BUILDING Rev. 02
02 1-Sep-2022 Issued for Review WANG Y.Q LIU M XU W.H Yuseri M.Ali H.Putit N/A
01 10-Jun-2022 Issued for Review WANG Y.Q LIU M XU W.H Yuseri M.Ali H.Putit N/A
00 17-Dec-2021 Issued for Review WANG Y.Q LIU M XU W.H Yuseri M.Ali H.Putit N/A
Prepared Reviewed Approved Reviewed Approved
Rev Date Description
CCCC SPSB
CCCC JOB NO
CHINA COMMUNICATIONS CONSTRUCTION
COMPANY (MALAYSIA) SDN BHD 21S225-DD-JSS-NT-0001
No part of this document or the information it contains may be reproduced or transmitted in any form or by any means electronic or mechanical, including
photocopying, recording, or by any information storage and retrieval system, without permission in writing from SARAWAK PETCHEM or CCCC.
On Hold Table
NOTE: “ON HOLD” means that the contents are provisional and they will be updated according to new
data.
Table of Contents
1 GENERAL....................................................................................................................................................................... 5
1.1 PROJECT INTRODUCTION AND PURPOSE..........................................................................................................................5
1.2 DEFINITIONS.............................................................................................................................................................. 5
2 REFERENCE DOCUMENTS............................................................................................................................................. 6
3 LIST OF HEAT-GENERATED EQUIPMENT.......................................................................................................................6
4 CALCULATION RESULTS.................................................................................................................................................8
5 CALCULATION SUMMARY............................................................................................................................................ 8
1 GENERAL
1.2 Definitions
BEPCC OF PRODUCT OFFTAKE / EXPORT JETTY FACILITY FOR SARAWAK
PROJECT
METHANOL PROJECT
DESIGN STAGE Basic Design & Detailed Design
OWNER SARAWAK PETCHEM SDN. BHD.
CONTRACTOR CHINA COMMUNICATIONS CONSTRUCTION COMPANY (M) SDN.BHD.
2 REFERENCE DOCUMENTS
The following project documents are refenced to carry out the calculations.
ENGINEERING ROOM
LV ROOM
CABLE ROOM
UPS ROOM
TRANFORMER ROOM 1
TR-SS4-C/D-01
02 DRY-TYPE TRANSFORMER
JER 3500
6.6/0.42kV ,Dyn11,Uk=4% 315KVA
TRANFORMER ROOM 2
DRY-TYPE TRANSFORMER
TR-SS4-C/D-02 JER 3500
6.6/0.42kV ,Dyn11,Uk=4% 315KVA
4 CALCULATION RESULTS
Refer to Annex 1 for the detailed calculation results.
5 CALCULATION SUMMARY
The calculation in this report provides the required capacity for each of the HVAC equipment.
All selected capacity of the HVAC equipment specified in the document of SMJ-CCCC-HVA-SPN-0001
SPECIFICATION FOR HVAC EQUIPMENT are higher than the required capacity.
Therefore, the selected capacity of the HVAC equipment specified in the above specification is
appropriate.
1 / 71
OWNER CONTRACTOR
1 Base Parameters
NO. ITEM CONTENT
1 MOISTURE LOAD UNITS kg/h
2 MOISTURE LOAD CORRECTION FACTOR 1
3 COOLING LOAD CORRECTION FACTOR 1
4 HEATING LOAD CORRECTION FACTOR 1
2 Meteorological Parameters
2.2 Parameters
ITEM CONTENT ITEM CONTENT ITEM CONTENT
Air-Conditioni
Air-Conditioning
ng Outdoor
Outdoor Average
ATM(Pa) 99860 36 Dry Bulb 33.2
Daily Temperature
Temperature
(℃)
(℃)
Air-Conditioning Atmospheric
Outdoor Average
Outdoor Wet Bulb 26.4 1.9 Transparency 4
Wind Speed(m/s)
Temperature (℃) Level
4 Building Information
5 Surfaces Information
5.1.5 Roof
4 / 71
OWNER CONTRACTOR
7 Floor Information
5 / 71
OWNER CONTRACTOR
6 / 71
OWNER CONTRACTOR
7 / 71
OWNER CONTRACTOR
8 / 71
OWNER CONTRACTOR
9 / 71
OWNER CONTRACTOR
10.2.16 Equipment
12 / 71
OWNER CONTRACTOR
13 / 71
OWNER CONTRACTOR
14 / 71
OWNER CONTRACTOR
15 / 71
OWNER CONTRACTOR
16 / 71
OWNER CONTRACTOR
10.3.6 Window[North]
10.3.6.1 Cooling Load
18 / 71
OWNER CONTRACTOR
10.3.6.11Radiation Load
10.3.7 Window[North]
10.3.7.1 Cooling Load
21 / 71
OWNER CONTRACTOR
10.3.7.11Radiation Load
10.3.8 Window[North]
10.3.8.1 Cooling Load
23 / 71
OWNER CONTRACTOR
24 / 71
OWNER CONTRACTOR
10.3.8.11Radiation Load
25 / 71
OWNER CONTRACTOR
10.3.9 Window[North]
10.3.9.1 Cooling Load
26 / 71
OWNER CONTRACTOR
27 / 71
OWNER CONTRACTOR
10.3.9.11Radiation Load
28 / 71
OWNER CONTRACTOR
10.3.10.2Temperature Difference(℃)
29 / 71
OWNER CONTRACTOR
10.3.11.2Temperature Difference(℃)
10.3.12.2Temperature Difference(℃)
10.3.13.2Temperature Difference(℃)
10.3.14.2Temperature Difference(℃)
31 / 71
OWNER CONTRACTOR
10.3.15.4Moisture Load
32 / 71
OWNER CONTRACTOR
10.3.17 Roof
10.3.17.1Cooling Load
10.3.17.3Temperature Difference(℃)
33 / 71
OWNER CONTRACTOR
35 / 71
OWNER CONTRACTOR
40 / 71
OWNER CONTRACTOR
41 / 71
OWNER CONTRACTOR
10.6.7 Roof
10.6.7.1 Cooling Load
42 / 71
OWNER CONTRACTOR
44 / 71
OWNER CONTRACTOR
10.8.7 Roof
45 / 71
OWNER CONTRACTOR
50 / 71
OWNER CONTRACTOR
10.9.7 Roof
10.9.7.1 Cooling Load
52 / 71
OWNER CONTRACTOR
54 / 71
OWNER CONTRACTOR
10.11.7 Roof
10.11.8 Equipment
55 / 71
OWNER CONTRACTOR
10.12.1.7Moisture Load
10.12.2.4Moisture Load
10.12.5.2Radiation Intensity(W/㎡)
60 / 71
OWNER CONTRACTOR
10.12.5.3Temperature Difference(℃)
10.12.6.2Radiation Intensity(W/㎡)
10.12.6.3Temperature Difference(℃)
10.12.7 Roof
10.12.7.1Cooling Load
10.12.7.3Temperature Difference(℃)
62 / 71
OWNER CONTRACTOR
10.14.7 Equipment
64 / 71
OWNER CONTRACTOR
10.15.1.7Moisture Load
10.15.2.4Moisture Load
69 / 71
OWNER CONTRACTOR
10.15.5.2Radiation Intensity(W/㎡)
10.15.5.3Temperature Difference(℃)
10.15.6 Roof
10.15.6.1Cooling Load
10.15.6.3Temperature Difference(℃)
71 / 71
CALCULATION FOR HVAC OF JETTY OPERATIONAL DOC. NO.: SMJ‐CCCC‐HVA‐ERP‐0001
BUILDING REV.: 00
BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY DATE: 13‐Jan‐22
FACILITY FOR SARAWAK METHANOL PROJECT IN
BINTULU, SARAWAK TOTAL PAGES: 7
00 13‐Jan 2022 Issued for Review WANG YQ LIU M XU WH C.Achong M.Ali H.Putit N/A
Prepared Reviewed Approved Reviewed App’d
Rev Date Description
CCCC SPSB
CCCC JOB NO
CHINA COMMUNICATIONS
CONSTRUCTION COMPANY (MALAYSIA)
21S225‐DD‐REP‐NT‐0001
SDN BHD
No part of this document or the information it contains may be reproduced or transmitted in any form or by any means electronic or mechanical, including
photocopying, recording, or by any information storage and retrieval system, without permission in writing from SARAWAK PETCHEM or CCCC.
BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY
FOR SARAWAK METHANOL PROJECT IN BINTULU,
SARAWAK
DOCUMENT NO. 21S225‐DD‐REP‐NT‐0001 DESIGN STAGE: DD
CLIENT NO. SMJ‐CCCC‐HVA‐ERP‐0001 REV.: 00
On Hold Table
NOTE: “ON HOLD” means that the contents are provisional and they will be updated according to new
data.
Table of Contents
1. GENERAL ..................................................................................................................................................... 5
ANNEX:
1. GENERAL
The Methanol Jetty comprises of a methanol export piping, ship loading arms, metering facility, jetty
operation building, associated electrical and instrumentation system, safety systems, communications
systems, utilities and supporting systems, and a Jetty complete with barriers, berthing and mooring
dolphins, wave screen, access channel and turning and berthing basins.
This report will carry out the HVAC calculation of the Jetty Operational Building for BEPCC OF PRODUCT
OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK METHANOL PROJECT IN BINTULU, SARAWAK.
1.2 Definitions
BEPCC OF PRODUCT OFFTAKE / EXPORT JETTY FACILITY FOR SARAWAK
PROJECT
METHANOL PROJECT
2. REFERENCE DOCUMENTS
The following Project documents are referenced to carry out the calculation.
3. CALCULATION RESULTS
1 Project Information
2 Meteorological Parameters
Load(h) Cooling
Load(h)
Summer 141295 Summer 141295 Summer 4.787
Cooling Load Room Moisture load
Cooling Load
Summer 4.787 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
Outdoor Air Outdoor Air Outdoor Air
Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 314.7 Summer 0.011
Cooling Load Moisture
Building Load Building
Indicator Indicator
4 Building Information
5 Surfaces Information
5.1.5 Roof
5.1.5.1 Roof
7 Floor Information
10.1.2.6 Window[North]
Coefficient(W/(㎡·K))
10.1.2.14 The inner
10.1.3.3 Equipment
20:00 8.2
10.1.3.6 Window[North]
10.1.3.9 Window[North]
20:00 3.6
10.1.6.7 Roof
20:00 288
10.1.12.3 Equipment
20:00 11.3
10.1.12.6 Exterior wall[East]
20:00 0