PRESTIGE ENG LLC

Date: 11/05/2024
CONTRACTOR’S HSE WEEKLY SITE REPORT

Project: Cold Box and Warm Skid


Location: RAK Port, ALMEM
Client: Air Liquide Middle East Manufacturing
Week start: 06/05/2024
Job no:

Scope of work: Installation and fit-up

HSE STATISTICS

S/N INDICATORS NO. OF REMARK


01 FATALITY 0
02 LOST TIME INJURY 0
03 RESTRICTED WORK CASE 0
04 RESTRICTED WORKDAYS 0
05 MEDICAL TREATMENT CASE 0
06 FIRST AID CASE 00
07 VEHICLE INCIDENT 0
08 ENVIRONMENTAL INCIDENT 0
09 PROPERTY DAMAGE 0
10 NEAR MISS AND DANGEROUS OCCURENCE
0
0
11 TOOLBOX TALK 6
12 PPE AUDIT 0
13 SITE OBSERVATION 01
14 HSE WEEKLY SAFETY TBT 1
15 TOOLS AND EQUIPMENTS INSPECTION 0
16 IN HOUSE TRAINING 0
17 HSE MONTHLY TRAINING 0

Contractor’s site coordinator Contractor’s HSE officer


Akhil Gopan Jithin Shankar

PEL/HSE/WR001