Kick Off MPPTCL-TR-108

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 15

 CLIENT : MADHYA PRADESH POWER TRANSMISSION CO.

LTD (MPPTCL)

 PROJECT NAME : CONSTRUCTION OF TRANSMISSION LINES


IN BHOPAL CIRCLE ON TOTAL TURNKEY BASIS- ONE
(Package No. - 8)
(PROJECT FUNDED BY – JICA)

 Bid Ref. No. JICA/MPPTCL/TR-108

 Work Order No. 04-01/JICA/MPPTCL/TR-108/06559-6 Dtd.


02/11/2012

 Completion Period : 18 Months


DETAILS ABOUT PROJECT
This Package consists of Lines as below :

 (LILO) of one circuit of 220kV double circuit Bhopal-Ashta line at Mugalia Chhap.
– 20 Kms (Time Schedule – 12 Months)

 132KV DCSS line between 220KV Shujalpur Substation and 132KV Pachhore
Substation. – 34 Kms (Time Schedule – 14 Months)

 Stringing of second circuit of existing 132KV Khilchipur - Jeerapur Transmission


Line – 25 Kms (Time Schedule – 6 Months)

 132 kV Jeerapur - Susner DCSS Line – 35 Kms

(Time Schedule – 15 Months)

 132 KV Ichhawar – Sehore DCSS Line – 30 Kms


(Time Schedule – 14 Months)

 132 KV Mugalia Chhap – Sehore DCSS Line – 38 Kms


(Time Schedule – 15 Months)
DETAILS ABOUT PROJECT
(FINANCIAL)

 Project Value :
 Funded by JICA : Rs. 4806.00 Lacs
 Supply Part : Rs. 3600.06 Lacs (including F & I Charges)
 Erection Part : Rs. 1206.12 Lacs

 Funded by MPPTCL : Rs. 219.67 Lacs (Sales Tax & Service Tax)
 Total Amount : Rs. 5026.42 Lacs

 Taxes :
 Excise duty Exempted. (PAC Certificate for reimbursement / exemption
will be issued by MPPTCL)
 CST – will be paid extra by MPPTCL @2%
 Entry Tax – Will be paid to Concerned authority directly by MPPTCL
 Service Tax - Reimbursable as actual.
DETAILS ABOUT PROJECT
(BILLING STRUCTURE)
 Mobilization Advance : 15% advance payment of CIP/ Ex-works price of
plant and installation services (against submission of BG)
 Supply Portion : 75% payment of CIP/ Ex-works price (along with 100%
freight & insurance charges) (excluding Tower Accessories) of Plant
consumed within 45 days from the date of submission of valid claim.
 Installation Services : 75% payment of Installation services (excluding
Service Tax) carried within 45 days from the date of submission of valid
claim
 On Commissioning : 10% of CIP/Ex-works price & 10% of Installation
Services on commissioning.
 For Tower Accessories : 85% payment of CIP/Ex-works price (along with
100% freight and insurance charges) of Tower accessories consumed and
85% cost of Installation services (excluding Service Tax) carried out upon
commissioning of work

 Bills for Payment is respect of Plant Consumed & Work Activity completed in
each Quarter to be Claimed by Contactor.
• Defect Liability Period : 1 Yr & 6 months from date of completion OR 1
year from date of operational acceptance whichever first occurs
[As per : Tender Vol-I, Technical Bid section – VII, GC, page 44 &45]

• Price Escalation : Applicable for Conductor, Tower material


[As per : Tender Vol-I, Section - IX, Contract forms, page 20 - 24]

• Effective Date / Starting Date : the date on which JICA releases the
Advance payment on behalf of MPPTCL.

• Way Leave : Way leave and Clearances of trees / Crop & land in MPPTCL
(Client) Scope. Railway Clearance, PTCC Clearance, Forest Clearance & any
other clearance as required in MPPTCL Scope.
Compensation towards way leave along route – MPPTCL Scope.
Compensation towards approach – IVRCL Scope.
BG REQUIREMENT

 BG towards Advance : 15% advance payment of CIP/ Ex-works price of


plant and installation services (i.e. 7,10,39,796/-) BG Submitted to MPPTCL
[Appendix – 1, Terms and procedure of payment]

1) 15% of total Ex works Price of Plant i.e. Rs. 5,29,47,974/- (15% of Rs. 35,29,86,490.03)
B.G No 2657BG5632012 Dated 28.11.2012 for Rs. 5,29,47,974 /- Valid up to 30.06.2014
2)15% of total cost of Installation services i.e. Rs. 1,80,91,822/- (15% of Rs. 12,06,12,146.92)
B.G No 2657BG5642012 Dated 28.11.2012 for Rs. 1,80,91,822 /- Valid up to 30.06.2014

 Performance Security : In form of Bank Guarantee - 10% of contract price


(i.e. for Rs. 5,02,64,220/-) -- BG Submitted to MPPTCL
[Cl. No. 7 of Work Order]

B.G No LG 245/12 Dated 24.08.2012 & ammedment dtd. 19.11.2012 for Rs. 5,02,64,220 /- Valid
up to 12.08.2015
INSURANCE REQUIREMENT AS PER TENDER
 Cargo Insurance during Transport
Covering loss or damage occurring, while in transit from the Contractor’s works until
erection at the Site, to the Facilities and to the construction equipment and material
until completion of the facilities.

 Installation All Risks Insurance


Covering physical loss or damage to the Facilities at the Site, occurring prior to
completion of the Facilities, with an extended maintenance coverage for the
Contractor’s liability in respect of any loss or damage occurring during the defect
liability period while the Contractor is on the Site for the purpose of performing its
obligations during the defect liability period.
INSURANCE REQUIREMENT AS PER TENDER

 Third Party Liability Insurance :


Shall be Covering bodily injury or death suffered by third parties (including the
Employer’s personnel) and loss of or damage to property (including the
Employer’s property and any parts of the Facilities that have been accepted by the
Employer) occurring in connection with the supply and installation of the
Facilities. .

 Automobile Liability insurance & Workmen Compensation –


Covering use of all vehicles used by the Contractor or its Subcontractors
(whether or not owned by them) in connection with the supply and
installation of the Facilities. Comprehensive insurance in accordance
with statutory requirements.

 Workmen Compensation – in accordance with statutory requirement.


 Communication Details of Client :
Executive Engineer (T&P)
M. P. Power Transmission Co. Ltd.
Block No. 3, Shakti Bhawan,
Jabalpur – 482008 (INDIA)
Tel No. : +91-761-2661450, +91-761-2702113/2134/2135
Fax No. : +91-761-2665593
e – mail : [email protected]
MAIN BAR CHART
LIST OF APPROVED VENDORS FOR SUPPLY
Major Items of Plant Approved Manufacturers
Tower M/s. IVRCL Ltd., Nagpur
M/s. Cabcon India Pvt. Ltd., Kolkatta
M/s. Galaxy Transmission Pvt. Ltd., Sangli
Conductor
M/s. KJV Alloy Conductors, Nagpur
M/s. Diamond Power Infrastructures Pvt. Ltd.
M/s. Bharat Wire Ropes Ltd. Mumbai
Earthwire M/s. Geekary Wires, Hyderabad
M/s. UIC Udyog Ltd., Kolkatta
M/s. Aditya Birla Insulators, Vadodara.
Insulators (Porcelain) M/s. BHEL, Jagadishpur
M/s. WS Industries Ltd., Chennai
Insulator Hardware fitting, Conductor, M/s. Rashtra Udyog, Kolkatta
Earth wire Access.
M/s. KTHL, Vadodara
Earth wire Set (Pipe Type / Counter M/s. General Forging Industries, Mumbai
Poise Type)
M/s. ESSAR Forging, Thane
M/s. Deepak Fastners, Ludhiana
Nut & Bolts
M/s. Panchsheel Fasteners Pvt. Ltd. Delhi
M/s. Hind Enamel, Mumbai
Danger Board, Circuit Plate & Number
plate M/s. Aqsa Towee Accessories, Thane
M/s. General Forging Industries, Mumbai
D-Shackle Hanger / Links M/s. ESSAR Forging, Thane
M/s. Aqsa Towee Accessories, Thane
TOP SHEET (PCA)
PROJECT- CONSTRUCTION OF TRANSMISSION LINES IN BHOPAL CIRCLE ON TOTAL TURNKEY
BASIS-ONE
Bid IDENTIFICATION NUMBER : JICA/MPPTCL/TR-108
TOP SHEET DOS-16.04.2012 CP 18 Months
220 KV TL-20 KMS & 132 KV TL-137 KM
%OF
%OF TOTAL INCOME (Rs)
EXPENDITURE TOTAL
SR.NO. DESCRIPTION WORK
(Rs) WORK
VALUE
VALUE
I WORK CONTRACT VALUE (to Quote) 480674812 100.00
SUPPLY OF Direct ITEMS 167041776 34.752
SUPPLY OF BOUGHT OUT ITEMS 193020890 40.156
CIVIL & ERECTION 120612147 25.092
A DIRECT COST
1 SUPPLY OF Direct ITEMS 144776961 30.12
SUPPLY OF BOUGHT OUT ITEMS 120228631 25.01
2 ERECTION & CIVIL 98969789 20.59
363975381 75.72
B SITE OVERHEADS
SUB TOTAL 27549304 5.73
C CORPORATE OVERHEADS
SUB TOTAL 24871817 5.17
TOTAL ( A+B+C ) 416396502 86.63

D M A R G I N INCL TDS 2.00% 64278310 13.37


GRAND TOTAL 480674812 100.00

Anticipated PV 3690452.98 0.77


Profit after considering PV 67968763.22 14.03
CASH FLOW

Quarter - I Quarter - II Quarter - III Quarter - IV Quarter - V Quarter - VI

Aug-14
Jul-14

Total
Description

May-14
May-13

S.D
Mar-13

Mar-14
Nov-13
Aug-13

Sep-13

Dec-13

Apr-14
Feb-13

Apr-13

Feb-14
Oct-13
Jun-13

Jun-14
Jan-13

Jan-14
Jul-13
Mob Adv. 721.01 721.01
WIP 77.48 239.83 311.69 144.52 949.01 346.17 593.28 685.89 612.97 218.52 48.68 535.79 23.99 9.65 6.66 2.64 0.00 0.00 4806.75
Exp. S 47.17 165.75 190.49 22.03 544.85 148.36 328.91 302.75 436.43 130.09 0.00 334.98 0.00 0.00 0.00 0.00 0.00 0.00 2651.81
Exp. E 15.29 33.89 65.87 97.17 118.92 141.86 161.66 124.69 82.26 49.94 39.78 18.77 19.60 7.88 5.44 2.15 0.00 0.00 985.19
Tota Exp. 62.46 199.64 256.36 119.21 663.77 290.22 490.57 427.44 518.69 180.03 39.78 353.75 19.60 7.88 5.44 2.15 0.00 0.00 3636.99
Margin 15.02 40.19 55.32 25.31 285.24 55.95 102.71 258.45 94.28 38.48 8.90 182.04 4.39 1.77 1.22 0.48 0.00 0.00 1169.75
T.O 160.61 1006.95 1788.93 1099.05 696.39 54.15 4806.07
Recievable 120.46 755.21 1341.69 824.29 522.29 40.61 3604.55
SD 16.06 100.70 178.89 109.91 69.64 5.41 480.61
To H.O 360.51 12.05 75.52 134.17 82.43 52.23 4.06 480.61 1201.57
Cash in Hand 360.51 108.41 679.69 1207.52 741.86 470.06 36.55
FUND REQUIRMENT
Cash in Hand 360.51 298.04 98.41 -157.96 -168.75 -832.5 -1122.7 -933.62 -1361.06 -1879.75 -852.26 -892.04 -1245.78 -523.53 -531.41 -536.85 -68.94 -68.94 -68.94 -32.39
CTC 62.46 199.64 256.36 119.21 663.77 290.22 490.57 427.44 518.69 180.03 39.78 353.75 19.60 7.88 5.44 2.151 0 0

You might also like