Summary of Specification and Bill of Quantities Gambella Aqsa Mesjid Medresa
Summary of Specification and Bill of Quantities Gambella Aqsa Mesjid Medresa
Note: 1) The price is for cost of man power only (Does not include cost of materials and equipments)
Page 1
It.No Description Unit Qty Rate Total Amount
A. SUB STRUCTURE
Page 2
m2 concrete m² 32.5 200 6,500.00
Page 3
Takeoff sheet
Qty x Sum Description
A. SUB- STRUCTURE
1 Excavetion & Earth Work
1.01 Site clearing
1 18.00
7.00 126.00
126.00 m2 of total area of site clearing
1.03 Trench excavation for Masonry
3 15.2 45.60 m
Window
Perimeter=1.5*2*2+2*2*2= 85m
16 12.8 204.80 m
Columns
32 3.4
108.80
Beams and HCB copying
1 92
92.00
0 60 Perimeter=15*4= 60m
0.00
451.20 ml of edge work
16/Elecctrical fixtures and
equipments
16.1/ Downlight fitting
7 1.00 7.00 pcs
16.2/Main Light Fitting
6 1.00 6.00 pcs
16.4/ switch
13 1.00 13.00 pcs
16.7/socket outlet
17 1.00 17.00 pcs
16.8/distribution board
1 1.00 1.00 pc
Reinforcement (Sub - structure)
Reinforcement x No.
Grade beam longer dxn f12 18.7 12
shorter dxn f12 7.2 16
stirrup longer dxn f6 0.7 180
stirrup shorter dxn f6 0.7 130