Contract No: 1170032631 JOB No:

42-19170

QC Form No

(EPC) Lump Sum Turn Key (LSTK) contract for Growth-II Project at Luberef II, Yanbu- PTJ-C-002 Rev 01

Sheet: 1/1

SURVEYING REPORT NO :1

Equipment Name & Serial : QQ1381 Reference Points

CALIBRATION DUE DATE: 10/28/2024 Reference Point ID : BM-1 Reference Point ID : BM-2

Equipment Name & Serial : CM2238 TOTAL STATION TOPCON Easting Northing ELEVATION Easting Northing ELEVATION

CALIBRATION DUE DATE: 8/11/2024 -694.992 -161.051 100.033 -694.79 -456.203 100.05

Item Description : Survey datum and control points verification (NPM-01,NPM-02,NPM-03) of Dyke and Tanks Area inside Luberef Reference Drawing : Area : Tank Farm
Plant. (PTJ-LUB-GTH II-CIV-00010)

DESIGN CO-ORDINATES ACTUAL CO-ORDINATES DIFFERENCE DESIGN ACTUAL DIFFERENCE


Point ID. Remarks
Easting Northing Easting Northing Easting Northing ELEVATION ELEVATION ELEVATION

NBM -1

NBM -2

NBM -3

SURVEY(PETROJET) CONTRACTOR (PETROJET) QUALITY (PETROJET) PID Representive

NAME: NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

1/1