8103 M-42 6u2816013 Plate Type Coolers

Download as pdf or txt
Download as pdf or txt
You are on page 1of 60

□ PROPOSAL

□ APPROVAL
DOCUMENT FOR □ INSPECTION

■ FINAL

CLIENT : 현대삼호중공업㈜

PROJECT : 13,200 TEU Class Container Carrier

SERVICE : No.1/2 Central F.W Cooler


Main L.O Cooler
Stern Tube L.O cooler
M/E Jacket F.W Cooler

HULL NO. : 8103

MODEL NO. : DX-30DLHVV-1P-369 2SETS


DX-30DLH-1P-455 1SET
DX-17DL-1P-9 1SET
DX-20DSV-1P-57 1SET

SHEET 1 OF 60

E 2023.02.24 FINAL C.S.Kim J.W.Byun M.K.Yang


D 2021.10.26 FOR WORKING C.S.Kim J.W.Byun M.K.Yang
C 2021.10.20 FOR APPROVAL C.S.Kim J.W.Byun M.K.Yang
B 2021.09.10 FOR APPROVAL C.S.Kim J.W.Byun M.K.Yang
A 2021.05.14 FOR APPROVAL C.S.Kim J.W.Byun M.K.Yang
NO. DATE DESCRIPTION PRE'D BY CHK'D BY APP'D BY

디에이치피이엔지㈜
DHP Engineering Co., Ltd.
☞ HEAD FACTORY
#105, GIMHAE-DAERO 1022BEON-GIL, HALLIM-MYEON,
GIMHAE, GYEONGNAM, KOREA ZIP CODE : 50850
TEL : +82-55-338-4301~3
FAX : +82-55-338-4304

DHP ENGINEERING CO., LTD.


DOC. NO. DW21339

DOCUMENT LIST
SHEET NO. 1 OF 59

1) MATERAL INSP. APPLICATION & REPORT 3 SHEETS

2) DATA SHEET 5 SHEETS

3) ASSEMBLY DRAWING 6 SHEETS

4) INSPECTION & TEST PROCEDURE 4 SHEETS

5) SPECIAL TOOL LIST 2 SHEETS

6) SPARE PARTS LISTS LIST FOR TWO(2) 2 SHEETS


YEARS OPERATION

7) PRESSURE TEST REPORT 6 SHEETS

8) DIMENSION INSPECTION REPORT 6 SHEETS

9) PAINTING INSPECTION REPORT 3 SHEETS

10) MILL SHEET 12 SHEETS

11) ABS CERT. 9 SHEETS

DHP ENGINEERING CO., LTD.


MATERAL INSP. DOC. NO. DW21339 - 01

APPLICATION &
REPORT SHEET NO. 1 OF 3

F-1001-5-1/1(0) DHP ENGINEERING CO., LTD. A4(210X297)mm


DOC. NO. DW21339 - 01

DATA SHEET
SHEET NO. 1 OF 5

DHP ENGINEERING CO.,LTD


DHP Engineering Co., Ltd Rev. E

Date 2023-02-24
Client 현대삼호중공업㈜ Hull No. 8103
Project 13,200 TEU Class Container Carrier Model No. DX-30DLHVV - 1P - 369
Service No.1/2 Central F.W Cooler Quantity 2
[Process data] Hot Side Cold Side
Fluid F.W S.W
Flow rate (m³/h) 970 1220
Inlet temperature (°C) 56.7 32.0
Outlet temperature (°C) 36.0 49.1
Pressure drop (Allow./Calc) (kg/cm²) 0.8 / 0.73 1.2 / 1.2
Inlet Pressure (kg/cm².g) 4.0 3.0

[Property] In Out In Out


Density (kg/m³) 1000 1000 1025 1025
Specific heat capacity (kcal/kg.°C) 1.000 1.000 0.9400 0.9400
Thermal conductivity (kcal/m.h.°C) 0.558 0.538 0.536 0.553
Viscosity (cP) 0.490 0.707 1.03 0.734

[Heat exchanger data]


Heat duty (kcal/h) 20060000
L.M.T.D (°C) 5.6
O.H.T.C _ clean (kcal/m².h.°C) 6667
O.H.T.C _ service (kcal/m².h.°C) 5770
Heat transfer area (m²) 619
Fouling resistance (m².h.°C/kcal) N/A N/A
Fouling margin (%) 15.5
Number of plates 369
Effective plates 367
No. of channel x pass 184 X 1 184 X 1
Plate / thickness Titanium / 0.5 (mm)
Gasket NBR NBR
Frame / Painting SS275 / Munsell No. 7.5BG 7/2
Facing Rubber Insert Rubber Insert
Material NBR Lining NBR Lining
Connection
Rating JIS 5K JIS 5K
Size 300A / 300A 300A / 300A
Design / Test pressure (kg/cm².g) 5.0 / 7.5 5.0 / 7.5
Design temperature (°C) 60 60
Fluid volume (ℓ) 1148 1148
Weight (Empty / Full) (kg) 5641 / 7936
Design Code ASME SECTION VIII DIV.1
[Remark] Case4

Version : DHPS 1.0.3 DS-210068-1 Designed by J.W.Byun


DHP Engineering Co., Ltd Rev. E

Date 2023-02-24
Client 현대삼호중공업㈜ Hull No. 8103
Project 13,200 TEU Class Container Carrier Model No. DX-30DLH - 1P - 455
Service Main L.O Cooler Quantity 1
[Process data] Hot Side Cold Side
Fluid L.O F.W
Flow rate (m³/h) 474 279
Inlet temperature (°C) 60.4 36.0
Outlet temperature (°C) 45.0 46.6
Pressure drop (Allow./Calc) (kg/cm²) 0.9 / 0.8 0.8 / 0.1
Inlet Pressure (kg/cm².g) 6.9 4.0

[Property] In Out In Out


Density (kg/m³) 900.0 900.0 1000 1000
Specific heat capacity (kcal/kg.°C) 0.4500 0.4500 1.000 1.000
Thermal conductivity (kcal/m.h.°C) 0.108 0.108 0.538 0.549
Viscosity (cP) 33.5 67.9 0.707 0.580

[Heat exchanger data]


Heat duty (kcal/h) 2949800
L.M.T.D (°C) 11.2
O.H.T.C _ clean (kcal/m².h.°C) 396
O.H.T.C _ service (kcal/m².h.°C) 344
Heat transfer area (m²) 764
Fouling resistance (m².h.°C/kcal) N/A N/A
Fouling margin (%) 15.1
Number of plates 455
Effective plates 453
No. of channel x pass 227 X 1 227 X 1
Plate / thickness A240-316L / 0.5 (mm)
Gasket NBR NBR
Frame / Painting SS275 / Munsell No. 7.5BG 7/2
Facing Unlined Unlined
Material NON-ASB NON-ASB
Connection
Rating JIS 10K JIS 5K
Size 300A / 300A 200A / 200A
Design / Test pressure (kg/cm².g) 6.9 / 10.4 5.0 / 7.5
Design temperature (°C) 65 65
Fluid volume (ℓ) 1415 1415
Weight (Empty / Full) (kg) 7929 / 10759
Design Code ASME SECTION VIII DIV.1
[Remark] Case2

Version : DHPS 1.0.3 DS-210068-2 Designed by J.W.Byun


DHP Engineering Co., Ltd Rev. E

Date 2023-02-24
Client 현대삼호중공업(주) Hull No. 8103
Project 13,200 TEU Class Container Carrier Model No. DX-17DLV - 1P - 9
Service Stern Tube L.O Cooler Quantity 1
[Process data] Hot Side Cold Side
Fluid L.O F.W
Flow rate (m³/h) 4 5
Inlet temperature (°C) 46.2 36.0
Outlet temperature (°C) 45.0 36.4
Pressure drop (Allow./Calc) (kg/cm²) 0.6 / 0.56 0.8 / 0.11
Inlet Pressure (kg/cm².g) 3.0 4.0

[Property] In Out In Out


Density (kg/m³) 900.0 900.0 1000 1000
Specific heat capacity (kcal/kg.°C) 0.4500 0.4500 1.000 1.000
Thermal conductivity (kcal/m.h.°C) 0.108 0.108 0.538 0.538
Viscosity (cP) 63.7 67.9 0.707 0.702

[Heat exchanger data]


Heat duty (kcal/h) 2000
L.M.T.D (°C) 9.4
O.H.T.C _ clean (kcal/m².h.°C) 322
O.H.T.C _ service (kcal/m².h.°C) 171
Heat transfer area (m²) 1.25
Fouling resistance (m².h.°C/kcal) N/A N/A
Fouling margin (%) 88.9
Number of plates 9
Effective plates 7
No. of channel x pass 4X1 4X1
Plate / thickness A240-316L / 0.5 (mm)
Gasket NBR NBR
Frame / Painting SS275 / Munsell No. 7.5BG 7/2
Facing Unlined Unlined
Material NON-ASB NON-ASB
Connection
Rating JIS 5K JIS 5K
Size 40A / 40A 40A / 40A
Design / Test pressure (kg/cm².g) 5.0 / 7.5 5.0 / 7.5
Design temperature (°C) 60 60
Fluid volume (ℓ) 2.5 2.5
Weight (Empty / Full) (kg) 203 / 208
Design Code ASME SECTION VIII DIV.1
[Remark]

Version : DHPS 1.0.3 DS-210068-3 Designed by J.W.Byun


DHP Engineering Co., Ltd Rev. E

Date 2023-02-24
Client 현대삼호중공업㈜ Hull No. 8103
Project 13,200 TEU Class Container Carrier Model No. DX-20DSV - 1P - 57
Service M/E Jacket F.W Cooler Quantity 1
[Process data] Hot Side Cold Side
Fluid F.W (Jacket) F.W
Flow rate (m³/h) 293 279
Inlet temperature (°C) 90.0 46.6
Outlet temperature (°C) 74.6 62.8
Pressure drop (Allow./Calc) (kg/cm²) 0.8 / 0.76 0.8 / 0.69
Inlet Pressure (kg/cm².g) 5.0 4.0

[Property] In Out In Out


Density (kg/m³) 1000 1000 1000 1000
Specific heat capacity (kcal/kg.°C) 1.000 1.000 1.000 1.000
Thermal conductivity (kcal/m.h.°C) 0.581 0.572 0.549 0.563
Viscosity (cP) 0.314 0.379 0.580 0.446

[Heat exchanger data]


Heat duty (kcal/h) 4519300
L.M.T.D (°C) 27.6
O.H.T.C _ clean (kcal/m².h.°C) 7077
O.H.T.C _ service (kcal/m².h.°C) 6109
Heat transfer area (m²) 26.8
Fouling resistance (m².h.°C/kcal) N/A N/A
Fouling margin (%) 15.8
Number of plates 57
Effective plates 55
No. of channel x pass 28 X 1 28 X 1
Plate / thickness A240-316L / 0.5 (mm)
Gasket NBR NBR
Frame / Painting SS275 / Munsell No. 7.5BG 7/2
Facing Unlined Unlined
Material NON-ASB NON-ASB
Connection
Rating JIS 5K JIS 5K
Size 200A / 200A 200A / 200A
Design / Test pressure (kg/cm².g) 5.0 / 7.5 5.0 / 7.5
Design temperature (°C) 95 95
Fluid volume (ℓ) 58 58
Weight (Empty / Full) (kg) 1246 / 1361
Design Code ASME SECTION VIII DIV.1
[Remark]

Version : DHPS 1.0.3 DS-210068-4 Designed by J.W.Byun


DOC. NO. DW21339 - 02

ASSEMBLY DWG
SHEET NO. 1 OF 6

DHP ENGINEERING CO.,LTD


DOC. NO. DW21339 -03
INSPECTION &
TEST PROCEDURE SHEET NO. 1 OF 4

DHP ENGINEERING CO.,LTD


INSPECTION & TEST PROCEDURE FOR HEAT EXCHANGER

This procedure defines the process of test and inspection procedure of heat exchanger

1. MATERIAL INSPECTION.
1-1 Plate Material
a. After checking the mill sheet of maker, check the applicable code with material composition
b. Confirm the allowable clearance By measuring the cut size.
c. Confirm the surface condition and inspect for other defects.

1-2 Gasket for Plate


a. Measure the hardness by sampling and confirm the allowable tolerance.
b. Confirm the composition, properties of main materials.
c. Check the allowable tolerance by measuring the thickness, shape and dimension.

1-3 Steel for Frame


a. Measure the thickness.
b. Check surface condition for defects.

1-4 Lining and Connection for Nozzle


a. Confirm the material.
b. Dimension and thickness check.
c. Check surface condition for defects.

2. INSPECTION DURING PROCESSING.


2-1 Pressure Parts
1) Heat plate
a. Measure the depth of pressed plate, and confirm the allowable tolerance.
b. Check the position of guide groove and nozzle.
c. Confirm the accuracy and condition of gasket's sealing.
d. Check for any scratches, marks on the pressed surface.

2-2 Non-Pressure Parts


1) Frame
a. Check the dimension of machined frame for suitability to allowable tolerances.

DHP ENGINEERING CO., LTD.


3. PRESSURE TEST MEDIUM
3-1 Water is the standard pressure test medium.

3-2 a. Hydrostatic test.


b. Pressure test one side at a time, while maintaining the opposite side at ambient pressure
c. Test pressure is 1.5 times of design pressure.
d. After filling of the test side and confirming no initial leaks, close the outlet valve and proceed
test pressure. Hold at the test pressure for (0.5 Hr)at least.
e. For stainless steel and nickel-alloy equipment, the water quality shell meet the following additional
minimum requirement:
ⅰ) For those situations where the equipment can be wiped dry or otherwise cleanly purged of the
hydrostatic test water, the water shall not contain more than 30 mg/ℓ(30 ppm) chloride.
- The total time that the water can be in the equipment is 3 days from start of fill to empty and
dry. When the time limit can not be met, contact an owner representative and request
input from an owner materials engineer, or comply with the requirements of the paragraph.
ⅱ) For stainless steel where the equipment can not be dried (ex. jacket,heat exchanger tubes),
The water used for testing shall not contain more than 30 mg/ℓ(30 ppm)chloride.

4. DIMENSION INSPECTION
a.Dimension inspection procedure will be followed as per tolerances on the dwg.
b. The tolerance is below,
- THICKNESS TOLERANCE
∼ 200mm → + 0.8 mm
200mm ∼ → + 2.0 mm
- LENGTH TOLERANCE
∼ 2500 mm → ± 3 mm
2500 mm ∼ → ± 5 mm

5. PAINTING INSPECTION
Check the painting colour and painting thickness in accordance with painting procedure.
The thickness check method is by thickness gauge or suitable thickness measuring device.

6. FINAL INSPECTION
1) Confirm the packing condition to prevent contamination of jointing area, vent hole and gauge hole.
2) check the packing list and accessories for additional supply items.
3) Check the anti-resin condition of flange, bolts and nuts.

DHP ENGINEERING CO., LTD.


CLIENT NAME : 현대삼호중공업㈜
PROJECT NAME : 13,200 TEU Class Container Carrier
HULL NO. : 8103

DOCUMENT NO. DW21339


INSPECTION AND TEST PLAN
PAGE NO. 4 OF 4 Rev. E
APPLICABLE INSPECTION INVOLVEMENT
NO. INSPECTION & TEST DESCRIPTION REPORTS
CODE & STANDARDS MANUFACTURE CLASS OWNER

ASME SECTION Ⅱ PART.A


Latest version QCP-05 (Receiving
1 ▶ RECEIVING INSPECTION ( MILL TEST REPORT REVIEW) Inspection Procedure)
H R R -
Rev.0

QCP-02 (Welding Pocedure Specification


2 ▶ WELDING PROCEDURE QUALIFICATION TEST & Qualification Procedure) , Rev.0
- - - -

QCP-01 (Welder or Welding


3 ▶ WELDER PERFORMANCE QUALIFICATION TEST Operator Control Procedure) , Rev.0
- - - -

QCP-04 (Calibration Control Procedure)


4 ▶ TEST TOOL CALIBRATION CHECK Rev.0
H R R -

QCP-14 (Dimensional Inspection


5 ▶ DIMENSION CHECK AND VISUAL INSPECTION Procedure) , Rev.0
H W W DIMENSION INSPECTION REPORT

PT-DHP01, Rev.0
6 ▶ NDE (PT / RT) RT-DHP01, Rev.0
- - - -

QCP-12 (Final Pressure Test Procedure)


7 ▶ HYDROSTATIC TEST Rev.0
H H W PRESSURE TEST REPORT

8 ▶ RUST PREVENTION CHECK AND PAINTING IS-02 (Painting Procedure) , Rev.0 H - W PAINTING INSPECTION REPORT

9 ▶ SHIPPING PREPARATION INSPECTION IS-03 (Packing Procedure) , Rev.0 H - W -

10 ▶ FINAL CONTRACTOR INSPECTION REPORT REVIEW - H - W -

NOTE: R : REPORT REVIEW W : WITNESS POINT H : HOLD POINT - : NONE

F-1001-11-1/1(0) DHP Engineering Co., Ltd. A4(210X297)mm


DOC. NO. DW21339 - 04

SPECIAL TOOLS LIST


SHEET NO. 1 OF 2

F-1001-4-1/1(0) DHP ENGINEERING CO.,LTD A4(210X297)mm


SPECIAL TOOLS LIST FOR OPERATION
CLIENT : 현대삼호중공업㈜
PJT. NAME : 13,200 TEU Class Container Carrier

SPARE PART
HULL NO. DESCRIPTION MODEL TYPE SKETCH REMARKS
PART MATERIAL Q'TY/SHIP

No.1/2 Central F.W Cooler DX-30DLHVV-1P-369

M36

Main L.O Cooler DX-30DLH-1P-455

8103 RATCHET SPANNER C.S 2EA

Stern Tube L.O Cooler DX-17DLV-1P-9 M20

M/E Jacket F.W Cooler DX-20DSV-1P-57 M36

F-0301-16-1/1(0) DHP Engineering Co.,Ltd. A4(210X297)mm


SPARE PARTS LIST FOR DOC. NO. DW21339 - 05

TWO(2) YEARS
OPERATION SHEET NO. 1 OF 2

F-1001-4-1/1(0) DHP ENGINEERING CO.,LTD A4(210X297)mm


SPARE PART LIST
CLIENT : HSHI
PJT. NAME : 13,200 TEU CLASS Container CARRIER

HULL NO. : 8070/71/72/73/8103/8104

SPARE PART(Gasket for Heat Plate)


HULL NO. DESCRIPTION MODEL TYPE
SKETCH PART MATERIAL Q'TY/SHIP

No.1/2 Central F.W GASKET


DX-30DL NBR 2 SET
Cooler 18 SHEETS

GASKET
Main L.O Cooler DX-30DL NBR 1 SET
31 SHEETS

8070/71/72/73/8
103/8104

GASKET
M/E Jacket F.W Cooler DX-20DS NBR 1 SET
3 SHEETS

GASKET
Stern Tube L.O Cooler DX-17DL NBR 1 SET
1 SHEETS

TOTAL

F-0301-16-1/1(0) DHP Engineering Co.,Ltd.


DOC. NO.
PRESSURE TEST
DW21339 - 07

REPORT SHEET NO. 1 OF 6

F-1001-5-1/1(0) DHP ENGINEERING CO., LTD. A4(210X297)mm


DOC. NO.
DIMENSION
DW21339 - 08

INSPECTION REPORT SHEET NO. 1 OF 6

F-1001-5-1/1(0) DHP ENGINEERING CO., LTD. A4(210X297)mm


DOC. NO.
PAINTING INSPECTION
DW21339 - 09

REPORT SHEET NO. 1 OF 3

F-1001-5-1/1(0) DHP ENGINEERING CO.,LTD A4(210X297)mm


DOC. NO. DW21339 - 10

MILL SHEET
SHEET NO. 1 OF 12

F-1001-5-1/1(0) DHP ENGINEERING CO.,LTD A4(210X297)mm


DOC. NO. DW21339 -11

ABS CERT.
SHEET NO. 1 OF 9

F-1001-5-1/1(0) DHP ENGINEERING CO.,LTD A4(210X297)mm


logo
Work Order: 5387417-C
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:

Equipment Certification Report


Asset Type Water Cooler
Customer Name DHP ENGINEERING CO., LTD.
WCN of Customer 835481
Location Kimhae, Korea
'This is to certify that the undersigned Surveyors to this Bureau did at the request of DHP ENGINEERING CO., LTD. , on 26-Jul-2022 carry out the
following survey and report as follows:

Client Asset Name Quantity


Nos.1 & 2 Central F.W. Coolers 1

Name Plate Data


ABS Label Manufacturer Purchaser Destination Vessel
Nos.1 & 2 Central F.W. DHP ENGINEERING CO., HYUNDAI SAMHO HEAVY IND. CO., BUENOS AIRES EXPRESS(Class Number
Coolers LTD. LTD. YY284369)

Basic Identification Data


Serial Number Model Number Owner Tag Number Supplier Ref. Number
DW21339-05-01-1 / DW21339-05-01-2 DX-30DLHVV-1P-369 - -

Report Details
ABS Stamping Maltese Cross
5387417 Yes

Statement of Work - Classification Service - Certification -

Asbestos-free declaration verified and supporting documentation reviewed.


All testing (pressure/load/operational/etc.) has been carried out as applicable and verified in accordance with the applicable Rules/
specifications.
Testing machines are maintained in a satisfactory condition and records of their recheck or calibration dates confirmed.
Traceability of materials used on this project has been verified.

Report Findings
Statement/Observation
Finding No Asset Survey Task Date Created

1111.0 Nos.1 & 2 Central F.W. Coolers Certification - Nos.1 & 2 Central 26-Jul-2022
F.W. Coolers

Found
Hull No.: 8103 (HSHI)

NOTE: This Report evidences that the survey reported herein was carried out in compliance with one or more of the Rules, guides, standards or other criteria of the
American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. This Report is a representation
only that the vessel, structure, item of material equipment, machinery or any other item covered by this Report has been examined for compliance with, or has met
one or more of the Rules, guides, standards or other criteria of American Bureau of Shipping. The validity, applicability and interpretation of this Report is governed by
the Rules and standards of American Bureau of Shipping who shall remain the sole judge thereof. Nothing contained in this Report or in any notation made in
contemplation of this Report shall be deemed to relieve any designer, builder, owner, manufacturer, seller, supplier, repairer, operator or other entity of any warranty
express or implied.
1 of 2
logo
Work Order: 5387417-C
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:

The two (2) sets of plate type heat exchanger were examined, hydrostatically tested (Report Nos. DQA-7PT-220726-01/02) and considered
satisfactory.

Description / Cooling Surface (m2) / Dwg. No. / Design Press. (bar) / Hydro-test Press. (bar) / Q'ty (set)
Nos. 1 & 2 Central F.W Coolers / 619 / DW21339-01-01-1/2 Rev. E / 5.0 (Hot Side), 5.0 (Cold Side) / 7.5 (Hot Side), 7.5 (Cold Side) / 2

Closing Paragraph:
The component/equipment was surveyed in accordance with the Rules, specifications, and approved drawings, as applicable, and is eligible
for installation on board an ABS classed vessel subject to satisfactory installation and testing, as necessary.

Attending Surveyor(s):
Chang, Kyoung-Suk
Signed-off Date: 27-Jul-2022

Reviewing Surveyor(s)
Work Order Reviewer: Lee, Sang-Weon
Work Order Credit Date: 08-Aug-2022

2 of 2
logo
Work Order: 5387417-B
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:

Equipment Certification Report


Asset Type Oil Cooler
Customer Name DHP ENGINEERING CO., LTD.
WCN of Customer 835481
Location Kimhae, Korea
'This is to certify that the undersigned Surveyors to this Bureau did at the request of DHP ENGINEERING CO., LTD. , on 26-Jul-2022 carry out the
following survey and report as follows:

Client Asset Name Quantity


Main L.O. Cooler 1

Name Plate Data


ABS Label Manufacturer Purchaser Destination Vessel
Main L.O. DHP ENGINEERING CO., HYUNDAI SAMHO HEAVY IND. CO., BUENOS AIRES EXPRESS(Class Number
Cooler LTD. LTD. YY284369)

Basic Identification Data


Serial Number Model Number Owner Tag Number Supplier Ref. Number
DW21339-05-02 DX-30DLH-1P-455 - -

Report Details
ABS Stamping Maltese Cross
5387417 Yes

Statement of Work - Classification Service - Certification -

Asbestos-free declaration verified and supporting documentation reviewed.


All testing (pressure/load/operational/etc.) has been carried out as applicable and verified in accordance with the applicable Rules/
specifications.
Testing machines are maintained in a satisfactory condition and records of their recheck or calibration dates confirmed.
Traceability of materials used on this project has been verified.

Report Findings
Statement/Observation
Finding No Asset Survey Task Date Created

1112.0 Main L.O. Cooler Certification - Main L.O. Cooler 26-Jul-2022

Found
Hull No.: 8103 (HSHI)

The one (1) set of plate type heat exchanger was examined, hydrostatically tested (Report No. DQA-7PT-220726-03) and considered
NOTE: This Report evidences that the survey reported herein was carried out in compliance with one or more of the Rules, guides, standards or other criteria of the
American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. This Report is a representation
only that the vessel, structure, item of material equipment, machinery or any other item covered by this Report has been examined for compliance with, or has met
one or more of the Rules, guides, standards or other criteria of American Bureau of Shipping. The validity, applicability and interpretation of this Report is governed by
the Rules and standards of American Bureau of Shipping who shall remain the sole judge thereof. Nothing contained in this Report or in any notation made in
contemplation of this Report shall be deemed to relieve any designer, builder, owner, manufacturer, seller, supplier, repairer, operator or other entity of any warranty
express or implied.
1 of 2
logo
Work Order: 5387417-B
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:

satisfactory.

Description / Cooling Surface (m2) / Dwg. No. / Design Press. (bar) / Hydro-test Press. (bar) / Q'ty (set)
Main L.O. Cooler / 764 / DW21339-01-02 Rev. D / 6.9 (Hot Side), 5.0 (Cold Side) / 10.4 (Hot Side), 7.5 (Cold Side) / 1

Closing Paragraph:
The component/equipment was surveyed in accordance with the Rules, specifications, and approved drawings, as applicable, and is eligible
for installation on board an ABS classed vessel subject to satisfactory installation and testing, as necessary.

Attending Surveyor(s):
Chang, Kyoung-Suk
Signed-off Date: 27-Jul-2022

Reviewing Surveyor(s)
Work Order Reviewer: Lee, Sang-Weon
Work Order Credit Date: 08-Aug-2022

2 of 2
logo
Work Order: 5328084-A
First Visit Date: 16-Jun-2022
Last Visit Date: 16-Jun-2022
Survey Kimhae, Korea
Location:

Equipment Certification Report


Asset Type Oil Cooler
Customer Name DHP ENGINEERING CO., LTD.
WCN of Customer 835481
Location Kimhae, Korea
'This is to certify that the undersigned Surveyors to this Bureau did at the request of DHP ENGINEERING CO., LTD. , on 16-Jun-2022 carry out the
following survey and report as follows:

Client Asset Name Quantity


Stern Tube L.O. Cooler 1

Name Plate Data


ABS Label Manufacturer Purchaser Destination Vessel
Stern Tube L.O. Cooler DHP ENGINEERING CO., LTD. HYUNDAI SAMHO HEAVY INDUSTRIES CO., LTD. -

Basic Identification Data


Serial Number Model Number Owner Tag Number Supplier Ref. Number
DW21339-05-03 DX-17DLV-1P-9 - -

Report Details
ABS Stamping Maltese Cross
5328084 Yes

Statement of Work - Classification Service - Certification -

Asbestos-free declaration verified and supporting documentation reviewed.


All testing (pressure/load/operational/etc.) has been carried out as applicable and verified in accordance with the applicable Rules/
specifications.
Testing machines are maintained in a satisfactory condition and records of their recheck or calibration dates confirmed.
Traceability of materials used on this project has been verified.

Report Findings
Statement/Observation
Finding No Asset Survey Task Date Created

1099.0 Stern Tube L.O. Cooler Certification - Stern Tube L.O. 16-Jun-2022
Cooler

Found
Hull No.: 8103

The following plate type heat exchanger was examined, hydrostatically tested (Doc. No. DQA-7PT-220616-01) and considered satisfactory.
NOTE: This Report evidences that the survey reported herein was carried out in compliance with one or more of the Rules, guides, standards or other criteria of the
American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. This Report is a representation
only that the vessel, structure, item of material equipment, machinery or any other item covered by this Report has been examined for compliance with, or has met
one or more of the Rules, guides, standards or other criteria of American Bureau of Shipping. The validity, applicability and interpretation of this Report is governed by
the Rules and standards of American Bureau of Shipping who shall remain the sole judge thereof. Nothing contained in this Report or in any notation made in
contemplation of this Report shall be deemed to relieve any designer, builder, owner, manufacturer, seller, supplier, repairer, operator or other entity of any warranty
express or implied.
1 of 2
logo
Work Order: 5328084-A
First Visit Date: 16-Jun-2022
Last Visit Date: 16-Jun-2022
Survey Kimhae, Korea
Location:

Description / Dwg. No. / Cooling Surface (m2) / Design Press. (kgf/cm2) / Hydro-test Press. (kgf/cm2) / Q'ty (set)
Stern Tube L.O. Cooler / DW21339-01-03, Rev. C / 1.25 / 5.0 (Hot Side), 5.0 (Cold Side) / 7.5 (Hot Side), 7.5 (Cold Side) / 1
Closing Paragraph:
The component/equipment was surveyed in accordance with the Rules, specifications, and approved drawings, as applicable, and is eligible
for installation on board an ABS classed vessel subject to satisfactory installation and testing, as necessary.

Attending Surveyor(s):
Lee, Song-Keun
Signed-off Date: 17-Jun-2022

Reviewing Surveyor(s)
Work Order Reviewer: Kim, Tae-Gyoo
Work Order Credit Date: 17-Jun-2022

2 of 2
logo
Work Order: 5387417-A
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:

Equipment Certification Report


Asset Type Water Cooler
Customer Name DHP ENGINEERING CO., LTD.
WCN of Customer 835481
Location Kimhae, Korea
'This is to certify that the undersigned Surveyors to this Bureau did at the request of DHP ENGINEERING CO., LTD. , on 26-Jul-2022 carry out the
following survey and report as follows:

Client Asset Name Quantity


M/E Jacket F.W. Cooler 1

Name Plate Data


ABS Label Manufacturer Purchaser Destination Vessel
M/E Jacket F.W. DHP ENGINEERING CO., HYUNDAI SAMHO HEAVY IND. CO., BUENOS AIRES EXPRESS(Class Number
Cooler LTD. LTD. YY284369)

Basic Identification Data


Serial Number Model Number Owner Tag Number Supplier Ref. Number
DW21339-05-04 DX-20DSV-1P-57 - -

Report Details
ABS Stamping Maltese Cross
5387417 Yes

Statement of Work - Classification Service - Certification -

Asbestos-free declaration verified and supporting documentation reviewed.


All testing (pressure/load/operational/etc.) has been carried out as applicable and verified in accordance with the applicable Rules/
specifications.
Testing machines are maintained in a satisfactory condition and records of their recheck or calibration dates confirmed.
Traceability of materials used on this project has been verified.

Report Findings
Statement/Observation
Finding No Asset Survey Task Date Created

1113.0 M/E Jacket F.W. Cooler Certification - M/E Jacket F.W. 26-Jul-2022
Cooler

Found
Hull No.: 8103 (HSHI)

NOTE: This Report evidences that the survey reported herein was carried out in compliance with one or more of the Rules, guides, standards or other criteria of the
American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. This Report is a representation
only that the vessel, structure, item of material equipment, machinery or any other item covered by this Report has been examined for compliance with, or has met
one or more of the Rules, guides, standards or other criteria of American Bureau of Shipping. The validity, applicability and interpretation of this Report is governed by
the Rules and standards of American Bureau of Shipping who shall remain the sole judge thereof. Nothing contained in this Report or in any notation made in
contemplation of this Report shall be deemed to relieve any designer, builder, owner, manufacturer, seller, supplier, repairer, operator or other entity of any warranty
express or implied.
1 of 2
logo
Work Order: 5387417-A
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:

The one (1) set of plate type heat exchanger was examined, hydrostatically tested (Report No. DQA-7PT-220726-04) and considered
satisfactory.

Description / Cooling Surface (m2) / Dwg. No. / Design Press. (bar) / Hydro-test Press. (bar) / Q'ty (set)
M/E Jacket F.W Cooler / 26.8 / DW21339-01-04 Rev. D / 5.0 (Hot Side), 5.0 (Cold Side) / 7.5 (Hot Side), 7.5 (Cold Side) / 1

Closing Paragraph:
The component/equipment was surveyed in accordance with the Rules, specifications, and approved drawings, as applicable, and is eligible
for installation on board an ABS classed vessel subject to satisfactory installation and testing, as necessary.

Attending Surveyor(s):
Chang, Kyoung-Suk
Signed-off Date: 27-Jul-2022

Reviewing Surveyor(s)
Work Order Reviewer: Lee, Sang-Weon
Work Order Credit Date: 08-Aug-2022

2 of 2