GOVERNMENT ORDERS ISSUED BY COMMERCE AND INDUSTRIES DEPARTMENT FOR THE PROJECTS APPROVED IN 19th SHLCC HELD ON 31-8-2009

INDEX
Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Content M/s. JSW Severfield Structures Ltd., M/s. JSW Steel Limited., M/s. NMDC Ltd., M/s. PBS Steel and Power Industries Pvt. Ltd., M/s. ICI India Ltd., M/s Anamitra Warehousing Pvt. Ltd., M/s Ravindra Trading and Agencies Ltd., M/s. Artech Steel Industries Pvt. Ltd. M/s. Tata Metaliks Ltd, M/s J.K.Tyre & Industries Limited

-2-

PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s. JSW Severfield Structures Ltd., Unit for manufacture of Fabricated Structural Products of Iron and Steel [except Rolling Shutters] at Sandur Taluk, Bellary District approval for order reg. 1. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:Structures Ltd., proposes to establish Unit for

Ref:

Preamble: M/s. JSW Severfield Shutters]

manufacture of Fabricated Structural Products of Iron and Steel [except Rolling at 65 acres of land to be taken on lease from M/s. JSW Steels Ltd., in Torangallu Village, Sandur Taluk, Bellary District, with an investment of Rs.234 crores, Generating employment to about 500 persons. In the 19th State High Level Clearance Committee (SHLCC) held on

31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting aspects. Hence the following order. held on 31.08.2009, in all

GOVERNMENT ORDER NO: CI 263 SPI 2009, BANGALORE DATED: 29.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s. JSW Severfield Steel [except Rolling Shutters] Structures Ltd., to establish Unit for manufacture of Fabricated Structural Products of Iron and at 65 acres of land to be taken on lease from M/s. JSW Steels Ltd., in Torangallu Village, Sandur Taluk, Bellary District, with an investment of Rs.234 crores, Generating employment to about 500 persons. and extend the following infrastructure facilities, incentives and concessions. ..2

-2-

-3-

INFRASTRUCTURE FACILITIES: Land: The Committee resolved to permit the Company to establish the unit in 65 acres of land to be taken on lease from M/s.JSW Steels Ltd., at Torangallu Village, Sandur Taluk, Bellary District. Power: Water Plant. 2000 KVA to be serviced by GESCOM. 0.3 MLD of water from M/s JSW Steel Ltd. This will be out of the The Company shall adopt rain water

water allocated to M/s. JSW Steel Ltd from TB Dam for their Integrated Steel No additional allocation is given. harvesting and waste water recycling. Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State. Environment: The promoters to obtain environmental clearance from MOEF, GOI. Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. CFE and CFO from KSPCB and

Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

-3-

-4..3 Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka, [Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Gulburga Electricity Supply Company [GESCOM] Hubli. 13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 16. M/s. JSW Severfield Structures Ltd., No.401 Deluxe Court, R.V. Bambardekar Road, Off: Station Road,Bandra [West] Mumbai-400 0050.

-4-

-517. PS to Principal Secretary to Industries Department. 18. Guard File / Spare Copies. Government, Commerce &

PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s. JSW Steel Limited., for enhancement of installed capacity of Integrated Steel Plant from 10 Million TPA to 16 Million TPA & to set up 600 MW captive power plant at Sandur Taluk, Bellary District approval for order reg. 2. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:-

Ref:

Preamble:

M/s. JSW Steel Ltd., proposes for enhancement of installed capacity of Integrated Steel Plant from 10 Million TPA to 16 Million TPA & to set up 600 MW captive Power Plant at 1150 acres of land within the existing factory premises of 8042 acres, in Torangallu Village, Sandur Taluk, Bellary District, with an investment of Rs.15131.70 persons. In the 19th State High Level Clearance Committee (SHLCC) held on crores, Generating employment to about 6000

31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting aspects. Hence the following order. held on 31.08.2009, in all

GOVERNMENT ORDER NO: CI 262 SPI 2009, BANGALORE DATED: 29.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s. JSW Steel Ltd., for enhancement of installed capacity of Integrated Steel Plant from 10 Million TPA to 16 Million TPA & to set up 600 MW captive Power Plant at 1150 acres of land within the Village, Sandur Taluk, crores, Generating existing factory premises of 8042 acres, in Torangallu Bellary District, with an investment of Rs.15131.70 employment to about 6000 persons facilities, incentives and concessions.

and extend the following infrastructure

-5-

-6-

INFRASTRUCTURE FACILITIES: Land: The Committee resolved to permit the Company to establish the unit within the existing factory premises in 8042 acres of land at Torangallu Village, Sandur Taluk, Bellary District. Power: To be met out of Captive Generation. Water 2500 M3/ hr to be met out of existing allocation. No additional allocation The Company shall adopt rain water harvesting and waste water

is given. recycling.

Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State. Environment: The promoters to obtain environmental clearance from MOEF, GOI. Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. CFE and CFO from KSPCB and

Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the

-6-

-7unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka, [Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 13. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 14. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 15. M/s. JSW Steel Limited, No. U 607, 6dth Floor, East Wing, Raheja Towers, M.G.Road, Bangalore-560 001.

-7-

-816. PS to Principal Secretary to Industries Department. 17. Guard File / Spare Copies. Government, Commerce &

PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s. NMDC Ltd., to establish 5 Million TPA Integrated Steel Plant [2 MTPA in the I Phase and 3 MTPA in the II Phase ] at Bellary Taluk, & District approval for order reg. 18. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:-

Ref:

Preamble:

M/s. NMDC Ltd., to establish 5 Million TPA Integrated Steel Plant [2 MTPA in the I Phase and 3 MTPA in the II Phase ] at 5000 acres of land to be allotted by KIADB, in Special Industrial Zone to be set up in Bellary Hospect and Sandur Taluks by Vijayanagara Area Development Authority [VADA] Bellary Taluk & District, with an investment of Rs.9280 crores, Generating employment to about 2500 persons. In the 19th State High Level Clearance Committee (SHLCC) held on

31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting aspects. Hence the following order. held on 31.08.2009, in all

GOVERNMENT ORDER NO: CI 264 SPI 2009, BANGALORE DATED: 30.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s. NMDC Ltd., to establish 5 Million TPA Integrated Steel Plant [2 MTPA in the I Phase and 3 MTPA in the II Phase ] at 5000 acres of land to be allotted by KIADB, in Special Industrial Zone to be set up in Bellary Hospect and Sandur Taluks by Vijayanagara Area Development Authority [VADA] Bellary Taluk & District, with an investment of Rs.9280 crores, Generating employment to about 2500 persons and extend the following infrastructure facilities, incentives and concessions.

-8-

-9-

..2

INFRASTRUCTURE FACILITIES: Land: The Committee resolved to recommend industrial area. Power: 500 MW to be serviced by GESCOM Water VADA to supply / permit to use 16.88 MGD of water for the project out Vijayanagar Area Development

Authority [VADA] to allot 2500 acres of land for the project in the proposed

of whatever allocation VADA gets in future. The Company shall adopt rain water harvesting and waste water recycling. Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State. Environment: The promoters to obtain environmental clearance from MOEF, GOI. Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. CFE and CFO from KSPCB and

Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the

-9-

- 10 unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

..3
Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka, [Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Gulburga Electricity Supply Company [GESCOM] Hubli. 13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore.

- 10 -

- 11 16. M/s. NMDC LIMITED, No.10-3311/A, Khanija Bhavan, Castele Hills, Masab Tank, Hyderabad 500 173. 17. PS to Principal Secretary to Government, Commerce & Industries Department. 18. Guard File / Spare Copies. PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s. PBS Steel and Power Industries Pvt. Ltd., to establish 100 x 2 TPD Sponge Iron Plant, 15 x 2 TPA Induction Furnace, 2 Strand Billet Caster, 82,500 TPA Bar & Rod Mill [Semi continuous] and 20 MW Captive Power Plant at Koppal Taluk, & District approval for order reg. 1. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:M/s. PBS Steel and Power Industries Pvt. Ltd., proposes to establish 100 x 2 TPD Sponge Iron Plant, 15 x 2 TPA Induction Furnace, 2 Strand Billet Caster, 82,500 TPA Bar & Rod Mill [Semi continuous] and 20 MW Captive Power Plant in 79 acres of land bearing Sy.Nos.25/3 & 4,27,28/1 & 2,44/1,2,3,4 & 5,47/1 to 47/17, 48/1 to 48/6 & 49, Arasinakeri Village, 362 persons. In the 19th State High Level Clearance Committee (SHLCC) held on 31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting held on 31.08.2009, in all aspects. Hence the following order. Koppal Taluk & District, with an investment of Rs.200.89crores, Generating employment to about

Ref:

Preamble:

GOVERNMENT ORDER NO: CI 265 SPI 2009, BANGALORE DATED:30.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s. PBS Steel and Power Industries Pvt. Ltd., to establish 100 x 2 TPD Sponge Iron Plant, 15 x 2 TPA Induction Furnace, 2 Strand Billet Caster, 82,500 TPA Bar & Rod Mill [Semi continuous] and 20 MW Captive Power Plant in 79 acres of land bearing Sy.Nos.25/3 & 4,27,28/1 & 2,44/1,2,3,4 & 5,47/1 to 47/17, 48/1 to 48/6 & 49, Arasinakeri

- 11 -

- 12 Village, Koppal Taluk, & District, with an investment of Rs.200.89 crores, Generating employment to about 362 persons and extend the following infrastructure facilities, incentives and concessions. 2

INFRASTRUCTURE FACILITIES: Land: The Committee resolved to permit the Company to establish the unit in 79 acres of land bearing Sy.Nos.25/3 & 4,27,28/1 & 2,44/1,2,3,4 & 5,47/1 to 47/17, 48/1 to 48/6 & 49, Arasinakeri Village, Koppal Taluk, & District and to recommend to Deputy Commissioner, Koppal District for conversion of the same for industrial use. Power: 18.6 MW to be serviced by GESCOM Water: The Committee resolved to permit the Company to source 1 MLD to be met out of own bore wells and 0.60 MLD from rain water harvesting. The Company shall adopt waste water recycling. Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State. Environment: The promoters to obtain environmental clearance from MOEF, GOI. Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. CFE and CFO from KSPCB and

Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

- 12 -

- 13 Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. 3 Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka,

[Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Gulburga Electricity Supply Company [GESCOM] Hubli. 13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001.

- 13 -

- 14 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 16. M/s. PBS Steel and Power Industries Pvt. Ltd., P.Balsubba Setty & Son, Post Box No.3, Hampi Road, Hospet-583 201. 17. PS to Principal Secretary to Government, Commerce & Industries Department. 18. Guard File / Spare Copies.

PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s. ICI India Ltd., to establish a Unit for Manufacture of Paints and Varnishes at Thandya Industrial Area, Mysore District approval for order reg. 1. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:Preamble: M/s. ICI India Ltd., proposes to establish a Unit for Manufacture of Paints and Varnishes in 70 acres of land to be acquired and allotted by KIADB at Thandya Industrial Area, Mysore District, [Plot next to Flair Garments or behind ITC] with an investment of Rs.253 crores, Generating employment to about 159 persons. In the 19th State High Level Clearance Committee (SHLCC) held on

Ref:

31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting aspects. Hence the following order. GOVERNMENT ORDER NO: CI 266 SPI 2009, BANGALORE DATED: 30.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s. ICI India Ltd., to establish a Unit for Manufacture of Paints and Varnishes in70 acres of land to be acquired and allotted by KIADB at Thandya Industrial Area, Mysore District, [Plot next to Flair Garments or behind ITC] with an investment of Rs.253 crores, Generating employment to about 159 persons and extend the following infrastructure facilities, incentives and concessions. INFRASTRUCTURE FACILITIES: held on 31.08.2009, in all

- 14 -

- 15 Land: The Committee resolved allot 70 as SUC. The 70% Company shall furnish consent extent of the land proposed from the land owners for minimum for initiating .2 acres of land to recommend to KIADB to acquire and District at Thandya Industrial Area, Mysore

for acquisition to KIADB

acquisition.

Power: Water The

5000 KVA to be serviced by CESCOM KIADB to supply 0.5 MLD of water. The Company shall pay harvesting and waste the water

charges for laying of pipe line and compensation to the land owners. Company shall adopt rain water recycling. Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State. Environment: The promoters to obtain environmental clearance from MOEF, GOI. Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. CFE and CFO from KSPCB and

Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the

- 15 -

- 16 unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. .3

Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka, [Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Chamundi Electricity Supply Company [CESCOM] Chamundi.

- 16 -

- 17 13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 16. M/s. ICI India Ltd., 7th Floor, Infinity Tower, DLF Cyber City, Plase-II, Gurgaon 122 002, Harayana. 17. PS to Principal Secretary to Government, Commerce & Industries Department. 18. Guard File / Spare Copies. PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s Anamitra Warehousing Pvt. Ltd., establish an Warehousing and Inland Container Depot at Bangalore North Taluk approval for order reg. 19. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:Preamble: M/s Anamitra Warehousing Pvt. Ltd., proposes to establish an Warehousing and Inland Container Depot for modern & Mechanised bulk

Ref:

handling inland container Depot having open stacking yard and enclosed warehouses catering to different export oriented sectors in 241 acres 27 guntas of land to be acquired and allotted by KIADB at Maralakunte Village, Jala Hobli, Bangalore North Taluk, with an investment of Rs.366.04 crores, Generating employment to about 9112 persons. The Committee directed BIAPPA to permit the change of land use for industrial purpose. In the 19th State High Level Clearance Committee (SHLCC) held on

31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting aspects. Hence the following order. held on 31.08.2009, in all

GOVERNMENT ORDER NO: CI 270 SPI 2009, BANGALORE DATED: 29.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s Anamitra Warehousing Pvt. Ltd., to establish an Warehousing and Inland Container Depot for modern & Mechanised bulk handling inland container Depot having open stacking yard and

- 17 -

- 18 enclosed warehouses catering to different export oriented sectors in 241 acres 27 guntas of land to be acquired and allotted by KIADB at Maralakunte Village, Jala Hobli, Bangalore North Taluk, with an investment of Rs.366.04 crores, Generating employment to about 9112 persons. The Committee directed BIAPPA to permit the change of land use for industrial purpose.

..2

The following infrastructure facilities, incentives and concessions are extended. INFRASTRUCTURE FACILITIES Land: Taluk. The Company to furnish the consents for minimum 80% of the extent of the land proposed for the project for acquisition by KIADB. KIADB to acquire the land by collecting only the service charges as the compensation to the land owners will be directly paid by the Company. Wherever consent is produced. Power: 3 MW to be serviced by BESCOM Water The Company to source 5 MLD of water through own bore wells, The Committee resolved to recommend to KIADB to acquire and allot 241 acres 27 guntas of land at Maralakunte Village, Jala Hobli, Bangalore North

recycled water and rain water harvesting. Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State. Environment: The promoters to obtain environmental clearance from MOEF, GOI. Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. CFE and CFO from KSPCB and

- 18 -

- 19 Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. ..3

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka, [Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore.

- 19 -

- 20 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Bangalore Electricity Supply Company [BESCOM] Bangalore North Taluk. ..4

13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 16. M/s. Anamitra Warehousing Pvt. Ltd., No.540, 3rd Floor, Indiranagar, Banalroe-560 038. 17. PS to Principal Secretary to Government, Commerce & Industries Department. 18. Guard File / Spare Copies.

- 20 -

- 21 PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s Ravindra Trading and Agencies Ltd., to establish Iron Ore Pelletisation and Steel Plant at Bellary Hospet Region approval for order reg. 3. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:Preamble: M/s Ravindra Trading and Agencies Ltd., proposes to establish Iron Ore Pelletisation and Steel Plant in 2 MTPA Iron Ore Pelletisation in 1st Phase & 6 MTPA Integrated Steel Plant in 2nd & 3rd Phase, in 650 acres of land at Bellary Hospet Region, with an investment of Rs.3292 crores, Generating employment to about 1000 persons. In the 19th State High Level Clearance Committee (SHLCC) held on

Ref:

31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting aspects. Hence the following order. held on 31.08.2009, in all

GOVERNMENT ORDER NO: CI 271 SPI 2009, BANGALORE DATED: 30.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s Ravindra Trading and Agencies Ltd., to establish Iron 650 acres of land Ore Pelletisation and Steel Plant at Bellary Hospet Region, in 2 MTPA Iron Ore Pelletisation in 1st Phase & 6 MTPA Integrated Steel Plant in 2nd & 3rd Phase, in with an investment of Rs.3292 crores, Generating employment to about 1000 persons and extend the following infrastructure facilities, incentives and concessions.

..2

- 21 -

- 22 -

INFRASTRUCTURE FACILITIES Land The Committee resolved to recommend to Vijayanagar Area Development

Authority [VADA] to allot 650 acres of land for the project in the proposed Industrial Area.

Power: 217 MW to be serviced by GESCOM

Water

VADA to supply / permit to use 2.3 MGD of water for the project out of

whatever allocation VADA gets in future. The Company shall adopt rain water harvesting and waste water recycling. Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State.

Environment: The promoters to obtain environmental clearance from MOEF, GOI.

CFE and CFO from KSPCB and

Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. ..3

- 22 -

- 23 -

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka, [Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Gulburga Electricity Supply Company [GESCOM] Gulburga.

- 23 -

- 24 ..4

13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 16. M/s. Ravindra Trading and Agencies Ltd., 7th Floor, Devchand House, Shiva Sagar Estate, Dr.Annie Besant Road, Worli, Mumbai-400 018. 17. PS to Principal Secretary to Government, Commerce & Industries Department. 18. Guard File / Spare Copies.

- 24 -

- 25 PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s. Artech Steel Industries Pvt. Ltd. to establish Beneficiation and Iron Ore Pellets 1.2 MTPA at Kunigal Taluk, Tumkur District approval for order reg.

Ref:

1. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:-

Preamble:

M/s. Artech Steel Industries Pvt. Ltd., proposes to establish Beneficiation and Iron Ore Pellets 1.2 MTPA in 195.30acres of land to be acquired by KIADB as SUC on consent of landowners at Kunigal Taluk, Tumkur District with an investment of Rs.455crores, generating employment to about 500 persons. In the 19th State High Level Clearance Committee (SHLCC) held on 31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting held on 31.08.2009 in all aspects. Hence the following order.

GOVERNMENT ORDER NO: CI 272 SPI 2009, BANGALORE DATED:31.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s. Artech Steel Industries Pvt.Ltd., proposes to establish Beneficiation and Iron Ore Pellets 1.2 MTPA in 195.30 acres of land to be acquired by KIADB as SUC on consent of landowners at Kunigal Taluk, Tumkur District with an investment of Rs.455crores, generating employment to about 500 persons and extend the following infrastructure facilities, incentives and concessions.

INFRASTRUCTURE FACILITIES: Land: The Committee resolved Kunigal Taluk, Tumkur District. to recommend to KIADB to acquire and allot

195.30acres of land at different Sy Nos. of Dasanapura & Nagalapur Villages,

- 25 -

- 26 ..2

The Company shall furnish consent from the land owners for minimum 70% extent of the land proposed acquisition. Power : 45000 KVA to be serviced by BESCOM. for acquisition to KIADB for initiating

Water : The Company to source 2.88 MLD of water from bore wells, rain water harvesting and waste water recycling. Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State. Environment: The promoters to obtain environmental clearance from MOEF, GOI. CFE and CFO from KSPCB and

Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A Copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

..3

- 26 -

- 27 -

Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka,

[Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Basngalore Electricity Supply Company [BESCOM] Bangalore. 13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 16. M/s. Artech Steel Industries Pvt. Ltd., No.A-4 & 5, 2nd Floor, Logix Park, Sector-16, Noida-201 301, Uttara Pradesh.

- 27 -

- 28 17. PS to Principal Secretary to Industries Department. 18. Guard File / Spare Copies. Government, Commerce &

- 28 -

- 29 PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s. Tata Metaliks Ltd, to establish Iron & Steel Plant 0.7 MTPA at Haveri Taluk and District for expansion of Iron and Steel Plant from 0.7 MTPA TO 3 MTPA & increase in project cost approval for order reg. 4. Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. -:0:-

Ref:

Preamble: Taluk and District

M/s. Tata Metaliks Ltd, proposes Iron & Steel Plant 0.7 MTPA at Haveri for expansion of Iron and Steel Plant from 0.7 MTPA TO & 3 MTPA & increase in project cost with an investment of Rs.6001.41 additional power of 58 MVA. In the 19th State High Level Clearance Committee (SHLCC) held on

31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting aspects. Hence the following order. held on 31.08.2009, in all

GOVERNMENT ORDER NO: CI 273 SPI 2009, BANGALORE DATED: 30.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal of M/s. Tata Metaliks Ltd, to establish Iron & Steel Plant 0.7 MTPA at Haveri Taluk and District for expansion of Iron and Steel Plant from 0.7 MTPA TO 3 MTPA & increase in project cost with an investment of Rs.6001.41 concessions. in 900 acres of land approval earlier at Devagiri Yellapur Villages of Haveri Taluk, following infrastructure facilities, incentives and

INFRASTRUCTURE FACILITIES:

Power: 58 MVA additional power to be serviced by HESCOM [Total requirement is 158 MVA] .2

- 29 -

- 30 -

Water

No additional water is required apart from 56 MLD

of water from

Tungabhadra as approved earlier. Varada rivers. recycling.

However, the Committee also recommended

WRD to permit the Company to draw the water from Tungabhadra and / or The Company shall adopt rain water harvesting and waste

Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State.

Environment: The promoters to obtain environmental clearance from MOEF, GOI.

CFE and CFO from KSPCB and

Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.

.3

- 30 -

- 31 -

Others: The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka, [Aparna Pavate] Desk Officer (Technical Cell) Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Haveri Electricity Supply Company [HESCOM] Haveri Taluk. 13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 16. M/s. TATA METALIKS LTD., 10th Floor, TATA Centre, 43, J.L.Nehru Road, Kolkata West Bengal-71.

- 31 -

- 32 17. PS to Principal Secretary to Industries Department. 18. Guard File / Spare Copies. Government, Commerce &

PROCEEDINGS OF THE GOVERNMENT OF KARNATAKA Sub: The Project Proposal of M/s J.K.Tyre & Industries Limited, for manufacture of Off the Road [OTR] Tyres at Belagola Industrial Area, KRS Road, Mysore approval for order reg.

Read: 1.Proceedings of the 19th State High Level Clearance Committee (SHLCC) meeting held on 31.08.2009. Preamble: -:0:-

The Project Proposal of M/s J.K.Tyre & Industries Limited, proposes to establish for manufacture of Off the Road Belagola Industrial Area, KRS Road, [OTR] Tyres at Plot No.85, at Mysore District, with an investment of

Rs.130 crores, Generating employment to about 219 persons. In the 19th State High Level Clearance Committee (SHLCC) held on

31.08.2009 the proposal of Company has been approved. Government has examined the recommendations made by the State High Level Clearance Committee in the 19th Meeting aspects. Hence the following order. GOVERNMENT ORDER NO: CI 267 SPI 2009, BANGALORE DATE: 29.10.2009 In the circumstances explained above, Government is pleased to accord approval for the project proposal M/s J.K.Tyre & Industries Limited, to establish for manufacture of Off the Road [OTR] Tyres at Belagola Industrial Area, KRS Road, Mysore District, Rs.130 crores, Generating employment to about 219 persons. INFRASTRUCTURE FACILITIES: Land: The Committee resolved to permit the Company to establish the project in 9 acres of existing land at Plot No.85, Belagola Industrial Area, KRS Road, Mysore. Power: 1200 KVA power to be serviced by CESCOM. Plot No.85, at with an investment of held on 31.08.2009, in all

- 32 -

- 33 Water KIADB to supply 0.3 MLD of water. The Company shall adopt rain

water harvesting and waste water recycling. Incentives and Concessions: As applicable under New Industrial Policy 2009-14 of the State. Environment: The promoters to obtain environmental clearance from MOEF, GOI. Employment: The Company shall prepare a plan for development of human resources required for the project, train local people and provide employment to these trained local youth and comply with Government policy of Employment to local people i.e. Dr. Sarojini Mahishi report. A copy of human resources development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring. Others: 1. The promoters shall take all statutory and other necessary clearances including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Departments, concerned. This approval is valid for a period of two years from the date of issue. By Order and in the name of the Governor of Karnataka, [Aparna Pavate] Desk Officer (Technical Cell) CFE and CFO from KSPCB and

- 33 -

- 34 Commerce & Industries Department. To, The Compiler, Karnataka Gazette, Bangalore for publication in the next issue of the Gazette. 1. The Principal Accountant General (Audit/Accounts) in Karnataka, Bangalore. 2. The Principal Secretary to Government, Energy Department, Bangalore. 3. The Principal Secretary to Government, Finance Department, Bangalore. 4. The Principal Secretary to Government, Urban Development Department, Bangalore. 5. The Principal Secretary to Government, Water Resources Department, Bangalore. 6. The Principal Secretary to Government, Forest, Ecology & Environment Department, Bangalore. 7. The Principal Secretary to Government, Revenue Department, Bangalore. 8. The Principal Secretary to Government, Rural Development & Panchayat Raj Department, Bangalore. 9. The Commissioner for Industrial Development and Director of Industries and Commerce, Khanija Bhavan, Bangalore. 10. The Commissioner for Commercial Taxes, Vanijya Therige Karyalaya, Gandhi Nagar, Bangalore 560 009. 11. The Secretary, Karnataka State Pollution Control Board, #49, Church Street, Parisara Bhavan, Bangalore 560 001. 12. The Managing Director, Chamundi Electricity Supply Company [CESCOM] Mysore District, Mysore. 13. The Director (Technical Cell), Commerce & Industries Department, Vikasa Soudha, Bangalore. 14. The Chief Executive Officer & Executive Member, Karnataka Industrial Area Development Board, Nrupatunga Road, Bangalore 560 001. 15. The Managing Director, Karnataka Udyog Mitra, Khanija Bhavan, Bangalore. 16. M/s JK Tyre & Industries Ltd., KRS Road, Metagalli, Mysore-570016. 17. PS to Principal Secretary to Government, Commerce & Industries Department. 18. Guard File / Spare Copies.

- 34 -