NOKIAN CAPACITORS
Power Factor Controller A12
1. CONTENTS
1. CONTENTS 1
2. FEATURES 2
4. DISPLAY 2
5. MENU OPERATIONS 3
5.1 USING SUBMENUS AND EDITORS 4
5.2 USING THE MEASUREMENTS MENU 5
5.3 USING THE COMMISSIONING MENU 7
5.4 USING THE PROGRAMMING MENU 9
5.5 USING THE ALARMS MENU 14
6. SETTINGS 15
6.1 CALCULATING C/K SETTINGS 15
6.2 TARGET POWER FACTOR ( COS M ) SETTING 16
6.3 RECONNECTION DELAY SETTING 16
6.4 SETTING OF VOLTAGE MEASURING SYSTEM 17
6.5 SETTING THE NUMBER OF CAPACITOR STEPS, 17
THERMOSTAT OPERATION
6.6 SETTING THE OPERATION SEQUENCE 17
7. ALARMS 20
7.1 THE ALARM DISPLAY 20
7.2 CLEARING OF AN ALARM 20
7.3 LIST OF ALARM CODES 20
7.4 LIST OF WARNINGS 22
8. COMMISSIONING 23
8.1 OPERATIONAL TEST 23
8.2 STARTING THE OPERATION 24
9. TROUBLESHOOTING 24
11. SCHEMATICS 26
1
1. FEATURES
x Panel mounting according to DIN 43700 or 35 mm DIN-rail mounting according to
EN 50022
x 12 steps
x Automatic CT polarity retrieval
x Automatic search of C/K – values
x Different C/K ind and cap values
x Automatic frequency selection 50/60 Hz
x THD(U) and Irms/In distortion measurements
x Detection of a step with decreased capacitance
x Hunting detection
x Setting for target power factor (cos M )
x Four-quadrant operation
x Easy-to-use menu-driven user interface
x Five-language menus
x Setting of reconnection delay
x 16-character alphanumeric liquid-crystal display with graphical symbols
x Plug-in connectors at rear side
x Separate alarm relay with potential-free contacts
x Possibility to operate steps manually and to set steps permanently on/off
x Serial communication option
x Protective momentary no-voltage reset function
x State-of-the-art microprocessor technology
x Complies with EN 50082-2 and EN 50081-2 EMC standards
The LN-operation ( measuring voltage between one phase and neutral ) the voltage must be taken from the same
phase where the CT is connected. In LL-operation ( measuring voltage between two phases ) the CT must not be
connected to either of the phases where the voltage is taken from.
Check the setting of menu item Connection from Programming-menu: this must be set to LL when voltage is
measured between two phases ( factory default ), or to LN when voltage is measured between one phase and neutral
line. Refer to chapter 5 “Menu Operations”.
If needed, the controller automatically reverses the polarity of current measurement provided that there is sufficient
current ( 1% of nominal 5 A ) flowing in the measurement circuit. If the wiring of measurement signals to the
regulator is not made according to instructions ( this means that the rotation order of phases is incorrect ).
3. DISPLAY
After the connections are correct and power is applied to the controller, it will enter to the cos M basic display which
displays the power factor of the system and step connection status. The symbols [ and indicate inductive or
capacitive power factor. The states of output relays are displayed in two rows one on the other. The special symbols
indicate various states as follows:
2
_
step is permanently ON
5. MENU OPERATIONS
The display of measured quantities as well as the input and editing of the operation parameters has been placed into
four menus as follows:
a) Measurements menu
x apparent current
x reactive current
x distortion THD(U)
x step status
b) Commissioning menu
x target cos M setting
x C/K auto search
x manual setting of C/K ratio
x manual operation
x language setting
3
c) Programming menu
x number of steps
x stepping method
x connection of voltage measurement
x reconnection delay
x automatic polarity detect
x input voltage
x low capacitance detection
x direct-on-line setup
d) Alarms menu (enable/disable and status)
x low power factor
x hunting
x abnormal cos M
x undervoltage
x overvoltage
x overtemperature
x THD(U) high
x capacitor overload
x capacitor output low
The Measurements menu is entered by pressing the enter button. The Commissioning menu is entered only from the
Measurements menu by pressing for at least two seconds. The Programming menu is entered from
Commissioning by pressing keys and
simultaneously for at least two seconds. The Alarms menu is entered by
pressing . See Appendix A for complete menu diagram
The regulation continues normally regardless of menu operations, with the exception of autosearch operation.
To enter a submenu from the main level, press enter . Then you can step through all submenu items in that menu by
pressing as many times as required. By pressing you can step in the opposite direction. The value involved
in that particular submenu item is shown on the right side of the display.
To enter the editor, press enter while in the submenu. An underscore _ appears below the edited value to indicate that
you are in the edit mode. Now you can change the value by pressing button to increase or button to decrease
it. A short keystroke affects the least significant digit ( first digit from right). A long keystroke moves to the second
digit from the right allowing a faster change of the value to be edited. When the desired value is on the display, press
enter to accept the value. The display returns back to the submenu level and the underscore disappears.
Basic display
4
Press to enter Measurements menu
Now the underscore is below the value to be edited. Now press two times to increase the value to 1.00. The
display should now look as follows:
Now you can exit to Commissioning of the main menu level by pressing esc. Pressing esc again you return to the
basis cos M display.
The Measurements menu is entered from basic cos M display by pressing . This menu contains no editable
variables, only basic measurement values obtained from network.
5
As the first item, apparent current display is shown.
The apparent current flowing through the CT is shown. The actual value from the CT is multiplied with the CT ratio (
if entered in Commissioning menu) to obtain the correct network value. If the CT ratio is not defined, this display
shows percentages scaled to 5A according to the following example:
The next key press of shows the next menu item, reactive current display. The remark of CT setting presented
Pressing again shows the total harmonic distortion in the network used
Finally, pressing once more shows the last item in the Measurements menu, the step status display
The step status display shows the condition of the capacitors in bank as detected by the step capacitance survey
feature of the controller. A fully functional step is shown with a small solid box whereas a step with decreased
capacitance is marked with a small cross.
Now pressing esc returns back to the cos M display and pressing for two seconds enters you to the next menu.
6
5.3 Using the Commissioning Menu
The first menu item in Commissioning menu is the target power factor
To edit this value, press enter. Refer to the editing instructions given in 5.1.
The target power factor value can be adjusted between 0.85 ind ... 1.00 ... 0.90 cap. Values between 0.97 inductive
and 1.00 are most commonly used. The signs [ and = indicate the inductive or capacitive setting value. See fig. 1 for
the effect of different target power factor settings.
By pressing the next menu item, C/K Auto Search, appears on the display
To initiate the automatic search of C/K value, press enter. Now the controller first disconnects all steps displaying
C/K Search
0
and starts the autosearch process by connecting and disconnecting the first step several times and measuring the
change of reactive power in network. The time this operation takes depends on the stability of the reactive power on
network and the selected reconnection time delay (explained later in this text). During this operation, the display
shows the cumulative number of connections/disconnections of the first step. The autosearch operation can be
stopped any time during operation by pressing the esc button and the display shows
C/K Search
Stop
If the automatic search was successful, the following display shows for a short time and the menu item display is re-
entered.
OK C/K=0.23
7
You can exit the display immediately by pressing any key. The regulation restarts automatically using the calculated
C/K value, which is displayed with the OK message shown above. If the controller was not able to fin a proper C/K
value, the following alarm message is displayed and the user must verify this by pressing a button
C/K Search
Error
To enter the third menu item, Response Values, press
The editor mode is entered by pressing enter. In edit mode, the value on the display can be modified in the usual
manner by buttons and . The edited value is accepted by pressing enter. After leaving the editor, the
capacitive C/K submenu is displayed
Editing this value is a similar procedure as with the inductive C/K setting.
For more information, see section 6.1, "Calculating C/K settings" on page 15.
The value of the CT ratio can be edited from 100/5 up to 6000/5 range. Also a percentage value can be selected,
meaning that all the current values displayed in Measurements menu show percentage values with respect to 5 A. The
percentage display is the factory default.
8
Now press to enter the Manual Override submenu
By pressing enter, the user can insert one step into the network. The step will be actually inserted after a response
delay, depending on reconnection delay, normally 10 seconds. As a confirmation to this, a + will appear on display,
immediately after the cos M value. When the step is connected, the + disappears. By pressing , a step will be
disconnected. This is indicated with a - sign on the display. The disconnection takes place after the response delay.
You can cancel the connection/disconnection before it takes place by pressing the opposite direction key, or .
During the manual operation of the controller, the connection/disconnections of steps use the stepping method and
delay that was selected before manual stepping mode was entered. If no key is pressed during five minutes, the
controller returns back to basic cos M display.
The last item in Commissioning menu is the selection of language. Pressing the name of the language used
appears on display
To change the language, press enter to display the editing cursor, then select the language with the and
buttons and confirm the selection by pressing enter.
The Programming menu can be entered only from item Commissioning of the main menu by pressing simultaneously
buttons and for at least two seconds. The first item of the menu appears on display
9
To edit the value, press the enter button.
The number of steps in use is indicated also in the basic cos M display: A connected existing step is indicated by a 3
line block and an unconnected existing step is indicated by a single horizontal line.
This is the selection of the stepping sequence used. To edit the value, press the enter button.
For further details refer to Section "Setting the stepping sequence" later in this text.
This is the selection of the connection of the voltage measurement inputs. To edit the value, press the enter button
The selection of reconnection delay also affects the response delay of each step. The response delay is one fifth of the
reconnection delay, the minimum value is 10 seconds, even when the reconnection time was selected less than 50
seconds.
10
To enter the next menu, press
In case the ON-state is selected, the controller automatically reverses the CT polarity at controller startup if the CT is
connected at reverse polarity. When disabled (OFF), the bank installer must take care of the proper phasing of the
CT.
____________________________________________________________________________________________
Note: If you intend to use the four-quadrant operation of the controller, the autopolarity feature and alarm 3 must be
set to OFF.
_____________________________________________________________________________________________
This is the reference setting for under and over voltage and Irms/In distortion alarms. This is the nominal value of the
voltage connected to voltage measurement terminals of the controller.
This submenu contains all the necessary settings needed for the step capacitance survey function. All these variables
must be set properly to facilitate the correct operation of this function.
This is actually the same CT setting as presented in the Commissioning menu but is duplicated here as part of a
group of settings mandatory for setting up the step survey function.
11
To enter the next menu item, press
This is the voltage at which the kvar values of the step sizes presented in the next menu item are defined. This does
not have to be the actual voltage of the network used.
Now press enter to browse through the entire step size list
You can change this value by pressing or or discard it by pressing esc. Press enter when the value on
display is correct and the next step appears on the display.
This value can be edited in similar manner as the previous one. Once entered, the user is forced to browse through the
entire step size list. Step sizes that do not need editing can be bypassed by esc or enter. When the last step is edited,
the menu control is returned to the upper level in menu. The step survey function is enabled by setting the
corresponding alarm mask to the ON position in the Alarms menu.
12
To quit the Cap Loss Setup menu, press esc. The following display appears
This means that the user must press to accept the edited values in use and initialize the history collected step size
information. If the key is pressed, the new values are accepted but the previous history is maintained. To set this
survey operation, the alarm 12 must be activated (set to ON state) from the Alarms menu.
The step sizes are initialized to zero as a default factory setting and the corresponding alarm mask is set to the OFF
state. When the user enters the step list for the first time and modifies the value of the first step, the value entered is
copied immediately to the rest of the steps. If the second value is changed from the value of the first one, it is copied
to the rest of the steps. Thus the user does not have to individually enter every step value since in most cases the
values of steps from the 3rd to the Nth (N = No. of the last step) are the same value. If this menu is entered later on,
the copying process of step sizes does not take place any longer.
12
The last item in Programming menu is Direct On Line Setup. It is entered by pressing
This means that the user can define for each capacitor step used to operate as permanently ON (1), permanently OFF
(0), or as an automatically operated (AUTO) step
Now pressing sets the step to the "permanently OFF" state. If instead you press
, the step goes to the
"permanently ON" state. Confirm your selection by pressing enter. The next step appears for editing. As with the
Step Power submenu, you are forced to browse through the entire list of steps. If you do not want to change any
particular step, just press esc or enter to bypass that step.
13
After browsing through the list, press enter to return to the main menu level.
The Alarms menu is entered with a single key press of button from the item Programming of the main menu
level.
Alarms
The alarms are arranged as a list of 12 individual alarms. To start viewing and editing the state of each alarm, press
enter
Alarm 1 ON
and keys.
To enable/disable the alarm, press enter. Now you can switch between ON and OFF states with
Finally, press enter to confirm the selection and to move to the next item.
The small rectangle in the right most character position of the display shows the state of that particular alarm. The
states expressed with the character are as follows
alarm is active
alarm is passive (no alarm)
All the twelve alarms are edited as described above. The complete list of alarms is given above.
The activating current setting, C/K, determines on which reactive current level the regulator starts to operate the
capacitor steps. The first capacitor step in the bank must be the smallest. The correct C/K is calculated as follows
C/K = ______Q1_______________
I1/5A * ULL * sqrt(3)
If C/K setting is adjusted too low, this will cause hunting with the time intervals of the reconnection delay. This can
be avoided by calculating and adjusting the settings correctly. A special alarm, ALARM 2, appears flashing on the
display if the regulator starts to hunt (see section 7 "Alarms")
15
Table for C/K selection: These values are calculated for 400 V operation and can be used for voltage between
380 V .... 415 line-to-line
The target power factor value can be adjusted between 0.85 ind .... 1.00 ....0.90 cap. Values between 0.97 inductive
and 1.00 are most commonly used. See Fig. 2.
____________________________________________________________________________________________
Note ! When calculating the correct values for C/K setting and target power factor, take care that there will not be
heavy over compensation. This is especially important with relatively weak network.
____________________________________________________________________________________________
The reconnection delay can be adjusted within the range of 10 to 900 seconds. The response time of a step is one fifth
of reconnection delay, however with delays shorter than 50 seconds the response time is always 10 seconds. The
reconnection delay protects the capacitors by preventing a step being connected to network before it is sufficiently
discharged.
______________________________________________________________________________________________
Warning ! The short reconnection delays are used, the capacitors and contactors or circuit breakers may be
damaged. Never use a shorter delay time than recommended before consulting the manufacturer of the capacitor
bank.
______________________________________________________________________________________________
16
Figure 2 The effect of power factor setting
The voltage measuring system can be programmed to either LN (line-to-neutral) or LL (line-to-line) from the menu.
Make sure that this setting complies with the connection of voltage inputs.
This facility is needed when a circular operation sequence is selected (described in detail later). The number of used
steps is easily selected from the Programming menu.
Another significant feature involved with the number of steps setting is the operation of a cooling fan. If the number
of steps programmed is less than the maximum number of steps available, the last relay (12th relay) can be used to
drive a fan. When the temperature sensed by the internal transducer exceeds 35° C, the relay is activated.
Four different operation sequences can be selected from the menu. The 1:2:4 sequence is the normal one, refer to Fig.
3. If all the steps are of the same size, then 1:1:1 sequence can be selected. In this operation sequence, the steps are
operated as a stack, refer to Fig. 4. With the step ratio 1:1:1 a circulating sequence can also be used. Here all the steps
will be connected an equal number of times, see Fig. 5. Another circulating sequence can be used with step ratio
1:2:2, where the first step is used as a fine adjustment step and the rest of the steps are connected in circular fashion,
refer to Fig. 6.
The controller always tries to switch on or off the first step and next the second after the activating limit is exceeded.
The next steps (3, 4, ...) are switched on or off in sequence. Switching on will start from 3, 4, ... if the first and second
steps are already on. Switching off will start from the last step if the first and the second steps are already off. Refer
to Fig. 3.
17
The other allowable step size combinations for use with 1:2:4 sequence are as follows
When all the capacitor steps are of equal size it is possible to use this operation sequence which obeys the last-in-
first-out principle. The first step connected will be the last one to be disconnected and the last step connected will be
the first one to be disconnected. Refer to Fig. 4. This method is especially useful with harmonic filters.
Step Step Number
Command 1 2 3 4 5 6
+ X
+ X X
+ X X X
+ X X X X
- X X X
- X X X
+ X X X
+ X X X X
+ X X X X X
- X X X X
- X X X
- X X X
- X
18
1.1.1 sequence (circulating operation A, CA)
If all the steps are equal in size and a first-in-first-out operation is required, then the circulating sequence is to be
selected. With this operation sequence, the number of times for each capacitor step to be connected and disconnected
will be equal. The number of hours connected is not calculated but the number of switchings on or off will eventually
be the same for each capacitor step. For this sequence, in order to operate correctly, the number of steps must be
programmed otherwise there will be empty steps in case the number of capacitor steps in the bank do not exactly
match with those in the controller. Refer to Fig. 5.
+ X
+ X X
+ X X X
+ X X X X
- X X X
- X X
+ X X X
+ X X X X
- X X X
- X X
+ X X X
+ X X X X
- X X X
Figure 5: Operation sequence 1:1:1 (circulating operation)
Similar to 1:1:1 circulating operation with the exception that the step one is used as fine adjustment step. The
regulator first always tries to switch on or off step number one after the activating limit is exceeded. The next steps
are switched on or off with the circulating principle. See Fig 6.
Step Step Number
Command 1 2 3 4 5 6
+ X
+ X X
+ X X X
- X X
+ X X X
+ X X X X
- X X X
- X X
- X
+ X X
+ X X X
+ X X X X
- X X X
- X X
- X
-
A comprehensive set of alarm messages has been provided to pin point the possible abnormal situations in network
and in usage of the controller.
The possible alarm conditions can rise from the following situations
Once an alarm condition is detected, the appropriate alarm code appears on display, the red alarm LED is lit and the
alarm relay is activated. The alarm display stays on as long as the condition prevails and can not be cleared until the
alarm condition is removed. The alarm relay will be deactivated after a delay of one minute from the disappearance
of the alarm condition but the alarm message stays on the display until it is manually cleared.
Also, three alarms have been provided. The warning message does not operate the alarm relay and disappears
automatically after the condition that caused the warning has disappeared. The warning messages originate from the
following circumstances:
x input current too low for proper operation of the controller (I low)
x input current is too high (I High)
x input voltage is too low (U Low)
Press to clear an alarm message. The alarm message will not disappear if the alarm condition is still on
ALARM 1
The controller has switched all steps on. Network is still inductive and a request to switch on more steps exists.
Check the voltage measurement setting and external wiring of the controller.
Hunting
ALARM 2
20
One or more capacitor steps are switched on and off in time intervals of reconnection delay. The C/K settings are too
low. Calculate and adjust correct C/K settings or use the Auto-C.K feature as described in section 5.3 " Using the
Commissioning menu". The activation time is 30 x response time.
Abnormal cos M
ALARM 3
The cause of this alarm in most cases is that the voltage inputs are connected to wrong phases with respect to the CT.
For correct connections, see Figs. 7 and 8. Also a highly varying reactive power load can trigger this alarm. The
activation time is 3 x reconnection delay. The alarm must be disabled in four-quadrant applications.
Low Voltage
ALARM 4
Line voltage is below 80% of nominal. The activation time is approximately 1 second. All steps are disconnected
simultaneously.
ALARM 5
The controller has switched all steps off. Network still stays on capacitive side and a request to switch off more steps
exists. Check the voltage measurement setting and external wiring of the controller and the possible fixed
compensation used.
Wrong frequency
ALARM 6
The controller has not been able to detect a correct network frequency, 50 or 60 Hz. at startup. The frequency must be
correct within a +/- 2 Hz limit
ALARM 7
The input current is higher than 115/120 % of nominal. The activation time for 115% limit is 180 seconds whereas
the time for 120% limit is 30 seconds. The controller will recover automatically from this alarm. Check the CT.
Over Voltage
ALARM 8
The network voltage is higher than 110/120% of nominal. The activation time for 110% over voltage is 30 minutes
and for 120% is 1 minute. As a protection action, the controller will disconnect all steps and will recover
automatically after a delay of 10 minutes.
21
Over temperature
ALARM 9
The controller measures the temperature in the bank with its internal temperature transducer. If the temperature is
above 35 ° C and below 50 ° C, the controller switches on relay 12 to start cooling of the bank using a fan, provided
that the number of steps adjustment is lower than the maximum number of available steps. When the temperature is
above 50 ° C, alarm 9 is issued. The controller disconnects all steps and recovers automatically after the bank
temperature has fallen below the alarm level.
THD(U)
ALARM 10
The controller measures continuously the voltage harmonic distortion of the network used. If the THD(U) value
exceeds 7%, an alarm is generated.
Capacitor overload
ALARM 11
Using the results of the THD(U) measurements, a capacitor overload factor Irms/In is calculated. If this factor exceeds
1.5, the controller will disconnect steps, enters a 10 minute shutdown period and issue alarm 11. The normal
regulation continues after the 10 minute period.
ALARM 12
Every time a capacitor step is switched on or off, the difference in reactive power is measured. Using these values as
input to a low-pass filter, the condition of each capacitor step can be evaluated. If the capacitor output has fallen
below 75% of nominal, alarm 12 is generated.
The CT current has dropped below 0.75% of the nominal current making cos M measurements vague and prevents
automatic polarity detection. If the load current during controller startup is low, setting autopolarity detection to OFF
state is recommended.
22
Input current too high
The input current is higher than 110% of nominal. This can be due to an under dimensioned CT or internal failure
The controller has not detected input voltage between its input terminals during startup. The frequency of the network
has not been detected.
8.0 COMMISSIONING
_____________________________________________________________________________________________
Note: The factory default settings are assumed to be left intact when starting this test
_____________________________________________________________________________________________
1. Make sure that the main fuses of the capacitor bank are open.
2. When power is connected to controller, the alarm relay contact should be open and the display should indicate
power factor.
3. The cos M step display should indicate that there are no steps connected yet
4. Select Manual override from the Commissioning menu (see section 5.3 for instructions). Switch on the first step.
Check the response delay which should be around 10 seconds. Switch off the step. The response time should
again be 10 seconds. Switch on the first step again. The reconnection delay should now be approximately 50
seconds due to reconnection delay. Switch off the step.
5. From the Commissioning menu, adjust both C/K settings to zero and target power factor to 0.90 capacitive. Now
the controller should connect all the steps available. Adjust the target power factor to 0.8 inductive. Unless the
cos M of the network is not very inductive, the controller will start disconnecting steps.
6. Check that the power factor of the network is within reasonable limits.
7. Check and adjust all the settings in Commissioning and Programming to suit your needs. If you choose to use
automatic C/K (autosearch) , set the manual C/K values back to factory default setting 0.50
23
8. Disconnect the controller power
2. The controller should now start operation by switching steps on, depending on the reactive power level in the
network and selected C/K values
3. Now an autosearch operation can be selected and started from Commissioning menu. (see section 5.3 for
instructions). If needed, the C/K-settings are updated with new values.
9.0 TROUBLESHOOTING
______________________________________________________________________________________________
2. Display is blank, controller does not react to pushbuttons. Possible alarms involved: none
- check the power supply connection of the controls
______________________________________________________________________________________________
4. Controller does not operate though inductive load is heavy. Possible alarms involved: none
- check the settings of the controller
______________________________________________________________________________________________
5. Controller does not disconnect step during small load. Possible alarms involved: none
- C/K settings too high
______________________________________________________________________________________________
6. One or more capacitor step(s) is (are) connected on and off in intervals of response/reconnection delay Possible
alarms involved: 2
- C/K values are adjusted too low. Calculate and adjust the correct settings or use the autosearch feature to
find correct C/K values.
______________________________________________________________________________________________
24
7. Cos M display indicates that some steps are connected but capacitor contactors are not activated. Possible alrms
involved: 1
- check the control circuit of the contactor
- check fuses
______________________________________________________________________________________________
8. Controller does not complete the autosearch procedure successfully. Possible alarms involved: None; message
C/K Search Error
- check the operation of contactors
- check fuses
- network is unstable. Wait for the network to stabilize or obtain C/K settings manually.
______________________________________________________________________________________________
9. The cos M is less than target cos M although all steps are connected
- connection (LN/LL) incorrectly programmed
- check the operation of contactors
- check fuses
- measure the current of each capacitor with a clamp ammeter
- bank under dimensioned
The controller casing is made of ABS plastic and can be recycled or disposed in accordance with the local
regulations.
The controller package is made of corrugated cardboard and thus is an excellent material for recycling. It can also be
incinerated.
The printed circuit board contains no recyclable parts and must be disposed.
25
26
12.0 TECHNICAL DETAILS
Measurement Voltage 120 V +/- 15% or, 230 V +/- 15% or, 400V +/- 15% or
415 V +/- 15% or 440 V +/- 15%
CT 5 A, burden 0.7 VA
Ambient Temperature 0 to + 50 °C
Weight 0.9 kg