Emily-1 Project Fuel Terminal and Jetty Survey Report
Emily-1 Project Fuel Terminal and Jetty Survey Report
Emily-1 Project Fuel Terminal and Jetty Survey Report
PTD-GEN-TPT9750-BPN-3003-FORM
Job No : 9750
Main Contractor : PT. TRIPATRA Engineers & Constructors Report No. : 9750-QC-MRR-BCI-0001
REFERENCES :
Item Name : DRAWING MCC ROOM BUILDING FOUNDATION PLAN Location : MCC Building
Sheet : 001
Coordinate Elevation
No. DESCRIPTION Remarks
Plan Actual Difference Plan Actual Difference
E = East
N = North
Job No : 9750
Main Contractor : PT. TRIPATRA Engineers & Constructors Report No. : 9750-QC-MRR-BCI-0001
REFERENCES :
Revision : D
Sheet : 001
Result Approval Acknowledged
Item of Inspection Remarks
Accepted Rejected BCI TPEC INTERPORT
Dewatering
COMMENT
M Saoki
Doc. no. PTD-GEN-TPT9750-BPN-3007-FORM
EMILY-1 PROJECT FUEL TERMINAL AND JETTY
client( Rev. A
subcon(
)logo Date
)logo COMPACTION INSPECTION REPORT Page. of
Job No : 9750
Main Contractor : PT. TRIPATRA Engineers & Constructors Report No. : 9750-QC-MRR-BCI-0001
REFERENCES :
Revision : D
Sheet : 001
RESULT APPROVAL ACKNOWLEDGED
NO INSPECTION ITEMS REMARKS
Accepted Rejected BCI TPEC INTERPORT
EQUIPMENT
Total Unit : pc(s)
M Saoki
QC Inspector Date Date Date
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Average #DIV/0!
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok