Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MATCHLI

SEEDRG M007-
Key Plan QATAR INTEGRATED RAILWAY PROJECT MAJOR STATIONS : GREEN LINE

NE
1 2 3 4 5 6 7 8 9 10 11 12 13 14

MML-
17400 17600 11500 10000 10000 8500 15000 15000 8500 10000 10000 10000 11500
EDUCATION CITY
STATION

ARC-
A B C D E

DWG-
00701 00702 00703 00704 00705

UCSTEDU-
MSHEIREB STATION

EXIT STAIR, LIFT


AND LOBBY TO

CL-
BE SUITABLE

00201-2-FOR CONTI
FOR FIRE
FIGHTING/
SECONDARY 15 16 17 18
EVACUATION
FIREMAN STAIR PREFERRED LOCATION FOR PRIMARY
KNOCK OUT
PUBLIC FACILITIES LAYOUT SUBJECT TO QF EGRESS TO STREET FIREMAN STAIR
SEE NOTE 2 PANEL SEE NOTE 2
CONFIRMATION FROM QRC

NUATI
STF STM SS-04
TCR-1 AC/DC-1 UPS-1 MEP/AHU RM SS-03 PRF ARF PAID CONCOURSE AREA CR-1

10775
UNPAID CONCOURSE AREA MEP/AHU RM
40 m2 FAR SMM 41 m2 DR 3

ON
DR 1 30 m2 FWC 29 m2 SMF 35 m2 Notes
88 m2 37 m2 37 m2 99 m2 55 m2 40 m2 23 m2 39 m2 158 m2
G 40 m2 TVM WS-150 m2
00602
11 m2 10 m2 1. ALL DRAWINGS TO BE READ IN CONJUNCTION WITH
TV-1

C
TV-3
M007-MML-ARC-DWG-UCSTEDU-AA-00005 & M007-MML-ARC-DWG-UCSTEDU-AA-00006
34 m2 16 m2

6750
UPS-2 AC/DC-2
TEL/IT TEL-T TEL/ITSS-02 2. THE DESIGN OF THE TV & DR SYSTEM SUBJECT TO CONFIRMATION BY THE SYSTEM
F
53 m2 54 m2
00601 TV-2 29 m2 51 m2 30 m2 37 m2 TV-4 WIDE CONTRACTOR. DS2 TUNNEL FAN SYSTEM IS BASED ON THE TUNNEL

B
16 m2 VENTILATION STRATEGY AGREED WITH THE CTO M007-MEP-ENN-00003.
34 m2 SCR-1
THE SIZE AND SETTING OUT SHOWN ON THIS DRAWING ARE IN ACCORDANCE WITH
36 m2

10775
DWA QAF
MWC QPR/QAF THE EMPLOYER REQUIREMENTS. FINAL POSITION OF OPENINGS AND PARTITIONS
TVS CNTRL-1 EL RM MEP/AHU RM MEP/AHU RM PRM FFL +6.060M TEL-P/TEL-Q TEL-M TEL/ITMEP/AHU RM DR 4
W.C EL RM
DR 2 ARM 34 m2 SS SRC-1 50 50 m2
60 m2 46 m2 153 m2 76 m2 32 m2 44 m2 18 m2 63 m2 TVS CNTRL-2 SUBJECT TO FURTHER COORDINATION WITH MSI. FOR OPENING CUPLER DETAILS
50 m2 41 m2
27 m2 30 m2 m2 42 m2 PLEASE REFER TO STRUCTURAL DESIGN PACKAGE.

A
3. FOR GAS SUPPRESSION CUPBOARDS TO ELECTRICAL ROOMS REFER TO MEP DS1
PUBLIC FACILITIES LAYOUT SUBJECT TO QAF AR QAF W.C 4. FOR ISSUE STATUS, REFER TO ARCHITECTURAL DESIGN STATUS REPORT:
PREFERRED LOCATION FOR KNOCK OUT
CONFIRMATION FROM QRC 10 m2 8 m2 M007-ARC-RPT-00011
QF EGRESS TO STREET PANEL
5. FOR CROSS OVER BOX DESIGN, REFER TO STRUCTURAL DS1 PACKAGE:
M007-MML-STR-PPT-00002
6. ALL MEP DESIGN TO BE READ IN CONJUNCTION WITH DESIGN BASIS REPORT:
M007-MML-MEP-RPT-00001 AND MEP DS1 SUBMISSION
7. REFER TO CIVIL AND STRUCTURAL DESIGN STATEMENT REPORT :
M007-MML-STR-RPT-0004
8. QATAR FOUNDATION TUNNEL LINK COORDINATES BASED UPON AS- BUILT
DRAWINGS:
EXW-P005-0004-SE-BLD-DG 11001
9. ALL DRAWINGS TO BE READ IN CONJUNCTION WITH FIRE LIFE SAFETY REPORT
M007-MML-SSA-RPT-00004 AND STRATEGY M007-MML-SSA-REP-00002

AS BUILT
PEDESTRIAN
LINK EXTENTS
BY OTHERS

1 PLAN VIEW - CONCOURSE LEVEL


00201 SCALE 1:500
Reference drawings

4.0 11/11/2015 CF FOR SONO (EDU_ARC_02) NB RD


SEEDRG M007-

MATCHLI

3.7 26/08/2015 CF FOR REVIEW AND COMMENT (EDU_ARC_02) NB RD

3.6 28/06/2015 RR FOR REVIEW AND COMMENT (EDU_ARC_02) NB RD


NE

3.5 02/06/2015 RR FOR REVIEW AND COMMENT (EDU_ARC_02) NB RD


15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
3.4 12/05/2015 RR FOR INFORMATION (EDU_ARC_VO45) NB RD
MML-

17600 12000 12000 17400 12000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000
3.3 18/02/2015 RR FOR REVIEW AND COMMENT (EDU_ARC_02) TN SE
ARC-

3.2 21/11/2014 RR FOR REVIEW AND COMMENT (EDU_ARC_02) TN SE


C D E
3.1 12/09/2014 RR FOR REVIEW AND COMMENT (EDU_ARC_02) TN SE
DWG-

00703 00704 00705


3.0 04/08/2014 RR ISSUED FRO SONO (EDU_ARC_01) TN SE
UCSTEDU-

2.4 21/07/2014 RR FOR REVIEW AND COMMENT (EDU_ARC_01) TN SE

2.3 27/06/2014 RR FOR REVIEW AND COMMENT (EDU_ARC_01) TN SE


EXIT STAIR, LIFT
2.2 05/06/2014 RR FOR REVIEW AND COMMENT (EDU_ARC_01) TN SE
AND LOBBY TO
CL-

BE SUITABLE 2.1 17/04/2014 RR ISSUED FOR REVIEW AND COMMENT TN SE


00201-1-FOR CONTI

FOR FIRE 2.0 12/03/2014 RR ISSUED FOR SONO TN SE


FIGHTING/ (SUBJECT TO MEP DESIGN AT
9 10 11 12 13 14 1.0 28/01/2014 RR ISSUED FOR SONO TN MY
EVACUATION DS2 - ROOM TO HAVE 0.4 23/12/2013 RR ISSUED FOR REVIEW AND COMMENT TN MY
PRIMARY WATERPROOF FLOOR FINISH
KNOCK OUT
0.3 06/11/2013 RR ISSUED FOR REVIEW AND COMMENT TN MY
FIREMAN STAIR SEE NOTE 2 TO PROTECT TRACK BELOW
PANEL

D
Rev Date Drawn Description Ch’k’d App’d
NUATI

STF STM SS-04 WS-2


CR-1 PUMP RM PUMP RM

10775
UNPAID CONCOURSE AREA MEP/AHU RM
40 m2 FAR SMM 41 m2 DR 3
ON

29 m2 SMF 35 m2 31 m2
23 m2 39 m2 158 m2 91 m2 114 m2
TVM WS-150 m2
11 m2 10 m2

C
TV-3 TUNNEL ESCAPE CORE
16 m2 WTANK SWITCHBOX

6750
UPS-2 AC/DC-2
582 m2 DAMPER
53 m2 54 m2 TV-4
ETS OPENING

B
16 m2 EL RM
SCR-1 223 m2
33 m2
36 m2

10775
DWA QAF
QPR/QAF DR 4
W.C TEL-P/TEL-Q TEL-M EL RM TEL/ITMEP/AHU RM TCR-2
SS SRC-1 50 50 m2
50 m2 44 m2 18 m2 63 m2 TVS CNTRL-2 123 m2
41 m2 Project
30 m2 m2 42 m2

A
QATAR INTEGRATED RAILWAYS PROJECT
QAF AR QAF W.C
KNOCK OUT
PANEL 10 m2 8 m2 MAJOR STATIONS
SPRINKLER + HYDRANT TANK/ WATER TANKS 605 M²
(SUBJECT TO MEP DESIGN AT DS2 - ROOM TO HAVE FOR REVIEW
WATERPROOF FLOOR FINISH TO PROTECT TRACK Station Name
Approved By PSUM Project Manager
BELOW)
EDUCATION CITY STATION
Title
DATE : 16/12/2015

PLAN VIEW - CONCOURSE LEVEL


+6.060 QNHD

AS BUILT
PEDESTRIAN
LINK EXTENTS
BY OTHERS

Client
QATAR RAILWAYS COMPANY
2 PLAN VIEW - CONCOURSE LEVEL This drawing and any information or descriptive matter set out hereon is licensed
to the Qatar Railways Company and is confidential and subject to copyright.
It must not be disclosed, loaned, copied or used for manufacturing, tendering or
P.O. BOX 29988 Doha
00201 SCALE 1:500 for any other purpose without written permission. © Qatar Railways Company
Qatar

Legend: Designed CF Eng check CP

Drawn CF Coordination EF
CUSTOMER RELATIONS / PUBLIC FACILITIES OVER SITE DEVELOPMENT PERMANENT CUT & COVER WALL (SURFACE LEVEL) N
EMERGENCY ACCESS / EGRESS VERTICAL CIRCULATION SCALE 1:500 @ A1
AS PER URBAN INTERFACE PLAN Dwg check NB Approved RD
SCALE 1:1000 @ A3
M007-QRC-UIF-DWG-UCSTEDU-00-00001 QI
BLA

PUBLIC AREA (UNPAID) Scale at A1 Status Rev


M+E/SRC PLANT RETAIL GROUND / EXISTING BUILDINGS
10m 0 10m 20m 30m 40m 50m 1:500 04 4.0

PUBLIC AREA (PAID) TUNNEL VENT SYSTEMS STAFF/ BOH / EXIT/ACCESS CORRIDOR EDUCATION CITY MASTERPLAN RIGHT OF WAY (ASHGHAL IPI No 13-1474) Drawing Number
EXPANSION AREA
M007-MML-ARC-DWG-UCSTEDU-CL-00201
Date: $DATE$ Time: $TIME$

You might also like