Assiut Cement Plant
Assiut Cement Plant
El attar 2019
History Assiut Cement Company
1974 The Egyptian government started erection of the first line of the
plant ( 5000 t/d kiln ) supplied by the Russian Institute of cement.
1991
Lines 2 and 3 initial operation 3700 t/d each
History Assiut Cement Company
• 1999 CEMEX picked up the plant from the Egyptian government
• 2001 Line 1 upgrading
- Changing cooler
- Changing main burner
- Modifications calciner and kiln inlet
- Changing ID Fans
• 2009 - conversion kiln main ESP to F.F.
• 2015 - Upgrading calciner and kiln hood for firing petcok
• 2002 Line 3 upgrading
- Changing cooler
- Changing main burner
- Changing ID Fans
• 2007 - Upgrading preheater tower
• 2015 - conversion kiln main ESP to F.F.
• 2015 - upgrading calciner for firing petcok
• 2003 Line 2 upgrading
- Changing cooler
- Changing ID Fans
- Changing main burner
2008 - Upgrading preheater tower
2014 - conversion kiln main ESP to F.F.
• 2015 installation coal/petcock mill and dosing system for the three kilns .
One plant with 5.46 M tons cement production, clinker production 4.96 M tons
CEMENT OPERATIONS HIGHLIGHTS
180 CLINKER
T/H STORAGE
FUEL OIL CAP. : 80,000T
M STORAGE
PREHEATER
CLAY 4 STAGES
CRUSHER 180 TWO STRING
CAP. : 300 CLAY- RECLAMER/
STACKER T/H PYROCLONE
TPH CALCINER
PREROV: CAP. : 10,000 T
PREROV :ROMANIAN 4000 T/D
CHIC
YEAR : 1987 YEAR : 1987
BURNER
6500KG/HR
Level 178 3.44 0.22 0.12 53.07 0.12 0.08 0.009 0.029 0.062
Level 153 3.99 0.31 0.17 52.68 0.20 0.06 0.014 0.014 0.064
Level 120 2.79 0.50 0.23 53.31 0.21 0.06 0.020 0.013 0.049
Total 3.42 0.33 0.17 53.02 0.17 0.07 0.014 0.019 0.059
Chert layer in limestone quarry
Explosive consumption :
Each 2.2. ton limestone needs 13 Kg .explosives materials .
Clay quarries : Gahdam & Bani Ghaleb Clay Quality
Layer “A’’ Si02 AI203 Fe203 CaO MgO SO3 K20 Na20 CI
Average 54.38 13.41 7.76 6.95 2.46 0.50 0.53 0.80 0.35
Min 58.15 16.73 9.86 8.77 2.90 1.22 0.73 1.57 1.03
Max 49.90 11.48 6.40 3.97 2.11 0.05 0.44 0.40 0.11
Std.Dev. 2.02 1.04 0.85 1.10 0.18 0.24 0.07 0.22 0.19
Layer “B’’ Si02 AI203 Fe203 CaO MgO SO3 K20 Na20 CI
Average 49.22 14.38 9.32 7.58 2.85 0.11 0.66 1.00 0.29
Min 58.20 16.52 10.48 10.70 3.49 0.43 0.90 1.61 0.69
Bani Ghaleb Clay Quarry Max 45.49 12.27 7.71 5.33 2.30 0.04 0.53 0.58 0.07
•The Clay Deposit Is General Brown, Soft, Frequent Lenses of Sand Stone
Std.Dev. 2.14 0.84 0.50 0.92 0.19 0.07 0.07 0.19 0.14
•The Clay deposit is covered by loose detrital young sediments of thickness varying
•The Lithological chemical correlation sections exhibit the sandy calcareous clay
Clay Quality
•The Average Humidity is 8.4%
•The Average Density is 1.8 Ton /M3
•It is connected with Crushers By Road and Transportation by Contractor.
•The Distance Between the Quarry and Crushers is 3 Km
Limestone Crushers& storage area process flow diagram
Limestone & clay storage area
Line # 1 process flow diagram
Line # 2 & 3 process flow diagram
Process flow diagram Line # 2 & 3 open circuit cement mills
Process flow diagram Line # 2 & 3 closed circuit cement mills
THANK YOU