NOTES FOR REINFORCED CONCRETE WORKS:-

1. REINFORCED CONCRETE DRAWINGS SHALL BE READ IN


CONJUNCTION WITH THE ARCHITECT'S DRAWINGS AS WELL AS
THE MECHANICAL AND ELECTRICAL ENGINEER'S DRAWINGS.
ALL DISCREPANCIES NOTED SHALL BE VERIFIED AND
CONFIRMED PRIOR TO COMMENCEMENT OF WORKS ON SITE.
2. UNLESS OTHERWISE STATED, ALL FOOTINGS, PILE CAPS AND
SUB-STRUCTURE LEVEL SHALL BE CONFIRMED ON SITE.
CONTRACTOR IS REQUIRED TO CONDUCT HIS OWN LEVEL
SURVEY TO ESTABLISH AND CONFIRM ALL LEVELS AT SITE. ”
SURVEY PLAN IF SO PROVIDED SHALL BE FOR REFERENCE
ONLY.
FF TO 3. REINFORCED CONCRETE WORKS SHALL BE EXECUTED IN
ROOF STRICT ACCORDANCE WITH B.S.8110 AND THE CONTRACT
SPECIFICATIONS.
4. DESIGN LOAD SHALL BE IN ACCORDANCE WITH B.S. C.P. 3.
5. THE CEMENT USED SHALL BE ORDINARY PORTLAND CEMENT IN
ACCORDANCE WITH B.S. 12
6. COARSE AND FINE AGGREGATES SHALL COMPLY TO B.S.882,
B.S.1201, B.S.887, B.S. 1047, B.S.3739 AND B.S. 4619.
7. UNLESS OTHERWISE STATED, CONCRETE USED SHALL BE OF
MINIMUM GRADE G30 FOR SUPER-STRUCTURE AND GRADE G35
FOR SUB-STRUCTURE.
8. UNLESS OTHERWISE STATED, CONCRETE COVER TO MAIN
REINFORCEMENTS SHALL BE :-
8.1 FOOTINGS AND PILE CAPS - 50MM
8.2 GROUND TEAMS AND STUMPS - 35MM
8.3 SUPER-STRUCTURAL BEAMS/COLUMNS - 25MM
8.4 STRUCTURAL, SLAB -- 13MM
9. UNLESS OTHERWISE STATED, MINIMUM LAP LENGTH OF
REINFORCEMENT SHALL BE :-
9.1 IN COMPRESSION - 45* DIAMETER OF BAR
GF TO 9.2 IN TENSION - 50* DIAMETER OF BAR
10.LAPPING TO ADJACENT BARS SHALL BE STAGGERED.
FF APPROVED RE-BAR COUPLER SHALL BE USED INSTEAD OF
LAPPING AT CONGESTED LOCATION OR AS INSTRUCTED BY
THE ENGINEERS.
11.ALL REINFORCEMENT SHALL BE CHECKED AND VERIFIED BY
CONTRACTOR'S COMPETENT SITE ENGINEER/COW BEFORE
REQUESTING JURUCITA FOR INSPECTION. MINIMUM 24 HOUR
NOTICE SHALL BE ALLOWED FOR JURUCITA TO RESPOND TO
THE REQUEST FOR INSPECTION. CONTRACTOR SHALL BE HELD
FULLY RESPONSIBLE FOR SENDING IN REQUEST WHILE WORKS
ARE NOT FULLY AND ADEQUATELY READY FOR INSPECTION.
ALL REINFORCEMENTS SHALL BE INSPECTED AND APPROVED
BY JURUCITA PRIOR TO CONCRETING.
12.APPROVED TYPE SUPER-PLASTICISER ADDITIVE SHALL BE
ADDED TO IMPROVE WORKABILITY OF CONCRETE AT
CONGESTED LOCATION OR AS INSTRUCTED BY THE JURUCITA.
ALL OTHER ADDITIVES USED SHALL BE BE APPROVED BY
JURUCITA.
13.BEARING CAPACITY OF SOIL IS TAKEN 1/5 TON PER FOOT
SQUARE. CONTRACTOR SHALL VERIFY THE ACTUAL SOIL
CONDITION ON SITE BY EXECUTING MACINTOSH PROBE TEST.
IF NECESSARY PILING SHELL BE PROVIDED.
STUMP TO 14.FORMWORK STRIKING TIME OR REMOVAL OF FORMWORK
SHALL BE AS SPECIFIED IN THE SPECIFICATIONS; AND/OR
GF FULFILLING THE REQUIREMENTS OF BS 8110. PERMISSION IN
WRITING SHALL BE OBTAINED FROM JURUCITA PRIOR TO ANY
TYPICAL SLAB REINFORCEMENT EARLY STRIKING OF FORMWORK.
ARRANGEMENT 15.ALL REINFORCEMENTS SHALL HAVE THE FOLLOWING
MINIMUM YIELD STRENGTH:-
SCALE : NTS
15.1 MILD STEEL ROUND BAR [DENOTED BY R] - 250 N/M2
15.2 HIGH TENSILE DEFORMED BAR [DENOTED BY Y] - 460
N/M2.
16.STIFFENER COLUMNS SHALL BE PROVIDED TO START, END
AND CORNER POSITION OF BRICKWALL AT HORIZONTAL
INTERVAL OF NOT MORE THAN 3000 MM FOR 125MM THICK
STOREY BRICKWALL AND 5000MM FOR 230MM THICK BRICKWALL.
LINTER BEAMS SHALL BE PROVIDED TO BRICKWALL AT VERTICAL
MARKING
INTERVAL OF NOT MORE THAN 3000 MM AND TO TOP OF ALL
DOORS, WINDOWS AND ETC. CAPPING BEAM SHALL BE
PROVIDED AT THE TOP END OF ALL BRICKWALLS.
STIFFENER:- :
230MM BRICKWALL, SIZE 230 X 450MM WITH 2Y16 TOP & 2Y25
BOT. WITH LINK R10@200C/C.
150MM BRICKWALL, SIZE 125 X 400MM WITH 2Y16 TOP & 2Y20 BOT.
SPLICING DETAIL FOR BRC FABRIC MESH WITH LINK R6@150C/C.
SCALE : NTS LINTEL:- :
230MM BRICKWALL, SIZE 230 X 230MM WITH 4Y20 WITH LINK
R10@200C/C.
150MM BRICKWALL, SIZE 125 X 230MM WITH 4Y16 WITH LINK
R6@150C/C.
17.SPACER BARS OF MINIMUM 25 MM DIAMETER SHALL BE
PROVIDED TO ADJACENT LAYERS OF PARALLEL
REINFORCEMENTS AND SPACED AT NOT MORE THAN 60 TIMES
DIAMETER OF SMALLER BARS.
18.SPACER BLOCKS USED FOR PROVISION
OF CONCRETE COVER SHALL BE OF EQUIVALENT STRENGTH NO. TARKIH PNIDAAN T.ANGAN
TO THE CONCRETE CONCERNED.
19.RIO REINFORCEMENT CHAIR SHALL BE PROVIDED AT
INTERVAL 1000 C/C BOTH WAYS TO ENSURE PROVISION OF
ADEQUATE AND PRECISE SPACING BETWEEN TOP AND BOTTOM
REINFORCEMENT.
20. STRUCTURAL OPENINGS THROUGH BEAMS, STABS OR
COLUMNS FOR PIPING, TRUNKING, DUCTING & ETC. SHALL BE TAJUK PROJEK :
ALLOWED PRIOR TO CONCRETING. ALL CONCEALED PIPES,
CONDUITS AND ETC. SHALL BE LAID IN BETWEEN THE TOP AND
BOTTOM REINFORCEMENT. STRICTLY NO PIPES, CONDUITS AND
ETC IS ALLOWED TO BE LAID IMMEDIATELY ABOVE BOTTOM
FORMWORK. STRICTLY NO HACKING OF COMPLETED
STRUCTURAL CONCRETE IS ALLOWED WITHOUT CONSENT
FROM JURUCTA.
21. READY MIXED CONCRETE SHALL BE USED AT SITE. TRIAL MIX
SHALL BE CARRIED OUT TO CONFIRM THE SUITABILITY OF THE
CONCRETE AFTER OBTAINING APPROVAL ON THE MIX DESIGN.
SITE MIX IS STRICTLY PROHIBITED FOR ALL RC WORKS.
22. ALL CONCEALED PIPING SHALL BE LAID IN BETWEEN TOP AND
BOTTOM REINFORCEMENT THE SLAB. NO CONCEALED PIPING /
TRUNKING IS ALLOWED TO BE LAID IMMEDIATELY ON TOP SLAB
FORMWORK.
TETUAN :
23. STRICTLY NO KICKER IS ALLOWED FOR CONSTRUCTION OF
COLUMNS
24. WATER PROOFING OF APPROVED TYPE SHALL BE PROVIDED
TO ALL TOILETS, RC GUTTER, BASEMENT, ROOF SLAB, WATER
TAJUK LUKISAN :
RETAINING STRUCTURES AND ALL OTHER EXPOSED RC
SUPER-STRUCTURE. MINIMUM 5 YEARS MANUFACTURES
WARRANTY SHALL BE SUBMITTED UPON COMPLETION.
25. SHOP DRAWING FOR WIRE MESH REINFORCEMENT SHALL BE
SUBMITTED BY CONTRACTOR THROUGH PROFESSIONAL
ENGINEER FOR PRIOR APPROVED.
26. SHOP DRAWINGS FOR METAL ROOF TRUSS SHALL BE
SUBMITTED THROUGH PROFESSIONAL ENGINEER FOR PRIOR
APPROVAL.
27. ALL EXISTING OR DISTURBED SOFT GROUND SHALL BE
REPLACED WITH APPROVED BACK FILL MATERIALS AND
ADEQUATELY COMPACTED IN LAYERS.
28. 50MM LEAN CONCRETE SHALL BE ALLOWED FOR ALL JURUCITA CONSULTANT
SUB-STRUCTURE AND RC MEMBERS WHICH ARE IN CONTACT CIVIL & STRUCTURAL CONSULTING
WITH SOIL. PVC SHEET SHALL BE LAID ON FINISHED GROUND ENGINEERS
BEFORE CASTING OF FLOOR SLAB. NO 11A, JALAN PERDA UTARA, BANDAR
29. MINIMUM 6 NUMBERS OF CONCRETE CUBES SHALL BE TAKEN PERDA 14000 BUKIT MERTAJAM,
FOR EACH CASTING AND ALL CUBES SHALL BE CURED AT SITE
PULAU PINANG
FOR TESTING AT INDEPENDENT TESTING LABORATORY AT 7
TEL : 04-5400083, 5483252, 5483253
DAYS AND 28 DAYS RESPECTIVELY.
FAX : 04-5400435
30. FORMWORK STRIKING TIME OR REMOVAL OF FORMWORK
SHALL BE AS SPECIFIED IN THE SPECIFICATIONS; AND/OR
FULFILLING THE REQUIREMENTS OF BS 8110. PENGESAHANJURUTERAPERUNDNIGDANSAKS
KIEPADAPEMLKI
31. PROPER AND ADEQUATE CURING SHALL BE PROVIDED TO ALL TANAHDANBANGUNAN
FRESHLY CAST CONCRETE IN ACCORDANCE WITH THE
REQUIREMENTS OF THE SPECIFICATIONS, AND/OR AND/OR
FULFILLING THE REQUIREMENTS OF BS 8110.
32. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE
HIMSELF FAMILIARISE WITH THE DRAWINGS, SITE CONDITIONS
AND AUTHORITY'S REQUIREMENTS, ESPECIALLY WITH THE
GEOTECHNICAL ASPECTS OF IT. THE RATE FOR FOUNDATION
WORKS ARE DEEMED TO HAVE INCLUDED THE COST FOR ALL
NECESSARY PROTECTIVE AND PREVENTIVE WORKS BE IT
TEMPORARY OR PERMANENT; LIKE SHORING, SHEET PILING,
TEMPORARY DRAINAGE SYSTEM, PROTECTION OF SLOPE,
SEDIMENTATION POND, CHECK DAM, TYRE WASHING, PUMPS
AND ETC.
33. EXCAVATED UNSUITABLE MATERIAL, CEMENT REMNANTS,
RUBBISH, UNWANTED MATERIALS AND ETC. SHALL BE CARTED
TO CONTRACTOR OWN DUMPING SITE.

DESIGNED : CHECKED :

DRAWING NO :
SLAB REINFORCMENT SCHEDULE APP PKM No :
SHEET :
APP BP No :

REMARKS : SCALE :

S:\2023\1923I - INOKOM ROOF AREA UPGRADE\DRAWING\PROJECT 2-Hyundai Carpark Shed - Architectural Drawings (Submission) (27-06-2012) (1)\RC F2\1923i-240312-F2-RC-R6.dwg