Constructing a comprehensive literature review for the construction industry requires meticulous

research, critical analysis, and adept synthesis of existing literature. It serves as the backbone of any
scholarly work, providing a thorough understanding of the topic while demonstrating the researcher's
knowledge and grasp of relevant literature.

The process of crafting a literature review can be daunting. It involves identifying relevant sources,
critically evaluating their credibility and relevance, synthesizing key findings, and presenting them
coherently within the framework of the research topic. Moreover, ensuring that the literature review
is well-structured, logically organized, and effectively communicates the research gaps and
contributions adds another layer of complexity.

For individuals grappling with the complexities of constructing a literature review, seeking
assistance from professional writing services can be invaluable. ⇒ StudyHub.vip ⇔ offers
specialized support tailored to the specific needs of researchers in the construction industry. With a
team of experienced writers well-versed in academic writing conventions and proficient in
conducting comprehensive literature reviews, ⇒ StudyHub.vip ⇔ ensures that your literature
review meets the highest standards of quality and rigor.

By entrusting your literature review to ⇒ StudyHub.vip ⇔, you can alleviate the stress and
challenges associated with this crucial aspect of research. Our dedicated team will work closely with
you to understand your research objectives, identify relevant literature, and construct a literature
review that not only showcases your expertise but also contributes significantly to the scholarly
discourse in the construction industry.

Don't let the complexities of writing a literature review hinder your research progress. Order your
literature review from ⇒ StudyHub.vip ⇔ today and embark on a journey towards academic
excellence and scholarly achievement.
An implication of the current study is that the improvement of project communication processes and
technologies at different functional levels may change the organization of future projects and how
their business activities and work routines are designed, planned, and performed. For control
concrete, IS method of mix design is adopted and considering this a basis, mix design for
replacement method has been made. Two case studies which demonstrate effective utilization of
waste in construction projects carried out in India are outlined. Therefore, Site director demand to
work out the job harmonizing their experiences. The major risk observed from the experts opinion is
the lack of skilled workers that most companies are facing. As a discipline, engineering is taught in
universities and technical and vocational training institutions. The importance of risk management in
construction comes are reportable by many authors. Download Free PDF View PDF EVALUATION
AND MANAGEMENT OF RISKS IN CONSTRUCTION PROJECTS Editor IJERMS
Construction field is majorly a risk prone area with complexity in its internal environment which
creates an environment of ambiguity and risk. For Later 0% 0% found this document useful, Mark
this document as useful 0% 0% found this document not useful, Mark this document as not useful
Embed Share Print Download now Jump to Page You are on page 1 of 6 Search inside document.
Formwork is fundamentally a mold which is used to achieve a coveted form of desired size out of
concrete and other constructing stuff. In addition, an information model is proposed to integrate the
different phases in the construction operations and to increase interaction among the stakeholders.
Upload Read for free FAQ and support Language (EN) Sign in Skip carousel Carousel Previous
Carousel Next What is Scribd. Improvements in these standard documentation and communication
instruments are required. These activities and actions provide an of import agencies for commanding
the waste of stuff, and do the right provider to extinguishing the add-on cost paid. A framework has
been developed, which will be used for the future research in this area. Therefore, I need to re-
organize the layout of the site and better the site consequently. Fullscreen Sharing Deliver a
distraction-free reading experience with a simple link. Some interview was conducted with industrial
practitioners for effectiveness of the collected questionnaire. It is really of import as the building
stuffs were bringing as requested and with the patterned advance by the proper direction of stock
control. Therefore, the labor can park their auto in safety topographic points without any excess fee
and will execute will when work because no demand scare the biddings when parking outdoors. A
Construction waste consists of unwanted material produced directly or indirectly by the construction
industries. The storage from new site layout all already named consequently such as aggregative
storage, instrument storage and safety equipment storage. This paper presents the results of a
comprehensive literature review of existing methods of classification of information and protocols
for communicating information. Production of cement also emits CO 2 in atmosphere. Rapid growth
in construction activities increases construction waste problems around the world. Therefore, the
efficient direction of stuffs is the chief keys issue to find the success of a completion of a
undertaking. You can download the paper by clicking the button above. As the building undertakings
grow in complexness and size, it is instantly clear that many measure surveyors have diversified into
supplying undertaking and edifice direction services. Therefore the site director should rectify it at a
topographic point and sell the recycle mill. As illustration when the cement merely located at site
without any screen, when rain the cement will botch.
The building industry is planetary and extends across all existent estate and substructure markets. In
the last few decades in fact, the frequency and severity of claims and disputes have increased
significantly. In addition, an information model is proposed to integrate the different phases in the
construction operations and to increase interaction among the stakeholders. Most of the edifices
which are made to stand for a long clip are made of concrete and. A questionnaire was designed and
circulated to collect responses about various risks occurring on construction sites. For Later 0 ratings
0% found this document useful (0 votes) 29 views 6 pages A Critical Literature Review On Criteria
For Effective Selection of Equipment and Its Management in Construction Industry-
IJAERDV04I0316418 Uploaded by Editor IJAERD AI-enhanced title Good project management in
construction must vigorously pursue the efficient utilization of labor, material and equipment.
Materials are really of import in the operations of the building site since inaccessibility of stuffs can
halt the building work. For illustrations, a elaborate stuff list and co-ordination of the buying and
order of stuff are important to guaranting the stuff will available on building site. So it will
necessitate the re-handling of stuffs and the costs of the undertaking. There are many sources of
generation of waste in construction as Design and documentation, Handling of material and
equipment, Worker's influences, Management of the firm, Site condition, Procurement of Materials,
Operation on site and external factors. For illustration, if the stuffs such as concrete batch works
seting excessively far from the physique topographic points, it will do a batch of clip for labors to
convey the concrete to sites. Subsequently, three legal experts of construction claims were
interviewed. Relative Importance Index (RII) is calculated and according to the highest values, the
top fifteen causes for time delay disputes of construction projects in Egypt are determined. The
mechanical properties like compressive quality, part rigidity, and flexural quality were examined for
cement arranged. Therefore, the stuffs direction method must use in building site to steer the stuffs.
Due to the rate of managing stuffs, there are some quality demands to be in considerations when
planing a stuffs managing system. This paper examines the possibilities of increasing integration in
the construction industry by integrating the planning, design, and construction processes. In case of
managing these activities, the project manager often requires reassessing the completed work.
Therefore, with the effectual direction of the stuffs, the company can salvage more than 6 % or
above of the cost from a undertaking. Al ( 1994 ) that is more that 40 % of the clip lost due to bad
direction in building site, hapless certification of stuffs, deficiency of stuffs on site when needed and
unequal storage. Engineering appears to be originated first in those parts of the world, where
mathematics of measurements and computation developed and flourished. Resources Dive into our
extensive resources on the topic that interests you. A model of Multidimensional Preemptive
Coordination was introduced, where a group of people, both management and subordinates are
gathered around a business problem and interact on a News Wall to report progress, comment or
discuss shared goals in their scope of visibility. So the wellness and safety is really of import in
building site. Concrete is feeble in pressure, has restricted malleability and little protection from
splitting. Consequently, the way the components of education namely, knowledge, skills and attitude
and values, are to be imparted has to be different. In today's situation concrete needs special
combinations of performance and uniformity requirements that cannot be always achieved by using
conventional constituents and normal mixing. On the contrary, if the project scope is changed, then it
will not be considered as the rework. Hence, a study is carried out to investigate the key barriers of
coordination in construction project. You can download the paper by clicking the button above.
This paper is an effort to illustrate present status of construction innovation research and perceptions
of researchers and practitioners based on a review of current literature. Embed Host your publication
on your website or blog with just a few clicks. In another manner, if late bringing stuffs to site, it will
do hold of the work as program by site director. These are: Financial related risk, Legal related risk,
Management risk, Market related risk, Political and security related risk, Technical related risk,
Environmental related risk, and Social related risk. The benefits and challenges in utilization of waste
for building applications are reviewed. The identification of the criteria that effect on equipment
selection has been carried out using different literatures and by interviewing from experts in
construction. India produces abundant quantity of rice annually, for example in 2019-2020, is 117.47
million tonnes. In this research paper, experimentation is done by using rice husk as well as rice husk
ash as a partial replacement of flyash along with steel fibres by 1%, 2% and 3% is provided to
procure more strength to the concrete. Literature study was carried out for the first objective whereas
two real-case studies on different delay analysis methods were investigated later. These make it a
natural candidate for cement replacement agent especially in Paddy producing countries. Download
Free PDF View PDF An Information Model for Collaboration in the Construction Industry Jos van
Leeuwen Download Free PDF View PDF A Model of Multidimensional Interdisciplinary Corporate
Coordination in Construction Dinko Bacun Numerous studies indicate that frequent and common
schedule and cost overruns in construction projects are result of multiple small disruptions and
delays across all the departments of the enterprise. Therefore, this paper aims at experimental study
of variation of percentage of rice husk ash with cement for improvement in properties of concrete.
This is because 50 % or more of the entire cost of the undertaking is for buying the stuffs or even
storage the stuffs costs. Construction projects have often suffered from high fragmentation, large
waste, poor productivity, cost and time overruns, and conflicts and disputes for a long time. In view
of this, an effective assessment and management of risks must be followed by industry practitioners.
Many companies increased their efficiency of stuffs direction to stay the competitory and protected
for their hereafter undertaking. As illustration when the cement merely located at site without any
screen, when rain the cement will botch. Hence, a study is carried out to investigate the key barriers
of coordination in construction project. As a new site director of the undertaking, I noticed that
many jobs are transporting out by the programs and those jobs will do the undertakings to be hold or
increase the cost of the undertakings. Construction claims are considered as one of the most
worrying and unpleasant events of a project. Many companies have recognize the importance cost
control, some companies development of relevant cost control system, some endeavors in
implementing cost control duty, and. Study of this paper involves finding of 47 factors which are
responsible for risk in construction projects. This is because it offer design freedom, a broad scope of
merchandises and easiness of managing. This paper examines the possibilities of increasing
integration in the construction industry by integrating the planning, design, and construction
processes. Thus, many new and innovative management and procurement systems in construction are
introduced such as partnering, joint venture, alliances, supply chain management, enterprise resource
planning (ERP), just in time (JIT), and total quality management (TQM) to meet these challenges.
This section provides an overview of dispute resolution methods commonly used. So that when they
are working, the accident can be secured consequently. As the production of cement is not eco-
friendly because during the production of cement there is a large amount of production of CO 2 gas
which is very harmful. But the certain losses through the construction process has impacted the
economy of the country. By using the construct of JIT, it can assist to better the motion of stuffs
from the providers to the building site. It's like a masterclass to be explored at your own pace.
Aggregate storage is merely for impermanent for seting the cement, hemorrhoids and sum. You can
download the paper by clicking the button above. Many companies increased their efficiency of
stuffs direction to stay the competitory and protected for their hereafter undertaking. The mechanical
properties like compressive quality, part rigidity, and flexural quality were examined for cement
arranged. Added on 2023-03-30 Show more Subscribe Now Subscribe Now Bookmark Share
Related Documents Running head: LITERATURE REVIEW Rework in the Construction Industry
Name of the Student: Name of the University: Author Note: LITERATURE REVIEW Literature
Review: Construction industry has been contributing much remarkably in the national economies.
Therefore, this paper aims at experimental study of variation of percentage of rice husk ash with
cement for improvement in properties of concrete. Results indicate that temperature of 6500
centigrade as well as sixty minutes burning period are actually the very best combination. So waste
management is important for construction industry. It is therefore in the common interest of all
involved parties to prevent them, minimize them, or resolve them as amicably as possible. Therefore,
the labor can park their auto in safety topographic points without any excess fee and will execute will
when work because no demand scare the biddings when parking outdoors. With the proper
agreement of the stuffs will assist contractor minimum the cost and maximum their net incomes. In
the last few decades in fact, the frequency and severity of claims and disputes have increased
significantly. So that when they are working, the accident can be secured consequently. It also calls
for change in mindsets so that the transition is smooth and successful. This is because 50 % or more
of the entire cost of the undertaking is for buying the stuffs or even storage the stuffs costs. For
illustrations, a elaborate stuff list and co-ordination of the buying and order of stuff are important to
guaranting the stuff will available on building site. The purpose of this paper is to evaluate these
criteria. This paper is an effort to illustrate present status of construction innovation research and
perceptions of researchers and practitioners based on a review of current literature. Although
coordination plays crucial functions throughout the building process especially during the design and
construction stages, some failures in construction projects adopting coordination principles are still
observed. Embed Host your publication on your website or blog with just a few clicks. Some
interview was conducted with industrial practitioners for effectiveness of the collected
questionnaire. Moreover, in many of the cases, it includes a potential amount of risks associated 1
Ajayi, Saheed O., Lukumon O. Oyedele, Olugbenga O. Download Free PDF View PDF Frontiers in
Built Environment Challenges confronting construction information management Ayodeji E Oke
This paper aims to present the results of an investigation of the prevailing challenges in construction
information management. This will assist them set up the stuffs consequently to increase their
hereafter undertaking and set up the site layout harmonizing to the demands of building undertaking.
Such as disputes can be reduced by checking that the contract documents are in place. Relative
Importance Index (RII) is calculated and according to the highest values, the top fifteen causes for
time delay disputes of construction projects in Egypt are determined. For investigating the top most
factor which increases the construction budget and waste in India have surveyed on Gwalior
construction sites. A questionnaire survey was distributed to the stakeholders in the construction
industry. Therefore the site director should rectify it at a topographic point and sell the recycle mill.
The location of the stuffs, storage and other impermanent installations should located harmonizing
the efficient of the building work.
It consumes a lot of time to redo the work and wastes the energy. According to the study, there is no
government control on building site waste, and other variables such as employee training, business
waste management plan, financial reward, and promotion are seen as more beneficial incentives to
reduce waste by respondents. In add-on, the control to the stuffs is capable to the difference
company and should be handled efficaciously to finish the undertaking. In add-on, it besides helps
to enter and administer the stuffs or instrument harmonizing to the demands of the site. There are
concerns about the degree of innovation within the construction industry, despite having potential to
be innovative. Thus, particular attending should be given to stuffs after they purchased from the
provider. It is necessary to hold a proper guard in the entryway to maintain path of all visitants to the
undertaking. As a result the project gets effected with delays and quality aspects. Rice husk is natural
fiber that has the advantages of low density, low cost and biodegradable. RHA which contains high
silica content produced by controlled incineration of rice husk can be used as supplementary
cementitious material (SCM) in concrete production since it exhibits high pozzolanic characteristics
and contributes to strength and impermeability of concrete. While science was originally a mental
exercise based on curiosity, engineering has always addressed itself to the needs of man. In the other
hand, the ineffective use of IT in managing information exacerbates the amount of rework that
occurs during many constrcution projects. As a discipline, engineering is taught in universities and
technical and vocational training institutions. From the previous concrete study, till now many
elements are added in the concrete such as fly ash, red ballast, silica fume, agricultural fibres, organic
fibres, glass, etc to enhance the properties of concrete or were also added as a partial replacement of
cement. Adobe Express Go from Adobe Express creation to Issuu publication. This section provides
an overview of dispute resolution methods commonly used. The storage from new site layout all
already named consequently such as aggregative storage, instrument storage and safety equipment
storage. As roles for future engineers expect different competencies from the graduating engineers, it
is the responsibility of future engineering education to reinvent itself and brace itself for a paradigm
shift in the way, students are groomed to match the changed expectations. See Full PDF Download
PDF See Full PDF Download PDF Related Papers Legal approach on assessment of contractors'
entitlement to extension of time cheng bruce Delay is acknowledged as the most common, costly,
complex and risky problem encountered in construction projects. However, whatever the actions of
stuffs direction is running, they need a concerted engagement of both parties such as caput office
and the site maps that are primary controlled under the action of site direction. If the waste stuffs
located behind of it, the sound or smell will upset the person which is inside the impermanent edifice.
This paper analyses the most recent research in the field of construction innovation and offers an
overview of what and how aspects of innovation have been studied in different construction
contexts. This paper has been planned to deal with identification of criteria affecting equipment
selection and its management, developing a framework for assessing the criteria affecting equipment
selection. Download Free PDF View PDF TIME DELAY DISPUTES IN CONSTRUCTION
INDUSTRY AND PREDICTION MODEL IJESRT Journal Construction disputes are one of main
obstacles, which face the construction projects, most of construction projects are long period and
complex, often finish out of planned period and budget. A framework has been developed, which
will be used for the future research in this area. Findings are based on literature review, structured
interview with construction professionals and present scenario of construction industry. You can
download the paper by clicking the button above. The challenges and standards for sustainable
construction are outlined. All developed and developing countries directly depend on construction
for the fulfilment of requirements of their citizen. Video Say more by seamlessly including video
within your publication.