Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SPS-IMS-LFT-F005

Rev.00

SCOPE
Petroleum Services
Certificate of Thorough Examination Test & NDE for Lifting
Equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment
Re ulations 1998
Date of Throu h Examination: 2 l/Mar ch/2023 Certificate number: ST-4694-02
Name and Address of employer for whom t he thorough examin ation was made: Address of premises at which the exam ination was
DAQING OILFI ELD CONSTR UCTION G ROUP, BASRA, IRAQ made: BLOCK 9
Identification NO Description Safe Working Load Date of next exa min ation

MOBILE WELDER TRACTOR TELESCOPIC BOOM


090429 CRANE 3000 KG @ Min imum 20/March/2024
MANUFACTURE: XCMG Boom Length

CRANE MODEL: GSQ3.2SK2Q

MACHINE MANUFACTU RE: RONGTONG

CHASIS NO: 10951125

MACH INE MODEL: YZDZ-80

YEAR OF MANUFACTURE: 2009

TOTAL WE IGHT: 10300 KG

REG. NO: 2882-BASRA

EXAM INED IN ACCORD ING TO BS EN 474-


2:2006+Al :2008 and BS EN 712 1-2-4:2013

I Too ls Details I Load Cell S/N: S0-7-38 1 I Measuring Tape S/N: SCP-L-001 I Vernier Calliper S/N: SCP-L-002
Sta ndard: BS EN ISO 9934-1 Contrast Media: WHITE
Procedure: SPS-INSP-P027 Method: W ET Indicator: MAG INK
Result MPI was ca rried out on welds of liftin oint and fo und free of surface defects at time from ins ection.
Was the exa min ation carried out:
Is this the first examination after insta llation
or assembly at a new site or location?
YES NO
" W ithin a n inter va l of 6 months? YES NO
"
If the a nswer to the above question is YES,
W ithin a n interva l of 12 months?
In accorda nce wit h a n examin ation
YES
" NO

has the eq uipm ent been insta lled correctly?


YES NO
schem e?
After the occu rrence of exceptional
YES
" NO

circumstances?
YES NO
"

Address: Burjesia-Tuba Area -After the Bridge Hamoud El-Wabdan


Contacts:[email protected]/[email protected]
Phone: +964 7803222202 I +964 7803773775
. . .
• •
0
••
0
:~. ~ •• iib ;Li..~~ r'·-~ ~~r.~-·.::, .. ~ :;~.'•~,rt/". •' .: "• • - •~ :_,

SPS-IMS-LFT-F015
Rev.00
SCOPE
Petroleum Services
MOBILE WELDER TRACTOR BOOM CRANE

Annex to certificate No: sT-4694-02


CHECK LIST
Date of Inspection: 21/March/2023
l!I

I
.
.

DESCRIPITION CONDITION OR REMARKS

0 GENERAL DESCRIPTION OF THE EQUIPMENT


WHEELED PAYWELDER KNUCKLE BOOM CRANE.

MANUFACTURE: XCMG
SERIAL NO : 090429
CRANE MODEL: GSQJ.2SK2Q
0.0 Description MACHINE MANUFACTURE: RONGTONG
MODEL: YZDZ-80
YEAR OF MANUFACTURE: 2009
REG. NO : 2882-BASRA

1 IN CAB
1.1 Manufacturers operation manual OK
1.2 Appropriate Load Chart OK
1.3 Operator competency certificate OK
1.4 Hand Brake Interlock OK
2 Hvdraulic svstem
2.1 Hydraulic oil level OK
2.2 Condition of oil OK
2.3 Boom cylinders OK
2.4 System and hoses OK
3 Boom section
3.1 Base section properly attached OK
3.2 Boom structure OK
3.3 Boom angle indicator OK
4 Kunckel crane
4.1 Operation of control levers OK
4.2 Emergency stop switches OK
4.3 Attachment of Knuckle to vehicle OK
5 Safety devices
5.1 Warning alarms OK
5.2 Safety equipment OK
6 Lifting gear
6.1 Correct lifting accessories
Ok
6.2 Condition of lifting accessories OK

~e\)~,&~-~~2'
ffl:eU'/( 'f{k ~Q ' . - ~"'IYU' ·~
~ J ::S ~ ~: a_<l> ~ ~-~&. . t--s:... ~:
I o ~ :\
~ S\;\)~~. ~ ..._, l ·.. 0-
. 0
·. 0~
. -::::: :
- ~' :.
..._ J' - .v /
{ (ffi1;~ . \\P°9~_.,,,,,,@
~ ~ .~
'<:; -
.....·.. (' >t ('\" \\\'..·· .....
· ... ..... . ..

Address: Bur'esia-Tuba
J Ar .,...,......,,..,.... e>ridge Hamoud El-Wabdan
Contacts:[email protected]/[email protected]
Phone: +964 7803222202 I +964 7803773775
' . ~ ·' ~ : . . . :. :.. ~ -~', ~ !_;_ .:. • . - . •

SCOPE
Petroleum Services
Rev.OD .
SPS-IMS-LFT-F015

MOBILE WELDER TRACTOR BOOM CRANE 1!J ..


CHECK LIST •
Annex to certificate No: ST-4694-02 Date of Inspection: 21/March/2023

Comment: Satisfactory

Surveyor's: Mohamed Abdel Halim Signature:

Address: Burjesia-Tuba Area -After the Bridge Hamoud El-Wabdan


Contacts:[email protected]/[email protected]
Phone: +964 7803222202 I +964 7803773775

You might also like