THE BATUMBACALS

STORYBOARD
PRESENTED BY:

ANTONE, JOVEE MAE S.


CARDEÑO, JEM HARRIETTE A.
LIM, ELLE JULIENNE
OANDASAN, MARIA FATIMA B.
SORIA, LEI JORIELLE M.
TESORO, CRISELDA B.
THE BATUMBACALS

OUTLINE
1 SITE OVERVIEW

2 PROJECT TIMEFRAME

3 OUTLINE OF ANIMATION
THE BATUMBACALS

SITE OVERVIEW
The site is located in GSIS Avenue cor. Marikina-
Infanta Highway, he steel construction project
located in Cogeo, Antipolo City, Rizal.

The project is a government-owned commercial


zone designed for a public wet market on the
ground floor and retail and merchandising dry
goods on the upper floor.
THE BATUMBACALS

PROJECT TIMELINE
1 PRODUCTION OF STORYBOARD (November 11, 2023 to November 18, 2023)

2 SITE VISIT IN COGEO, ANTIPOLO - DAY 1 (NOVEMBER 19, 2023)

3 GRAPHIC PRODUCTION (NOVEMBER 20-24, 2023)

4 SITE VISIT IN COGEO, ANTIPOLO - DAY 2 (NOVEMBER 26, 2023)

5 GRAPHIC PRODUCTION (NOVEMBER 27- DECEMBER 2, 2023)

6 SITE VISIT IN COGEO, ANTIPOLO - DAY 3 (DECEMBER 3, 2023)

7 GRAPHIC PRODUCTION (DECEMBER 4-8, 2023)

TARGET SUBMISSION OF OUTPUT (DECEMBER 9, 2023)


8 THROUGH MICROSOFT TEAMS CHANNEL
STORYBOARD
1 2 3 4

SCENE 1: EXCAVATION PROCESS SCENE 2: LAYING GROUNDLINE FOOTING SCENE 3: PLANTING OF STEEL COLUMN SCENE 4: INSTALLATION OF SLAB ON GRADE
This process is the preliminary step of The groundline footing is laid post- The steel column is planted to serve as This will provide a solid surface on
every construction. excavation the skeletal system of the structure. building’s floor system

SCENE 5: INSTALLATION OF CONCRETE SCENE 6: RAFTERS SCENE 7: ROOFING SYSTEM SCENE 8: DOORS AND WINDOWS
SLABS Involves the installation of insulation Crowning the structure to withstand the To permeate interior spaces, determine
Reinforcement of concrete slabs that materials to provide thermal comfort weather conditions ingress/egress, and contribute to overall
will act as the plane of interior spaces aesthetics