TNC Concept
TNC Concept
Post Installation Test Procedure for Interlocking & Train Detection Systems
SIG Post Installation Test Procedure for On Board Train Control Systems
INTEGRATION TO EXISTING Post Installation Test Procedure for Wayside Equipment (ATS Balise)
COM
COM
Post Installation Test Procedure for Interlocking & Train Detection Systems
Post Installation Test Procedure for On Board Train Control Systems
Post Installation Test Procedure for Wayside Equipment (Point Machine, Signal Lamp, Axle Counter)
Post Installation Test Procedure for Interlocking & Train Detection Systems (OCC & BOCC)
Post Installation Test Procedure for Uninterruptable Power Systems for Signalling
SIG
Post Installation Test Procedure for Signalling Cable
Post Installation Test Procedure for Grounding Systems
Post Installation Test Procedure for Cabling Tray
COM
AWAMANGUN
COM
SYS.INT
SYS.INT
Post Installation Test Procedure for Interlocking & Train Detection Systems
Post Installation Test Procedure for On Board Train Control Systems
Post Installation Test Procedure for Wayside Equipment (Point Machine, Signal Lamp, Axle Counter)
Post Installation Test Procedure for Interlocking & Train Detection Systems (OCC & BOCC)
SIG
Post Installation Test Procedure for Uninterruptable Power Systems for Signalling
Post Installation Test Procedure for Signalling Cable
Post Installation Test Procedure for Grounding Systems
Post Installation Test Procedure for Cabling Tray
ROME - MANGGARAI
SIG
VELODROME
Partial Acceptance Test Procedure for On Board Train Control Systems
Partial Acceptance Test Procedure for Wayside Equipment (Point Machine, Signal Lamp, Axle Counter)
Partial Acceptance Test Procedure for Interlocking & Train Detection Systems (OCC & BOCC)
Partial Acceptance Test Procedure for Uninterruptable Power Systems for Signalling
SYS.INT
Stage SYS Test Procedures
Post Installation Test Procedure for Interlocking & Train Detection Systems
SIG Post Installation Test Procedure for On Board Train Control Systems
INTEGRATION TO EXISTING Post Installation Test Procedure for Wayside Equipment (ATS Balise)
COM
COM
Factory Acceptance Test Procedure for Signalling & Train Control System
SIG Post Installation Checkout Procedure for Signalling & Train Control System
Partial Acceptance Test Procedure for Signalling & Train Control System
Post Installation Checkout Procedure for Telecommunication System
COM Post Installation Checkout Procedure forTelecommunication System
Partial Acceptance Test Procedure for Telecommunication System
Factory Acceptance Test Procedure for PS&PSCADA System
PS&PSCADA Post Installation Checkout Procedure for PS&PSCADA System
Partial Acceptance Test Procedure for PS & PSCADA System
ROME-RAWAMANGUN
PS
VELODROME - MANGGARAI
Post Installation Test Procedure for MV Cubicles
Post Installation Test Procedure for Traction Transformer
PS Post Installation Test Procedure for Rectifier
Post Installation Test Procedure for DC Cubicles
Post Installation Test Procedure for Low Voltage System
Post Installation Test Procedure for Earthing & Bonding
Post Installation Test Procedure for Blue Light Station
3rd Rail Post Installation Test Procedure for Third Rail
Post Installation Test Procedure for Platform Screen Door System
PSD
Partial Acceptance Test Procedure for Platform Screen Door System
Partial Acceptance Test Procedure for Interlocking & Train Detection Systems
SIG
SYS.INT
SYS.INT
D
O
N
E
E
Stage SYS Test Procedures
Site Installation Test Procedure for Point Machine
SIG
Site Installation Test Procedure for Onboard Signalling Equipment (2 TRAINS)
Site Installation Test Procedure for Onboard Radio Equipment
Site Installation Test Procedure for Fibre Optic Cable
COM Site Installation Test Procedure for Access Control System
Site Installation Test Procedure for Backbone Transmision Network
Site Installation Test Procedure for Tetra Radio System
(JAKABARING & OPI)
SIG
Site Installation Test Procedure for Onboard Signalling Equipment (Static)
Site Installation Test Procedure for Axle Counter Equipment
SIG
, OPI, JAKABARING, POLRESTA, DISHUB, TELKOM & Site Installation Test Procedure for Signal Equipment
Site Installation Test Procedure for LEU & Balise
Site Installation Test Procedure for Indoor Equipment System
Site Installation Test Procedure for Onboard Radio Equipment (Static Test)
Site Installation Test Procedure for Fibre Optic Cable
Site Installation Test Procedure for Access Control System
Site Installation Test Procedure for Backbone Transmision Network
Site Installation Test Procedure for Master Clock System
COM
Site Installation Test Procedure for PIDS
Site Installation Test Procedure for Public Address System
Site Installation Test Procedure for CCTV System
Site Installation Test Procedure for Intercom System
Site Installation Test Procedure for Tetra Radio System
Site Installation Test Procedure for 20KVAC Power Cable
Site Installation Test Procedure for 750VDC Power Cable
Site Installation Test Procedure for MV Cubicles
Site Installation Test Procedure for Traction Transformer
PS Site Installation Test Procedure for Rectifier
Site Installation Test Procedure for DC Cubicles
KM2.7(BANDARA)]
PSCADA
Partial Acceptance Test Procedure for Power SCADA (Local)
System Integration Test Procedure for Tetra Radio Coverage with Onboard Radio(Dynamic)
System Integration Test Procedure for Onboard Signalling with Train(Dynamic)
System Integration Test Procedure for ATS and PIDS
SYS.INT
System
System Integration
Integration Test Procedure for
Test Procedure for Induced
Normal Operation with Timetable
Voltage Measurement Under Traction Fault
Condition
System (PT Cinka)Test Procedure for Simultaneous Multiple Train Startup with Power Supply &
Integration
Distribution System(PS&DS) and Signalling ("X" TRAINS)