Professional Documents
Culture Documents
Induction PPT Visitor UPDATED
Induction PPT Visitor UPDATED
RIG NO :- J# 00
WELCOME TO OUR
FACILITIES
2 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00
BEFORE WE START
Name: Name:
Name: Name:
Name: Name:
Name: Name:
Name: Name:
GOAL O S
R
ZE E N T
C I D
I N
Camera
Photography is prohibited. Permission to be obtained
from company men
MOBILE
Mobiles are prohibited inside the Rig site.
Speed Limit
5 Km / Hr.
13
Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00
Zero Tolerance Behaviors
PERMIT
Blue background
Must do
White symbol
Red circle
Restriction
Black symbol
Yellow triangle
Warning hazard
Black symbol
Green background
Emergency information
White symbol
Red background
Fire
White symbol
Rig Equipment's
RIG
Rig Equipment's
U
URR
HER
HER
E
E
Bunk Bunk HSE Training
26 Houses Houses Room
Assembly Points
Assembly point - 2
• Site Medic :
• Site HSE :
• Site RO :
Protect yourself
Ensure Derrick Retractable Fall A lift plan describes how Obtain
Wire Rope Grabber against a fall when
Transfer Flapper - to lift and hoist safely. authorization
arrester on Monkey System Available on working at height
above 1.8 Mtr. Use Ensure Taglines to before entering a
Walkway from Mast Board, Crown & Mast Ladder Double lanyard Full control load .Working or confined space.
ladder to monkey Below Sub Structure body harness with walking under a Conduct gas testing
Board Scaffolding / flat steel frequently
suspended load is unsafe
rebar hook while
as the load can fall on
working @ Mast
you.
50 60 70
40 80
30 90
20 100
10 110
KM/HR
Employees following
good safety practices shall
be recognised