Mooring Forces
environmental and operational. Environmental forces are caused by natural phenomena such as wind, waves, currents and tides. Operational forces include those caused by passing ships, changes in the vessel trim, freeboard or draught and mooring line overtension.
6/13/2013
6/13/2013
6/13/2013
6/13/2013
6/13/2013
times as great on vessels with very small underkeel clearances than for vessels in deepwater.
6/13/2013
Vessel Motion
6/13/2013
Design of Bollord
6/13/2013
Aex2
D B
Aex1
LBP
6/13/2013
10
EXAMPLE 1
It is required to find the pull forces under the effect of both wind and current effect on a ship berthing on container quay ( closed structure). Ship characteristics are as given: - Dwt = 40,000 tons & LOA =237m , LBP 225 m, B = 32.2 m , D = 11.70m, F = 6.9 ms. Where Vs = 30 knots , Vc = 1.0 m /sec., d = 13.0 m.
6/13/2013
11
Current direction
6/13/2013
12
Solution
Aex1 = 225 x 11.70 = 2632.5 m2 ship full (Longitudinal direction) Aex1 = 225 x 6.9 = 1552.5 m2 ship empty (Cross direction) Aex2 = 32.2 x 11.7 = 376.75 m2 ship full (Cross direction) Aex2 = 32.2 x 6.9 = 222.18 m2 Cf1 = Aex1/ L2 empty < 0.50 Cf1 = 1.2
Prof.Dr. Tharwat Sarhan 6/13/2013
13
Cf2 = Aex2/ (B)2 =376.75 / (32.2)2 = 0.363 Cf2 = 0.70 from tables Wind force calculations Pw = 0.066 Vs2 Vs = 30 x 0.5144 = 15.432 m/sec. Vs = Vs x S1 x S2 x S3 S1 = coefficient due to location & exposed for wind ~ 1.0 for normal condition S2 = coefficient depends on the shape of vessel , take S2 = 0.96 from tables S3 = 1.0
Prof.Dr. Tharwat Sarhan 6/13/2013
14
14.815 m/sec.
Pw = 0.066 x (14.815)2 = 14.490 Kg / m2 Fw1(maximum) = Cf1 x Pw x Aex1 (empty)
= 45.8 tons.
Fw1(minimum) = Cf1 x Pw x Aex1 (full) = 27 tons. Fw2 (max) = Cf2 x Pw x Aex2 (empty) = 3.82 tons
6/13/2013
Current calculation
Current force calculations Pc = current intensity = 52 Vc2 Kg/m2 Vc = 1.0 m /sec. Pc = 52 Kg/m2
Fc1 = 0.6 x B x D x [1 + D/d]3 x Pc Fc1 (min) = 12.4 tons Fc1 (max) = 80.6 tons.
Prof.Dr. Tharwat Sarhan 6/13/2013
16
Forces on Berth
Case (I) Current is normal to the berth, closed structure Force on the berth F final1 = 45.8 tons
80.6 + 2.25 = 82.85 tons No. of Required Bollards as min. are 4 units Bollard capacity = 82.85 /4 = 20.71 x 2 (S.F.) = 41.42 ton Take Required Bollard with 50 ton tension force
6/13/2013
17
References
* Code of practice for design of Fendering and Mooring systems BS 6349 : Part 4 : 1994 (ISBN 0-580.22653-0) * PIANC WG33 Guidelines for the Design of Fenders: 2002 (ISBN 2-87223-125-0) * Recommendations of the Committee for Waterfront Structures EAU 2004 8th Edition (ISBN 3-433-01790-5)
6/13/2013
18
6/13/2013
19
6/13/2013
20
6/13/2013
21
Structures
The jetty structure will have a large influence on the choice of
fendering system, and sometimes vice versa. Structure design will depend to a large degree on local practice, geology and materials. The right choice of the fender, when considered at an early stage, can often have a significant effect on the overall cost of the berth.
The structures can be classified to i) Open Pile Jetties Ii) Dolphin Iii) Monopile Iv) Mass Structure V) Sheet Pile
6/13/2013
22
Location
Berthing Structures are sited in a variety of location,
from sheltered basins to unprotected open waters. Local conditions will play a large part in deciding the berthing speeds and approach angles, in turn affecting the type and size of suitable fenders. 1) Non-Tidal Basins 2) Tidal Basins 3) River Berths 4) Coastal Berths
6/13/2013
23
6/13/2013
24
Tides
Tides vary greatly with location and may have extremes of just a few centimeters (Mediterranean, Baltic, etc.) up to of 15 meters (part of UK and Canada). Tidal variations will influence the structure design and selection of fenders. HRT Highest Recorded Tide HAT Highest Astronomical Tide MHWS Mean High Water Spring MHWN Mean High Water Neap MSL Mean Sea Level MLWN Mean Low Water Neap MLWS Mean Low Water Spring LAT Lowest Astronomical Tide LRT Lowest Recorded Tide
6/13/2013
25
6/13/2013
26
6/13/2013
27
Dolphin Berthing
6/13/2013
28
End Berthing
6/13/2013
29
Lock Entrance
6/13/2013
30
6/13/2013
31
Berthing Velocity
6/13/2013
32
Berthing Velocities
6/13/2013
33
6/13/2013
34
6/13/2013
35
6/13/2013
36
Block Coefficient CB
6/13/2013
37
Eccentricity Coefficient CE
6/13/2013
38
C E = K 2 / { K2 + R 2 }
K = [(0.19 CB) + 0.11 LBP R = [ LBP/2 x]2 + [B/2]
2
Where x = LBP/4 for Quarter Point berthing X = LBP/3 for third- point berthing X = LBP/2 for mid-ships berthing
Prof.Dr. Tharwat Sarhan 6/13/2013
39
Cc ~ 0.80
Cc = 1.00
6/13/2013
40
Cc ~ 0.90
Cc = 1.00
6/13/2013
41
Open Structures
Cc = 1.00
Where Kc = Under keel Clearance D = Draft (m)
6/13/2013
42
Cs ~ 0.90 Cs = 1.00
6/13/2013
43
6/13/2013
44
6/13/2013
45
6/13/2013
46
LOAD FACTORS
In Limit State Design, The load factors applied to fender reactions
under normal berthing are higher than those applied under abnormal berthing.
Fenders are generally designed to absorb the full abnormal
energy, and the reaction will be similar for both normal and abnormal impacts. In this instance, factored normal reactions often yield the worst design case.
It is important to check both the normal and abnormal cases to
determine which results in the highest structural loads, moments and stresses.
It is sometimes possible, depending on the fender and structure
type, to balance the normal and abnormal reactions of the fender. This will optimize the design of both fender and structure.
6/13/2013
47
Abnormal impacts may occur for many reasons engine failure, breakage of towing lines, sudden weather changes or human error. The following table summaries the safety factors according to PIANC11
Type of Berth Tankers and Bulk Cargo Container General Cargo Ro/Ro and Ferries Tugs, Workboats etc.
Safety Factor 1.25 1.75 1.50 2.00 1.75 2.0 or higher 2.00
6/13/2013
48
6/13/2013
49
Design of Fenders
Example It is required to design a fender system for a
grain ship with the following specifications; DWT = 100,000 tons & Mass displacement = 125,000 tons. LBP = 280 ms, B ship = 41ms, draft = 15.0 ms, approach velocity = 0.10 m/sec.
6/13/2013
50
Solution : Cm = 1 + (2x15/ 41) = 1.73 Ce = K2 / (K2 + R2) = (56)2 / ( 562 + 702 ) = 0.39 Cs = 1.0 for soft fenders Cc = 0.8 for solid quays. The absorbed energy EN EN= 0.5 x M x V2 x Cm x Ce x Cs x Cc EN = 0.5 x 125,000 x (0.10)2 x 1.73 x 0.39 x 1.0 x 0.8 = 337.35 K J = 34.39 ton . m.