724C 21725A 21725B 21725C
NOTES :
1. REFER TO "INTERLOCK LOGIC DIAGRAM", DOCUMENT-NO.10003224351 FOR DETAILS.
IS
H H 2. ALL SIGNALS ARE AVAILABLE VIA MODBUS TCP/IP TO DCS.
21310 IS ZI ZT SCV TI TI
21010 21721B 21721B 21721B 21724 21725
L USHH USHH USHH USHH USHH USHH
IS 21724A 21724B 21724C 21725A 21725B 21725C
ZY ZY CCC CCC CCC CCC CCC CCC
H 21051
SI 21721B 21721B TRIP TO PLC TRIP TO PLC TRIP TO PLC TRIP TO PLC TRIP TO PLC TRIP TO PLC
21721 L IS TT TT
LL 21052
LLL 21724 21725
IS ZI ZT
SCV
21010 21721C 21721C
L 21721C
SI SI
21721A 21721B ZY ZY TE TE
21721C 21721C 21724 21725
UPPER LOWER
CASING CASING
SE SE SE FC

FC

FC

FC
21721A 21721B 21721C
SPARE

STEAM TURBINE
TGB-21001

NOTE 1
HHH IS
21150

PT PI HHH IS
21722A 21722A 21120

1/2"-VB-218201-150-EC
LO
CCC HHH
HH
PT PI PI H IS
SE SE SE LO 21722B 21722B 21722 21051
L
21720A 21720B 21720C CCC CCC
OVER
IS PT PI IS
SPEED
21051 LO 21722C 21722C 21010
2oo3

PY-21721
1/2"-VM-218201-300-EC
SY HH SY HH SY HH CCC
21720A 21720B 21720C TE TT TI
LO

LO

LO

CCC CCC CCC


OVER 21727A 21727A 21727A
SPEED PT PT PT CCC
2oo3 21720A 21720B 21720C HH
TE TT TI TI H IS
SSL SSL SSL 21727B 21727B 21727B 21727 21052
21720A 21720B 21720C CCC CCC
CCC CCC CCC
ZERO ZERO ZERO PI PI PI
TE TT TI
SPEED SPEED SPEED 21720A 21720B 21720C
1"-CC-218203-300-EC

1"-CC-218204-300-EC

1"-CC-218206-150-EC

1"-CC-218205-300-EC 21727C 21727C 21727C


CCC CCC CCC
SSL SSL SSL CCC
21720A 21720B 21720C
H
PI
21720

3033 x 1032
CCC
SSL
21720
ZERO PY
SPEED 21721
CCC

IS
21120
CHAMBER
FROM WHEEL
DRAIN

FROM UPSTR BLADE


CARRIER 1
DRAIN

LP PIPE

FROM UPSTR BLADE


DRAIN

FROM BAL PISTON

DRAIN

CARRER 2
206-00058G 10091

PAH PAH PAH PAHH


206-00058G 10092

STEAM
CONDENSATE
206-00058G 10094

206-00058G 10093

206-00058A 9023

21721 21721 21721 21721


CCC CCC CCC CCC

IS
21052

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-PROCESS STEAM TURBINE
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058C 00
CAD FILE :
206-00058A 10775
GENERAL NOTES :
206-00058A 10776 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
206-00058A 10777 2. DELETED.

TI TI TI 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.


21908A 21908B 21908C
CCC CCC CCC

HH HH
IS TSHH TI H TKI H TSHH IS TRIP ONLY AFTER SECL
ST ACCELERATION
21052 21908 L 21908 L TSLL 21052 START VENDOR
CCC LL LL
STEAM TURBINE
IS MULTIFUNCTIONAL
CONTROLLER
21010
IS ZSHH ZSHH
HH 21310 21720 21720
IS TSLL UI H TDI H TDI IS 100%
CCC
21052 21908 L 21728 21729 L 21010
LL LL ZSH ZSH
CCC LLL IS 21720B 21720B NOTES :
21052 90%
CCC 1. ALL LIVE STEAM PIPING LOW POINTS TO BE DRAINED TO SAFE ATMOSPHERE.
IS TRIP ONLY
HH ACTIVE UNTIL ZSH ZSH 2. DELETED.
PI H 21052 TI IS 21720A 21720A
ST LOADABLE
90% 3. ALL SIGNALS ARE AVAILABLE VIA MODBUS TCP/IP TO DCS.
21723 L TRIP ONLY 21729 L 21310 CCC
LL ACTIVE UNTIL LL
LLL ST LOADABLE
IS ZSL ZSL IS
PT TT 21010 21720 21720 21051
0%
21723 21729 IS
21052

SLOPE ( / m)
FO
TE 21720
XV
21729
21720
FLANGE INTERMEDIATE HP STEAM
206-00058A 9000
FC

FC

FC

FC
1"-VA-218201-600-EC

DRAIN 1"x1/2"
STEAM TURBINE
1"-CC-218202-600-EC 1/2"-CC-218202-600-EC
206-00058G 10090 TGB-21001
SLOPE ( / m)
FROM TRIP & THR.
VALVE GLAND

DRAIN
1"-CC-218201-600-EC
206-00058G 10088
FROM VALVE CHEST

USL I
21720 21052

ST LIVE STEAM TRIP VALVE HYDAULIC ERROR:


VALVE CLOSES WITHOUT TRIP SIGNAL.

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-LIVE STEAM AND VALVE CHEST
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058D 00
CAD FILE :
GB-21001-BY01 GB-21001-EA02 206-00058A 9050 GENERAL NOTES :
MAIN AIR BLOWER EJECTOR GLAND STEAM CONDENSER 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
PG DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DESIGN CAPACITY (MOTIVE STEAM) BY VENDOR TYPE BEM GB-21001-SPE02
DESIGN CAPACITY (SUCTION FLUID) 92.0 kg/hr DESIGN DUTY BY VENDOR 21723
DP 15.5 kg/cm^2g HEAT TRANSFER AREA 7.1 m^2 2. DELETED.
DT 260 C DP (SHELL) 3.57 kg/cm^2g GB-21001-BY01 MP STEAM
MATERIAL CS DP (TUBE) 10.5 kg/cm^2g 1"-VB-218221-300-EC 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
INSULATION EC DT (SHELL) 10 C / 260 C 206-00058A 9002
BY VENDOR DT (TUBE)

DRAIN
TRIM 10 C / 80 C

206-00058A 11587
MATERIAL (SHELL) SA-106 B PIPE (S) K03006 DRAIN
1"-DAA-210025-T-A60T1-N
MATERIAL (TUBE) TUBE - ALLOY 2205 (S31803) 11590 206-00058A
INSULATION EC
TRIM (SHELL) BY VENDOR DRAIN
TRIM (TUBE) BY VENDOR 1"-DAA-210028-T-A60T1-N SECL
9043 206-00058A
VENDOR
PSV DRAIN
1"-DAA-210029-T-A60T1-N
21720 9045 206-00058A
TG PG FROM PSV-21720
21720 21724

2" LO
2"-SAE-218221-150-N
206-00058A 9006
COOLING WATER
2"-SAE-218222-150-N INLET
NOTES :
1. ALL SIGNALS ARE AVAILABLE VIA MODBUS TCP/IP TO DCS.
GB-21001-EA02
TG PG
21721 21725
2"-RAE-218222-150-N

4"-P-219107-T-A18T1-PP
2"-RAE-218221-150-N
9005 206-00058A
DRAIN
1"-CB-218221-150-N COOLING WATER
206-00058A 9047
OUTLET
DRAIN
1"-DAA-210027-T-A60T1-N
9042 206-00058A

3"-VO-218221-150-EC(ET) 3"-VO-218222-150-EC

4"x3" 4"x3"
DRAIN
1"-DAA-210094-T-A60T1-N
11589 206-00058A
CPL
CPL FC

FC

FC

FC
DRAIN
1"-CC-218212-300-EC(ET)
10096 206-00058G
EC(ET) FROM SEAL STEAM
EC OUTLET
STEAM TURBINE
TGB-21001

1-1/2"x1"

1-1/2"-VB-218212-300-EC(ET)
DRAIN DRAIN
1/2"-CC-218221-150-N 1/2"-CC-218222-150-N
206-00058A 9039 9020 206-00058A

TI 3"-VB-218211-300-EC(ET)
21730 L
LL
ZI
SEAL STEAM 21724
EC
TT CONTROLLER EC(ET)
21730 H
1/2"-CC-218213-150-EC

I PIC PI I
21150 21724 21724 21510 1-1/2"-VB-218213-300-EC(ET)
L
TE
INSTRUMENT AIR 21730
11151 206-00058A
TW ZT ZY PT
21730 21724 21724 21724

SEALSTEAM
MP STEAM CV 4"x3"
1-1/2"-VM-218211-300-EC(ET) 4"-VB-218211-300-EC(ET) 3"-VB-218212-300-EC(ET)
9001 206-00058A
FO
GB-21001-STR03 PV
21724
4"x1-1/2" 4"-VM-218212-300-EC(ET)

FO
21724
DRAIN
1"-CC-218211-300-EC
206-00058G 10095
FROM SEAL STEAM
INLET

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-SEAL & GLAND STEAM
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058E 00
CAD FILE :
GB-21001-FA01 ZSH ZSH ZSH ZSH GENERAL NOTES :
LUBE OIL ACCUMULATOR 21724A CCC 21724B CCC 21724C CCC 21723 CCC 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
ID
TL-TL DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DP 21 kg/cm^2g XSH XSH XSH XSH
DT / 2. DELETED.
21724A 21724B 21724C 21723
MATERIAL SS316L/NBR
INSULATION N CCC CCC CCC CCC 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
TRIM

ZSH
ZSH ZSH ZSH 21723 XV
21724A 21724B 21724C S 21723 SECL
XV XV XV
S 21724A S 21724B S 21724C VENDOR

PARTIAL STROKE TEST

2 OUT OF 3 TESTABLE SAFETY VALVE BLOCK


PG P T A E
21726G 1-1/2"-AH-218222-150-N
3/4"-AH-218207-300-N

3/4"-AH-218208-300-N
3"x1"
3"-AH-218211-150-N 1/2"-AH-218212-150-N

3"-AH-218222-150-N GB-21001-EXJ03 NOTES :


1. REGULATING VALVE WITH INTEGRATED ORIFICE TO ENSURE CORRECT MINIMUM LUBE OIL
PRESSURE TO BEARING.
A T
3/4"-AH-218204-300-N X 2. ALL SIGNALS ARE AVAILABLE VIA MODBUS TCP/IP DCS.
3. MCC SIGNAL DETAILS REFER TO DRAWING NO. 206-00058N.
3/4"-AH-218203-300-N

GB-21001-FA01
TRIP 1/2"-AH-218213-150-N
IS IS YSHH ZY
21052 21051 21720A 21720A

3/4"-AH-218205-300-N CCC
1-1/2"-AH-218202-300-N

1/2"-AH-218219-150-N
TRIP
IS IS YSHH ZY
1-1/2"-AL-210001-T-A73T3-N 1-1/2"-AH-218201-300-N

1/2"-AH-218218-150-N
21052 21051 21720B 21720B
OIL
3/4"-AH-218206-300-N CCC
9026 206-00058L
1/2"-AH-218220-150-N
FO TRIP
TURNING
21727 IS YSHH ZY
GEAR
21051 21720C 21720C
IS ZSL ESZ
IS CCC
21120 21722 21722 3/4"-AH-218223-150-N
21052 1"-AH-218215-150-N
3"-AH-218214-300-N
FC

FC

FC

FC
1/2"-AH-218221-150-N
MCC 1"-AH-218216-150-N 1"-AH-218217-150-N
FROM MCC
H
ZSL
21722
M O STEAM TURBINE
3"-AL-218211-150-N
A
TGB-21001
GB-21001-SPE01

CONNECTION TO
COMPRESSOR
2"-AL-218201-300-N

1/2"-AL-218223-2500-N

1/2"-AL-218224-2500-N
GB-21001-EXJ04
GB-21001-EXJ05

3/4"-AL-218212-150-N IS IS
21120 21052 PG PG PG
PG PG PG 21729 21731A 21731B
21732A 21732B 21730 PI IS
21733 L 21103
PCV PCV LL PCV PCV
CCC IS
21720 21721 21722 21723
21105
NOTE 1

NOTE 1
FO FO FO
21728 21725 PI PI PI PI IS 21726
SGL SGL
21733A 21733B 21733C 21733D L 21010

2"-AL-218213-300-N
21725 LL 21726
CCC CCC CCC LLL
3/4"-AL-218202-300-N
PT PT PT PT
21733A 21733B 21733C 21733D
1/2"-AL-218221-2500-N

1/2"-AL-218222-2500-N

10"x8" LUBE OIL SUPPY


LO

LO

LO

HEADER
2"-AL-218201-300-N
206-00058K 10036

JACKING OIL SUPPLY


HEADER
3/4"-AL-218221-2500-N
206-00058K 10037

LUBE OIL RETURN


HEADER
10"-AL-218211-150-N
10033 206-00058K

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-OIL PIPING
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058F 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

SECL
VENDOR

VALVE GLAND
FROM TRIP&THR.
DRAIN
206-00058D 10090

CHAMBER
FROM UPSTR BLADE
CARRIER 1

FROM UPSTR BLADE


CARRIER 2

LP PIPE
FROM BAL PISTON
FROM WHEEL
DRAIN

DRAIN

DRAIN

DRAIN

FROM SEAL SYSTEM


INLET
DRAIN

FROM SEAL STEAM


DRAIN

OUTLET
206-00058C 10092

206-00058C 10091

206-00058C 10093

206-00058C 10094

206-00058E 10096

206-00058E 10095
NOTES :
1. IN VACUUM OPERATED VALVES HAVE TO BE DESIGNED WITH VACUUM TIGHT DESIGN
(E.G:WITH BELLOWS OR WATER SEALING).

1"-CC-218212-300-EC(ET)
1"-CC-218202-600-EC

1"-CC-218204-300-EC

1"-CC-218203-300-EC

1"-CC-218205-300-EC

1"-CC-218206-150-EC

1"-CC-218211-300-EC
GB-21001-TRV01 T GB-21001-TRV02 T GB-21001-TRV03 T

FO FO FO FO
SPARE 21730 21731 21732 21733
DRAIN
4"-CC-218220-150-EC(ET)
9035 206-00058A
TO FLASH BOX

FROM VALVE CHEST


DRAIN
206-00058D 10088
FO
21734
DRAIN
1"-CC-218201-600-EC
10089 206-00058A
TO FLASH BOX

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-DRAIN SYSTEM
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058G 00
CAD FILE :
FG-21001 GENERAL NOTES :
SIGNAL MAIN AIR BLOWER INTAKE FILTER 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
11504 206-00058A DESIGN CAPACITY 451650.0 m^3/hr DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
SIGNAL DP 0.0 kg/cm^2g
PI EXTERNAL DT 10 C / 48 C 2. DELETED.
10103 206-00058A SETPOINT MATERIAL CS (COATED)
21008 CCC INSULATION N (NOTE 7)
FROM PT-21008 TI 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
SIGNAL PERFORMANCE CONTROLLER FIC TRIM BY VENDOR 206-00058A 10105
FI FIC-21720 21006
10104 206-00058A 21004 CCC IS IS FROM TT-21006
21005
FROM FT-21005 CCC 21003 21001
PERMISSIVE
10107 206-00058I
SECL
FROM ZI-21729
ANTI-SURGE AND PROCESS CONTROL SYSTEM VENDOR
206-00058I 10108
TO ZY-21729
MESSAGE OF MESSAGE OF MESSAGE QUICK
206-00058I 10109 SURGE CONTROLLER GENERAL ERROR GENERAL ERROR SURGE OPENING VALVES DIST TO
DETECTION ON MESSAGE MESSAGE DETECTION FROM SD SPEED CTRL-LINE
TO ZY-21728 206-00058 9887
XA HS XA FA YA YA SI XI
10110 206-00058I
21720 21720 21720B 21720 21720A 21720E 21720 21720A
FROM ZI-21728
CCC SUCTION DISCHARGE
10101 206-00058A
FROM TI-21735 NOTES :
XA HS XA FA YA YA SI XI PI TI PI TI
10102 206-00058A 1. DELETED.
21720 21720 21720B 21720 21720A 21720E 21720 21720A 21734 21734 21735 21735
FROM PI-21735 2. 1/2" NPT WELDOLET WITH PLUG FOR PRESSURE MEASUREMENTS (ONLY TEMPORARY).
SAFETY ON RUN/STOP CONTROLLER EXC. SURGE EMERGENCY
SURGE DETECTED FAULT /SAFE ON SHUTDOWN 3. 3/4" NPT WELDOLET WITH PLUG FOR TEMPERATURE MEASUREMENTS (ONLY TEMPORARY).
ANTI-SURGE CONTROLLER
4. MINIMUM LENGTH 3D STRAIGHT PIPING.
5. DELETED.
6. ALL SIGNALS ARE AVAILABLE VIA MODBUS TCP/IP TO DCS.

HH 7. SOUND INSULATION IS APPLIED ON SILENCER, TRANSIENT DUCT AND SUCTION PIPE.


PDI H
PDI PDI TI 21725C
21736 21737 21734
CCC CCC CCC

PDT
PDI PDI PDI PDI PDI PDI TI TI TI 21725C
21736A 21736B 21736C 21737A 21737B 21737C 21734A 21734B 21734C
CCC CCC CCC CCC CCC CCC CCC CCC CCC
HH HH
ZSL PDI H PDI H
PDT PDT PDT PDT PDT PDT TT TT TT 21725B 21725B 21725A
21736A 21736B 21736C 21737A 21737B 21737C 21734A 21734B 21734C

PI
21734 ZSL PDT PDT
CCC
TE TE TE 21725B 21725B 21725A
EXHAUST AIR 21734A 21734B 21734C
206-00058 8992
PI PI PI
21734A 21734B 21734C
GB-21001-EXJ06
CCC CCC CCC

PT PT PT
21734A 21734B 21734C

NOTE 2 NOTE 3
GB-21001 GB-21001-EXJ01
NOTE 4
FG-21001

TE TE TE
21733A 21733B 21733C
DRAIN
ZSL ZSL ZSL
206-00058A 8993
21725A 21726 21727

DRAIN

DRAIN
206-00058A 11501

206-00058A 8996
TT TT TT
21733A 21733B 21733C
SURGE DETECTOR
SURGE SURGE DETECTOR ZSL ZSL ZSL
RESET SURGE 1ST SURGE 2ND SURGE 3RD SURGE 50TH SURGE TRIP SURGE COUNTER VALVE QUICK OPEN 21725A 21726 21727

HS UA UA UA UA XZ XI HS TI TI TI
21720A 21720A 21720B 21720C 21720D 21720 21720 21720B 21733A 21733B 21733C
CCC CCC CCC

HS UA UA UA UA XZ XI HS TI
21720A 21720A 21720B 21720C 21720D 21720 21720 21720B 21733
CCC CCC CCC CCC CCC CCC CCC CCC CCC

IS XI HS
21052 21720 21720B
SD

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-PROCESS COMPRESSOR
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058H 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

SECL
VENDOR

NOTES :
1. DELETED.

IS IS IS
IS ZAH ZSH 21001 21051 21052
21010 21728 21728

ZAL ZSL XSL


21728 21728 21728
CCC
S
XY
21728
ZY ZY
10108 206-00058H
21728 21728

ZI ZT TO ATMOSPHERE
206-00058H 10107 XV INSTRUMENT AIR
21728 21728 AT SAFE LOCATION
21728 206-00058A 11153

BLOW OFF SPE


36"-P-210599-T-A06T1-PP
10084 206-00058 21010
28" 36"x28" 36"x28"
FO
TSO

DRAIN
28"x20"

206-00058A 10099
IS IS IS
IS ZAH ZSH 21001 21051 21052
21010 21729 21729

ZAL ZSL XSL


21729 21729 21729
CCC
S
XY
21729
ZY ZY
10109 206-00058H
21729 21729

ZI ZT
206-00058H 10110 XV INSTRUMENT AIR
21729 21729
21729 206-00058A 11152

BLOW OFF
28"-P-210033-T-A06T1-PP
10083 206-00058
20" 28"x20"
FO
TSO

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-BLOW-OFF LINE COMPRESSOR
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058I 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

SECL
MMS MMS MMS MMS
COMMON COMMON COMMON COMMON VENDOR
TRIP TRIP TRIP TRIP

IS IS IS IS
21052 21052 21052 21052

TSHH TSHH TSHH TSHH


21740 21741 21742 21743
2oo3 BN 2oo2 BN 2oo2 BN 2oo2 BN
NOTES :
TSHH

TSHH

TSHH

TSHH

TSHH

TSHH

TSHH

TSHH

TSHH
HH HH HH HH HH HH HH HH HH
TI H TI H TI H TI H TI H TI H TI H TI H TI H
21740A 21740B 21740C 21741A 21741B 21742A 21742B 21743A 21743B

HH HH HH HH HH HH HH HH HH
TY H TY H TY H TY H TY H TY H TY H TY H TY H
21740A 21740B 21740C 21741A 21741B 21742A 21742B 21743A 21743B
MMS MMS MMS MMS MMS MMS MMS MMS MMS

TE TE TE TE TE TE TE TE TE TE TE
21740A 21740B 21740C 21741A 21741B 21742A 21742B 21743A 21743B 21743C 21743D
DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX DUPLEX
SPARE SPARE

CONNECTED TO
STEAM TURBINE
GB-21001

ZE ZE VE VE VE VE VE VE
21740A 21740B 21740X 21740Y 21741X 21741Y 21742X 21742Y
SPARE SPARE

ZT ZT VT VT VT VT
21740A 21740B 21740X 21740Y 21741X 21741Y

MMS MMS
HH HH HH HH HH HH HH HH HH HH HH HH
ZI H ZY H ZY H ZI H VI H VY H VY H VI H VI H VY H VY H VI H
21740A L 21740A L 21740B L 21740B L 21740X 21740X 21740Y 21740Y 21741X 21741X 21741Y 21741Y
LL LL LL LL
MMS MMS MMS MMS
VSHH

VSHH

VSHH

VSHH
TSHH

TSHH
TSLL

TSLL

ZSHHLL VSHH VSHH


21740 21740 21741
2oo2 BN 1oo2 BN 1oo2 BN

IS IS IS
21051 21052 21052

MMS MMS MMS


COMMON COMMON COMMON
TRIP TRIP TRIP

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-BEARINGS COMPRESSOR
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058J 00
CAD FILE :
GB-21001-FB02 GENERAL NOTES :
RUN DOWN TANK 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
ID 1200 mm DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
TL-TL 1550 mm
OP 0 kg/cm^2g 2. DELETED.
DP 0 kg/cm^2g
OT 45 C
DT / 100 C
3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
MATERIAL SS316L
INSULATION N
TRIM BY VENDOR

SECL
VENDOR

PCV
21738
PLANT AIR
1"-AP-218232-150-PP
206-00058A 9004
FO

NOTES :
1. REGULATING VALVE WITH INTEGRATED ORIFICE TO ENSURE CORRECT MINIMUM LUBE OIL
PRESSURE TO BEARING.
PG PG FO 2. OVERHEAD TANK MINIMUM HEIGHT IS 6M ABOVE TURBO MACHINERY CENTER LINE.
VENT TO SAFE
21738 21739 21738 LOCATION 3. CHECK VALVE ASSEMBLY LOOSE SUPPLY BY VENDOR. (HORIZONTAL MOUNTING INSTALLATION).
PCV
21739 4. MOUNTED ON MACHINE LEVEL.
1"-AP-218232-150-PP 5. INSPECTION HOLE.
FO

1"-AP-218231-150-PP
TO ATM
AT SAFE LOCATION

CONNECTED TO
STEAM TURBINE

GB-21001
NOTE 4

SLOPE ( / m) 3"-AL-219106-T-A73T3-N
10074 206-00058L

3"-AL-219105-T-A73T3-N
2"-AL-218215-150-N SGL
21735
LT LI IS
1-1/2"-AL-218204-300-N

1/2"-AH-218225-2500-N

1/2"-AH-218226-2500-N

21751 21751 L 21010


LL
8"-AL-218214-150-N

1/2"-AL-218227-2500-N

3/4"-AL-218221-2500-N
4"-AL-218216-150-N
6" GB-21001-FB02
NOTE 5
PG PG PG PG PG PG PG
21735 21737A 21737B 21734 21733 21736A 21736B
NOTE 2

2"
PCV PCV PCV PCV 3"-AL-219102-T-A73T3-N
21726 21727 21728 21729 VALVE ASSEMBLY
NOTE 1

NOTE 1

NOTE 1
FO FO FO #150
21740 21741 21742 #300
SGL SGL
21722 21721

1"-AL-218206-300-N
FO
1-1/2"-AL-218205-300-N 21747

NOTE 3
LUBE OIL LUBE OIL
3"-AL-218201-300-N 3"-AL-219103-T-A73T3-N
206-00058F 10036 206-00058L 10035
TO SUPPLY HEADER 3"x2" FROM SUPPLY
HEADER

JACKING OIL JACKING OIL


3/4"-AL-218221-2500-N
206-00058F 10037 206-00058L 10034
TO SUPPLY HEADER FROM SUPPLY
3/4"-AL-219104-T-G73T3-N
HEADER

LUBE OIL LUBE OIL


12"-AL-218211-150-N
10033 206-00058F 10032 206-00058L
FROM RETURN TO RETURN HEADER
14"-AL-219107-T-A73T3-N
HEADER
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-OIL PIPING COMPRESSOR
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058K 00
CAD FILE :
GB-21001-FA02 GB-21001-BV01 GB-21001-FG01A GB-21001-FG01B GB-21001-FB01 GB-21001-EA01A GB-21001-EA01B GB-21001-BR01 GB-21001-BR02
PT PI IS ACCUMULATOR L.O. DEMISTER BLOWER L.O. MAIN FILTER L.O. STAND-BY FILTER L.O. TANK L.O. MAIN COOLER L.O. STAND-BY COOLER L.O. MAIN PUMP L.O. STAND-BY PUMP GENERAL NOTES :
21752 21752 21010 ID 552 mm DESIGN CAPACITY 210 m^3/hr 854 VENDOR
BY VENDOR BY VENDOR BY L/min
VENDOR BY
854 VENDOR
DESIGN CAPACITY BY L/min DESIGN CAPACITY 854 L/min DIMENSION 2800 mm x 2200 mm x 1900 mm TYPE AEW TYPE DESIGN CAPACITY 854 DESIGN CAPACITY L/min 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
L TL-TL 1060 mm DIFF. PRESSURE -100 mbar DP 21.0 kg/cm^2g DP BY VENDOR OP 0 kg/cm^2g DESIGN DUTY 216 kW DESIGN DUTY BY VENDOR DIFF. PRESSURE 19 kg/cm^2g DIFF. PRESSURE 19 kg/cm^2g
JACKING OIL LINES BY DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
IS DP 21.4 kg/cm^2g DRIVER POWER 2.2 kW DT 10 C / 90 C DT / BY VENDOR DP 0 kg/cm^2g HEAT TRANSFER AREA BY VENDOR HEAT TRANSFER AREA BY VENDOR BHP 45 kW BHP BY VENDOR
45 kW
JACKING OIL PIPING DESIGN DT 10 C / 100 C MATERIAL BY VENDOR MATERIAL SS316L MATERIAL BY VENDOR OT DP (SHELL) 21 kg/cm^2g DP (SHELL) BY VENDOR MATERIAL MATERIAL
BY VENDOR BY VENDOR BY VENDOR 2. DELETED.
T-G73T3 21120 MATERIAL SS316L INSULATION N INSULATION BY VENDOR DT /BY VENDOR DP (TUBE) 10 kg/cm^2g DP (TUBE) BY VENDOR
206-00058K 10034 INSULATION N TRIM BY VENDOR TRIM BY VENDOR MATERIAL SS316/316L DT (SHELL) 10 C / 90C DT (SHELL) / BY VENDOR
TO SUPPLY HEADER PCV IS
TRIM BY VENDOR INSULATION N DT (TUBE) 10 C / 80C DT (TUBE) / BY VENDOR GB-21001-BR03 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
TRIM BY VENDOR MATERIAL (SHELL) CS MATERIAL (SHELL) BY VENDOR JACKING OIL PUMP
21752 21155 IS MATERIAL (TUBE) ALLOY MATERIAL (TUBE) BY VENDOR
21155 PDI H INSULATION N INSULATION
BY VENDOR
DESIGN CAPACITY 13.2 L/min
TRIM (SHELL) BY VENDOR TRIM (SHELL) DIFF. PRESSURE 155.1 kg/cm^2g
21751 BY VENDOR BHP 5.5 kW
TRIM (TUBE) BY VENDOR TRIM (TUBE)
BY VENDOR MATERIAL ALLUMINIUM ALLOY
SET @ 180 kg/cm^2g FROM MCC IS
PG SECL
PSV H 21010
ESZ 21759 VENDOR
21752 O
21758 PDT 4"
A
21751

1"x3/4" 3/4"
INSTRUMENT AIR

1"x3/4"

1"x3/4"
MCC H NOTE 8 206-00058A 10907
M TI FO
3/4"

4"
21751 OIL TEMP CTRL TIC
GB-21001-BR03 MGB-21001-BR03
21751 L GB-21001-FG01A SET @ 10.0kg/cm^2g
Ø2mm 21751
Ø2mm GB-21001-FA02 GB-21001-EA01A
PSV
FO 21752
21578
3/4" 1"x3/4" NOTES :
PG TG TT 3/4"

1"x3/4"
1"x3/4"
1. DELETED.

3/4" 1"x3/4"

3/4" 1"x3/4"
21753 21751 21751 Ø2mm ZT ZY TO GRADE
PCV NOTE 1 NOTE 8 2. NOZZLES WILL END OVER DEGASSING TRAY.
3" NOTE 9 FO NOTE 9 21751 21751

3/4"

LO
21753 1/4" 1/4"
3/4"

LUBE OIL 21753 3. WAFER TYPE.


3" 3" 4"x3" 4"x3" NOTE 10 NOTE 11 4"
206-00058K 10035 4. SWING TYPE.
TO SUPPLY HEADER 2" NOTE 4 5. INTERGRATED IN FILTER.
3/4"

3/4"
FO TCV

LO
3/4"

3/4"

PG
3" 21751 6. PURIFIER SUCTION.
21754 SAMPLING 3/4" FO

3/4"

3/4"
7. PURIFIER RETURN.
1"

1"x3/4"
PT 21756 COOLING WATER
OIL SUPPLY SUPPLY 8. CHEMICAL CLEANING NOZZLE.
21751 FO 1"x3/4" FC Ø2mm
206-00058F 9026 3" 10119 206-00058M 9. MINIMESS COUPLING.

3/4"

3/4"
21752 FO
TO STEAM FO 10. CLEAN DRAIN.
CONTROLLER Ø3mm Ø2mm 21749

3/4"
COOLING WATER

LO
21755
GB-21001-FG01B Ø2mm 4" SUPPLY 11. DIRTY DRAIN.
PI 3"
206-00058A 9010 12. LOCKED IN INTERMEDIATE POSITION AFTER COMMISSIONING.

1"x3/4"
1"x3/4"
21751 L
OIL MIST

1"x3/4" 3/4"
4"x3"
206-00058A 10098

1"x3/4"
FO NOTE 8
TO VENT PG TG
IS NOTE 10 NOTE 11 21750 3/4"
SET @ 10.0kg/cm^2g 21755 21752
4"x2"

21153 Ø2mm

4"
PSV
GB-21001-EA01B 21753
3/4" 1"x3/4" IS
SGL 3/4" PG TG
2"

21152
21736
PDI H TO GRADE 21756 21753

3/4" 1"x3/4"

3/4" 1"x3/4"
PDT
3/4"

3/4" 1"x3/4"

3/4"
NOTE 8

LO
21757 21757 Ø2mm COOLING WATER
RETURN
GB-21001-FG02 NOTE 5 ESZ FO PCV
9008 206-00058A
3/4" 1"x3/4"

21759 21748 21754

3/4"
COOLING WATER
DEMISTER RETURN
BLOWER 4"x2" FC 4"x2"
206-00058M 10118

3/4"
ASSEMBLY

3/4"
IS 4"x2" MCC
1"

21010 4"
3/4"
IS SET @ 21.0 kg/cm^2g
Ø1mm
LUBE OIL 21153 M
FO PSV
GB-21001-BV01

LO

LO
4"

4"
10032 206-00058K 2" 21754
IS NOTE 1 21759 SLOPE (40 mm / m) SET @ 21.0 kg/cm^2g
FROM RETURN H

OVERHEAD TANK
FROM
LUBE OIL

4"x2"
21151 NOTE 12

206-00058K 10074
HEADER PSV
O NOTE 4 NOTE 4
LI SLOPE (40 mm / m) 21753 H
A PI PT
21750 #150 #150 #150
NOTE 3
SLOPE ( / m)

4"x2"
L FROM MCC 21753 21753
4"

3"

#300 #300 Ø2mm #300 TURBINE DETAILS


PG SEE DRAWING
FO PG

4"x3"
21750B R2B-P3-206-02-A-DTI-00058M
LT GWR SGL 21527 21760

4"x3"
SGL SGL SGL SGL
H 21750 21730
PI 21731 FILTER WITH FILLER 21732 21734 21733
SPARE

SPARE

21750 14"x12" PG 2"


2" 1" MANHOLE MANHOLE
21750A GB-21001-BR01
TGB-21001-BR01
NOTE 2

NOTE 2

NOTE 2

NOTE 2

NOTE 2

NOTE 2

NOTE 2

NOTE 2 NOTE 2 NOTE 2 NOTE 2

LO
6"
3/4" NOTE 2
FROM MCC PT
H
21750 PG
O NOTE 7
3/4" 1" 21752
PG
A SAMPLING
21761
BORE HOLE

4"x3"
6" 2" Ø = 6 mm MGB-21001-BR02
6"
REFLEX M MCC
TCS LG LO
MCC GB-21001-BH01
21750 LUBE OIL HEATER 21750 GB-21001-BR02
NOTE 1
GB-21001-FB01
2" 2" L.O. TANK 1"
TSHH TG
NOTE 1 NOTE 6 H
21750 21750 2" TT TI IS
O ESZ
21750 21750 21153 2" 21757
L A
IS ESZ FROM MCC
21151 21750

BASE PLATE DRAIN BASE PLATE DRAIN IS


206-00058A 11406 11408 206-00058A 21153

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-OIL UNIT
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058L 00
CAD FILE :
TGB-21001-BR01 GENERAL NOTES :
LUBE OIL PUMP STEAM TURBINE PG 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
STEAM FLOWRATE BY VENDOR DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
MATERIAL BY VENDOR 21757
2. DELETED.
3/4" SLOPE (40 mm / m) 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
T
GB-21001-TRV04

MP STEAM
4" SECL
206-00058A 9015
VENDOR
4"
PG #600
21758

3/4" SLOPE (40 mm / m)


T
GB-21001-TRV05
NOTES :

1. DELETED.
3/4" SLOPE (40 mm / m)
2. NON SLAM CHECK VALVE.
FC
3. NOZZLE RING GAUGE CONNECTION.
SV
21754

3/4" SLOPE (40 mm / m)

SV
21755

3/4" SLOPE (40 mm / m)


T
GB-21001-TRV06
SET @ 7.7 kg/cm^2g

SENTINEL
NOTE 3 VALVE
Φ 5.9 mm 3/4"
#600
FO
21754
COOLING WATER
SUPPLY 1/2" PACKING CASE PACKING CASE
10119 206-00058L
1/2"

SE SI

SLOPE (40 mm / m)
21754 21754

TGB-21001-BR01
3/4"

MECHANICAL
SPEED CONTROL
MECHANICAL
SGL SGL OVERSPEED PROTECTION
21740 21741

1/2"

SLOPE (40 mm / m)

1/2X1
SET @ 6.5 kg/cm^2g
PSV
21754

3/4" SLOPE (40 mm / m)


TO GRADE

1/2" LEAK OFF


3"
11179 206-00058A
COOLING WATER
RETURN 1/2"
206-00058L 10118
NOTE 2
LP STEAM
9014 206-00058A

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-STEAM TURBINE OIL PUMP
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058M 00
CAD FILE :
GENERAL NOTES :
IS IS IS IS 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DETAIL TURNING GEAR 21120
DETAIL LUBE OIL PUMP - 2 21153
DETAIL JACKING OIL PUMP 21155
DETAIL OIL MIST FAN 21152
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
DCS UCP (PLC) MCC DCS UCP (PLC) MCC DCS UCP (PLC) MCC DCS UCP (PLC) MCC 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

SECL
VENDOR
XA XA XA XA XL XL XA XA
21722 21722 21757 21757 21758 21758 21759 21759
FAULT FAULT FAULT FAULT FAULT FAULT FAULT FAULT

XLA XLA XLA XLA XLA XLA XLA XLA


21722 21722 21757 21757 21758 21758 21759 21759
RUNNING RUNNING RUNNING RUNNING RUNNING RUNNING RUNNING RUNNING

NOTES :
HL HL HL HL HL HL HL HL
21722 21722 21757 21757 21758 21758 21759 21759
LOCAL/ LOCAL/ LOCAL/ LOCAL/ LOCAL/ LOCAL/ LOCAL/ LOCAL/
REMOTE REMOTE REMOTE REMOTE REMOTE REMOTE REMOTE REMOTE

HAS HAS HAS HAS


21722 21757 21758 21759
START START START START

HSP HSP HSP HSP HSP HSP HSP HSP


MCC MCC MCC MCC
21722 21722 21757 21757 21758 21758 21759 21759
STOP STOP STOP STOP STOP STOP STOP STOP

LCP LCP LCP LCP

HS HS HS HS HS HS HS HS HS HS HS HS
21722A 21722B LOCAL/ 21736 21757A 21757B LOCAL/ 21736 21758A 21758B LOCAL/ 21736 21759A 21759B LOCAL/ 21736
START STOP START STOP START STOP START STOP
REMOTE REMOTE REMOTE REMOTE

LCP SIGNALS HARDWIRED TO PLC LCP SIGNALS HARDWIRED TO PLC LCP SIGNALS HARDWIRED TO PLC LCP SIGNALS HARDWIRED TO PLC

LCS LCS LCS LCS

HS HS HS HS HS HS HS HS
21722C 21722D 21757C 21757D 21758C 21758D 21759C 21759D
START STOP START STOP START STOP START STOP

IS IS
DETAIL OIL HEATER 21151
DETAIL SEAL STEAM CONTROLLER 21150

DCS UCP (PLC) MCC TRIP IF SEAL STEAM FAILS MORE THAN 45min

XLA XLA ZI XSL IS


HTR 21750 HTR 21750 21724 21724 21052
OFF OFF TRIP

XA XA ZI PC XSH
HTR 21750 HTR 21750 21724
DEV
21724 21724
FAULT FAULT USP CTR ON

XLB XLB ZY PIC XL


HTR 21750 HTR 21750 21724 21724 21724A
AUTO ON AUTO ON VIVSP CTR OUT MSG CTR AUTO

XL XL XL XA
MCC
HTR 21750 HTR 21750 21724B 21724
HEATING HEATING MSG CTR MANUAL MSG CTR ERR

LCP

HS HS TCS TSHH
HTR 21750 HTR 21750A 21750 21750
OFF AUTO
START
LCP SIGNALS HARDWIRED TO PLC

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-MCC SIGNALS-OIL UNIT
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058N 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
SIGNAL TRANSFER EXTERN <-> TURSAFE <-> PLC SIGNAL TRANSFER PLC <-> TURSAFE SIGNAL TRANSFER TURSAFE <-> PLC UCP COUNTERS
3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

XS XS UAH UAH IEC HOTHOT-START YQSHHH


ALARM RESET ALARM MONITOR A
21748 21748 21748A 21748A COUNTER 21760A SECL
CCC CCC VENDOR

TRIP STORAGE XS XS UAH UAH IEC HOT-START YQSHH


ALARM MONITOR B
RESET 21749 21749 21748B 21748B COUNTER 21760B
CCC CCC

UAH UAH IEC WARM-START YQSH


ALARM MONITOR C
21748C 21748C COUNTER 21760C
CCC
NOTES :
HSHH IS
1. DELETED.
21745 21051
2. DELETED.
CCC UAH UAH IEC COLD-START YQSL
SIGNAL TRANSFER MMS <-> PLC SYSTEM FAULT 1
21749A 21749A COUNTER 21760D
3. ESD BUTTON SIGNAL IS SUBMITTED FROM ESD/EIS TO PLC.
HSHH HSHH HAHH HAHH IS
21745 21745 21745 21745 21120 CCC
CCC CCC ESD BUTTON
UNIT CONTROL PANEL
HSHH MMS COMMON ZSHHLL ZSHHLL IS UAH UAH
SYSTEM FAULT 2
21745 AXIAL TRIP 21740 21740 21051 21749B 21749B
CCC MMS CCC CCC

HSHH IS VSHH VSHH IS UNDELAYED TRIP USHH USHH


MMS COMMON
TURSAFE TO
21746 21051 VIBRATION TRIP 21740 21740 21052 21750 21750
COMPRESSOR
CCC MMS CCC CCC
HSHH HSHH HAHH HAHH IS
21746 21746 21746 21746 21120 MMS COMMON TSHH TSHH IS XA XA
ALERT PARTIAL
BEARING TEMPERATURE
CCC CCC ESD BUTTON 21740 21740 21052 STROKE TEST A 21731A 21731A
TRIP
FIELD MMS CCC CCC
HSHH
21746
CCC XY XY XA XA
ALERT PARTIAL
MMS TRIP MULTIPLY
21740 21740 STROKE TEST B 21731B 21731B

HSHH IS MMS CCC


21747 21051
CCC XL XL XA XA
BENTLY NEVADA ERROR MSG
HSHH HSHH HAHH HAHH IS RELAY OK 21740 21740 MONITOR TEST 21732A 21732A
21747 21747 21747 21747 21120 MMS CCC
CCC CCC ESD BUTTON
LOCAL CONTROL PANEL
HSHH ERROR MSG XA XA
21747 TRIP LINE TEST 21732B 21732B
CCC CCC

MSG COMMON XA XA
FAILURE TRIP
MONITOR (PULSE) 21733A 21733A
CCC
XS XS
NORMAL STOP FROM DCS
21750 21750 MSG COMMON
HS HS XA XA
L/R SP SELECTOR FAILURE TRIP
21740B 21740B MONITOR (CONTIN.) 21733B 21733B
CCC

MAB TRIP REQUEST XS XS MSG SAHH SAHH


FROM EIS 21936E 21936P OVERSPEED TRIP 21720 21720

XSHH IS CCC
21900A 21052
CCC

XS XSHH XAHH XAHH


21900 21900B 21900 21900
CCC CCC TRIP FROM EIS
XSHH
21900C
CCC

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-PFB.7 : 31-1-2 SIGNAL TRANSFER
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058O 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.
LOCAL CONTROL PANEL
3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

HMI

SCREEN FOR
- INDICATION SOFTLINK HMI TO UCP SECL
- START UP
- ALARM VENDOR
- START
- STOP ETC.

OIL RESERVOIR
OIL PUMP 2 JACKING OIL PUMP
MIST FAN

XL XA XL XA XL XA
21757A 21757A 21759A 21759A 21758A 21758A
NOTES :
RUN FAULT RUN FAULT RUN FAULT

HS HS HS HS HS HS
21757A 21757B 21759A 21759B 21758A 21758B
START STOP START STOP START STOP

TURNING GEAR LUBE OIL HEATER

XL XA XL XA
21722A 21722A 21750A 21750A
RUN FAULT AUTO ON

HARDWIRED DI/DO
HS HS HS HS SIGNAL TO PLC
21722A 21722B 21750A 21750B
START STOP AUTO START HEATER OFF

XL XL HSH HSH XL XI
21726AA 21726BA 21738A 21739 21721A 21723A
TURBINE READY TURBINE READY SPEED START UP TURBINE IS ON TURBINE TRIP
TO START TO START SETPOINT RAMP
ACCELERATION INCREASE START/CONTINUE

HS HS HSL HSL XL
21723A 21723B 21738B 21739 21724A
START TURBINE STOP TURBINE SPEED START UP CRITICAL
SETPOINT RAMP SPEED AREA
DECREASE STOP/LOWER

XA HS HS HS
21730 21731 21732 21736
COMMON ALARM ALARM RESET LAMP TEST LOCAL/REMOTE

ESD BUTTON
LOCAL CONTROL
PANEL
HS
21747
EMERGENCY STOP

POWER FROM POWER DISTRIBUTION PANEL


PDP 120VAC UPS, 60 Hz, 1PH
0.5kW, 6A NORMAL CURRENT

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER DETAIL-LOCAL CONTROL PANEL SIGNALS
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00058P 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

MIN.
INSTRUMENT AIR
3/4"-AI-210444-B1A1-N
206-00060 5257
FROM HEADER

3/4"
3/4" RELIEF VALVE
PRESSURE PICKUP
NOTE 6 3/4"-P-210445-B1A1-N
206-00062 5446 NOTES :
FROM DC-21002 1. 13 mm WEEP HOLE.

3/4"
2. DELETED.
3. LINE LENGTH SHALL NOT EXCEED 1200 MM.
4. MINIMUM DISTANCE FROM PILOT VALVE.
3/4" RELIEF VALVE
PRESSURE PICKUP 5. PSV TO BE LOCATED TO CLOSE TO REGENERATOR AS POSSIBLE.
NOTE 6 3/4"-P-210446-B1A1-N
206-00062 5445 6. LOW POINT.
FROM DC-21002
3/4"-AI-210204-B1A1-N

3/4"-AI-210206-B1A1-N

3/4"-AI-210208-B1A1-N

3/4"-AI-210210-B1A1-N
3/4"
3/4" RELIEF VALVE
PRESSURE PICKUP
NOTE 6 3/4"-P-210447-B1A1-N
206-00062 5444
FROM DC-21002

3/4"
3/4" RELIEF VALVE
PRESSURE PICKUP
NOTE 6 3/4"-P-210448-B1A1-N
206-00062 5443
FROM DC-21002

3/4"
FO FO FO FO
21004A 21004B 21004C 21004D

PG PG PG PG
21008GA 21008GB 21008GC 21008GD
LO

LO

LO

LO
3/4"

3/4"

3/4"
3/4"
LO
3/4"

3/4"

3/4"

3/4"
LO
LO

LO
PIPING
INSTRUMENT

NOTE 5 NOTE 5 NOTE 5 NOTE 5


8"x10" 8"x10" 8"x10" 8"x10"
SET @ 3.867 kg/cm^2g SET @ 4.06 kg/cm^2g SET @ 4.06 kg/cm^2g SET @ 4.06 kg/cm^2g
PSV PSV PSV PSV
21004A 21004B 21004C 21004D

TO ATMOSPHERE 16"-V-210663-T-A06T1-N 16"x10" NOTE 4 TO ATMOSPHERE 16"-V-210664-T-A06T1-N 16"x10" NOTE 4 TO ATMOSPHERE 16"-V-210665-T-A06T1-N 16"x10" NOTE 4 TO ATMOSPHERE 16"-V-210666-T-A06T1-N 16"x10" NOTE 4
AT SAFE LOCATION NOTE 1 FREE AT SAFE LOCATION NOTE 1 FREE AT SAFE LOCATION NOTE 1 FREE AT SAFE LOCATION NOTE 1 FREE
DRAINING DRAINING DRAINING DRAINING
T-A06T1-N 12"x8" 12"x8" 12"x8" 12"x8"
T-A06T1-N T-A06T1-N T-A06T1-N
B1A1-PP 3/4" B1A1-PP 3/4" B1A1-PP 3/4" B1A1-PP 3/4"

S S S S
LO LO LO LO
12"

12"

12"

12"
FP FP FP FP
NOTE 3

NOTE 3

NOTE 3

NOTE 3
12"-P-210014-B1A1-PP

12"-P-210015-B1A1-PP

12"-P-210024-B1A1-PP
12"-P-210019-B1A1-PP

AIR 56"-P-210002-B1A1-PP AIR


5253 206-00058 PP PP 5442 206-00060
FROM GB-21001 TO BA-21001

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER HEADER & RELIEF VALVES (1/2)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00059 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

B1A1 T-A05T3 2. DELETED.


5256
INSTRUMENT AIR 3/4" 3/4"
3/4"-AI-210444-B1A1-N 3/4"-AI-210202-T-A05T3-N AI 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
206-00059 5257
LO 206-00621C
TO PSC 21004A~D
STR
21005

RELIEF VALVE
PRESSURE PICK-UP
NOTE 7 3/4"-P-210456-B1A1-N
206-00062 5261
FROM DC-21002

3/4"-AI-210212-B1A1-N

3/4"-AI-210214-B1A1-N

3/4"-AI-210225-B1A1-N
3/4"
RELIEF VALVE
PRESSURE PICK-UP
NOTE 7 3/4"-P-210457-B1A1-N
206-00062 5262 NOTES :
FROM DC-21002 1. 13 mm WEEP HOLE.

3/4"
2. DELETED.
3. PIPE LENGTH SHALL NOT EXCEED 1200 MM.
4. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
RELIEF VALVE
PRESSURE PICK-UP 5. MINIMUM DISTANCE FROM PILOT VALVE.
FO FO FO NOTE 7 3/4"-P-210458-B1A1-N
206-00062 5263 6. PSV TO BE LOCATED TO CLOSE TO REGENERATOR AS POSSIBLE.
21004E 21004F 21004G
FROM DC-21002 7. LOW POINT.

3/4"
PG PG PG
21008GE 21008GF 21008GG

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"
LO

LO

LO

LO

LO

LO
PIPING
INSTRUMENT

NOTE 6 NOTE 6 NOTE 6


8"x10" 8"x10" 8"x10"
SET @ 4.06 kg/cm^2g SET @ 4.06 kg/cm^2g SET @ 3.867 kg/cm^2g
PSV PSV PSV
21004E 21004F 21004G 10087 206-00058A
TO GB-21001
TO ATMOSPHERE 16"-V-210667-T-A06T1-N 16"x10" NOTE 5 TO ATMOSPHERE 16"-V-210668-T-A06T1-N 16"x10" NOTE 5 TO ATMOSPHERE 16"-V-210678-T-A06T1-N 16"x10" NOTE 5
AT SAFE LOCATION NOTE 1 FREE AT SAFE LOCATION NOTE 1 FREE AT SAFE LOCATION NOTE 1 FREE
DRAINING DRAINING DRAINING
T-A06T1-N 12"x8" 12"x8" 12"x8"
T-A06T1-N T-A06T1-N 10086 206-00058A
B1A1-PP 3/4" B1A1-PP 3/4" B1A1-PP 3/4"
TO GB-21001
S S S
LO LO LC
12"

12"

12"
FP FP FP
10085 206-00058A
12"-P-210025-B1A1-PP

12"-P-210026-B1A1-PP

12"-P-210027-B1A1-PP
NOTE 3

NOTE 3

NOTE 3
TO GB-21001

PT FT FT TT
21008 21906B 21005 21006

AIR AIR
56"-P-210002-B1A1-PP
5442 206-00059 PP 4001 206-00061
FROM GB-21001 TO BA-21001

FT FT
21906A 21906C

FSLL
IS
FSLL 21001 FSLL
NOTE 4

FI
21906A L
D
FA
21906

FI
21906B L

FALL CRIT FI
21906 21906C L

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN AIR BLOWER HEADER & RELIEF VALVES (2/2)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00060 00
CAD FILE :
BA-21001 GENERAL NOTES :
PLANT AIR
2"-P-210460-B1A1-N
DIRECT FIRED AIR HEATER
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
3999 206-00055 DESIGN DUTY 399699 kg/hr DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
TO / FROM PLANT NNF DP 5.47 kg/cm^2g
XY DT 10.00 C / 343 C
AIR HEADER INSTRUMENT AIR MIN. 2. DELETED.
21907 MATERIAL (SHELL) KCS
NOTE 18 INSULATION REFRACTORY CONCRETE
IS TRIM B1A1 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

S
21001
B1A1 H
B2A1 PDI
SPE 2"-P-210003-B2A1-PP

2"
21015
21009 L PG

MIN.
AIR MIN.
56"-P-210002-B1A1-PP 56"-P-210003-B2A1-PP 21013G SECL
4001 206-00060
NOTE 7 VENDOR
FROM GB-21001 #300
B1A1 B2A1 FF

4"
PDT
206-00063 3454
PDI PDI PDI PDALL 21015 L
NOTE 11 FROM DC-21002
21913A L 21913B L 21913C L 21913 CRIT PG H BOTTOM
D NOTE 20
PA 21012G
21913
NOTE 18
IS
PDSLL 21001 PDSLL
206-00061A 8410 NOTES :

PDSLL
TO PDIC-21011 1. DELETED.
L L L L
1/2"-P-210877-B1A1-N

1/2"-P-210884-B1A1-N

1/2"-P-210883-B1A1-N

1/2"-P-210882-B1A1-N
FF 2. SIGHT PORT (SIGHTING OPPOSITE WALL AT CENTER LINE OF OUTLET NOZZLE).
PDT PDT PDT PDT
PG PG 3. PROVIDE CLEARANCE AND BREAK FLANGES TO PERMIT REMOVAL OF PILOT / IGNITER WITH
21011 21913C 21913B 21913A DIRECT FIRED AIR HEATER UNDER PRESSURE.
21017 21015G
NOTE 22 H NOTE 22 H NOTE 22 H NOTE 22 H 4. PDI MUST BE READABLE FROM DAMPER.
TREATED DRY GAS
6"-GD-212480-M1A1-N 5. DELETED.
8407 206-00061A
PRIMARY 6. DELETED.
FROM HEADER
3"-GD-212481-M1A1-N 7. MAKE CONNECTION ON TOP OF PIPE.
PDI PDI PDI PDALL 3" SECONDARY 8. DELETED.
21909A L 21909B L 21909C L 21909 CRIT 4"-GD-212482-M1A1-N 9. DIRECT FIRED AIR HEATER (BA-21001) IS DIRECT CONNECTED TO REGENERATOR (DC-21002) BOTTOM.

6"x3"
D TERTIARY REFER DRAWING NO. R2B-P3-206-02-A-DTI-00063.
PA 4"
21909 10. DETAIL VENT AND DRAIN SYSTEM FOR CONTROL VALVES REFER TO DRAWING NO.
PG R2B-P3-206-02-A-DTI-00015.
NOTE 18
IS PI 21018 11. VACUUM CLEANING CONNECTION (BLANK OFF).
NOTE 20
PDSLL 21001 PDSLL 21009 NOTE 9
206-00061A 8411 "DA-14" 12. SIGHT PORT (SIGHTING BURNER).
PDSLL

TO PDIC-21010 "DA-15" "DA-9" 13. DELETED.

3000 MIN.
"DA-16" TT TSHH
1/2"-P-210878-B1A1-N

1/2"-P-210881-B1A1-N

1/2"-P-210880-B1A1-N

1/2"-P-210879-B1A1-N

FF E1 D1 14. MINIMUM LENGTH STRAIGHT PIPE.


L L L FF 21917A
PDT L PDT PDT PDT PT PG E2 15. DELETED.
2"-VB-210605-T-A18T1-EC EC N
21010 21909C 21909B 21909A 21009 21011G E3 NOTE 18
3471 E4 TT TSHH IS 16. TO BE LOCATED AT SAFE DISTANCE (MIN.15M) FROM BA-21001.
NOTE 22 H NOTE 22 H NOTE 22 H NOTE 22 H 2" NOTE 17 D2
VB NOTE 20 21917B 21001 D 17. FOR STEAM CURTAIN.
NATURAL GAS 206-00617D "DA-11" TA
2"-GNB-210815-M1A1-N
8408 206-00061A "DA-12" TT TSHH 21917 18. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
NOTE 16 D3
3/4"-VB-217411-T-A18T1-EC "DA-13"
2"x1"

FROM HEADER CRIT CRIT CRIT CRIT 21917C 19. DELETED.


3/4" 3/4"-CACBP-217411-T-A18T1-PP
10916 "DA-10" TAHH CRIT 20. REFER TO DRAWING NO. 206-00004.
BA BA BA BA D FF
CACBP E5 TT 21917 21. DELETED.
21908A 21908B 21908C 21908D T D4

RS
RS

RS
1"-GNB-210816-M1A1-N 206-00627C E6 21008
STP E7 22. THESE 8 PDTS ARE CONNECTED TO HARD PIPE FOR HIGH PRESSURE SIDE.
PILOT ON
1"-GNB-210815-M1A1-N 21026 3/4" PDG E8
XL
PILOT ON 21014 TI H TI H TI H INST TUBE
21908B
1"

1"

NOTE 4 1"x3/4" 21917A 21917B 21917C


XL IS HS IGNITOR
21908A 21001 NOTE 18 21912B START
RS

RS

3/4"
3/4" 1/2" "A"
BY BE FLAME
IGNITOR HS 2" #6000 B1A1
1/2"

1/2"

START 21912A 21908D 21908D SENSOR DAMPER


1/2" NOTE 4 M1A1
1/2" 34"

3/4"
3/4"x1/2"
1"

1"

BY BY BE FLAME SIGHT PORT 3/4"


NOTE 3 NOTE 3 NOTE 3 NOTE 3
21908A 21908C 21908C SENSOR 3/4"
#3000 #3000 #3000 #3000

3/4"
BY 4"
3/4"
21908B PILOT / 3" 3"
HIGH ENERGY IGNITOR / NOTE 2
IGNITOR 4" BURNER FLAME RODS I2
#300
RS 3" INSTRUMENT TAG LINE NO. (A)
BE BE #3000 #3000 NOTE 12 PDT-21011 1/2"-P-210877-B1A1-N
21908A 21908B NOTE 3 NOTE 3 I1 3"
2" K1 #3000 #300 4" PDT-21010 1/2"-P-210878-B1A1-N
FLAME FLAME #6000 MIN. K2 #3000 PDT-21909A 1/2"-P-210879-B1A1-N
1"

1"

SENSOR SENSOR K3 #3000 NOTE 11


SIGHT PORT 3/4" NOTE 14 3/4"
3/4"

PDT-21909B 1/2"-P-210880-B1A1-N
1"-GC-210218-M1A1-N

1"-GC-210220-M1A1-N

BLAST AIR
3/4" PDT-21909C 1/2"-P-210881-B1A1-N
3/4" BA-21001
PDT-21913A 1/2"-P-210882-B1A1-N
3/4" 3/4" PDT-21913B 1/2"-P-210883-B1A1-N
8409 206-00061A PDT-21913C 1/2"-P-210884-B1A1-N
TO TIC-21008
RS

RS
RS

23. 6 MM DRILL HOLE. (300 MM PITCH)

RS
BLAST AIR CONN. 3/4" 3/4"-P-210465-B1A1-N
1"

1"

M1A1 M1A1
T-A05T3 T-A05T3
RS 1-1/2"x1" 3/4"-P-210462-B1A1-N

PG 1-1/2"-AI-210216-T-A05T3-N HS
1"-P-210461-B1A1-N
21010G 21909B
EMERGENCY
1-1/2"

SHUTDOWN
B1A1
1-1/2"-AI-210376-T-A05T3-N T-A06T1
1"-AP-210061-T-A06T1-N CRIT
HS IS HA
206-00621C 206-00619C 21909A 21001 21909
AI AP
3608 3451

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL DIRECT FIRED AIR HEATER (1/2)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00061 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
XV-21925 XV-21916
POSITION FAILURE POSITION FAILURE 2. DELETED.

HA HA 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.


206-00061 8409
21925 21916
FROM TT-21008

IS
21001 TIC H

NOTE 1 21008

TO SAFE LOCATION
HY HIC

1"-V-210806-T-A18T1-N
NOTE 1 21017 21017

IS NOTE 2
21001
NOTES :
1. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
PDIC H
H 206-00061 8410 2. BURNER MINIMUM DIFFERENTIAL PRESSURE SETTING.

TYPE 1-2
21011

NOTE 1
PI FI L FROM PDT-21011
NOTE 6 3. DELETED.

FO
TSO
21012 21006 TI
L 4. SEE DETAIL ON DWG 206-00020C.
21008
XV 5. VALVE BODY TYPE IS ECCENTRIC DISC.
21925
FF FF 6. TI MUST BE READABLE FROM CONTROL VALVE.
PT FT TI NOTE 7 NOTE 1, 5, 7
NOTE 1, 5, 7 FF 7. REFER THE DETAILS OF ON-OFF VALVES ON THE P&ID NO. 206-00014.
21012 21006 21007 PDV
XV 1"-GD-210813-M1A1-N XV
21011
21916 21915
TREATED DRY GAS 6"-GD-210813-M1A1-N 6" 6" 6" 6" 6" TREATED DRY GAS
6"-GD-210813-M1A1-N 6"-GD-212480-M1A1-N
7065 206-00612 8407 206-00061
FC FC 6"
FROM FA-21611 TSO TSO TO BA-21001

3/4"

3/4"
FC
3/4"

BURNER
2"

2"

TYPE 1-2 TYPE 1-1 #300


3/4"-GD-210814-M1A1-N
MIN.
NOTE 4 SC
21001
TYPE G 6"

XV-21924 XV-21912
POSITION FAILURE POSITION FAILURE
HA HA
21924 21912

IS
2"

21001 NOTE 1
NOTE 1 IS
21001

TO SAFE LOCATION
1"-V-210805-T-A18T1-N

H
PDIC
206-00061 8411
21010
FROM PDT-21010
2"-GNB-210814-M1A1-N

TYPE 1-2
NOTE 1
TSO
FO

XV
21924
NOTE 7
PDG NOTE 1, 7
1"-GNB-210814-M1A1-N NOTE 1, 7
21001 XV
XV PDV FF
21912 21010
21911
NATURAL GAS 2" 2" NATURAL GAS
2"-GNB-216100-T-A04T1-N 2"-GNB-210814-M1A1-N 2"-GNB-210815-M1A1-N
7930 206-00506 8408 206-00061
FC FC 2"x1-1/2" FC 2"x1-1/2"
FROM HEADER STR 3/ TSO 1-1/2" TO BA-21001 PILOT
4" TSO
21022 TYPE 1-2 TYPE 1-1 #300
T-A04T1 M1A1 MIN.

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING DOS BOCAS REFINERY PARAISO, TABASCO
MCA DESCRIPTION DATE BY APR NUMBER TITLE
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL
CATALYTIC CRACKING UNIT, FCC
PROJECT

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL DIRECT FIRED AIR HEATER (2/2)
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00061A 00
CAD FILE :
DC-21002
REGENERATOR (TOP) GENERAL NOTES :
ID 13900 mm 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
TL-TL 34000 mm DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
OP (TOP, BOTTOM) 1.93 kg/cm^2g, 2.21 kg/cm^2g
DP(TOP, BOTTOM) 3.87 kg/cm^2g , 4.5 kg/cm^2g 2. DELETED.
OT (TOP, BOTTOM) 720 C, 706 C (INTERNAL)
DT 10 C / 343 C (BODY)
3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
MATERIAL KCS
INSULATION N
TRIM FC-7, FC-8, B1A1, B1A2, B2A1

H H H H
TI TI TI TI
21029A 21029B 21029C 21029D
L L L L

TE TE TE TE
21029A 21029B 21029C 21029D
SKIN SKIN SKIN SKIN

NOTE 5
FLUE GAS
2000IDL-GCO-210024-FC-8-N
3073 206-00073 NOTES :
TO FA-21006 1. NOZZLE FOR PRESSURE PICK UP.
EXJ
21004 2. EQUIPMENT CONTINUES ON DRAWING NUMBERS :

2000IDL-GCO-210024-FC-8-N
R2B-P3-206-02-A-DTI-00061 FOR DIRECT AIR FIRED HEATER
R2B-P3-206-02-A-DTI-00062 FOR REGENERATOR TOP
R2B-P3-206-02-A-DTI-00063 FOR REGENERATOR BOTTOM

H 5202 206-00073 3. TOTAL 14 TEMPERATURE TRANSMITTERS TO BE INSTALLED FOR EACH CYCLONES TAG NUMBER OF
PDI TO HIGH SIGNAL THEM ARE FROM TI-21009 TO TI-21022.
RELIEF VALVE NOTE 3 NOTE 6 21016 SELECTOR 4. FOURTEEN 2 STAGE SEPARATOR CYCLONES. (ONE SET SHOWN)
PRESSURE PICK UP H H
3/4"-P-210445-B1A1-N TI TI 5. THERMOCOUPLES TO BE FURNISHED WITH EXPANSION JOINT.
206-00059 5446
21009 21028 6. REFER THE FIGURE 1 OF UOP PROJECT SPECIFICATION NO. 9038069-827.
TO PSV-21004A 36" "DA-24"
MW FF
L PDT 7. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
H 3925 206-00068
RELIEF VALVE 21016 PIC 8. REFER TO DRAWING NO. 206-00004.
B02 TO PDT-21039 HIGH
PRESSURE PICK UP H 21017
3/4"-P-210446-B1A1-N 9. PRESSURE PICK UP LINES ARE CONNECTED WITH NOZZLES THROUGH REDUCED FLANGE (2"X3/4").
206-00059 5445
B01-1~14 B44-1 2" BLANKOFF
TO PSV-21004B
34" 34"
B03
RELIEF VALVE
MW B05-2 B05-3 MW PG PT
FF
LI
H
LALL CRIT LI
H
LALL CRIT
PRESSURE PICK UP NOTE 8
3/4"-P-210447-B1A1-N "DA-25" 21016G 21017 21904A L 21904A 21904B L 21904B
206-00059 5444
NOTE 4 NOTE 7
TO PSV-21004C NOTE 8
"DA-26" IS
RELIEF VALVE NOTE 8 B44-2 21002
"DA-17" NOTE 8

LSLL
PRESSURE PICK UP "DA-27"
3/4"-P-210448-B1A1-N NOTE 1, 9 2"
206-00059 5443 B07
NOTE 8
TO PSV-21004D "DA-18" B09-1 NOTE 8
NOTE 1, 9 B06 "DA-28" L LT H
2" 206-00063 5214
RELIEF VALVE NOTE 8 21904A
"DA-19" B09-2 B08-1 NOTE 8 FROM DC-21002
PRESSURE PICK UP B10-1 B10-2 "DA-29"
3/4"-P-210456-B1A1-N NOTE 1, 9 L LT
206-00060 5261 2"
NOTE 8 21904B
TO PSV-21004E "DA-20" B09-3 B08-3
NOTE 1, 9 34" H
2" MW
RELIEF VALVE NOTE 8 B05-4 TT TSHH1
"DA-21" B09-4
PRESSURE PICK UP 21918C TSHH2 CRIT
3/4"-P-210457-B1A1-N NOTE 1, 9 B10-3 TAHH1
206-00060 5262 2" B11 206-00063 8361
NOTE 8 MW 21918
TO PSV-21004F "DA-22" B09-5 FROM DC-21002
NOTE 1, 9 ID 2640
2"
NOTE 8 NOTE 7 CRIT
RELIEF VALVE B09-6 TT TSHH1 IS TAHH2
PRESSURE PICK UP "DA-23"
3/4"-P-210458-B1A1-N NOTE 1, 9 21918A TSHH2 21001 21918
206-00060 5263 2"
TO PSV-21004G B09-7 H
TI
COUNTERWEIGHTED TT TSHH1 TI H
FLAPPER VALVE 21027
21918B TSHH2 21918A
H B13-1
TI B13-2
21025 B13-3 MW H
TI
B05-5 34"
21918B
H
TI
21026 TI H
NOTE 2
21918C
DC-21002
TA D
21918

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL REGENERATOR TOP
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00062 00
CAD FILE :
DC-21002
REGENERATOR (BOTTOM) GENERAL NOTES :
ID (TOP, BOTTOM) 13900 mm, 9600 mm 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
TL-TL 34000 mm FF DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
FIC FT
OP (TOP, BOTTOM) 1.93 kg/cm^2g, 2.21 kg/cm^2g
DP (TOP, BOTTOM) 3.87 kg/cm^2g , 4.5 kg/cm^2g FF 21007 21007 2. DELETED.
OT (TOP, BOTTOM) 720 C, 706 C (INTERNAL) FV L
B2A1 T-A06T1
DT 10 C / 343 C (BODY) 21007 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
MATERIAL KCS
INSULATION N 4"-P-210501-B2A1-PP 4" 4" 3" 3"-AP-210070-T-A06T1-PP
TRIM FC-7, FC-8, B1A1, B1A2, B2A1
4"x1-1/2" FO 3"x1-1/2" #300
1-1/2"

3/4"

3/4"

3/4"
PIC

6"x3"
#300
1-1/2" 21719
L

6"-AP-210377-T-A06T1-PP
NOTE 27
FF
FIC FT
FF
FV 21009 21009 FF
B2A1 T-A06T1 L
21009 PT
4" 4" 3" 3"-AP-210166-T-A06T1-PP 21719
DENSITY
FF "DA-30" 4"x1-1/2" FO 3"x1-1/2" #300
DI NOTE 21 DT 1-1/2" FLUFFING AIR

3/4"

3/4"

3/4"
21005 21005 MIN. #300 206-00081 7536
L
"DA-31" NOTE 1 4" 1-1/2"
H NOTE 21 B33-1 FROM GB-21002
B36-1 NOTE 27
"DA-32" MIN.
206-00062 5214
NOTE 21 B33-2 NOTE 1 FIC FT
FF NOTES :

6"
"DA-33" 4"-P-210503-B2A1-PP FF

6"x3"
B08-2 FV 21008 21008 3/4" 1. DISTRIBUTOR.
TO LT-21904A NOTE 21 B36-3 B2A1 T-A06T1 PV

4"-AP-216119-T-A06T1-PP
MIN. L
H 21008 21719

6"x4" 4" 6"x4"


NOTE 1 2. VACUUM CLEANING CONN. (BLANK OFF).
TI B08-4 4" 4" 4" 3" 3"-AP-210164-T-A06T1-PP
4"-P-210502-B2A1-PP
3. EQUIPMENT CONTINUES ON DRAWING NUMBERS :

#300
H 21089

FC

4"
TI B14-2 B36-2 4"x1-1/2" FO 3"x1-1/2" #300 R2B-P3-206-02-A-DTI-00061 FOR DIRECT AIR FIRED HEATER
206-00062 8361 1-1/2" R2B-P3-206-02-A-DTI-00062 FOR REGENERATOR TOP

3/4"

3/4"

3/4"
21090 B14-3 B16 #300 3/4"
TO LT-21904B B15-1 R2B-P3-206-02-A-DTI-00063 FOR REGENERATOR BOTTOM
45° DETAIL 45° DETAIL 45° DETAIL 45° DETAIL 45° DETAIL 1-1/2"
"BC-7" "BC-8" "BC-16" "BC-17" "BC-90" B15-2 B14-1 6"-AP-216119-T-A06T1-PP 4. PDI MUST BE READABLE FROM SLIDE VALVE MANUAL OPERATOR.
B43 NOTE 27

6"
NOTE 22 4"-P-210178-B1A2-PP H
NOTE 15 TI B3 8" 5. LOW DIFFERENTIAL PRESSURE SIGNAL CLOSES SLIDE VALVE.
300 mm 300 mm NOTE 16 5-1
L 21922 NOTE 2 6. HIGH DENSITY SIGNAL CLOSES SLIDE VALVE.
NOTE 24, 25, 26 NOTE 24, 25, 26 "B-2" B37 8" PP 8080
B3
4"-P-210178-B1A2-PP

NOTE 12 7. THERMOCOUPLES TO BE FURNISHED WITH EXPANSION JOINT.

8"-P-210184-B1A2-PP
5-2 NOTE 2 N AP
NOTE 24, 25, 26 NOTE 24, 25, 26 H TI SKIN H TI SKIN
CRIT 8" 206-00619D 8. DELETED.
TALL B3
L 21040D L 21041D
NOTE 14

NOTE 14
5-3 NOTE 2 6"-AP-216119-T-A06T1-N
DETAIL DETAIL DETAIL DETAIL DETAIL DETAIL DETAIL DETAIL 21922 REGENERATED 9. RECIRCULATION CATALYST STAND PIPE MISC. CONN. FC-8.
SKIN H
"BC-19" H H SKIN

NOTE 9 "GG-2"
"BC-9" "BC-10" "BC-18" "BC-30" "BC-31" "BC-32" "BC-33"
NOTE 9 "GG-1"

TI TI B46-1~8 TI CATALYST
4"-P-210178-B1A2-PP 45° 45° 45° 45° 45° 45° 45° 45° 10. CATALYST FILLING AND WITHDRAWAL.
21040C L 21041C 3" NOTE 13 21037 3023 206-00064
L NOTE 11 11. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
SPENT CATALYST H SKIN H SKIN IS B18-1~8 TO REACTOR RISER
NOTE 22 TI TI IS
206-00057 5155 SPE 21001 3" NOTE 13 12. CATALYST WITHDRAWAL.
TO FA-21002A/B 300 mm 300 mm L 21040B 300 mm 300 mm L 21041B 21007B
21001
H SKIN SKIN 13. EIGHT 3" BLANK OFF.

TSLL
NOTE 24, 25, 26 NOTE 24, 25, 26 TI NOTE 24, 25, 26 NOTE 24, 25, 26 H TI
NOTE 22
21040A DC-21002 14. DETAIL "GG", SEE DWG 206-00007.
HIC L PDI L 21041A H DENSITY
NOTE 4 FF 15. DETAIL "J", SEE DWG 206-00011.
NOTE 14

SPE TI TT

NOTE 14
21004 21018 "DA-38" NOTE 21 L DT DIC
"GG-3"

"GG-4"
"BC-89"
DETAIL

21007A NOTE 7 21032 21922 16. DETAIL "B", SEE DWG 206-00003.
45°

NOTE 7 21006 21006


B19-1 17. DETAIL "H", SEE DWG 206-00006.
NOTE 4 NOTE 21 H
NOTE 24, 25, 26

NOTE 21 "DA-36" 18. DETAIL "D", SEE DWG 206-00003.


"DA-34" B17-3 TI H
300 mm

HS DY PDIC FF PDI B17-1


H PDT B17-2 21036 19. DETAIL "L", SEE DWG 206-00012.
21004 21006A NOTE 5 21018 21019 H NOTE 19
L 21018 "L-1" 20.
FF 4" B24-1 B24-4 4" "L-4" NOTE 19
L PDT PG NOTE 19 DETAIL "M"
PG "L-2" 4" B24-2 B24-5 4" "L-5" NOTE 19
VALVE
"BC-88"
DETAIL

L 21019 21073G 920A AND 921A


NOTE 19 4" B24-3 B24-6 4" "L-6" NOTE 19
45°

21072G POSITION
NOTE 17 "L-3" ZI
B24-7 4" "L-7" NOTE 19 FAILURE ZT 920B
"H-1" 21 AND
PG DY PDIC "DA-40" NOTE 21 920 21
"BC-43"
DETAIL

5336 206-00067 XA CRIT 921B


45°

AND ZI ZT
C1 C2 "M-1" 21084G 21006B
NOTE 5
21019
L
NOTE 17 "DA-41" NOTE 21
TO PDT-21930A 21
NOTE 20 "H-2" B27-2 921 21 21 920C
NOTE 6

"DA-43" NOTE 21
NOTE 24, 25, 26

SPE NOTE 4 B27-1 AND


"DA-42" NOTE 21 ZLL IS ZSL
C1 "M-2" 921C
300 mm

21003A C2
NOTE 20 B27-3 21 21001 21 NOTE 17
NOTE 4 PG SPE
21003B B27-4 "DA-44" NOTE 21 5337 206-00067 920C AND 921C MANUAL
HIC HS 21074G
TO PDT-21038 OPERATOR
NOTE 21 "DA-37" B26-2
"BC-42"
DETAIL

21005 21005 DY
920 ACTUATOR
45°

NOTE 21 "DA-35" ACTUATOR


TI H TI H TI H B21-1 AND 21 SPE
ALARMS
NOTE 6 21033 L 21034 L 21035 L 921 21003A/B
B2 B26-1 B28 XA IS
3
B2 -2
"BC-41"
DETAIL

5338 206-00067
45°

NOTE 23 3-1 007 AND 008 21 21001


FRESH CATALYST "DA-39" NOTE 21 TO PDT-21930B
MAKE-UP NOTE 11
NOTE 24, 25, 26

2"-P-210171-B1A2-N "D" B22-1 B22-2 B22-3 L


4196 206-00055 NOTE 18
300 mm

B34 NOTE 1 B19-2 "DA-45" NOTE 21 DT IS DALL CRIT


FROM FA-21001 NOTE 22
B21-2 H 21923 DSLL 21001 21923 DY-21920 DY-21921
1"-AH-210001-T-F73T3-N

1"-AH-210002-T-F73T3-N

8"-P-210179-B1A2-PP "B-1" 5339 206-00067


NOTE 16 52" DENSITY NOTE 11 ZSL-21920C ZSL-21921C
B25 B20 TO PDT-21930C
ZT-21920A ZT-21921A
"BC-40"
DETAIL

1"-AH-210004-T-F73T3-N
1"-AH-210003-T-F73T3-N

B29 MW DI
45°

B31 ZT-21920B ZT-21921B


NOTE 3 21923 L ZI-21920A ZI-21921A
8" 34" SPENT CATALYST
ZI-21920B ZI-21921B
"BC-39"
DETAIL

B30 MW 206-00067 5335


45°

NOTE 2 ZLL-21920C ZLL-21921C


1/2" 1/2"

1/2" 1/2"

NOTE 10 FROM SPE-21002


XA-21920 XA-21921
NOTE 24, 25, 26

C2 C1
300 mm

8"-P-210179-B1A2-PP

SPE21003A-LCP-001 1-1/2"-SAE-210013-T-A01T1-N SPE21003B-LCP-001 1-1/2"-SAE-210014-T-A01T1-N


11769 11766 3454 206-00061
C1 C2
1-1/2"x1/2" 1-1/2" 1-1/2"x1/2" 1-1/2" TO PDT-21015 21. REFER TO DRAWING NO. 206-00004.
1/2" 1/2"

1/2" 1/2"

SAE SAE
"BC-38"
DETAIL

45°

206-00623 206-00623 22. TEE + CAP TO BE INSTALLED AT THE POINT WHERE THE DIRECTION OF THE PIPE CHANGES WHERE
THE DIRECTION OF THE PIPE CHANGES INSTEAD OF ELBOW FOR CATALYST LINE.
11764 11763
1-1/2"x1/2" 1-1/2" RAE 1-1/2"x1/2" 1-1/2" RAE 23. AS AN ALTERNATE TO TEE'S. PROVIDE LONG RADIUS IN CATALYST FILLING AND WITHDRAWAL LINES.
MSV CATALYST MAKE UP LINE AND HOPPER LOADING LINES.
206-00624 206-00624
8"-P-210184-B1A2-PP

21024
24. 3/4" BLAST CONNECTIONS APPROXIMATELY 4000 RUN OF OF CATALYST LINE.
4" 1-1/2"-RAE-210013-T-A01T1-N 1-1/2"-RAE-210014-T-A01T1-N 4"-P-210185-B1A2-N
NOTE 10

206-00071 5156 25. MAKE CONNECTION TOP OF PIPE.


FROM VACUUM
N.

26. DETAIL "BC", SEE DWG 206-00007.


MI

3/4" DETAIL 45° 45° DETAIL DETAIL 45° 45° DETAIL CLEANING RISER
"BC-1" "BC-2" "BC-11" "BC-12" HEADER 27. 6.3kg/cm2g NITROGEN RISER CONN.
CATALYST
8"-P-210179-B1A2-PP
5199 206-00057
TO AND FROM 300 mm 300 mm
FA-21001 NOTE 22 NOTE 24, 25, 26 NOTE 24, 25, 26 NOTE 24, 25, 26 NOTE 22
NOTE 24, 25, 26
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL REGENERATOR BOTTOM
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00063 00
CAD FILE :
DC-21001 PI
GENERAL NOTES :
REACTOR 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
21021
ID 8400 mm DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
TL-TL 21150 mm PDIC NOTE 3 TY NOTE 4
206-00072 3402
OP (TOP, BOTTOM) 1.76kg/cm^2g, 2.30 kg/cm^2g 21020 21056 2. DELETED.
DP (TOP, BOTTOM) 3.52 kg/cm^2g 4.38 kg/cm2g FF L NOTE 5 FROM TIC-21056
OT (TOP, BOTTOM) 537 C, 573 C PT 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
DT (TOP, BOTTOM) 10 C / 552 C PDI
21021
MATERIAL 1-1/4 CR-1/2 MO 21020
INSULATION EC
TRIM H2A2, H2A4, B2A2-NACE, FC-8 PDT
21924A L
H PG
21025G
FF PDT L
21020
PDI PDI PDI
H

PDSLL
21924A L 21924B L 21924C L PG
REGENERATED
21026G
CATALYST
3023 206-00063 CRIT PDALL IS PDSLL PDT L
FROM DC-21002 21924 21001 21924B
NOTE 16
D
PA H NOTES :
PDSLL PDT L
21924 1. WYE SECTION DISTRIBUTOR.
21924C
2. EQUIPMENT CONTINUES ON DRAWING NUMBERS :
H ZI R2B-P3-206-02-A-DTI-00064 LOWER REACTOR RISER
"A" "AA-1, 2, 3" 21925A
SKIN H SKIN H SKIN H SKIN CRIT L R2B-P3-206-02-A-DTI-00065 UPPER REACTOR RISER
NOTE 18 ZALL
NOTE 19 H R2B-P3-206-02-A-DTI-00066 REACTOR
TI TI TI TI 21925
ZI 3. LOW DIFFERENTIAL PRESSURE SIGNAL CLOSES SLIDE VALVE.
21042A 21042B 21042C 21042D
L NOTE 16 21925B L
L L L 4. HIGH TEMPERATURE SIGNAL CLOSES SLIDE VALVE.
IS
NOTE 12 NOTE 16 ZAL CRIT 5. PDI MUST BE READABLE FROM SLIDE VALVE MANUAL OPERATOR.
21001 ZSLL IS
21925C 6. DELETED.
SPE TY 21001
NOTE 23 NOTE 23 7. DELETED.
21005 "DA-47" 21925 XA CRIT

ZSLL
"DA-48"
NOTE 19 ZT 8. REGENERATED CATALYST STAND PIPE MISC. CONN. FC-8.
21925

"DA E 23
"AA-4"

-49"

"DA E 23
MANUAL 21925A 9. HS-21927 TO BE LOCATED NEAR VAVLE. REFER TO P&ID NO. 206-00014.

-50"
NOT
OPERATOR ZT

NOT
VALVE 10. MAKE CONNECTION AT BOTTOM OF PIPE.
21925B POSITION
NOTE 23 ZSL FAILURE 11. ACTUATOR ALARM.
"DA-46" ACTUATOR
21925C 12. THERMOCOUPLES TO BE FURNISHED WITH EXPANSION JOINT.
NOTE 21
"C-1" NOTE 20 XA 13. LOCATE CLOSE TO RISER AS POSSIBLE.
"H-3" 21010
SPE 14. 4" VACUUM CLEANING AND DRAIN CONNECTION.
NOTE 5 NOTE 11
L H 21001 C2 C1 15. MAKE CONNECTION ON TOP OR SIDE OF PIPE.
DI DT FF NOTE 8 16. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
21009 21009 NOTE 23
1"-AH-210005-T-F73T3-N
"DG-1" NOTE 23 17. MINIMUM LENGTH STRAIGHT PIPE.

1/2" 1/2"
DENSITY
"DG-2" NOTE 23 18. DETAIL "A", SEE DWG 206-00008.
1"-AH-210006-T-F73T3-N NOTE 23
"DG-3"
"DG-4" REACTOR RISER 19. DETAIL "AA", SEE DWG 206-00008.
C1
NOTE 2 20. DETAIL "H", SEE DWG 206-00006.
FI SPE21001-LCP-001
1-1/2"-SAE-210015-T-A01T1-N 11768 21. BLAST AND SAMPLE CONN. SC-21002 (TYPE R). SEE DWG 206-00020E. DETAIL "C", SEE DWG 206-00010.
21086 C2
1-1/2"x1/2" 1-1/2"

1/2" 1/2"
FF SAE 22. MINIMUM TO UTILITY RISER.
FT FI 206-00623 NOTE 1 23. REFER TO DRAWING NO. 206-00004.
21085 21085 1-1/2"-RAE-210015-T-A01T1-N 11765 N EC
4" 24. DETAIL VENT AND DRAIN SYSTEM FOR CONTROL VALVES REFER TO DRAWING 206-00015.
FF 1-1/2"x1/2" 1-1/2" RAE NOTE 14 C01
FT C04
206-00624 C08-1 C08-2 25. MULTIHOLE ORIFICE.
21086 SPECIAL PWHT 4"-P-211122-B2A2-NACE-N 4" NOTE 13 4" NOTE 22

4"-P
NOTE 17

1-1/2"
1-1/2" 1-1/2"
NNF

-210
XN XN STEAM
1-1/2" 1-1/2"-P-210505-B2A1-EC 2"x1-1/2" 2"-P-210504-B2A1-EC 2" 2" 2"-VM-210522-T-A18T1-EC
3/4" XN

526
4"-P-210634-B2A2-NACE-N SPECIAL PWHT 206-00069 7260
206-00066 3037

-B2
NNF B2A1 T-A18T1 FROM 6.3 KG/CM2G

A2-N

1-1/2"
TO UPPER REACTOR STEAMS RISER
RISER T-B04T1 B2A2-NACE NOTE 15 1-1/2" 1-1/2"-P-210506-B2A1-EC 2"x1-1/2"

ACE
18"-VM-210414-T-B04T1-EC 18" NOTE 13 18" 45° 1-1/2"

-EC
ZLH
10"-VM-210414-T-B04T1-EC XN XN SPECIAL PWHT C07 C09
VALVE 3" XN
POSITION 21981 18"x14" 18"-P-210526-B2A2-NACE-EC
ZSL FAILURE
21927
NOTE 16 NOTE 9 NOTE 16
VALVE XA CRIT IS CRIT XA IS ZSH
10"

14"
POSITION FC
FAILURE 21927 21001 TYPE 1-1 21981 21001 21981
3/4" NOTE 10 3/4"
XV FF
FF FV
21927 FV 12"x10" FC 14"x10"
FO 10"x6"

ZLL 21010
XN
4"

21081
21927 3/4"

3/4"
10"
6"

6"

DE 8"
FV FF XN
FC 4"x2"

8"x6"

S
21011 3/4" 3/4"
VENT
NOTE 24

FY
2"

2"

XN

21981
12"
4"x2"

8"

3/4" STP
3/4"-VM-217401-T-B04T1-EC 21008
XN
1"-VM-217400-T-B04T1-EC
XN
4"

T T-B04T1-EC T T-B04T1-EC
FF T-A18T1-PP FF T-A18T1-PP
FIC FT STP FIC FT
21081 21081 21009 21010 21010
FF L
IS FIC FT NOTE 25 1"-CACBP-217400-T-A18T1-PP
NOTE 25 8"-VM-210423-T-B04T1-EC
21001 21011 21011 FOR START-UP
3/4"-CACBP-217401-T-A18T1-PP LIFT
IS STEAM 12"-VM-210423-T-B04T1-EC
NAPHTHA SPECIAL 21001 206-00627D 206-00615 206-00627D
4"-P-211107-B2A2-NACE-N NNF
3041 206-00131 PWHT CACBP VM CACBP
FROM GA-21110A/B 8567 3040 8568

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL . LOWER REACTOR RISER
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00064 00
CAD FILE :
DC-21001 FA-21004 GENERAL NOTES :
REACTOR FEED STEAM SEPARATOR 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
ID 8400 mm ID 508mm DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
TL-TL 21150 mm TL-TL 1407mm
OP (TOP, BOTTOM) 1.76kg/cm^2g, 2.30 kg/cm^2g DP 15.5 kg/cm^2g / F.V @ 220 °C 2. DELETED.
DP(TOP, BOTTOM) 3.52 kg/cm^2g 4.38 kg/cm2g DT 10C / 260C
OT (TOP, BOTTOM) 537 C, 573 C MATERIAL CS 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
DT (TOP, BOTTOM) 10 C / 552 C INSULATION N
MATERIAL 1-1/4 CR-1/2 MO TRIM T-B04T1
INSULATION EC
TRIM H2A2, H2A4, B2A2-NACE, FC-8

VALVE POSITION
FAILURE
XA CRIT
21937

H
NOTE 3 PI ZLL IS
21052 21937 21001
L
NNF 66°C 4"-P-210022-H2A4-EC(ST) RECYCLE BYPASS
4"-P-210022-H2A4-EC(ST)
REACTOR RISER 5139 206-00066 NOTES :
FF
TO DF-21101 1. PROVIDE LIMIT STOP.
PT ZSL
4"-P-210830-H2A4-EC(ST) XV
21052 2. TOTAL 9 FEED LINES INCLUDING DETAIL "O" ARE CONNECTED TO THE DEDICATED LINE.

4"
21937
C18 21937 10" NOZZLES OF DISTRIBUTOR IN REACTOR RISER. MP STEAM IS SUPPLIED THROUGH HEADER
8"x4" 66°C MIN. A AND B. AND RAW OIL IS SUPPLIED THROUGH HEADER C ON THE P&ID NO. 00066.
DISTRIBUTOR

4" 4"-P-210030-H2A4-EC(ST) 66°C TAG NUMBERS OF PIPING AND INSTRUMENT ARE SUMMARIZED AS BELOW.

NOTE 12 MIN. RAW OIL AND FEED STEAM LINE NUMBER TABLE
FC RISER FEED NOZZLE ASSOCIATED WITH LINES
MIN.
3"

1"

PG TYPE 1-1 FF

4"-P-210030-H2A4-EC(ST)
1" FV FF (SEE UOP PROJECT DRAWING 9038069-327-60-A1-FOR NOZZLE LOCATIONS)
21052 NOTE 6 FIC FT
21012 21012 21012 C06-1 C06-2
66°C L 66°C FF
3" 3"-VM-210477-T-B04T1-EC 3" 2" ATOMIZING STEAM PG PG PDT PDI H 70 6"-P-210008-H2A2-EC(ST) 6"-P-210009-H2A2-EC(ST)
DC-21001 3"x1" FO 2"x1" 21077G 21078G 21037 21037 71 3"-VM-210426-T-B04T1-EC 3"-VM-210431-T-B04T1-EC
MIN. H2A4 T-B04T1 1" STR STR 72 3"-VM-210701-H2A2-EC(ST) 3"-VM-210702-H2A2-EC(ST)

2"-VM-210477-T-B04T1-EC
IS

1"

1"
3/4"

3/4"
NOTE 1 21006 21007 73 2"-VM-210429-T-B04T1-EC 2"-VM-210455-T-B04T1-EC
21001 4" 4"
PI 1" 74 3"-VM-210429-T-B04T1-EC 3"-VM-210455-T-B04T1-EC
025 75 3/4"-DAA-210008-T-A60T1-N 3/4"-DAA-210009-T-A60T1-N
21024 TO OTHER PRESSURE THRU
DIFFERENTIAL 033 FIC HIC TO OTHER PRIMARY
NOTE11 INDICATORS ATOMIZING STEAM 4"-P-210028-H2A4-EC(ST)

1"

1"
21039 L 21006 CONTROLLERS C06-3 C06-4
"DG-5" H
FF PDY PDI 039 4" 4" 70 6"-P-210010-H2A2-EC(ST) 6"-P-210011-H2A2-EC(ST)
PT THRU FROM OTHER PRIMARY
21025 21025 ATOMIZING STEAM 71 3"-VM-210433-T-B04T1-EC 3"-VM-210435-T-B04T1-EC
21024 L 047 H 4"-P-210029-H2A4-EC(ST)
C13 3"-VM-210701-H2A2-EC(ST) FF H FY FI CONTROLLERS PG 72 3"-VM-210703-H2A2-EC(ST) 3"-VM-210704-H2A2-EC(ST)
10"x6" PT PI FF
FV FF FT 2"

1"

1"
NO 21014 21014 21032G 73 2"-VM-210457-T-B04T1-EC 2"-VM-210459-T-B04T1-EC
21028GA 028GA 21028GA 21039 L
TE 21039
DISTRIBUTOR 12 THRU 66°C 74 3"-VM-210457-T-B04T1-EC 3"-VM-210459-T-B04T1-EC
(PROVIDE CLEARANCE FOR REMOVAL) C06-1~6 C11-1~6 028GI 3"-VM-210426-T-B04T1-EC 6"-VM-210426-T-B04T1-EC 5090
C17-1~3 3" 66 °C 72 3" 3"x1-1/2" 3"x1-1/2" 3" 71 6" 75 3/4"-DAA-210010-T-A60T1-N 3/4"-DAA-210011-T-A60T1-N
C15-1~3 3" 3" 6"-VM-210425-T-B04T1-EC VM PG
FO HEADER A NOTE 10 3/4" B01 A01 206-00615 21039G
NO 074 C06-5 C06-6
MIN.
3/4"

3/4"

TE H2A2 T-B04T1 1-1/2"

3/4"
6"
3/4"

STR
2
C FF THRU NOTE 1 NOTE 2 70 6"-P-210012-H2A2-EC(ST) 6"-P-210013-H2A2-EC(ST)
C1 12-1 PT 082 PI 1-1/2" 21008
NOTE 3 6-1 ~6 FA-21004 71 3"-VM-210437-T-B04T1-EC 3"-VM-210439-T-B04T1-EC

4"
~3 21074 21074 3/4"-VM-217404-T-B04T1-EC 4"-P-211026-H2A4-EC(ST) RECYCLE
72 3"-VM-210705-H2A2-EC(ST) 3"-VM-210706-H2A2-EC(ST)

3/4"-VM-217525-T-B04T1-EC
DETAIL "O" 2"
A2

206-00103 3548
H2

70 PG FF NOTE 2 73 2"-VM-210461-T-B04T1-EC 2"-VM-210463-T-B04T1-EC


027GA T FROM GA-21103A/B
T-B04T1-EC 74 3"-VM-210461-T-B04T1-EC 3"-VM-210463-T-B04T1-EC
T1

21027GA THRU
04

NO NOTE 4
T-A18T1-PP
T-B

TE 027GI 75 3/4"-DAA-210012-T-A60T1-N 3/4"-DAA-210013-T-A60T1-N


7 HIC FI STP
8576
N.

MI 21015 21027
MI
C

N. 21008 L
1-E

008 CACBP D01 C15-1 C15-2


4T

3/4"-CACBP-217525-T-A18T1-PP
THRU 206-00627D
B0

6"x 2"-CACBP-210609-T-B04T1-EC
"

STP
3/4

STP 70 6"-P-210016-H2A2-EC(ST) 6"-P-210017-H2A2-EC(ST)


-T-

3" 016
29

HV FF 015 3/4"-CACBP-217404-T-A18T1-PP 21028 21002 71 3"-VM-210445-T-B04T1-EC 3"-VM-210447-T-B04T1-EC


04

THRU
-21

F 21008 FT 72 3"-VM-210707-H2A2-EC(ST) 3"-VM-210708-H2A2-EC(ST)


VM

75 3" O 6" FF 023 T T-B04T1-EC T T-B04T1-EC 73 2"-VM-210469-T-B04T1-EC 2"-VM-210471-T-B04T1-EC


3"-

x3 21015
"
T-A18T1-PP T-A18T1-PP 74 3"-VM-210469-T-B04T1-EC 3"-VM-210471-T-B04T1-EC
3/4"-DAA-210008-T-A60T1-N NOTE 8 NOTE 14 10771 5092 75 3/4"-DAA-210016-T-A60T1-N 3/4"-DAA-210017-T-A60T1-N
74

CACBP 2"-CACBP-210610-T-A18T1-PP CACBP


6"
TO DRAIN HEADER

206-00627D 206-00627D RAW OIL FROM


206-00635A 11212

C15-3
"

HEADER "C"
3/4

6"-P-210008-H2A2-EC(ST) 6"-P-210008-H2A2-EC(ST) 70 6"-P-210018-H2A2-EC(ST)


EC 206-00066 5145
71 3"-VM-210449-T-B04T1-EC
ST 72 3"-VM-210709-H2A2-EC(ST)
73 2"-VM-210473-T-B04T1-EC
74 3"-VM-210473-T-B04T1-EC
PURGE STEAM
1-1/2"-VM-210478-T-B04T1-EC 75 3/4"-DAA-210018-T-A60T1-N
3" EC 5115 206-00066
NNF
TO DF-21101
3"x 3. EQUIPMENT CONTINUES ON DRAWING NUMBERS :
1"
R2B-P3-206-02-A-DTI-00064 LOWER REACTOR RISER
"

027
3/4

FV THRU TO OTHER SECONDARY R2B-P3-206-02-A-DTI-00065 UPPER REACTOR RISER


F FICFF HIC
ATOMIZING STEAM R2B-P3-206-02-A-DTI-00068 REACTOR
NO 1" O 2"x 035

4"-VM-210428-T-B04T1-EC
TE 1" 21027 21027 21007 CONTROLLERS (NOTE 2)
13 2"- 4. MINIMUM TO REACTOR RISER.
1" 2" VM-2 FROM OTHER SECONDARY
"
3/4

10 5. DELETED.
42 ATOMIZING STEAM
9-T CONTROLLERS (NOTE 2) 6. LOCATE NEAR VALVE XV-21937.
-B FF FY FI
04 FT
T1 7. FREE DRAINING TO HEADER.
-E 21027 21013 21013
C
8. CLOSE COUPLED.
9. SECONDARY ATOMIZING STEAM.
2"
"
3/4

2" 10. PRIMARY ATOMIZING STEAM.


TO 73
OT 11. REFER TO DRAWING NO. 206-00004.
HE
NO R NO 12. REDUCED FLANGE SHALL BE PROVIDED. SEE UOP PROJECT DRAWING 9038069-836.
TE ZZ 4"x
2 LES 2" NOTE 9
HEADER B 13. VALVE NORMALLY CLOSED DURING OPERATION OF DESIGN HYDROTREATED FEED.
THIS VALVE IS RECOMMENDED TO BE USED FOR A FEED OF 60% OF THE DESIGN TO THE RISER OR
STP T-B04T1-EC
WHEN CHANGED TO NOT FULLY HYDROTREATED FEED.
21010 T-A18T1-PP 8674 14. MULTIHOLE ORIFICE.
3/4"-VM-217405-T-B04T1-EC 3/4"-CACBP-217405-T-A18T1-PP CACBP
T
206-00627D
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL UPPER EXTERNAL REACTOR RISER (1/2)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00065 00
CAD FILE :
GENERAL NOTES :
1-1/2"-VM-210478-T-B04T1-EC MIN. 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
PURGE STEAM 1-1/2" 1-1/2" 1-1/2"-P-210901-H2A2-EC(ST) NNF DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
5115 206-00065 EC
66°C 2. DELETED.
H2A2 ST
T-B04T1 EC(ST) 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

RAW OIL 6"-P-210008-H2A2-EC(ST)


206-00065 5145 EC
TO REACTOR RISER

6"-P-210012-H2A2-EC(ST)

6"-P-210017-H2A2-EC(ST)

6"-P-210010-H2A2-EC(ST)
6"-P-210011-H2A2-EC(ST)
6"-P-210016-H2A2-EC(ST)

6"-P-210009-H2A2-EC(ST)

6"-P-210018-H2A2-EC(ST)

6"-P-210013-H2A2-EC(ST)
ST

NOTE 1

NOTE 1

NOTE 1

NOTE 1

NOTE 1

NOTE 1

NOTE 1

NOTE 1
TI
21044
L
MIN. MIN.
66°C NOTE 3 12"-P-210008-H2A2-EC(ST) 1-1/2"-P-211060-H2A2-EC(ST) BACKFLUSH
66°C 66°C
EC EC 206-00109 5151
12"x3" NOTE 2 NOTE 2 NOTE 2 NOTE 5 NOTE 2 NOTE 2 NOTE 2 NOTE 2 12"x3"
2" FROM SPE-21101
HEADER C ST ST

3"
NOTES :
3"

1. TOTAL 9 LINES INCLUDING 6"-P-210008-H2A2-EC(ST) ARE CONNECTED WITH THE DISTRIBUTOR OF


3"

3"
REACTOR RISER. REFER THE NOTE 2 OF DRAWING NO. R2B-P3-206-02-A-DIT-00065.
3/4" 3/4"

NNF
12"-P-210159-H2A2-EC(ST)
2. MAKE CONNECTION ON TOP OF PIPE.
66°C PG 3. MAKE CONNECTION ON CENTER OF HEADER.

66°C
3"

3"
21038G 4. HEADER WARM-UP LINE.
3"-P-210021-H2A2-EC(ST) 1-1/2" 1-1/2"
5. HEADER AND ASSOCIATED PIPING TO BE ELEVATED TO MINIMIZE PIPING DISTANCE TO FEED
EC DISTRIBUTORS.
NNF FREE DRAINING NO
4" VALVE VALVE

NOTE 4
NAPHTHA ST

3/4"

3/4"
4" 4"-P-210635-H2A2-EC(ST) 6. REACTOR BYPASS.
4"-P-210634-B2A2-NACE-N POSITION POSITION

3"-P-210378-H2A2-EC(ST)
3037 206-00064 FAILURE FAILURE 7. MAINTAIN VELOCITY IN THE RANGE OF 1.2~1.8 M/S.
SPECIAL PWHT
FROM GA-21110A/B H2A2 MIN. CRIT CRIT
3/4"

XA XA 8. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.


B2A2-NACE-N EC(ST)

MIN.
21929A 21929B FF
66°C H 9. SEE DETAIL 206-00014.
PG PG PDT PDI

12"
ZLL ZLH 21036G 21037G 21023 21023

FREE DRAINING

3/4"

3/4"
PG 21929A 21929B
21031G 1-1/2" 1-1/2"
ZSL IS NOTE 8
21929A 21001 NO
STR STR
12" FC

3/4"

3/4"
21009 21010
TYPE 1-1
NOTE 9
XV 66°C
21929A

NNF
MIN.
1-1/2" 1-1/2"-P-211060-H2A2-EC(ST)
66°C NOTE 7

MIN.
3/4"

3"-P-210021-H2A2-EC(ST)
MIN.
MIN.

1-1/2"
1-1/2"-P-210023-H2A2-EC(ST) 3/4"
XV ZSH TI
21929B 21929B 21043

1-1/2"

EC(ST)
EA(ST)
MIN.
6" 6"-P-210020-H2A2-EC(ST) RAW OIL
66°C 66°C
EC 5154 206-00114
NOTE 6 LO NNF NNF FREE DRAINING
FO TO MAIN COLUMN
ST

EC(ST)
EA(ST)
6"-P-210144-H2A2-EC(ST) TYPE 1-1

MIN.
NOTE 9

MIN.
EC(ST)
EA(ST)
66°C H2A2 H2A4
12"-P-210144-H2A2-ECST

6"x4"
EA(ST)
EC(ST)
4"-P-210122-H2A2-EC(ST) 4" 4" RECYCLE BYPASS
66°C
FF H EC 206-00065 5139
PG PG PDT PDI NNF
21033G 21034G 21022 21022 ST

1"
STR STR
3/4"

3/4"

21011 21012
12" 12"

NO
3"

3"

12" 12"

NO
EC(ST)
3"

3"

EC

PG
21035G

RAW OIL
12"-P-211015-H2A2-EC
3461 206-00103 EC
FROM EA-21104A/B

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL UPPER REACTOR RISER (2/2)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00066 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

NOTES :
1. LI-21005 AND PDI-21038 MUST BE READABLE FROM SLIDE VALVE MANUAL ORERATOR.
PDT
5336 206-00063 2. LOW DIFFERENTIAL PRESSURE SIGNAL CLOSES SLIDE VALVE.
L 21930A H
FROM DC-21002 3. BLAST AND SAMPLE CONN. SC-21003 (TYPE R) SEE DWG. 206-00020E AND FOR DETAIL "C".
PDSLL SEE DWG. 206-00010.
PDI PDI PDI 4. SPENT CATALYST STAND PIPE MISC CONN.S FC-7.
PDT 21930C L 21930B L 21930A L 5. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
5338 206-00063
L 21930B H 6. DETAIL "N" SEE DWG. 206-00009.
FROM DC-21002
CRIT 7. DETAIL "NN" SEE DWG. 206-00009.
(BOTTOM) PDSLL IS PDALL
8. DETAIL "H" SEE DWG. 206-00006.
21001 21930
NOTE 5 9. REFER TO DRAWING NO. 206-00004.
LI
5550 206-00068

PDSLL
21005 D
FROM LIC-21005 PDI PA
NOTE 1 21038 21930
NOTE 1

LY NOTE 2 PDIC
5340 206-00068
21005 21038
FROM LIC-21005 L
PG PG
21079G 21091G
FF
PDT
5337 206-00063
L 21038 H
FROM DC-21002

PDT
5339 206-00063
L 21930C H
FROM DC-21002
(BOTTOM)

VALVE
POSITION
FAILURE ACTUATOR
ALARMS
CRIT XA
21931A XA
21011
CRIT ZALL
21931

ZI
21931A SPENT CATALYST
L NOTE 5 NOTE 5
206-00068 5341
IS ZSLL LY IS
ZI FROM DC-21001
21001 21931 21001
21931B
L FF
ZSLL

NOTE 9
CRIT ZT NOTE 9 "DG-17"
ZAL FF MANUAL
21931A NOTE 9 "DG-15" SPE NOTE 6
21931C ZT OPERATOR
NOTE 9 "DG-16" 21006 "N"
21931B
ZSL "DG-14"
ACTUATOR NOTE 7
21931C "NN-1, 2, 3"

NOTE 8
"H-4" NOTE 3
SPE "C-2"
21002
C2 C1

NOTE 4 1"-AH-210007-T-F73T3-N
1/2" 1/2"

SPENT CATALYST 1"-AH-210008-T-F73T3-N


206-00063 5335
TO DC-21002 C1
SPE21002-LCP-001
C2 11771
1-1/2"x1/2" 1-1/2" 1-1/2"-SAE-210016-T-A01T1-N
1/2" 1/2"

SAE
206-00623

11759
1-1/2"x1/2" 1-1/2" 1-1/2"-RAE-210016-T-A01T1-N RAE
206-00624

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL REACTOR SPENT CATALYST STAND PIPE
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00067 00
CAD FILE :
DC-21001 GENERAL NOTES :
REACTOR 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
ID 8400 mm / 4950 mm DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
TL-TL 21150 mm
OP (TOP, BOTTOM) 1.76kg/cm^2g, 2.30 kg/cm^2g 2. DELETED.
DP(TOP,BOTTOM) 3.52 kg/cm^2g / 4.38 kg/cm^2g
OT (TOP, BOTTOM) 537 C, 573 C 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
DT (TOP,BOTTOM) 10 C / 552 C REACTOR OVHD
MATERIAL 1-1/4 CR-1/2 MO SIL 1560ID-P-210005-FC-4-EC
INSULATION EC 3403 206-00072
TRIM H2A2, H2A4, B2A2-NACE, FC-8 21002 NOTE 17
FF SKIN NOTE 20 TO DF-21101
TI TE
"DG-18"
21053 21053 BLANKOFF
MW NOTE 11 6" 6" TO OTHER
6"-V-210633-T-A18T1-N 6" 26"
T-A 6" MIN. DISTRIBUTORS
NOTE 4, 16 A04 LC 16"
18 LC NOTE 3, 9 (NOTE 6)
H T1 A05 A02-1 6"-P-210510-FC-7-EC
PDIC FC A06 A03-1
-7 6" NOTE 6 6" 6"-VM-210509-T-B04T1-EC
21039 A01-1~6 STEAM
L FF 16"-VM-210379-T-B04T1-EC
TI TE NOTE 6, 14 L 206-00069 5194
FF H FREE DRAINING

A02-3
2" FC-7 T-B04T1 FO
21052 21052 MW PDT PDI FROM FA-21003
PG H LT SKIN
26" 21005A

A02-2
26" 21042 21042
MW NOTE 10 L
21045G 21932A NOTE 18 "DG-19" NOTE 20 NOTE 15 LSHH IS LI H
D/P NOTE 13 H
L NOTE 20 "DG-6" SPE 21001 21932A
FF A03-2 L
NOTE 20 "DG-8" 21015 CRIT

A13
H PDT "DG-20" NOTE 20 H HA
3925 206-00062
21039
LSHH LI
21901
NOTES :
FROM DC-21002 TI A36 TI A10 "DG-22" NOTE 20 21932B
L 1. COUNTER WEIGHTED FLAPPER VALVE.
L 21051 21057 "DG-24" NOTE 20

LSHH
A12-1 A30 EMERGENCY 2. LOW LEVEL SIGNAL CLOSES SLIDE VALVE.
NOTE 19 LI H
PG A09 SHUTDOWN RESET
FF SKIN 3. INSULATE LINE TO BLIND.
21044G TI TE MW MW 21932C

A23-1
L LT L HS IS HS
21050 21050 30" A12-2 A11 (ID2000) NOTE 18 4. GUIDE AND SUPPORT SYSTEM OF THIS LINE MUST TAKE INTO ACCOUNT THERMAL
NOTE 20 "DG-10" 21932B CRIT 21901A 21001 21902 EXPANSION DURING START-UP.
H D/P LAHH
A02-4 MW H
NOTE 20 "DG-11" A07 FF H 21932 FCC EMERGENCY INTERLOCK SYSTEM SHUTDOWN 5. EQUIPMENT CONTINUES ON DRAWING NUMBERS :
26" TI PDT PDI
H FF A08 A34-1 R2B-P3-206-02-A-DTI-00064 LOWER REACTOR RISER
PI PT A33-1 21054 21041 NOTE 18 21041 D
NOTE 1 THREE POSITION R2B-P3-206-02-A-DTI-00065 UPPER REACTOR RISER
21053 L 21053 3" D/P L LA
SWITCH R2B-P3-206-02-A-DTI-00066 REACTOR
L 21932
3" TI CRIT
A33-2 A34-2 HS IS HL 6. TOTAL SIX REACTOR DOME PURGE LINES ARE CONNECTED TO THE DEDICATED SIX 6" NOZZLES
TI TE FF 21055 FOR STEAM DISTRIBUTORS, LINE NUMBER OF EACH LINE ARE SUMMARIZED BELOW ;
L NOTE 21 L LT 21903 21001 21903B
21059 SKIN 21059
LIC H LT FF "DG-25" NOTE 20 21932C NOTE 18
206-00067 5340 FF SKIN D/P NO. STEAM SUPPLY REACTOR CONNECTION FO TAG NO.
21005 21005 NOTE 18 TI TE L H HL
TO LY-21005 NOTE 2 L NOTE 22 FF 1 6"-VM-210509-T-B04T1-EC 6"-P-210510-FC-7-EC FO-21005A
D/P 21058 21058 A15 LT LI H
H 21903A 2 6"-VM-210511-T-B04T1-EC 6"-P-210511-FC-7-EC FO-21005B
FF SKIN 21006 21006
TI TE D/P FCC EMERGENCY INTERLOCK SYSTEM FEED TO REACTOR 3 6"-VM-210513-T-B04T1-EC 6"-P-210512-FC-7-EC FO-21005C
"DG-26" NOTE 20 H
21049 21049 4 6"-VM-210515-T-B04T1-EC 6"-P-210513-FC-7-EC FO-21005D
IS
A17 5 6"-VM-210517-T-B04T1-EC 6"-P-210514-FC-7-EC FO-21005E
21001 FC-7 T-B04T1
T-B04T1 FC-7 MIN. 6 6"-VM-210519-T-B04T1-EC 6"-P-210515-FC-7-EC FO-21005F
MIN.
A16-1 A16-2
3" 3" 6"x3" 6"x3" 3" 3" 4"x3" STEAM 7. DELETED.
4"-VM-210684-T-B04T1-EC
206-00067 5550 206-00069 7160
6" NOTE 10 NOTE 10 6" 8. DELETED.
TO LI-21005 3/4" 3/4" FROM FA-21003
9. THIS VALVE MUST BE LOCKED CLOSED AND BLINDED WHEN REACTOR IS IN HYDROCARBON SERVICE.
26"
3"-P-210519-FC-7-EC A35 MW 3"-P-210516-FC-7-EC 10. DISTRIBUTOR.

NOTE 20 "DG-7" RAW OIL FEED 11. LOCK CLOSED DURING NORMAL OPERATION.
DC-21001 CRIT 12. VACUUM CLEANING CONNECTION (BLANK OFF).
NOTE 20 "DG-9" IS HL

A37 A20
NOTE 20 "DG-21" NOTE 20 21001 21900B 13. TWELVE SINGLE STAGE REACTOR CYCLONES (ONE SHOWN).
"DG-12"

A19
14. SIX 6" NOZZLES.
"DG-23" NOTE 20
L 15. SIX FO TO BE CONSIDERED.
H FF A18-1 HL

A32
DI DT FF SKIN 21900A 16. 13 MM WEEP HOLE.
TE TI
21013 21013
L DENSITY "DG-13" 21048 21048 LOW FLOW SHUTDOWN BYPASS 17. FREE DRAINING IN HOT POSITION AT A 3% MINIMUM SLOPE.
H NOTE 20
18. TO BE INSTALLED AT SAME ELEVATION FOR LT-21005, LT-21932A/B/C AND NOZZLES, DG.
A18-2
T-B04T1 FC-7 NOTE 10 NOTE 10 FC-7 T-B04T1 19. TO BE INSTALLED AT SAME ELEVATION WITH UPPER NOZZLE (LOW SIDE) OF LT-21932A/B/C.
MIN. MIN. 20. REFER TO DRAWING NO. 206-00004.

6" 6" 8"x6" 8"x6" 6" 6" 8"x6" STEAM 21. THERMOCOUPLE ASSEMBLY INCLUDES TOTAL 6 ELEMENTS FROM TE-21059 TO TE-21064.
8"-VM-210483-T-B04T1-EC NOZZLE SIZE OF THIS ASSEMBLY TO BE 3" WITH 300#.
206-00069 5182
8" A21-1 A21-2 8" FROM FA-21003 22. THERMOCOUPLE ASSEMBLY INCLUDES TOTAL 6 ELEMENTS FROM TE-21058, TE-21065 TO TE-21069.
6"-P-210521-FC-7-EC 2" 2" 6"-P-210518-FC-7-EC PG NOZZLE SIZE OF THIS ASSEMBLY TO BE 3" WITH 300#.
21046G

206-00009 11271 "DG-27"


TO DETAIL "N" A31-1 NOTE 20 4"x3" STEAM
4"-VM-210489-T-B04T1-EC
MW 206-00069 5185
T-B04T1 FC-7 TI TI 30" FC-7 T-B04T1
206-00009 11270 MIN. 21046 21047 A23-2 MIN. FROM FA-21003
TO DETAIL "NN"
3" 3" 6"x3" 6"x3" 3" 3" L
FF H
DT DI
A22-2
A22-1

206-00009 11269 6" 6"


3/4" A24-1 A24-2 3/4" 21012 21012
TO DETAIL "NN" 3"-P-210517-FC-7-EC L
NOTE 10 H DENSITY
NOTE 10 3"-P-210520-FC-7-EC
TI TT TE
206-00009 11268
21045 21045 21045
TO DETAIL "NN" L A26 MIN.

206-00067 5341 FC-7 T-B04T1


A25

A28 NOTE 10 4" STEAM


TO SPE-21006 4"-VM-210486-T-B04T1-EC
206-00069 5186
6"x4" 4"-P-210522-FC-7-EC
3/4" FROM FA-21003
"DG-28"
A31-2
A27
4" PG
1- 21040
1/2
" NOTE 12
NOTE 5 REACTOR RISER
4216 206-00073
TO PDI-21039

4215 206-00073
TO PDY-21048 TO
PDY-21039C
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL REACTOR
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00068 00
CAD FILE :
H FA-21003 H
FIC
SPENT CATALYST STRIPPER STEAM SEPARATOR FIC GENERAL NOTES :
21055 21053
L ID 762 mm FF 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
TL-TL 1901mm FT NOTE 1 DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DP 7.38 kg/cm^2g/ F.V @ 211 ˚ C 21053 FF
DT 10 C / 260 C FV
NOTE 1 2. DELETED.
FF FF MATERIAL CS 21053 NOTE 3
FV FT INSULATION N
3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
TRIM T-A18T1 NOTE 1 NOTE 1 4"
21055 4"-VM-210507-T-A18T1-EC
21055
STEAM 4" 3" #300 4" 4"x2" FO 4"x2" 4"
4"-VM-210684-T-B04T1-EC 3"-VM-210498-T-A18T1-EC

3/4"

3/4"
206-00068 7160 2"
TO DC-21001 4"x1-1/2" FO 3"x1-1/2" #300 NOTE 1

3/4"
1-1/2"

4"-VM-210508-T-B04T1-EC
3/4"
PRESTRIPPING 2"
EC

FREE DRAINING
DISTRIBUTOR
FIC T-A18T1 T-B04T1
1-1/2"
EC 21052
T-B04T1 T-A18T1 FF
H FT NOTE 1
FIC
21056 21052 FV FF
L NOTE 1 21052 NOTE 3
5204
NOTE 1 STEAM
VM 10" 10"-VM-210521-T-B04T1-ECNOTE 1 16"-VM-210379-T-B04T1-EC
FA-21003

EC
FF 5194 206-00068
FT 206-00615 #300 START-UP STEAM 10" 10"x8" FC 16"x8" 16" FREE DRAINING
FF NOTE 6 8" TO DC-21001
2"
NOTES :

3/4"

3/4"
FV 21056 FROM MP STEAM
STR D01
21056 1. LOCATE ON TOP OF REACTOR PLATFORM.
21013 6"
STEAM 8" 8" 8"-VM-210482-T-A18T1-EC 8" 12"x8" 12" 12" 12"x8" EC 2. PROVIDE 3/4" CONNECTION AT EACH PLATFORM.
8"-VM-210483-T-B04T1-EC
206-00068 5182 NOTE 1
8"x4" FO 8"x4" #300 3. MINIMUM TO REACTOR.
TO DC-21001 B01 A01

2"
11376
3/4"

3/4"

4" EC PP 4. DELETED.
STRIPPER 3/4"-CACBP-217407-T-A18T1-PP
3/4"-VM-217407-T-A18T1-EC CACBP
T
206-00627C NOTE 3 5. DELETED.
4" STP
11375 E01 6. LOCKED CLOSED DURING NORMAL OPERATION.
EC 21012
3/4"-VM-217532-T-A18T1-EC 3/4"-CACBP-217532-T-A18T1-PP CACBP
T-B04T1 T-A18T1 T 7. 10" 6.3 KG/CM2G STEAM RISER.
206-00627C 2"
3/4"-GI-210486-T-A03T1-N H 8. 13 MM WEEP HOLE.
8416 FIC STP
EC PP C01 2" STEAM
GI 3/4" 3/4" 3/4" 21087 21035 2"-VM-210522-T-A18T1-EC 9. PROVIDE NITROGEN TO AVOID PLUGGING IN THE DISTRIBUTOR WHEN STEAM IS NOT AVAILABLE.
L 7260 206-00064
206-00620B NOTE 9 TO REACTOR RISER

2"
3/4" STEAM
FF 1-1/2"-VM-210480-T-A18T1-EC
6245 206-00010

EC

EC
FT
T-A03T1-N FF 2"-CACBP-210613-T-A18T1-EC TO DETAIL "C"
FV 21087
T-B04T1-EC STEAM
3/4"

21087 STP 1"-VM-210529-T-A18T1-EC


5175 8089 206-00006
STEAM 4" 3" 3"-VM-210485-T-A18T1-EC 21004 TO DETAIL "H"
4"-VM-210486-T-B04T1-EC CACBP 2"-CACBP-210614-T-A18T1-PP
206-00068 5186 T STEAM
4"x1-1/2" FO 3"x1-1/2" #300 206-00627C 1-1/2"-VM-210538-T-A18T1-EC
TO DC-21001 6039 206-00007
1-1/2"
3/4"

STRIPPER CONE
LOWER SECTION TO DETAIL "GG"
STEAM
1-1/2"-VM-210542-T-A18T1-EC
6033 206-00007
EC
1-1/2" TO DETAIL "GG"
T-B04T1 T-A18T1 H STEAM
FIC 1-1/2"-VM-210540-T-A18T1-EC
6064 206-00007
21088 TO DETAIL "GG"
L
STEAM

EC
1-1/2"-VM-210536-T-A18T1-EC
6036 206-00007
8T10 8T10
FF SET @ 7.382 kg/cm^2g SET @ 7.382 kg/cm^2g TO DETAIL "GG"
FT NOTE 5 NOTE 5
FF STEAM
FV 21088 1"-VM-210527-T-A18T1-EC

8"-VM-210481-T-A18T1-EC
PSV PSV 6063 206-00006

21000-DMB04M-0204
21088 21009A TO ATMOSPHERE 21009B TO ATMOSPHERE TO DETAIL "H"
STEAM 3"-VM-210488-T-A18T1-EC AT SAFE LOCATION AT SAFE LOCATION
4"-VM-210489-T-B04T1-EC 4" 4" 16"x10" 16"-V-210676-T-A18T1-PP 16"x10" 16"-V-210682-T-A18T1-PP
#300

#300
206-00068 5185 1-1/2"-VM-219203-T-A18T1-EC
4"x2" FO 4"x2" 4"x3" NOTE 8 FREE NOTE 8 21000-DMB04M-0203
TO DC-21001 #300 FREE
1-1/2"
3/4"

2" STP PP DRAINING


3/4"

DRAINING

14"x8"
14"x8"

STRIPPER CONE 3/4"-CACBP-217531-T-A18T1-PP PP


21034 EC STEAM
UPPER SECTION 11377 1"-VM-210090-T-A18T1-EC
3/4" EC 3/4" 8088 206-00006
3/4"-VM-217531-T-A18T1-EC CACBP

21000-DMB04M-0202

21000-DMB04M-0201
2" T TO DETAIL "H"
EC 206-00627C S S
STEAM
T-B04T1 T-A18T1 LO LC 1-1/2"-VM-210562-T-A18T1-EC
EC PP
14"

14"
FP FP 8423 206-00010
PIC 4"x1-1/2" TO DETAIL "C"

1-1/2"-VM-219204-T-A18T1-EC
HHC
21044
1-1/2"-VM-219202-T-A18T1-EC

1-1/2"-VM-219201-T-A18T1-EC
STEAM
14"-VM-210380-T-A18T1-EC

L 21003 1-1/2"-VM-210551-T-A18T1-EC
FREE DRAINING 11267 206-00009
DRAINING

NOTE 2
TO DETAIL "N"
FREE

1-1/2"

1-1/2"
FF
PT PG

3/4"
FF STEAM
PV 21044 21048G EC 1"-VM-210533-T-A18T1-EC
7062 206-00073

8"
21044 EA
5170 TO SPE-21004
VM 8"-VM-210479-T-B04T1-EC 8" 8" 8"-VM-210595-T-A18T1-EC 14"x8" 14"x10" 10"-VM-210595-T-A18T1-EC
EC EC NOTE 7
206-00615 8"x6" FO 8"x6" EC EA EA EC STEAM
3/4"

3/4"

6" 1-1/2"-VM-210549-T-A18T1-EC
8085 206-00009

3/4"-VM-217406-T-A18T1-EC TO DETAIL "N"


8577
6" STEAM
EC 3/4"-CACBP-217406-T-A18T1-PP CACBP 1-1/2"-VM-210550-T-A18T1-EC
T 8084 206-00008
T-B04T1 T-A18T1 206-00627C
TO DETAIL "A"
STP EC PP STEAM
21011 1"-VM-210030-T-A18T1-EC
8083 206-00006
TO DETAIL "H"
STEAM
1"-VM-210499-T-A18T1-EC
5241 206-00073
TO SPE-21014
STEAM
2"-VM-210555-T-A18T1-EC
11266 206-00009
TO DETAIL "NN"
STEAM
2"-VM-210554-T-A18T1-EC
11265 206-00009
TO DETAIL "NN"
4"x2" STEAM
4"-VM-210553-T-A18T1-EC
11264 206-00009
TO DETAIL "NN"
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL UTILITY RISERS (1/3)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00069 00
CAD FILE :
3/4"
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
PLANT AIR PLANT AIR DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
1-1/2"-AP-210104-T-A06T1-N 1-1/2"-AP-210101-T-A06T1-N
206-00007 8095 6032 206-00007
2. DELETED.
TO DETAIL "GG" TO DETAIL "GG"
PLANT AIR
1-1/2"-AP-210103-T-A06T1-N 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
PLANT AIR 8097 206-00007
1-1/2"-AP-210102-T-A06T1-N
206-00007 8094 TO DETAIL "GG"
TO DETAIL "GG"

PLANT AIR
1-1/2"-AP-210728-T-A06T1-N
206-00008 8108
TO DETAIL "AA"

1"-AP-210149-T-A06T1-N
206-00010 7322
TO DETAIL "C" 2J3 2J3
SET @ 7.382 kg/cm^2g SET @ 7.382 kg/cm^2g
PSV PSV PLANT AIR
1-1/2"-AP-210126-T-A06T1-N
21008A TO ATMOSPHERE 21008B 6066 206-00008
AT SAFE LOCATION TO DETAIL "AA"

3"-AP-210100-T-A06T1-N
4"x3" 4"-V-210675-T-A06T1-N 4"x3" 4"-V-210775-T-A06T1-N
TO ATMOSPHERE
NOTE 7 FREE NOTE 14 NOTE 7 FREE NOTE 14 AT SAFE LOCATION PLANT AIR NOTES :
1-1/2"-AP-210105-T-A06T1-N
DRAINING DRAINING 6067 206-00008 1. LOW PRESSURE OPENS THIS VALVE FIRST.
4"x2" 4"x2" TO DETAIL "A" 2. LOW PRESSURE OPENS THIS VALVE LAST.
3/4" 3/4"
S S PLANT AIR 3. DELETED.
1"-AP-210083-T-A06T1-N
LO LC 7063 206-00073 4. 6.3 kg/cm2g PLANT AIR RISER.
4" FP 4" FP TO SPE-21004 5. 6.3 kg/cm2g NITROGEN RISER.

FREE DRAINING
FF 6. 1-1/2" 6.3 kg/cm2g PURGE GAS RISER.
NOTE 12 PIC PT PG FREE DRAINING NOTE 15 HHC
FF 21005 7. SEE DETAIL ON DWG. 206-00002.
PV 21043 21043 21047G
L 8. DELETED.
21043 4"-AP-210072-T-A06T1-N

3/4"
9. BALL TYPE.
3"-AP-210075-T-A06T1-N 3" 3" 4"x3" 4"x3" 3"-AP-210083-T-A06T1-N
8726 206-00082 NOTE 4 10. PISTON TYPE.
FROM FA-21008 3"x1-1/2" FO 3"x1-1/2"
11. DELETED.
3/4"

PLANT AIR
3/4"

1-1/2"
#300 1-1/2"-AP-210692-T-A06T1-N
8093 206-00008 12. DETAIL VENT AND DRAIN SYSTEM FOR CONTROL VALVES REFER TO DRAWING 206-00015.
1-1/2" TO DETAIL "AA" 13. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
PLANT AIR
1-1/2"-AP-210710-T-A06T1-N
8092 206-00008 14. 13 mm WEEP HOLE.
PLANT AIR
1"-AP-210076-T-A06T1-N TO DETAIL "AA" 15. PROVIDE 3/4" CONNECTION AT EACH PLATFORM.
206-00073 5189
TO SPE-21014 16. REFER TO DETAIL "A"

NITROGEN
1"-GI-210099-T-A03T1-N
8096 206-00006
TO DETAIL "H" DETAIL "A"
NITROGEN
2"-GI-210782-T-A03T1-N
NITROGEN 3K4 3K4 8103 206-00009
1"-GI-210416-T-A03T1-N SET @ 7.382 kg/cm^2g SET @ 7.382 kg/cm^2g
206-00010 7384 TO DETAIL "NN" 100%

3"x2"
TO DETAIL "C" PSV PSV
21010A TO ATMOSPHERE 21010B NITROGEN
2"-GI-210764-T-A03T1-N

VALVE OPENING
NITROGEN AT SAFE LOCATION 8099 206-00009

A
1"-GI-210097-T-A03T1-N 4"-V-210677-T-A06T1-N

46

46
4"-V-210777-T-A06T1-N TO ATMOSPHERE TO DETAIL "NN"

10

10
206-00006 8098

-2

-2
NOTE 7 FREE NOTE 14 NOTE 7 FREE NOTE 14 AT SAFE LOCATION

PV

PV
TO DETAIL "H"
DRAINING DRAINING NITROGEN
4"x3" 2"-GI-210393-T-A03T1-N
T-A06T1 4"x3" T-A06T1 8102 206-00009
NITROGEN 3/4" 3/4"
1"-GI-210783-T-A03T1-N T-A03T1 T-A03T1
206-00006 6065 TO DETAIL "NN"
S S 0% 50% 100%
TO DETAIL "H"
LO LC NITROGEN
HHC HHC HHC 1"-GI-210098-T-A03T1-N
4"
2"-GI-210371-T-A03T1-N

4"
FP FP 8368 206-00006 CONTROLLER OUTPUT
21011 21012 21013
TO DETAIL "H"
FREE DRAINING

FREE DRAINING NOTE 17 NOTE 17 NOTE 17


FF NITROGEN
1-1/2"-GI-210370-T-A03T1-N
FF PIC PT PG 6251 206-00009
PV 21045 21045 21051G TO DETAIL "N"

3/4"

3/4"

3/4"
NOTE 12 L 4"-GI-210365-T-A03T1-N 17. PROVIDE 3/4" CONNECTION TO UPPER REGENERATOR FLUIDIZATION DISTRIBUTORS.
21045
5231
GI 3"-GI-210367-T-A03T1-N 3" 3" 3" 3" 3" 4"x3" 4"x3" 3"-GI-210366-T-A03T1-N
NOTE 5
206-00620B 3"x1-1/2" FO 3"x1-1/2" 5220
3/4"

3/4"

FROM NITROGEN 1-1/2"


3/4"

#300 4"-DAP-210683-T-A63T1-N DAP


(7.0 kg/cm2g MIN.)
2"-GI-210368-T-A03T1-N

1-1/2" 1-1/2G3 1-1/2G3 FREE DRAINING 206-00629


SET @ 7.382 kg/cm^2g SET @ 7.382 kg/cm^2g
PSV PSV
H FF X 21011A LO 21011B LO
FI FT

4"

4"
3/4"

3/4"
FF D FP FP
21051 21051 PY PA 4"x3" 4"x3"
PV NOTE 7 NOTE 7

1-1/2"-DAP-210683-T-A63T1-N
NOTE 12
21046B 21046B 21934 FREE
T-A63T1 T-A63T1
2" 1-1/2" DRAINING
2" 2" 2" SPLIT RANGE 3"x1-1/2" 3"x1-1/2"

FREE DRAINING
NOTE 13 T-A03T1 T-A03T1
NOTE 2 S S
2"x1" FC 1-1/2"x1" NOTE 16 X PSLL IS PALL CRIT
NOTE 9 NOTE 10 2" 1" 3/4" 3/4"
3/4"

3/4"
3/4"

#300 PY PIC 21001 21934 LO LC

3"

3"
#300 L LL
21046A NOTE 1 21046 PSL FP FP
1"
L T-A03T1 T-A63T1

FREE DRAINING
FREE DRAINING
PSLL

1-1/2"-GI-210369-T-A03T1-N PI PI PI
FF 1-1/2" 1-1/2"
FI FT FF FF FF FF 21934C 21934B 21934A L
FF PT PG PT PT PT
21090 L 21090 PV FREE DRAINING
NOTE 12 21046 21049G 21934C 21934B 21934A L L

3/4"
21046A 3"-GD-212004-T-A03T1-N
TREATED DRY GAS 2"x1-1/2" 1-1/2" 1-1/2" 1-1/2" PURGE GAS
1-1/2" 2"x1-1/2" 2"x1-1/2" 1-1/2"x1" 1-1/2"-GD-210100-T-A03T1-N 1-1/2"-GD-210100-T-A03T1-N
8122 206-00503 7940 206-00071A
#300 FO 1-1/2"x1"
FROM FA-21502 1" 3"x1-1/2" 3"x1-1/2" TO HEADER
3/4"

3/4"
3/4"

3/4"

#300
2"-GD-212001-T-A03T1-N 1"

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL UTILITY RISERS (2/3)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00070 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

NOTES :
1. DELETED.
2. DELETED.
3. VACUUM CLEANING RISER.
HHC HHC 4. DELETED.
VACUUM CLEANING VACUUM CLEANING
21010 21004 5. DELETED.
HOSE CONN HOSE CONN
6. 6.3 KG/CM2G INSTRUMENT AIR RISER.
7. 13MM WEEP HOLE.

4"

4"
4"-P-210185-B1A2-N
206-00063 5156 NOTE 3
TO CATALYST
FILLING AND
WITHDRAWAL LINE

2"-AI-210256-T-A05T3-N
8575 206-00071A

1-1/2"-AI-210235-T-A05T3-N
8574 206-00071A

3L4 3L4
SET @ 7.382 kg/cm^2g SET @ 7.382 kg/cm^2g
PURGE
PSV PSV 2"-AI-210100-T-A05T3-N
7941 206-00071A
21012A 21012B
TO DETAIL "DA"
6"x4" 6"-V-210232-T-A06T1-N 6"x4" 6"-V-210233-T-A06T1-N
TO ATMOSPHERE TO ATMOSPHERE
FREE DRAINING NOTE 7 AT SAFE LOCATION FREE DRAINING NOTE 7 AT SAFE LOCATION
T-A06T1 T-A06T1
1-1/2"-AI-210271-T-A05T3-N
6"x3"

6"x3"

T-A05T3 T-A05T3
8128 206-00071A

3/4" 3/4"

S S
PURGE
LO LC 2"-AI-216103-T-A05T3-N
8127 206-00071A
6"

6"

FP FP
PIC
21047
L
6"-AI-210603-T-A05T3-N

FREE DRAINING
FREE DRAINING

PURGE
2"-AI-216104-T-A05T3-N
FF 8126 206-00071A
PT PG
FF
PV 21047 21050G
21047
5148
AI 3"-AI-210230-T-A05T3-N 3" 3" 6"x3" 6"x3" 3"-AI-210229-T-A05T3-N
NOTE 6
206-00621C 3"x2" FO 3"x2"
2"
3/4"

3/4"

#300

2"

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL UTILITY RISERS (3/3)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00071 00
CAD FILE :
CP
PURGE AIR
PURGE GAS

8128 206-00071
7941 206-00071
7940 206-00070

INSTRUMENT AIR

DATA
FROM UTILITY RIZER
FROM UTILITY RISER
FROM UTILITY RISER
7491
3/4"-AI-210325-T-A05T3-N AI 7390

1
0

00
A3
A2
206-00004

MCA
3/4"-GD-210337-T-A03T1-N GD
206-00004
7506

NOTE 1

2"x3/4"
3/4"-AI-210231-T-A05T3-N AI 7393

NOTE 1

AS BUILT
206-00004 3/4"-GD-210334-T-A03T1-N GD
206-00004
7479

NOTE 1
3/4"-AI-210273-T-A05T3-N AI

1-1/2"-AI-210271-T-A05T3-N

ISSUE FOR DESIGN


7490 7391
3/4"-AI-210275-T-A05T3-N AI 206-00004 3/4"-GD-210336-T-A03T1-N GD
206-00004 206-00004

ISSUE FOR CONSTRUCTION


ISSUE FOR CONSTRUCTION
7501

NOTE 1
7454 3/4"-AI-210277-T-A05T3-N AI 7392

NOTE 1

ISSUE FOR DESIGN (FOR PLANNING)


3/4"-AI-210323-T-A05T3-N AI 206-00004 3/4"-GD-210335-T-A03T1-N GD
206-00004 206-00004

NOTE 1
NOTE 1
NOTE 1
NOTE 1

7453 7394

NOTE 1
3/4"-GD-210333-T-A03T1-N

1-1/2"x3/4"
3/4"-AI-210271-T-A05T3-N AI GD

DESCRIPTION
206-00004 1-1/2"x3/4" 206-00004
7505
AI 3/4"-AI-210287-T-A05T3-N
7432

NOTE 1
206-00004 3/4"-GD-210361-T-A03T1-N

REVISIONS
GD
206-00004
7483

NOTE 1
AI 3/4"-AI-210279-T-A05T3-N 7482 7430
NOTE 1

206-00004

1-1/2"-AI-216108-T-A05T3-N
3/4"-AI-210289-T-A05T3-N AI 3/4"-GD-210362-T-A03T1-N GD
206-00004 206-00004

8574 206-00071
7488

NOTE 1
AI 3/4"-AI-210281-T-A05T3-N 7484

NOTE 1
NOTE 1

206-00004 3/4"-AI-210295-T-A05T3-N AI
206-00004

DATE
7481
2"x3/4" 2"x3/4"

NOTE 1

20 Apr 20

11 Jun 21
10 Feb 21

30 Sep 23
19 Nov 21
AI 3/4"-AI-210285-T-A05T3-N
7487

NOTE 1
206-00004 3/4"-AI-210293-T-A05T3-N AI

BY

YDC
YDC
YDC
YDC
YDC
206-00004
NOTE 1

8134 7427

NOTE 1
AI 3/4"-AI-210283-T-A05T3-N 3/4"-GD-210347-T-A03T1-N GD

2"-AI-210100-T-A05T3-N
7485
NOTE 1
206-00004 3/4"-AI-210297-T-A05T3-N AI 206-00004

1-1/2"-AI-210235-T-A05T3-N

APR

KHL
KHL
KHL
KHL
KHL
7477
3/4"-AI-210234-T-A05T3-N AI 206-00004
7428

NOTE 1
NOTE 1

1-1/2"x3/4"

206-00004 3/4"-GD-210348-T-A03T1-N GD
7486
NOTE 1

3/4" 3/4"-AI-210299-T-A05T3-N AI 206-00004


1-1/2"-GD-210100-T-A03T1-N

NOTE 1

NUMBER
7476
206-00004

1-1/2"x3/4"
3/4"-AI-210235-T-A05T3-N AI 7429
NOTE 1

206-00004 3/4" 3/4"-GD-210349-T-A03T1-N GD


7478
NOTE 1

MIN.
206-00004
1-1/2"x3/4"

3/4"-AI-210291-T-A05T3-N AI

NOTE 1
206-00004
7426
NOTE 1

3/4"-GD-210346-T-A03T1-N GD
1-1/2"-GD-216012-T-A03T1-N

NOTE 1

206-00004
NOTE 1

TITLE
7411
1"x3/4" 3/4"-GD-210359-T-A03T1-N GD

8126 206-00071
INSTRUMENT AIR
206-00004

FROM UTILITY RIZER


8127 206-00071

REFERENCE DRAWINGS
INSTRUMENT AIR

7412
NOTE 1

FROM UTILITY RISER

3/4"-GD-210360-T-A03T1-N GD
206-00004
7499
3/4"-AI-210267-T-A05T3-N AI
7442 7423
NOTE 1

3/4"-AI-210247-T-A05T3-N AI 206-00004 3/4"-GD-210355-T-A03T1-N GD


206-00004 206-00004
7500
NOTE 1

3/4"-AI-210265-T-A05T3-N AI

2"-AI-216104-T-A05T3-N
7503 7399

NOTE 1
NOTE 1

2"x3/4"
1-1/2"x3/4"

3/4"-AI-210263-T-A05T3-N AI 206-00004 3/4"-GD-210345-T-A03T1-N GD


206-00004 206-00004
7450
NOTE 1

M.A.T
3/4"-AI-210269-T-A05T3-N AI 7413

REVIEWED
NOTE 1
NOTE 1

APPROVED
206-00004 3/4"-GD-210344-T-A03T1-N GD

WORK RESIDENT
7449
3/4"-AI-210248-T-A05T3-N AI 206-00004
7502
NOTE 1

206-00004 3/4"-AI-210233-T-A05T3-N AI 7424


NOTE 1

SIGNED BY
206-00004 3/4"-GD-210353-T-A03T1-N GD
7451

NOTE 1
3/4"-AI-210259-T-A05T3-N AI 206-00004
7445
NOTE 1

206-00004 3/4"-AI-210232-T-A05T3-N AI 7421


NOTE 1

206-00004 3/4"-GD-210341-T-A03T1-N GD
7448

NOTE 1
1-1/2"-GD-216011-T-A03T1-N

3/4"-AI-210249-T-A05T3-N AI 206-00004
8583
NOTE 1

206-00004 3/4"-AI-210270-T-A05T3-N AI 7425


NOTE 1

206-00004 3/4"-GD-210339-T-A03T1-N GD
7447

NOTE 1
3/4"-AI-210250-T-A05T3-N AI 206-00004
7466
NOTE 1

2"-AI-216103-T-A05T3-N

206-00004 3/4"-AI-210303-T-A05T3-N AI
NOTE 1

206-00004
7444 7415

NOTE 1

PTI
3/4"-AI-210253-T-A05T3-N AI 7468 3/4"-GD-210357-T-A03T1-N GD
NOTE 1

206-00004 3/4"-AI-210305-T-A05T3-N AI 206-00004


206-00004
7446 7414
NOTE 1
NOTE 1

1"x3/4"
2"x3/4"

3/4"-AI-210255-T-A05T3-N AI 7469 3/4"-GD-210358-T-A03T1-N GD


NOTE 1

206-00004 3/4"-AI-210307-T-A05T3-N AI 206-00004

CONTRACT NO. : PTI-ID-O-004-2-2020


206-00004
7440 7416

Infraestructura de
NOTE 1
NOTE 1

3/4"-AI-210251-T-A05T3-N AI 3/4"-GD-210343-T-A03T1-N GD
NOTE 1

206-00004 206-00004

Desarrollo, S.A. de C.V.


7467 7417
NOTE 1
NOTE 1

1-1/2"x3/4"

3/4"-AI-210301-T-A05T3-N AI 3/4"-GD-210342-T-A03T1-N GD
206-00004 206-00004

3/4"-GD-210350-T-A03T1-N
8575 206-00071
INSTRUMENT AIR

8585 8161 7422


NOTE 1
NOTE 1

3/4"-AI-210264-T-A05T3-N 3/4"-AI-210241-T-A05T3-N
FROM UTILITY RISER

AI AI GD
206-00004 206-00004 206-00004

7441 7409 3/4"-GD-210351-T-A03T1-N 7418


NOTE 1
NOTE 1
NOTE 1

2"x3/4"

3/4"-AI-210252-T-A05T3-N AI 3/4"-AI-210246-T-A05T3-N AI GD
206-00004 206-00004 1"x3/4" 206-00004

7405 3/4"-GD-210338-T-A03T1-N 7403


1-1/2"-GD-216010-T-A03T1-N

NOTE 1
NOTE 1
NOTE 1

3/4"-AI-210245-T-A05T3-N AI GD
SIMA

206-00004 206-00004
7507
2"-AI-210256-T-A05T3-N

3/4"-AI-210237-T-A05T3-N AI 7410
NOTE 1
NOTE 1

206-00004 3/4"-AI-210244-T-A05T3-N AI 7401


DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL
ASOCIADOS

206-00004 3/4"-GD-210340-T-A03T1-N GD
7508
NOTE 1

3/4"-AI-210238-T-A05T3-N AI 206-00004
7404
NOTE 1

206-00004 3/4"-AI-210239-T-A05T3-N AI 7400


NOTE 1

DATE :

206-00004 3/4"-GD-210352-T-A03T1-N
DBNR S.A. DE C.V.

GD
CONSTRUCTORES

7504
NOTE 1

DBNR
1-1/2"x3/4"

3/4"-AI-210236-T-A05T3-N AI 206-00004
7407
NOTE 1

206-00004 3/4"-AI-210240-T-A05T3-N AI 7420


NOTE 1

206-00004 3/4"-GD-210356-T-A03T1-N GD
7452
1-1/2"-GD-216010-T-A03T1-N

NOTE 1

3/4"-AI-210257-T-A05T3-N AI 206-00004
7406
SCALE :
NOTE 1

REVIEW

206-00004
PROJECT

APPROVAL
DRAWING

COORDINATION

3/4"-AI-210243-T-A05T3-N AI
NOTE 1

206-00004
7402
NOTE 1
1-1/2"x3/4"

3/4"-GD-210354-T-A03T1-N GD
7443 7408
NOTE 1

2"x3/4"
2"x3/4"

3/4"-AI-210254-T-A05T3-N AI 3/4"-AI-210242-T-A05T3-N AI 206-00004


206-00004 206-00004
NOTE 1

DIMENSION:
NOTE 1
NOTE 1
1.
3.
2.
1.

NOTES :
DELETED.
GENERAL NOTES :

PROJECT NO. : SO6625


MINIMUM DISTANCE FROM UTILITY RISER.

PLACE : Dos Bocas, Paraiso, TAB.


CAD FILE :
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

CATALYTIC CRACKING UNIT, FCC

REACTOR REGENERATOR SECTION

-DTI-00071A
DOS BOCAS REFINERY PARAISO, TABASCO

R2B-P3-206-02-A
FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND

UTILITY RISER-CONNECTION FOR DETAIL "DA" AND "DG"


FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

REV

00
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
CRIT DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
TAHH
21933 2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.


TI H TI H TI H TALL2 CRIT
21933A L 21933B L 21933C L 21933 1-1/2F2 1-1/2F2
SET @ 4.218 kg/cm^2g SET @ 4.218 kg/cm^2g

TALL1 CRIT PSV PSV


21933 21013A 21013B

NOTE 3 3"x2" 3"-V-210684-T-A18T1-PP VENT TO ATMOSPHERE 3"x2" 3"-V-210685-T-A18T1-PP VENT TO ATMOSPHERE


NOTE 17 D NOTE 19 AT SAFE LOCATION NOTE 19 AT SAFE LOCATION
IS TI TA FREE DRAINING FREE DRAINING
T-A18T1-PP T-A18T1-PP
21001 21056 21933 3"x1-1/2" T-B04T1-EC 3"x1-1/2" T-B04T1-EC
IS 3/4" 3/4"
TSLL1
TSLL2

TSLL1
TSLL2

TSLL1
TSLL2
TSHH

TSHH

TSHH

21001 S S
LO LC

3"

3"
FP FP

FF H NOTES :

3"-P-210381-T-B04T1-EC
TT TT TT TT TIC
1. PROVIDE 1800 mm OR MORE CLEARANCE AT THIS POINT TO ENABLE USE OF REAMER.

FREE DRAINING
21933A 21933B 21933C 21056 21056 STP FI H
MW L 2. FI-21080A MUST BE READABLE FROM VALVE.
6" 21040 21079
24" NOTE 20 11431 L
REACTOR OVHD 3. TI MUST BE READABLE FROM REGENERATED CATALYST SLIDE VALVE MANUAL OPERATOR.
CACBP 3/4"-CACBP-217535-T-A18T1-PP 3/4"-VM-217535-T-B04T1-EC
3403 206-00068 T 4. LOCATE ACCESSIBLE FROM PLATFORM. PROVIDE SUFFICIENT CLEARANCE FOR INSTALLATION
FREE DRAINING 206-00627D AND RETRIEVAL OF A 2500 mm LONG PROBE.
FROM DC-21001
NOTE 12 NOTE 9 T-A18T1-PP T-B04T1-EC
5. GUIDE AND SUPPORT SYSTEM OF THIS LINE MUST TAKE INTO ACCOUNT THERMAL EXPANSION
EC

1560ID-P-210005-FC-4-EC FF DURING START-UP.


PG FT
21053G FF 21079 6. THIS VALVE MUST BE LOCKED OPEN AND BLIND REMOVED WHEN VAPOUR LINE BLIND IS IN PLACE
PDV

EC
206-00064 3402 AT MAIN COLUMN. THIS VALVE MUST BE LOCKED CLOSED AND BLINDED WHEN REACTOR IS IN

T-B04T1
FC-4
1-1/2"-P-210500-T-B04T1-EC 21065 HYDROCARBON SERVICE.
TO TY-21056 3022
3"x1-1/2" 3" 3"x1-1/2" 1-1/2"x1" 1-1/2"x1" 1-1/2" 7. VAPOUR LINE BLIND FOR START-UP TO BE PROVIDED. A PLATFORM AND FACILITIES FOR INSTALLATION,
1560ID-P-210005-FC-4-EC

1-1/2"-VM-210497-T-B04T1-EC VM
EC REMOVAL, HANDLING AND STORAGE OF BLIND TO BE PROVIDED.
FREE FREE 1-1/2" FO 2"x1-1/2" 2"x1-1/2" 206-00616
THE AREA NEAR THE BLIND SHOULD BE CLEAR FROM ANY PIPING OBSTRUCTION.
NOTE 5 DRAINING DRAINING 1"
1/2"-P-210872-T-B04T1-EC 3/4" 3/4" PURGE STEAM 8. MAKE CONNECTION ON TOP OF PIPE.
VENT TO ATMOSPHERE MIN.
AT SAFE LOCATION 9. FREE DRAINING IN HOT POSITION AT A 3% MINIMUM SLOPE.
1"
10. INSULATE LINE TO BLIND.
26"-V-210492-T-A18T1-N

11. MINIMUM DISTANCE TO MAIN COLUMN.


1" 12. MINIMUM TO REACTOR.
NOTE 23
13. MINIMUM LENGTH STRAIGHT VERTICAL PIPE.
NOTE 4
MIN. 14. DELETED.
T-A18T1-N 3/4" 3/4" 15. DELETED.
FF H
FC-4F-EC H
26"

PDT PDIC 16. DELETED.


1-1/2"x3/4"

1-1/2"x3/4"
1" NOTE 6, 18
T-B04T1 FC-4 T-B04T1 FC-4 21065 21065 17. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
1" 3029 3028 L
1" BLANKOFF FP 1-1/2" 1-1/2"

1-1/2"-VM-210382-FC-4-EC
26"-P-210491-FC-4F-EC

1-1/2" 1-1/2" L
MIN.

VM VM 18. PG-21052G MUST BE READABLE FROM VALVE.


FP
206-00616 206-00616 19. 13 MM WEEP HOLE.
NOTE 21 NOTE 18
NOTE 13

NOTE 13
1-1/2"-VM-210493-T-B04T1-EC 1-1/2"-VM-210495-T-B04T1-EC 20. PROVIDE INSPECTION AND VENTILATION FOR EVERY VERTICAL C.L.
1-1/2"

1-1/2"
MIN.

MIN.
60 ° "DG-29" 1-1/2"-P-210523-FC-4-EC 1-1/2"-P-210524-FC-4-EC
TI PG 21. REFER TO DRAWING NO. 206-00004.
21070 21052G 22. LOCATE IN HORIZONTAL RUN NEARBY ELBOW.
SPE
EC

EC
NOTE 10 FC-4F NOTE 7 21016 "DG-30" 23. BLEED AND DRAIN.
FC-4 NOTE 21 REACTOR VAPOR
1560ID-P-210005-FC-4-EC 1560ID-P-210006-FC-4-EC 24. MINIMUM LENGTH STRAIGHT PIPE TO MAIN COLUMN.
EC EC 5824 206-00118
NOTE 9 FREE DRAINING
FREE DRAINING NOTE 8 MIN. NOTE 8 MIN. LO TO DF-21101 25. 1200 mm.
NOTE 9 4" NOTE 11
2"

1-1/2"
24" 4" DRAIN 4" 26. THIS VALVE SHALL BE A SCREWED VALVE AND THREAD TO MATCH PRESSURE TAP REAMER SEE
ID UOP STANDARD DRAWING 6-122 AND 6-123.
MW DRAIN
NOTE 22
NOTE 25
FO
1"-VM-210593-T-B04T1-EC 21006
T-B04T1 FC-4

EC
3020
1" 1" FREE DRAINING
VM
FI H 206-00616
1"-P-210529-FC-4-EC

1-1/2"-P-211303-FC-4-EC(ST)
21080 STR
L 21015
FI
21080A EC

MIN.
FF EC(ST)
TI FT 1"
21092 21080 NOTE 2 1"-P-210527-FC-4-EC(ST)

175°C 1-1/2" 1-1/2"-P-211303-FC-4-EC(ST)

6"x1-1/2" 6"x1-1/2" 2"x1-1/2" 2"x1-1/2"


1-1/2"
1-1/2"

175°C
NOTE 1 1-1/2"-P-211303-FC-4-EC(ST)
3/4" 1-1/2" PURGE STEAM
5825 206-00118
NOTE 26 LO TO DF-21101

NOTE 24

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL MAIN COLUMN FEED
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00072 00
CAD FILE :
3073 206-00062
2000IDL-GCO-210024-FC-8-N FA-21006 GENERAL NOTES :
FROM DC-21002
ORIFICE CHAMBER 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
NOTE 10 ID 3550 mm DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
PLANT AIR 1" 1"
1"-AP-210083-T-A06T1-N TL-TL 11550 mm
7063 206-00070 DP 3.87 kg/cm^2g 2. DELETED.
DT 10 C / 343 C
FROM PLANT AIR
T-A06T1 T-A18T1 MATERIAL SA-516 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
RISER INSULATION N
1"-VM-210534-T-A18T1-EC TRIM FC-8
T-A18T1-EC FC-8 EC(ST)
STEAM 1" 1" 1" 1" 1"-P-210528-FC-8-EC(ST) 175°C
1"-VM-210533-T-A18T1-EC
7062 206-00069
1/2 FREE DRAINING
FROM 6.3 KG/CM2G NOTE 10 "
STR SECL
STEAM RISER 3/4" 3/4"-VM-210628-T-A18T1-EC MIN. FO
21016 VENDOR
7064 21007
NG
3/4"-CACBP-210629-T-A18T1-PP NI
CACBP AI
206-00627C
T
DR
STP EE 1-1/2"-GCO-210030-FC-3-EC
PP EC FR 16
NOTE 2 21005
TE

EC
5202 206-00062
NO

"
1/2
1-
FROM PRESSURE EC

N.
CONTROLLER N

MI
NOTE 4, 12
NOTE 1 PDY 3/4" SC NOTES :
4215 206-00068
21039C 21004
FROM PDIC-21039 1. HIGH DIFFERENTIAL PRESSURE SIGNAL OPENS SLIDE VALVE.
TYPE G
2. HIGH PRESSURE SIGNAL OPENS SLIDE VALVE.
3/4"-GCO-210032-FC-3-EC
NOTE 3 FO FO 3. PDI MUST BE READABLE FROM SLIDE VALVE MANUAL OPRATORS.
FF FF
PDI 21031A 21031B 4. LOCATE OFF VERTICAL RUN OF PIPE, ACCESSIBLE FROM FLUE GAS SLIDE VALVE PLATFORM.
4216 206-00068 PI PT PG PG PT PI
21039 21055 21055 21055 21056 21056 21056 5. PROVIDE MANWAYS AS REQUIRED FOR COMPLETE INSPECTION OF FLUE GAS LINE.
FROM PDT-21039 1" NOTE 7 1" 11505
1/2"-DBP-210082-T-A63T1-N DBP 6. THREE POSITION
206-00628A 1. BYPASS STACK
MANUAL MIN. MIN. MANUAL
MIN. MIN. 2. STOP
OPERATING 36" OPERATING
3. FLUE GAS STEAM GENERATOR

1"

1"
1800 mm MW 1800 mm
ACTUATOR ACTUATOR
7. CONFIGURATION TO BE SYMMETRICAL.

MIN.

MIN.

1/2"
11506
1/2" 3/4"x1/2" 3/4"-AI-217496-T-A05T3-N

E/H

E/H
AI 8. DELETED.
FF NOTE 4, 15
ACTUATOR XA ZI ZT PDY SPE PDY ZT ZI XA ACTUATOR OXYGEN 206-00621C 9. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
ALARMS 21014A 21001A 21001A 21004 NG 21001B 21001B ALARMS FF
21039A NI 21039B 21014B AT AI 10. MINIMUM DISTANCE FROM UTILITY RISERS.
AI
PG DR 21001 21001
C1 EE L 11. REFER TO DRAWING NO. 206-00004.
C2 21054G FR
C2 DO NOT POCKET 12 SEE DETAIL ON DWG 206-00020C.
C1

1/2"
"DA-51" P03A
13. WELDED JOINT.

"
36"

1/2
NOTE 11 P02 1"-AH-210011-T-F73T3-N

1-
2" 1 MW 2"

1/2"-DAA-210084-T-A60T1-N
14. MIN. 1800 mm.
1"-AH-210012-T-F73T3-N

N.
P01

MI
15. INSERTION TYPE INSTRUMENT.
3/4" 2 1/2" 1/2" 1/2" 1/2"
1"-AH-210010-T-F73T3-N 16. REFER TO AT-21001 HOOK UP DWG FOR SAMPLE PROBE DETAILS.
P03B
36" C1 17. THERMOCOUPLES TO BE FURNISHED WITH EXPANSION JOINT.
1"-AH-210009-T-F73T3-N "DA-52" P04A MW
NOTE 11 2" 3
18. SPE-21014 ACTIVE PURGING SYSTEM.
1/2" 1/2" 1/2" 1/2" C2
4 FA-21006 SPE21004-LCP-001
3/4" C2
P03C
36"
"DA-53" P04B 5 MW
NOTE 11 2" C1

3/4" 206-00020C
6
DAA
"DA-54" P04C 11503
NOTE 11 2" H H 11770
TI TI
P03D 1-1/2"x1/2" 1-1/2" 1-1/2"-SAE-210017-T-A01T1-N SAE
21096A 21096B
36" L L 206-00623
MW
11760
1-1/2"x1/2" 1-1/2" 1-1/2"-RAE-210017-T-A01T1-N RAE
TE TE 206-00624
PLANT AIR 1"-AP-210076-T-A06T1-N NOTE 10 1" NOTE 13 21096A 21096B
1"-VM-210077-T-A18T1-EC
5189 206-00070 2800 ID OF LINING
MW SKIN SKIN
FROM PLANT AIR 1"
36" EXJ
RISER T-A06T1-N T-A18T1-EC NOTE 5 NOTE 17 BYPASS STACK
21005
FO ZLH
21079 21935 ZAHH CRIT
EC EC(ST) MIN. 2800IDL-GCO-210026-FC-8-N
FF 21935
1"-VM-210491-T-A18T1-EC(ST) NOTE 14 PG PT PI FLUE GAS STEAM
STEAM 1"-VM-210499-T-A18T1-EC NOTE 10 1" 1"-VM-210490-T-A18T1-EC(ST) 21068 21072 21072
GENERATOR
5241 206-00069 EC NOTE 9
1/2 ZLL IS ZI H
FROM 6.3KG/CM2G 1" "
STEAM RISER STR 21002 21001 21935A
3/4"

1"-VM-210502-T-A18T1-EC

21026
H H H H
NOTE 18 SPE-21014-LCP-002 ZI H
TI TI TI TI
FF FF 21935B
ZSL ZSHH ZT ZT 21097A 21097B 21097C 21097D
EXJ 21002 21935C 21935A 21935B L L L L
21009 ZAH CRIT
MIN.

21935C TE TE TE TE

E/H
21097A 21097B 21097C 21097D
STP NOTE 17 HY ACTUATOR
SPE HS SKIN SKIN SKIN SKIN
8125 21006 21020 C2 NOTE 6
21014 C1 21020 EXJ
CACBP 1"-CACBP-210499-T-A18T1-PP TE TE TE TE 1"-AH-210013-T-F73T3-N NOTE 17
T 1"-AH-210014-T-F73T3-N 21006
206-00627C 21099D 21099C 21099B 21099A 1/2" 1/2" 2800IDL-GCO-210031-FC-8-N 2800 ID OF LINING
PP 2800 ID OF LINING
SKIN SKIN SKIN SKIN 3146 206-00076
EC 1/2" 1/2"
H H H H TO BYPASS STACK
C1 SPE-21017
TI TI TI TI
SPE21014-LCP-001
21099D 21099C 21099B 21099A
C2 LINING
L L L L 2800 ID OF LINING 2800IDL-GCO-210027-FC-8-N
5047 206-00074
11761 11767
TO SPE-21012
RAE 1-1/2"-RAE-210018-T-A01T1-N 1-1/2" 1-1/2"x1/2" 1-1/2"x1/2" 1-1/2" 1-1/2"-SAE-210018-T-A01T1-N SAE
206-00624 206-00623

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL ORIFICE CHAMBER
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00073 00
CAD FILE :
SPE-21012 GENERAL NOTES :
FLUE GAS STEAM GENERATOR NOTE 30
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DP BY VENDOR DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DT / BY VENDOR
CAPA BY VENDOR NOTE 26 2. DELETED.
3/4"-VA-210597-T-D62T3-EC SC
10296 206-00074A 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
21006
FIC TYPE E
206-00074A 8781
21057
L FROM FY-21060
FF NOTE 6 H
FT TI
FF
6"-ACAA-210383-T-D61T1-EC 21057 FV SECL
21079
21057 L
HP BOILER FEED 3" VENDOR
5002 3"
6" 6"x3" 8"x3" 8" WATER FULE GAS 2050ID-GCO-210028-FC-11-PP FLUE GAS
ACAA 6" 8" 8"-ACAA-210638-T-D61T1S-EC
8764 206-00074A 8747 206-00074A PP 3114 206-00076
206-00631 FC NOTE 1
TO ECONOMIZER FROM ECONOMIZER TO SPE-21013
3"
3/4" 3/4"

3/4" 3/4"
H
PI
3" 21093
206-00074A 8757 L
NOTE 2 TO TV-21075
T-D61T1 T-D61T1S
2" FF H FF NOTES :
2"-ACAA-210643-T-D61T1-EC TIC TI PT
EC 8782 206-00074A 1. MINIMUM WALL THICKNESS SHALL BE 13 MM.
21075 21076 21093
TO L T-D61T1S T-D61T1 2. LI-21007 OF STEAM DRUM MUST BE READABLE FROM FEEDWATER CONTROL VALVE BYPASS.
10"-VM-210596-T-D61T1S-EC DESUPERHEATER SUPERHEATED HP
5012 5016
10" 10" 10" SPE-21012 STEAM 16" 16" 16"-VA-210599-T-D61T1-EC
3. SEAL TYPE BLIND TO BE PROVIDED. PROVIDE FACILITIES FOR INSTALLATION, REMOVAL, HANDLING
VM 10"-VM-210501-T-B04T1-EC VA AND STORAGE OF BLIND.
EC 8783 206-00074A STEAM EVAPORATOR / SUPERHEATER / SOOT BLOWER 8758 206-00074A
206-00615 START-UP 206-00614 4. DELETED.
STP TO SUPERHEATER NOTE 31 FROM 16"x14" 1"-VA-217409-T-D61T1-EC
T-B04T1 T-D61T1S DESUPERHEATER
2"

21013 3/4"-VM-217408-T-D61T1S-EC 8683 16"-VA-210598-T-D61T1S-EC 3" STP 5. DELETED.


1"-CACBP-217409-T-A18T1-PP
3/4"-CACBP-217408-T-A18T1-PP CACBP 21014 6. LOCATE FV-21057 AT GRADE.
2"

T 3" 8681
206-00627C TWO PHASE FLOW CACBP 7. VACUUM CLEANING CONNECTION (BLANKOFF).
DRAIN T
T-D61T1S-EC T-A18T1-PP 1"-CACBP-218953-T-A18T1-PP 206-00627C
5054 206-00075A 11720 8. DELETED.
4"-VM-210832-T-B04T1-EC FROM T-D61T1-EC T-A18T1-PP
VM 2"x1" 9. DELETED.
8784 206-00074B SPE-21012-SPE01
206-00615 10. DELETED.
TI TO SOOT BLOWER DRAIN
SYSTEM 1"-CACBP-218954-T-A18T1-PP

2"-CACBP-218973-T-A18T1-PP
21091 206-00075A 11721 11 DO NOT TRAP OR POCKET THIS LINE.
FROM 12. DELETED.
FLUE GAS NOTE 21 SPE-21012-SPE01
2800IDL-GCO-210027-FC-8-N NOTE 15 13. DELETED.
5047 206-00073 8785 206-00074A DRAIN
NOTE 3 TO STEAM 1"-CACBP-218955-T-A18T1-PP STEAM/ 8833 14. BY DESUPER HEATER VENDOR.
FROM SPE-21014 206-00075A 11722 CONDENSATE
PIC GENERATOR 3"-CACBP-210400-T-A18T1-PP CACBP 15. REFER THE FIGURE 1 OF UOP PROJECT SPECIFICATION NO. 9038069-827.
FROM PSV-21068A/B 8834 206-00074B
21073 3"x1" NOTE 24 TWO PHASE FLOW 206-00627C 16. REFER TO CAUSE & EFFECT DIAGRAM FOR DETAILS.
NOTE 16 FROM SOOT
BLOWER SYSTEM 17. 13 MM WEEP HOLE.
HIC IS 2"-CACBP-218959-T-A18T1-PP
206-00075B 11754
FF 21026 21001 8832 18. DELETED.
PT DRAIN
HV 1"-CACBP-210401-T-A18T1-PP CACBP 19. LOCATE ON TOP OF PIPE.
21073 DRAIN 8831 206-00074A
HP SATURATED 21026 1"-CACBP-218122-T-A18T1-PP TWO PHASE FLOW 206-00627C

2"-CACBP-218974-T-A18T1-PP
206-00074A 11717 FROM NOTE 24 20. LOCATE MIN DISTANCE FROM POSITVE SEAL BLIND.
STEAM 8" 8" 8"
8"-VA-211005-T-D61T1S-EC 8" 8"-VA-211015-T-D61T1S-EC FROM SUPERHEATER 21. SEE PURGE DETAIL BELOW.
5045 206-00111 EC 8786 206-00074A
SPE-21012-SPE03
FROM EA-21108A/B/C FO TO SUPERHEATER
8" DRAIN DRAIN NOTE 19
3/4" 3/4"

3/4" 3/4"
NNF

2"

2"

1"-CACBP-218121-T-A18T1-PP 3"-CB-218105-T-A18T1-PP
206-00074A 11719 8838 206-00074A

3"
PG T-A18T1-PP 4"-GCO-210027-FC-8-PP
2"

2"

FROM FROM ECONOMIZER


T-A18T1 FC-8
3/4"-CACBP-217410-T-A18T1-PP

21069 8" SPE-21012-SPE02 T-A60T1U-N 11356


VB
DRAIN
3/4"-VA-217410-T-D61T1S-EC 1"-CACBP-218120-T-A18T1-PP 206-00617D
206-00074A 11718

3/4"
T
FROM PSV-21078
STP 206-00635A 4"-VB-210027-T-A18T1-EC

2"
T-A18T1 T-D61T1S
8"-VA-210600-T-D61T1S-EC

DAA

BLOWDOWN
INTERMITTENT
21033

TO UTILITY STATION

TO UTILITY STATION

TO UTILITY STATION

206-00074A 8830
8837

10987 206-00074A

10989 206-00074A

10986 206-00074A

8793 206-00074A
TO OUTLET DUCT
FLUE GAS LINE PURGE DETAIL
NOTE 20
206-00627C

HOPPER
VENT TO
CACBP ATMOSPHERE 22. DELETED.
11309 AT SAFE LOCATION
23. DELETED.
TO GRADE
24. DELETED.
8"

25. TG-21071 TO BE READABLE FROM GLOBE VALVE.


FO 3/4" 3/4" TO ATMOSPHERE TO ATMOSPHERE TO ATMOSPHERE TO ATMOSPHERE 12"x6"
FF AT SAFE LOCATION AT SAFE LOCATION AT SAFE LOCATION AT SAFE LOCATION 26. PROVIDE STEAM SAMPLE POINT PER ASTM D 1066.
PV 6"-CB-210611-T-A18T1-PP
21009
8"x6" TWO PHASE FLOW 27. 300 mm.
12"-V-210001-T-A18T1-PP

12"-V-210002-T-A18T1-PP

12"-V-210003-T-A18T1-PP

12"-V-210004-T-A18T1-PP

21073
28. 700 mm.

FREE DRAINING
12"-CB-210811-T-A18T1-PP
6" FC
6"

T-D61T1S 4P6 4P6 4P6 29. MIN. 200 mm.


4P6 NOTE 28

NOTE 29
T-B04T1 SET @ 15.5 kg/cm^2g SET @ 15.5 kg/cm^2g SET @ 15.5 kg/cm^2g SET @ 15.5 kg/cm^2g 30. DETAILS OF STEAM DRUM AND WATER CIRCULATION PUMPS ARE SPECIFIED ON THE DRAWING NO.
16"x6" R2B-P3-206-02-A-DTI-00075, 00075A, 00075B.
PSV PSV PSV PSV
FREE 21079B FREE 21079C FREE 21079D FREE 31. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00074A~00074C.

1-1/2"-VB-210005-T-A18T1-EC
3/4" 3/4" 21079A

1-1/2"-AS-210002-T-A01T1-N

1-1/2"-AP-210079-T-A06T1-N
1-1/2"-GI-210001-T-A03T1-N

12"x6" DRAINING 12"x6" DRAINING 12"x6" DRAINING 12"x6" DRAINING


NOTE 17 NOTE 17 NOTE 17 NOTE 17
16"
3/4"

T-A18T1-PP T-A18T1-PP T-A18T1-PP T-A18T1-PP T-A18T1-PP T-A01T1-N


NOTE 27 4"-AS-210003-T-A01T1-N
8"x4" T-B04T1-EC 8"x4" T-B04T1-EC 8"x4" T-B04T1-EC 8"x4" T-B04T1-EC NOTE 25
3/4" 3/4" 3/4" 3/4"
PT
21070 S S S S
NOTE 25
LO

LO

LO

LC
FP

FP

FP

FP
8"

8"

8"

8"

TG
16"-VM-210032-T-B04T1-EC 21071
12"x6" 4"-AS-218972-T-A01T1-N
H
PI
12" 16"x12"

21070 STP
L
21045 11676
1"-VM-217582-T-B04T1-EC 1"-CACBP-217582-T-A18T1-PP CACBP
T 4"-AS-210001-T-A01T1-N
206-00627C
12"-VM-210504-T-B04T1-EC
T-B04T1-EC T-A18T1-PP
206-00615 206-00620B 206-00617D 206-00626B 206-00619D 206-00635A 206-00626B
VM GI VB AS AP DAA AS
5038 10561 10562 11080 4995 8149 8135

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
B ISSUE FOR REVIEW 24 Dec 19 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
C ISSUE FOR REVIEW 31 Jan 20 YDC KHL REVIEWED
Infraestructura de DBNR
A1 ISSUE FOR DESIGN (FOR COST ESTIMATION) 25 Feb 20 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
A2 ISSUE FOR DESIGN (FOR PLANNING) 20 Apr 20 YDC KHL Desarrollo, S.A. de C.V.
A3 ISSUE FOR DESIGN 10 Feb 21 YDC KHL APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL FLUE GAS STEAM GENERATOR (1/2)
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL
00 AS BUILT 30 Sep 23 YDC KHL WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00074 00
CAD FILE :
SPE-21012-DSC01
DESUPERHEATER 3456 206-00075A
GENERAL NOTES :
DESIGN DUTY BY VENDOR TO TV-21077 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DP (TUBE) 56 kg/cm^2g /F.V.@200C DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

3/4" 3/4"
DT (TUBE) 10 C / 455 C
MATERIAL (BOX/TUBES) SA335M GR P11 / AISI 302 2. DELETED.
INSULATION EC 206-00075A 10236
HEATED BFW TRIM A1160S 8" 8"
8"-ACAA-210640-T-D61T1S-EC 8"-ACAA-218111-T-D61T1S-EC 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
206-00075A 8763 H
TO STEAM DRUM LC LC TI PG TIC

3/4" 3/4"

3/4" 3/4"

3/4" 3/4"
21078 21063G 21077 6"-ACAA-218110-T-D61T1S-EC
L

8"
8753 206-00075A 1E2
SET @ 57 kg/cm^2g HP BFW
3/4"-CACBP-218963-T-A18T1-PP 3/4"-CACBP-218962-T-A18T1-PP

LO

LO
FROM LIC-21007

8"

8"
SECL
3/4" 3/4" PSV 2"-V-218104-T-A18T1-PP 3/4" 3/4" 2"x3/4" 206-00074 8764
TO GRADE VENDOR
206-00074 8781 21076 NOTE 8
TO FIC-21057 2"-CACBP-218964-T-A18T1-PP

LO

LO
10"-VM-218951-T-D61T1S-EC

8"

8"
TANGENTIAL
MP STEAM ENTRY
8783 206-00074 TO GRADE
FF T-D61T1S T-A18T1 3"x2"
FT FI FY

STEAM DRUM

STEAM DRUM

STEAM DRUM

STEAM DRUM

STEAM DRUM
3/4"-ACAA-218961-T-D61T1S-EC
3/4" 3/4"

3/4" 3/4"
21059 21059 21060

RISERS TO

RISERS TO

RISERS TO

RISERS TO

RISERS TO
SATURATED HP
STEAM 12"x10" H
12"-VA-218101-T-D61T1S-EC 3/4"-ACAA-218971-T-D61T1S-EC TI
8775 206-00075A
21080 3"-CB-218104-T-A18T1-PP NOTES :
T-D61T1S NOTE 7 L
TO SUPERHEATER 3/4"-ACAA-218970-T-D61T1S-EC 1. ALL STEAM VENTS TO BE LEFT AT SAFE LOCATION.
T-D62T3 PG TI TI 3/4"-ACAA-218965-T-D61T1S-EC
TI TI 3/4"-ACAA-218960-T-D61T1S-EC

STEAM DRUM
21055G 21072A 21072B 2. THE ASME CODE SPECIFICATRION BREAK FOR PIPING SHALL BE AS FOLLOWS : -

RISERS TO
TO SC-21006 21073A 21073B
3/4"-VA-218108-T-D62T3-EC ASME ASME ASME
206-00074 10296 3/4"-ACAA-218966-T-D61T1S-EC
DOWNCOMER SECTION 1 SECTION B 31.1 SECTION B 31.3

3/4" 3/4"
3/4" 3/4"

3/4" 3/4"

RS WALL

3/4" 3/4"

3/4" 3/4"
LS WALL
FROM

RS WALL
LS WALL
3/4" 3/4"

STEAM DRUM 3. INSTRUMENT IS SUPPLIED BY CUSTOMER, CABLE FROM INSTRUMENT TO JUNTION BOX IS BY TBWES.
SATURATED HP 4. CABLE BETWEEN INSTRUMENT TO JUNCTION BOX, INCLUDING JUNCTION BOX & INSTRUMENT
STEAM IS BY CUSTOMER.
8"-VA-218109-T-D61T1S-EC
8786 206-00074 5. TEMPERATURE TEST POINT (TTP) CONNECTION DN 2" SCH.40 CL300 SORF FLANGE CONNECTION
SPE-21012 MH MH MH MH MH
FROM EA-21108A/B/C WITH BLIND FLANGE.
3/4" 3/4"

6. PIPE LINE SHALL BE ANCHOR SECURELY CONSIDERING TWO PHASE FLOW.

PG 7. PROVIDE STEAM SAMPLE POINT PER ASTM D1066. DOUBLE BLOCK VALVE WITH SA182 GR.F316/316L
WILL BE SUPPLIED FOR SAMPLING LINE.
TI TI 21057G TI TI
8. MINIMUM 30 PIPE DIA, MAXIMUM 50 PIPE DIA.
21091A 21092A 21093A 21094A
PG PG
21056G TTP TTP
21058G OPEN CLOSE LOCAL/
OPEN CLOSE LIMIT LIMIT STATUS REMOTE FAULT
NOTE 5 TTP 2050ID-GCO-210028-FC-11-PP COMMAND COMMAND SWITCH SWITCH SIGNAL SELECTED STATUS
2800IDL-GCO-210027-FC-8-N
PG PG PG PG HSO HSC ZLO ZLC XS HL XA
FLUEGAS FLUE GAS
SCREEN

21091G 21092G 21093G 21094G 21XXX 21XXX 21XXX 21XXX 21XXX 21XXX 21XXX
8785 206-00074 SH-2 SH-1 EVAP-1 EVAP-2 EVAP-3 EVAP-4 EVAP-5 ECONOMISER 8747 206-00074
FROM SPE-21014 TO SPE-21013
NOTE 5
MOV ZLO ZLC XS HL XA
TTP
21XXX 21XXX 21XXX 21XXX 21XXX 21XXX
1"
TI TI 1" TI TI
21091B 21092B 1" 21093B 21094B TYPICAL FOR MOV DETAIL "A"
1" 1-1/2"x1" 1-1/2"-AP-218131-T-A06T1-N
PLANT AIR INCHING TYPE
206-00074 8793
REFRACTORY

ES-21101
MH MH MH MH MH DETAIL "B"
FC-11

4"
CONFIGURATION OF UTILITY
2"x3/4" 2"x3/4" 14"x12" 4"-P-210384-FC-11-EC STATION

1"-CB-218961-T-D61T1S-EC
DOWNCOMERS

RS WALL

LS WALL
1"

1"

1"

1"
DOWNCOMERS 1"-CB-218958-T-D61T1S-EC

DOWNCOMERS 1"-CB-218959-T-D61T1S-EC

DOWNCOMERS 1"-CB-218960-T-D61T1S-EC
FROM STEAM DRUM
3/4" LS WALL

3/4" RS WALL
16"x14"

16"x14"
1"

1"

1"

1"

1"

1"
14"-VA-218102-A1160S-EC
3/4"
3/4"

3/4"

3/4"

3/4"

3/4"

3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"
1"
1"

3/4"-GI-210101-T-A03T1-N

MIN.
1"-CB-218956-T-D61T1S-EC NITROGEN FROM
3/4"

3/4"

3/4"
3/4"

3/4"

3/4"

3/4"

3/4"

3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"
T-D61T1-EC HEADER
1"-CB-218957-T-D61T1S-EC A1160S

1" 1"-CB-218962-T-D61T1S-EC
1-1/2"x3/4"
T-D61T1S

T-D61T1S

T-D61T1S

T-D61T1S

T-D61T1S
T-A18T1

T-A18T1

T-A18T1
DRAIN DRAIN
T-A18T1

T-A18T1

1"-CB-218102-T-A18T1-PP T-A18T1 T-A18T1-PP 1"-CB-218103-T-A18T1-PP 3"x1" 3"-CB-218105-T-A18T1-PP 10987 206-00074


FROM STEAM DRUM

FROM STEAM DRUM

FROM STEAM DRUM

FROM STEAM DRUM


206-00074 8831 8838 206-00074 3/4"
DOWNCOMERS

TO OILY 1"x3/4" 1"x3/4" TO OILY WTAER


PG

ES-21101

ES-21102

ES-21103

ES-21104

ES-21105

ES-21106
CONDENSATE SEWER
21059G
HEADER
NOTE 3 H 1"-CB-218963-T-D61T1S-EC
INTERMITTENT TI
BLOWDOWN 21074 206-00074 8757
NOTE 6 6"-CB-218101-T-A18T1-PP 1"
206-00074 8830 FROM TIC-21075
TWO PHASE FLOW FF
TO DAA
14"-VA-218103-A1160S-EC

3/4" 3/4"

TV
1"

1"

A1160S T-D61T1S 21075 TO 1-1/2"-VB-210101-T-A18T1-EC


DESUPERHEATER

MIN.
TI 2"-ACAA-210644-A1160S-EC 2" 2"-ACAA-210644-T-D61T1S-EC 2" 2"-ACAA-210644-T-D61T1-EC LP STEAM FROM
206-00074 8782 HEADER
21039 2"x1" FC 2"x1" 2" VENT TO ATM VENT TO ATM
3/4"-VA-218967-A1160S-EC NOTE 4 HP BFW 10989 206-00074
T-D61T1S A1160S FL
3/4" 3/4"

3/4" 3/4"
T-A18T1-PP T-D61T1S-EC 10 D DETAIL "A" 1"-CACBP-218121-T-A18T1-PP SPE-21012-SPE02 1"-CACBP-218122-T-A18T1-PP SPE-21012-SPE03 1-1/2"
3/4"-CACBP-218968-T-A18T1-PP

SPE-21012-TRV01 DRAIN 18"-V-218104-T-A18T1-PP DRAIN 14"-V-218105-T-A18T1-PP


MIN. SPE-21012-DSC01

ES-21101

ES-21102

ES-21103

ES-21104

ES-21105

ES-21106
MOV 3/4"
T DESUPERHEATER M 206-00074 11719 206-00074 11717
21075
14"x10"
3/4"

3/4"
1"x3/4" 1"-CACBP-218120-T-A18T1-PP

10"x6"
4P6 11718 206-00074 T-A18T1
2"x1" 2"x1" SET @ 51 kg/cm^2g
T-A18T1 T-D61T1S
3/4" 3/4"

T-D61T1S T-D61T1 PSV T-D61T1S PG


3/4" 3/4"

HIC

8"x6"
21078 HV
21069G 21093 SUPERHEATED HP
21093 14" STEAM

8"
CONDENSATE 14"-VA-210598-T-D61T1S-EC 1-1/2"-AS-210101-T-A01T1-N
1"-CACBP-218105-T-A18T1-PP 8758 206-00074

MIN.
206-00074B 11393 T
3/4" SERVICE WATER
TO HEADER
1"x3/4" 3/4"-VA-218969-T-D61T1S-EC FROM HEADER
3/4"

SPE-21012-TRV02 3/4" 3/4"


1"x3/4" 10986 206-00074
3/4"-CB-218115-T-D61T1S-EC 3/4" 3/4" 1-1/2"

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL FUEL GAS STEAM GENERATOR DETAIL
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00074A 00
CAD FILE :
SPE-21012-BV05A / B GENERAL NOTES :
SEAL AIR FAN-1 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
MH MH MH MH MH DESIGN CAPACITY kg/hr DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
DIFF. PRESSURE 1741 mmH2O
DRIVER POWER 75 kW
PALL 2. DELETED.
MATERIAL ASTM A36
21687 NOTE 8 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
PAL I SH-2 SH-1 EVAP-1 EVAP-2 EVAP-3 EVAP-4 EVAP-5 ECONOMISER

SCREEN
21687 21687

DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E"
3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" SECL
SB-01A SB-01B SB-01C SB-01D SB-01E SB-01F SB-01G SB-01H SB-01J SB-01K SB-01L
PI PI VENDOR
21687 L 21687
LL
3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3"

REFER
DETAIL "A" PT

3"-VM-218102-T-D61T1S-EC

3"-VM-218111-T-D61T1S-EC
MOV 21687 3"-VM-218101-T-B04T1-EC

3"-VM-218103-T-B04T1-EC

3"-VM-218104-T-B04T1-EC

3"-VM-218105-T-B04T1-EC

3"-VM-218106-T-B04T1-EC

3"-VM-218107-T-B04T1-EC

3"-VM-218108-T-B04T1-EC

3"-VM-218109-T-B04T1-EC

3"-VM-218110-T-B04T1-EC
21691 M
DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E"
MP STEAM 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2"
8784 206-00074 SB-02A SB-02B SB-02C SB-02D SB-02E SB-02F SB-02G SB-02H SB-02J SB-02K SB-02L NOTES :
4"-VM-218123-T-B04T1-EC

1. SOOT BLOWER AUTOMATIC SEQUENTIAL START PUSH BUTTON WILL BE PROVIDED ON THE PLC PANEL.
LOCAL START & STOP PUSH BUTTONS FOR LOCAL OPERATION WILL BE PROVIDED ON EACH
4"-VM-210833-T-B04T1-EC
3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" SOOT BLOWER.
2. EACH SOOT BLOWER CONSISTS OF ONE KNIFE EDGE GATE VALVE.
4"-AP-218105-T-A06T1-N 4"-AP-218107-T-A06T1-N 4"-AP-218109-T-A06T1-N 4"-AP-218111-T-A06T1-N 4"-AP-218113-T-A06T1-N 4"-AP-218115-T-A06T1-N 4"-AP-218117-T-A06T1-N 4"-AP-218119-T-A06T1-N 4"-AP-218121-T-A06T1-N 4"-AP-218123-T-A06T1-N 4"-AP-218125-T-A06T1-N 3. SOOT BLOWER SHALL BE SLOPING TOWARDS FGC.
4. FOR INDICATION & PUSH BUTTION SELECTOR SWITCH DETAILS REFEER SOOT BLOWER DRAWINGS.
5. HOSE LENGTH SHALL BE MINIMUM.
6. ALL THE STEAM LINES TO SOOTBLOWER INLET ARE ADEQUATELY SLOPED WITH ON POCKET
6"x4"

6"x4"

6"x4"

6"x4"

6"x4"

6"x4"

6"x4"

6"x4"

6"x4"

6"x4"

6"x4"
TO DRAIN CONDENSATE.
DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" 7. CABLE BETWEEN SOOT BLOWER INSTRUMENT JUCTION BOX SOOT BLOWER MCC PANEL TO
3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" SOOT BLOWER PLC IS BY CONTRACTOR.
SB-03A SB-03B SB-03C SB-03D SB-03E SB-03F SB-03G SB-03H SB-03J SB-03K SB-03L
8. CABLE BETWEEN DCS TO SOOT BLOWER PLC IS BY CONTRACTOR.
9. REFER TO DETAIL "B","C", "D", "E" ON 206-00074C FOR SOOT BLOWERS.
3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 10. REFER TO DETAIL "A" ON 206-00074C FOR XV DETAIL.

SOOT BLOWER (SB) TAG NUMBERS

3"-VM-218115-T-B04T1-EC
3"-VM-218116-T-B04T1-EC
3"-VM-218121-T-B04T1-EC

3"-VM-218120-T-B04T1-EC

3"-VM-218119-T-B04T1-EC

3"-VM-218118-T-B04T1-EC
3"-VM-218122-T-B04T1-EC

3"-VM-218117-T-B04T1-EC
SB NUMBER SB TAG NUMBER SB MOTOR TAG NUMBER SB TRAIN NUMBER XV NUMBER

3"-VM-218114-T-B04T1-EC

3"-VM-218113-T-B04T1-EC

3"-VM-218112-T-B04T1-EC
DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" DETAIL "B","D","E" SB-01A SPE-21012-BV01A MSPE-21012-BV01A XV-21687A
2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" SB-01B SPE-21012-BV01B MSPE-21012-BV01B XV-21687B
SB-04A SB-04B SB-04C SB-04D SB-04E SB-04F SB-04G SB-04H SB-04J SB-04K SB-04L
SB-01C SPE-21012-BV01C MSPE-21012-BV01C XV-21687C
SB-01D SPE-21012-BV01D MSPE-21012-BV01D XV-21687D
SB-01E SPE-21012-BV01E MSPE-21012-BV01E XV-21687E
3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3"
SB-01F SPE-21012-BV01F MSPE-21012-BV01F TRAIN-1 XV-21687F
SB-01G SPE-21012-BV01G MSPE-21012-BV01G XV-21687G
SB-01H SPE-21012-BV01H MSPE-21012-BV01H XV-21687H
SB-01J SPE-21012-BV01J MSPE-21012-BV01J XV-21687J
SB-01K SPE-21012-BV01K MSPE-21012-BV01K XV-21687K
4"-VM-218124-T-B04T1-EC SB-01L SPE-21012-BV01L MSPE-21012-BV01L XV-21687L
SB-02A SPE-21012-BV02A MSPE-21012-BV02A XV-21688A
SB-02B SPE-21012-BV02B MSPE-21012-BV02B XV-21688B
SB-02C SPE-21012-BV02C MSPE-21012-BV02C XV-21688C
1"-CACBP-218105-T-A18T1-PP SB-02D SPE-21012-BV02D MSPE-21012-BV02D XV-21688D
SB-02E SPE-21012-BV02E MSPE-21012-BV02E XV-21688E
SB-02F SPE-21012-BV02F MSPE-21012-BV02F TRAIN-2 XV-21688F
MH MH MH MH MH 206-00074A 11393
SB-02G SPE-21012-BV02G MSPE-21012-BV02G XV-21688G
SB-02H SPE-21012-BV02H MSPE-21012-BV02H XV-21688H
MOV M 1"-CACBP-218125-T-A18T1-PP SB-02J SPE-21012-BV02J MSPE-21012-BV02J XV-21688J
21692 REFER SB-02K SPE-21012-BV02K MSPE-21012-BV02K XV-21688K
6"x4" 6"x1" DETAIL "A" OILY CONDENSATE
4"-VM-218125-T-B04T1-EC SB-02L SPE-21012-BV02L MSPE-21012-BV02L XV-21688L
8834 206-00074
SB-03A SPE-21012-BV03A MSPE-21012-BV03A XV-21689A
TO HEADER
3/4" SB-03B SPE-21012-BV03B MSPE-21012-BV03B XV-21689B
PALL PAL PI SB-03C SPE-21012-BV03C MSPE-21012-BV03C XV-21689C
TT TE 3/4"-CACBP-218127-T-A18T1-PP SB-03D SPE-21012-BV03D MSPE-21012-BV03D XV-21689D
21688 21688 21688 L
LL 21689 21689 SB-03E SPE-21012-BV03E MSPE-21012-BV03E XV-21689E
REFER DETAIL "C"
3/4" 3/4" SB-03F SPE-21012-BV03F MSPE-21012-BV03F TRAIN-3 XV-21689F
6"-AP-218104-T-A06T1-N

6"-AP-218106-T-A06T1-N

6"-AP-218108-T-A06T1-N

6"-AP-218110-T-A06T1-N

6"-AP-218112-T-A06T1-N

6"-AP-218114-T-A06T1-N

6"-AP-218118-T-A06T1-N

6"-AP-218120-T-A06T1-N

6"-AP-218122-T-A06T1-N
6"-AP-218116-T-A06T1-N
ATMOSPHERIC MSPE-21012-BV05A T SB-03G SPE-21012-BV03G MSPE-21012-BV03G XV-21689G
H NOTE 8
AIR NOTE 8
SB-03H SPE-21012-BV03H MSPE-21012-BV03H XV-21689H

T-B04T1
T-A18T1
M O I PI TI I SB-03J SPE-21012-BV03J MSPE-21012-BV03J XV-21689J
A 21688 21688 21689 21689 SB-03K SPE-21012-BV03K MSPE-21012-BV03K XV-21689K
FROM MCC

6"-AP-218124-T-A06T1-N
SB-03L SPE-21012-BV03L MSPE-21012-BV03L XV-21689L
SB-04A SPE-21012-BV04A MSPE-21012-BV04A XV-21690A
SB-04B SPE-21012-BV04B MSPE-21012-BV04B XV-21690B
PT TI TALL SB-04C SPE-21012-BV04C MSPE-21012-BV04C XV-21690C
21688 21689 21689 SB-04D SPE-21012-BV04D MSPE-21012-BV04D XV-21690D
LL
SPE-21012-BV05A SB-04E SPE-21012-BV04E MSPE-21012-BV04E XV-21690E
SEAL AIR FAN-1 SB-04F SPE-21012-BV04F MSPE-21012-BV04F TRAIN-4 XV-21690F
16"-AP-218101-T-A06T1-N 16"x14" 14"-AP-218102-T-A06T1-N 14"x10" 10"-AP-218103-T-A06T1-N
REFER DETAIL "C" SB-04G SPE-21012-BV04G MSPE-21012-BV04G XV-21690G
ATMOSPHERIC MSPE-21012-BV05B SB-04H SPE-21012-BV04H MSPE-21012-BV04H XV-21690H
H SB-04J SPE-21012-BV04J MSPE-21012-BV04J XV-21690J
AIR
M O SB-04K SPE-21012-BV04K MSPE-21012-BV04K XV-21690K
A SB-04L SPE-21012-BV04L MSPE-21012-BV04L XV-21690L
FROM MCC

SPE-21012B
SEAL AIR FAN-2
CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY
DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL SOOT BLOWER FOR SPE-21012
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00074B 00
CAD FILE :
GENERAL NOTES :
CONTROL CABLING TO DCS LAMPS / INDICATION ON MCC PANEL / PLC 1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
SR. NO.
OPERATING STATION DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.
CLOSE OPEN C C 2. DELETED.
ZSC ZSO T T 1. ALL SOOT BLOWER IN REST POSITION XL
NOTE 7 21693A 3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.
XL XL
2. SOOT BLOWING IN AUTO 21693B 21693A
XL
XV 21693B
XY 3. AUTO SEQUENCE ON XL SECL
S 21693C VENDOR

MCC 4. AUTO SEQUENCE COMPLETED


XL
21693D
XL
21693C
ZSF ZSR
+ XL
M DETAIL "E"
LCS 5. MECHANICAL FAULT
21693D
XL

(FIELD) SOOT BLOWER XL


21693E
XL
BOILER INSIDE

6. MP STEAM TEMPERATURE OK
SOOT BLOWING POWER CABLING PLC PANEL 21693F
XL
21693E

POPPET VALVE (CONTROL ROOM) 7. MP STEAM PRESSURE OK


21693F
XL
21693G
XL XL
8. SEAL AIR BLOWER OUTLET PRESSURE OK 21693H 21693G
XL
21693H
RTP NOTE 5
SR. NO. PUSH BUTTONS / SELECTOR SWITCH ON MCC
1. SOOT BLOWER START PB
FROM SEAL
2. SOOT BLOWER RESET PB
AIR FAN
3. SOOT BLOWER SEQUENCE STOP PB SOFT PUSH BUTTON & INDICATIONS ON
4. HOOTER / ALARM ACCEPT PB SR. NO. SOOT BLOWER PLC SCADA GRAPHICS
5. AUTO / BYPASS / MANUAL SELECTOR SWITCH (COMMON FOR ALL 44 SOOT BLOWERS)
SELECTOR SWITCHES FOR INDIVIDUAL FOR S.B ON LCS
HS
1. LOCAL / REMOTE MODE 1. SOOT BLOWER SEQUENCE START PB
21693A
2. FORWARD PB
HS
3. RETRACT PB HS
21693A
LAMPS 2. SOOT BLOWER RESET PB 21693B
1. SOOT BLOWER FORWARDING HS
2. SOOT BLOWER RETRACTING 21693B
3. SOOT BLOWER TRIP 3. SOOT BLOWER SEQUENCE STOP PB HS
4. SOOT BLOWER FORWARD LIMIT SWITCH 21693C
5. SOOT BLOWER REST LIMIT SWITCH HS
HS
4. HOOTER / ALARM ACCEPT PB 21693C
DETAIL "D" 21693D
THE SCHEME INDICATED BELOW TYPICAL FOR 1 SOOT BLOWER. HS
SAME SCHEME WILL BE APPLICABLE FOR 44 SOOT BLOWERS 21693D

MOTOR
START STOP RUNNING FAULT STOP
HS HS XL XA HS
21012A5 21012A5

M
KGV KGV FORWARD REST
OPEN CLOSE LIMIT LIMIT AUTO
START SWITCH SWITCH FORWARDING RETRACTING TRIP SELECTION
ZSO ZSC
STOP I HAS ZSF ZSR WSF WSR XS HL
HSP-21012A5
LCS
DETAIL 'C' (MOTOR) FORWARD FORWARD FORWARD OPEN CLOSE LOCAL/
COMAND COMAND COMAND OPEN CLOSE LIMIT LIMIT REMOTE FAULT
SB PLC MOTOR COMMAND COMMAND SWITCH SWITCH SELECTED STATUS
ZSF ZSF ZSF
START STOP RUNNING FAULT STOP HSO HSC ZSH ZLC XS XA
SB MCC HS HS XL XA HS
21012B5 21012B5 SB PLC

s ZSO ZSC MOV ZSH ZSL XS XA


M SB MCC
ZSF ZSR

M
STOP I
HSP-21012B5 TYPICAL FOR MOV DETAIL 'A'
DETAIL 'B' FOR SOOT BLOWER KGV DETAIL 'E' FOR SOOT BLOWER MOTOR ON / OFF
DETAIL 'C' (MOTOR)

CP DATA REVISIONS REFERENCE DRAWINGS SIGNED BY


DRAWING
MCA DESCRIPTION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A3 ISSUE FOR DESIGN 08 Mar 21 YDC KHL PROJECT CATALYTIC CRACKING UNIT, FCC

PTI
0 ISSUE FOR CONSTRUCTION 11 Jun 21 YDC KHL REVIEWED
Infraestructura de DBNR
1 ISSUE FOR CONSTRUCTION 19 Nov 21 YDC KHL SIMA REVIEW
REACTOR REGENERATOR SECTION
00 AS BUILT 30 Sep 23 YDC KHL Desarrollo, S.A. de C.V.
APPROVED
ASOCIADOS CONSTRUCTORES
DBNR S.A. DE C.V.
APPROVAL SOOT BLOWER FOR SPE-21012 DETAILS
REV
M.A.T COORDINATION PROJECT NO. : SO6625 R2B-P3-206-02-A
WORK RESIDENT
CONTRACT NO. : PTI-ID-O-004-2-2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : SCALE : DIMENSION: PLACE : Dos Bocas, Paraiso, TAB. -DTI-00074C 00
CAD FILE :
GENERAL NOTES :
1. FOR DESCRIPTION OF SYMBOLS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES SEE LEGEND
DRAWINGS R2B-P3-206-02-A-DTI-00001A THROUGH R2B-P3-206-02-A-DTI-00001E.

2. DELETED.

3. FOR NOTES/DETAILS REFER TO DRAWING R2B-P3-206-02-A-DTI-00002A AND R2B-P3-206-02-A-DTI-00002B.

SECL
VENDOR

1"x3/4" PHOSPHATE
3/4"-PQ-211001-T-D62T3-N
206-00075A 8756 206-00603 5345

T-D61T1 T-D62T3

NOTES :
1. DELETED.
2. DELETED.
3. DELETED.
4. LOW FLOW START.
8745 5. DELETED.
INSTRUMENT AIR
1"-AI-210400-T-A05T3-N AI
206-00075A 10243 6. DELETED.
206-00621C
7. DUAL PLATE CHECK VALVE.
8. 13 mm WEEP HOLE.
3/4X1 9. LOCATE NEAR BLOWDOWN DRUM.
SET @ 10 kg/cm^2g
10. DETAIL OF SAMPLE CONNECTION TYPE REFER TO DETAIL P&ID 206-00020B.
PSV
11. DELETED.
21083 1"-V-210007-T-A18T1-N
12. DETAILS OF STEAM EVAPORATOR, SUPER HEATER AND SOOT BLOWER ARE SPECIFIED ON THE DRAWING
T-A18T1 FREE NO. R2B-P3-201-02-A-DTI-00074, 00074A~C.
3/4" DRAINING
T-A01T1 13. FOR VENDOR SCOPE P&ID, REFER TO P&ID NO. 206-00075A~00075B.
SPE-21012 TO GRADE
3397 14. INSERTION TYPE INSTRUMENT.

3/4"
VM 6" 6"-VM-210091-T-B04T1-EC
MP STEAM STEAM DRUM / WATER CIRCULATION PUMPS
8749 206-00075B
206-00615 NOTE 13 COOLING WATER 3/4"-RAE-210012-T-A01T1-N

1"
TO SPE-21010-GA1A 8774
STR RETURN

3/4"
1" TURBINE 2"
2"

2"-RAE-210012-T-A01T1-N RAE
21023 10239 206-00075C