Sbea139731 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

Leonardo S.p.A.

Via Giovanni Agusta, 520


21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595

SERVICE BULLETIN N° 139-731


DATE: October 11, 2022
EMERGENCY ALERT REV. : /-2

TITLE
ATA 00 – FORWARD CABIN ROOF CEILING HARNESS INSPECTION

REVISION LOG
First Issue.

An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.

Page 1 of 23
1. PLANNING INFORMATION

A. EFFECTIVITY
All AB/AW139 from S/N 31005 to S/N 31984 (except S/N 31007, S/N 31803,
S/N 31959, S/N 31967, S/N 31969, S/N 31974, S/N 31982 and S/N 31983), from
S/N 41001 to S/N 41580 and from S/N 41801 to S/N 41806.

B. COMPLIANCE
Part I:
Within and not later than ten (10) FH from the issue date of this Service Bulletin.
Part II:
Within and not later than twenty-five (25) FH from the issue date of this Service Bulletin.

C. CONCURRENT REQUIREMENTS
N.A.

D. REASON
This Service Bulletin is issued in order to prescribe one-off inspections of the Forward
Cabin Roof Ceiling Harnesses and their installation in the area between STA 3120 and
3900 to identify potential chafing conditions.

E. DESCRIPTION
Part I of this Service Bulletin is developed to prescribe a one-off inspection of the
Forward Cabin Roof Ceiling Harnesses installation in the area between STA 3120 and
3400 to verify the proper installation of the C/As in the area.
Part II of this Service Bulletin is developed to prescribe a one-off inspection of the
harness installation in the area between STA 3400 and 3900 where the diode A77 is
located.

F. APPROVAL
The technical content of this Service Bulletin is approved under the authority of DOA nr.
EASA.21.J.005. For helicopters registered under other Aviation Authorities, before
applying the Service Bulletin, applicable Aviation Authority approval must be checked
within Leonardo Helicopters customer portal.
EASA states mandatory compliance with inspections, modifications or technical
directives and related time of compliance by means of relevant Airworthiness Directives.
If an aircraft listed in the effectivity embodies a modification or repair not LH certified and
affecting the content of this Service Bulletin, it is responsibility of the Owner/Operator to

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
Page 2 of 23 REVISION: /
obtain a formal approval by Aviation Authority having jurisdiction on the aircraft, for any
adaptation necessary before incorporation of the present Service Bulletin.

G. MANPOWER
To comply with this Service Bulletin, the following MMH are deemed necessary:
Part I: approximately two (2) MMH;
Part II: approximately ten (10) MMH;
MMH are based on hands-on time and can change with helicopter configuration,
personnel and facilities available.

H. WEIGHT AND BALANCE


N.A.

I. REFERENCES

1) PUBLICATIONS
Following Data Modules refer to AMP:
DATA MODULE DESCRIPTION PART
DM01 39-A-00-20-00-00A-120A-A Helicopter on ground for a safe I, II
maintenance.
DM02 39-A-24-91-01-00A-520A-A Circuit breaker panel - Remove I
procedure
DM03 39-A-24-91-01-00A-720A-A Circuit breaker panel - Install I
procedure
Following Data Modules refer to CSRP:
DATA MODULE DESCRIPTION PART
DM04 CSRP-A-51-21-02-02A-257A-D Waterborne chromate free I
primer (AWMS28-002) - Paint
and apply marking
DM05 CSRP-A-51-21-06-00A-644A-D Chromate conversion I
treatments of aluminum alloys
– Chromate

2) ACRONYMS & ABBREVIATIONS


AMP Aircraft Maintenance Publication
AR As Required
ATA Air Transport Association
AMDI Aircraft Material Data Information
C/A Cable Assy
CSRP Common Structural Repair Publication
DM Data Module

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
REVISION: / Page 3 of 23
DOA Design Organization Approval
EASA European Aviation Safety Agency
FH Flying Hours
ITEP Illustrated Tool and Equipment Publication
IPD Illustrated Part Data
LH Leonardo Helicopter
MMH Maintenance Man Hours
N.A. Not Applicable
P/N Part Number

3) ANNEX
N.A.

J. PUBLICATIONS AFFECTED
N.A.

K. SOFTWARE ACCOMPLISHMENT SUMMARY


N.A.

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
Page 4 of 23 REVISION: /
2. MATERIAL INFORMATION

A. REQUIRED MATERIALS

1) PARTS

PART I
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N
1 3P5315A12931 STRIP ASSY REF . (1) -
2 AW001CL504B-N6 Support 3 .. (1) -
3 MS21075L3N MS21075L3 Nut plate 2 .. (1) -
4 NAS1097AD3-3 Rivet 0.1 kg .. (1) -
5 NAS1720H5L2A Rivet 3 .. (1) -
6 3P5315A10531 STRIP ASSY REF . (1) -
7 AW001CL504B-N6 Support 3 .. (1) -
8 MS21075L3N MS21075L3 Nut plate 2 .. (1) -
9 MS20426AD3-3 Rivet 0.1 kg .. (1) -
10 NAS1720H5L2A Rivet 3 .. (1) -

PART II
N.A.

2) CONSUMABLES
The following consumable materials, or equivalent, are necessary to accomplish this
Service Bulletin:
# SPEC./LH CODE NUMBER DESCRIPTION Q.TY NOTE PART
Aluminium Sheet AL-ALY 2024,
11 Commercial AR (2) (3) I
AMS-QQ-A-250/5, thickness 0.81 mm

Refer also to AMDI for the consumable materials required to comply with the AMP DM
referenced in the accomplishment instructions.

3) LOGISTIC MATRIX
N.A.

NOTES
(1) The quantity of items to be ordered depends on the results of the inspection.
(2) Item to be procured as local supply.
(3) As alternative it is possible to use material AMS-QQ-A-250/4 and thickness 1.02
mm.

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
REVISION: / Page 5 of 23
B. SPECIAL TOOLS
The following special tools, or equivalent, are necessary to accomplish this Service
Bulletin:
# P/N DESCRIPTION Q.TY NOTE PART
12 Comercial Borescope 1 I

Refer also to ITEP for the special tools required to comply with the AMP DM referenced
in the accomplishment instructions.

C. INDUSTRY SUPPORT INFORMATION


As reported in Part I step 4 and Part II step 3, only if Product Support Engineering
confirms the replacements, please Issue relevant MMIR form to your Warranty
Administration Dpt.
Please note that “Product Support Engineering’s approvals” is mandatory to evaluate
your request, otherwise MMIR could be rejected.
Owners/Operators who comply with the instructions of this Service Bulletin no later than
the applicable date in the “Compliance” section will be eligible to receive required
materials on free of charge basis, except for Consumable Materials and Special Tools.
NOTE: Customers who fail to comply with the instructions in this Service Bulletin before
the compliance date are not eligible for the aforementioned special policy.
Please Issue relevant MMIR form to your Warranty Administration Dpt.

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
Page 6 of 23 REVISION: /
3. ACCOMPLISHMENT INSTRUCTIONS

GENERAL NOTES
a) Place an identification tag on all components that
are re-usable, including the attaching hardware that
has been removed to gain access to the modification
area and adequately protect them until their later re-
use.
b) Shape the cables in order to prevent interference
with the structure and the other existing installations,
using where necessary suitable lacing cords and
plastic cable tiedown.
c) Let adhesive cure at room temperature for at least
24 hours.
d) All lengths are in mm.

PART I
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or
the external power supply.
2. With reference to Figure 1 thru Figure 5 perform the inspection of the Forward Cabin Roof
Ceiling Harnesses and installation in the area between STA 3120 and 3400 as described
in the following procedure:
2.1 With reference to Figure 1 thru Figure 5, perform a visual inspection of the harness
installation on strips P/N 3P5315A10531 and 3P5315A12931 according to the
following steps:
2.1.1 In accordance with the applicable steps of AMP
DM 39-A-24-91-01-00A-520A-A and with reference to Figure 1, open the
circuit breaker panel assy without removing it.
2.1.2 With reference to Figure 1, insert the borescope inside the lightening
holes showed to access the area of the inspection.
2.1.3 Perform a visual inspection of the C/As installation.

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
REVISION: / Page 7 of 23
NOTE
When C/A installation is correct, C/A are installed below
the RH/LH strips P/N 3P5315A10531 and
P/N 3P5315AA12931, as shown in Figure 3.
2.1.4 If C/As are installed above the strips P/N 3P5315A10531 and/or
P/N 3P5315A12931 as per Figure 4 “Incorrect Installation”, go to step 3.
2.1.5 If C/As are installed correctly as shown in Figure 3, go to step 5 and
close SB Part I application.

NOTE
Perform step 3 only in case the C/As are installed as per
step 2.1.4.
3. In accordance with AMP DM 39-A-06-41-00-00A-010A-A and with reference to Figure 1
thru 5, remove all external panels, internal panels and internal liners as required to gain
access to the area affected by the installation and perform visual inspection of the C/As
and of the Torque Tube C3 and the strip installation adjustment as described in the
following procedure:
3.1 With reference to Figure 2 and Figure 3, perform a visual inspection of the C/As
fixed to strips P/N 3P5315A10531 and 3P5315A12931 according to the following
steps:
3.1.1 Check for chafing and/or damage of the cable harness.
3.1.2 In case of any finding, contact Product Support Engineering
([email protected]) in order to receive further
instruction.
3.2 With reference to Figure 2, perform a visual inspection of the Torque Tube C3
P/N 3E6711A00433. Make sure that there is no damage on the tube.
If damage is found, contact Product Support Engineering
([email protected]) in order to receive further instruction.
3.3 With reference to Figure 4 and to Figure 6 thru 9 perform strip installation
adjustment as described in the following procedure:
3.3.1 With reference to Figure 4, remove C/A from supports
AW001CL504B-N6 installed on strips P/N 3P5315A10531 and/or
P/N 3P5315A12931.
3.3.2 With reference to Figure 6 remove strips P/N 3P5315A10531 and/or
3P5315A12931 and put them on a workbench. Retain the fixing
hardware for later use.

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
Page 8 of 23 REVISION: /
3.3.3 With reference to Figure 7, remove n° 3 supports AW001CL504B-N6
from P/N 3P5315A10531 and/or P/N 3P5315A12931.

NOTE
Perform Steps 3.3.4 ONLY in case of damage of
the strip P/N 3P5315A10531 and/or
P/N 3P5315A12931 and if replacement is
needed. Otherwise, go to step 3.3.5.
3.3.4 With reference to Figure 7, assemble strips P/N 3P5315A10531 and/or
3P5315A12931 with reference to the following procedure:
3.3.4.1 With reference to Figure 8, manufacture strips
P/N 3P5315A10551 and/or 3P5315A12951 using Aluminium
Sheet AL-ALY 2024.
3.3.4.2 In accordance to CSRP DM CSRP-A-51-21-06-00A-644A-D apply
Chromate Conversion Treatment.
3.3.4.3 With reference to Figure 8 and in accordance with CSRP DM
CSRP-A-51-21-02-02A-257A-D apply a layer of primer on strips
P/N 3P5315A10551 and/or 3P5315A12951.
3.3.4.4 With reference to Figure 7 install n°2 nut plates P/N MS21075L3N
by means of n°4 rivet P/N NAS1097AD3-3 or
P/N MS20426AD3-3 (as applicable) on strips P/N 3P5315A10551
and/or 3P5315A12951.
3.3.4.5 With Reference to Figure 7, install n° 3 new supports
AW001CL504B-N6 by means of n° 3 rivets NAS1720H5L2A on
strips P/N 3P5315A10551 and/or 3P5315A12951. Make sure they
are oriented opposite with respect to nut plates MS21075L3N.
3.3.4.6 With reference to Figure 7, countermark the obtained components
as P/N 3P5315A10531 and/or 3P5315A12931.

NOTE
Perform Step 3.3.5 ONLY in case Steps 3.3.4
was not performed.
3.3.5 With Reference to Figure 7, install n° 3 supports P/N AW001CL504B-N6
by means of n° 3 rivets NAS1720H5L2A on bracket P/N 3P5315A10531
and/or 3P5315A12931. Make sure they are oriented opposite with
respect to nut plates MS21075L3N.
3.3.6 With reference to Figure 9, fix C/As on strips P/N 3P5315A10531 and/or
3P5315A12931 by means of tie wraps.

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
REVISION: / Page 9 of 23
3.3.7 With Reference to Figure 6, reinstall strips P/N 3P5315A10531 and/or
3P5315A12931.
4. In case of findings, contact Product Support Engineering
([email protected]) to report about the results of the inspections
requested.
5. In accordance with the applicable steps of AMP DM 39-A-24-91-01-00A-720A-A and with
reference to Figure 1 thru Figure 5, close the circuit breaker panel assy.
6. Return the helicopter to flight configuration and record for compliance with Part I of this
Service Bulletin on the helicopter logbook.
7. Send the attached compliance form to the following mail box:
[email protected]
As an alternative, gain access to My Communications section on Leonardo WebPortal and
compile the “Service Bulletin Application Communication”.

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
Page 10 of 23 REVISION: /
PART II
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or
the external power supply.
2. In accordance with AMP DM 39-A-06-41-00-00A-010A-A and with reference to Figure 5,
Figure 10 and Figure 11, remove all external panels, internal panels and internal liners as
required to gain access to the area affected by the installation and perform the diode A77
harness installation inspection in the area between STA 3400 and 3900 as described in
the following procedure:
2.1 With reference to Figure 5, Figure 10 and Figure 11, perform a visual inspection of
the C/As installation next to the Diode A77 P/N 3G2430V00352 according to the
following steps:
2.1.1 With reference to Figure 10, check for chafing or damage on the cable
harness in the area showed.
2.1.2 In case of any finding, contact Product Support Engineering
([email protected]) in order to receive further
instruction.
2.1.3 With reference to Figure 10 and Figure 11, ensure that clearance of at
least 10.0 mm exists in the area inside the red circle shown in Figure 11,
between the cable harness and Diode A77 P/N 3G2430V00352.

NOTE
In case of any doubt and/or need to support,
contact Product Support Engineering
([email protected]) in order to
receive further instruction.
2.1.4 If necessary, in accordance with Figure 10 and Figure 11, re-route the
cable harnesses (using if needed also lacing cord to fix the cables with
each other) in order to respect the clearance of at least 10.0 mm from
the diode or any other surrounding structure or component.
2.2 With reference to Figure 10 and 11, perform a visual inspection of the Diode A77.
Make sure that no damage is present on the component.
2.3 In case of any finding, contact Product Support Engineering
([email protected]) in order to receive further instruction.
3. In case of findings, contact Product Support Engineering
([email protected]) to report about the results of the inspections
requested.

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
REVISION: / Page 11 of 23
4. Return the helicopter to flight configuration and record for compliance with Part II of this
Service Bulletin on the helicopter logbook.
5. Send the attached compliance form to the following mail box:
[email protected]
As an alternative, gain access to My Communications section on Leonardo WebPortal and
compile the “Service Bulletin Application Communication”.ruzione sezione

S.B. N°139-731 EMERGENCY ALERT


DATE: October 11, 2022
Page 12 of 23 REVISION: /
STA
3.900
REF

STA
3.120
REF

UP

LH
A77 DIODE (REF)
FWD
C
B
3P5315A10531 STRIP ASSY
(REF)
D
3P5315A12931 STRIP ASSY
(REF)
OVERHEAD PANEL (REF)

VIEW A
STRUCTURES AND SYSTEMS ARE PARTIALLY
OMITTED FOR BETTER CLARITY PURPOSE

OVERHEAD PANEL (REF)


VIEW B
STRUCTURES AND SYSTEMS ARE PARTIALLY
OMITTED FOR BETTER CLARITY PURPOSE SB139-731-001-01

Figure 1
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
REVISION: / Page 13 of 23
STRUCTURES AND SYSTEMS ARE PARTIALLY
OMITTED FOR BETTER CLARITY PURPOSE
VIEW C

SB139-731-002-01

Figure 2 /
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
Page 14 of 23 REVISION: /
Figure 3
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
REVISION: / Page 15 of 23
Figure 4 /
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
Page 16 of 23 REVISION: /
FWD

A4T6 TERMINAL LUG


CABLE B1B6 RH LH

REVISION: /
3P5315A10531 STIRP ASSY
3P5315A12931 STRIP ASSY (REF)
(REF) A3T6 TERMINAL LUG
A4T8 TERMINAL LUG B1A3 CABLE B1A10
CABLE B1B3 B1B3 B1A4
B1B7 B1A17 B1A8
B1B8 B1A19 A3T4 TERMINAL LUG
A4T4 TERMINAL LUG B1B11 CABLE B1A8
CABLE B1B7 B1A10

DATE: October 11, 2022


B1B21 Part I
B1B6 B1B23 A3T3 TERMINAL LUG
CABLE B1A3

BL 0,0
STA 3120

S.B. N°139-731 EMERGENCY ALERT


Figure 5
STA 3900 STA 3900

A4T3 TERMINAL LUG


CABLE B1B8 Part II

BL 800
BL-550
BL-800

BL 550
A3T12 TERMINAL LUG
A4T12 TERMINAL LUG CABLE B1A4
CABLE B1B11
A4T7 TERMINAL LUG
CABLE B1B22
A77 DIODE (REF)

VIEW D
STRUCTURES AND SYSTEMS ARE PARTIALLY
OMITTED FOR BETTER CLARITY PURPOSE

SB139-731-003-01

Page 17 of 23
Figure 6 /
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
Page 18 of 23 REVISION: /
3P5315A10531 STRIP ASSY

Ø4.26÷4.39 TYP N˚3 PLACES


AW001CL504B-N6 SUPPORT ELECTRICAL CABLE (3 OFF)
NAS1720H5L2A RIVET (3 OFF)
Ø5.15÷5.28 ACCORDING TO NTA670A
(TYP 2 PLACES)

3P5315A10551 STRIP

MS21075L3 NUT
MS20426AD3-3 RIVET
(TYP 2 PLACES)

3P5315A12931 STRIP ASSY

MS21075L3 NUTPLATE (2 OFF)


NAS1097AD3-3 RIVET (4 OFF)

Ø5.00
(TYP 2 PLACES)
3P5315A12951 STRIP

Ø4.26÷4.39 TYP N˚3 PLACES


AW001CL504B-N6 SUPPORT ELECTRICAL CABLE (3 OFF)
NAS1720H5L2A RIVET (3 OFF)
ACCORDING TO NTA670A

SB139-731-004-01

Figure 7
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
REVISION: / Page 19 of 23
3P5315A10551 STRIP
MATERIAL AL-ALY 2024 T3
AMS-QQ-A-250/5, TH 0.81

165.0

12.0 98.4 33.3


TYP TYP

PILOT HOLE Ø2.5


TYP
8.0

PILOT HOLE Ø2.5

45˚
TYP

12.0

38.7
TYP
6.0

TYP
13.3
TY .0

56.5
5
R

12.8
104.7 TYP
N˚2 EQUAL SPACE

PILOT HOLE Ø2.5

3P5315A12951 STRIP
MATERIAL AL-ALY 2024 T3
AMS-QQ-A-250/5, TH 0.81

113.00

92.00

68.50

45.00

24.00
45˚

P.
TY

N˚5 PILOT HOLES Ø2.50

R
9 .00

TY 5.0
6.00

11.00

19.00
19.00

12.00

P. 0

112.70 12.00

137.00

SB139-731-005-01

Figure 8 /
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
Page 20 of 23 REVISION: /
Figure 9
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
REVISION: / Page 21 of 23
Figure 10 /
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
Page 22 of 23 REVISION: /
Figure 11
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
REVISION: / Page 23 of 23
Please send to the following address:
SERVICE BULLETIN COMPLIANCE FORM Date:

LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY Number:

PRODUCT SUPPORT ENGINEERING & LICENSES DEPT.


Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) - ITALY Revision:
Tel.: +39 0331 225036 Fax: +39 0331 225988

Customer Name and Address: Telephone:

Fax:

B.T. Compliance Date:

Helicopter Model S/N Total Number Total Hours T.S.O.

Remarks:

Information:

We request your cooperation in filling this form, in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

You might also like