Traffic & Transit

Lane Restrictions Set For Southbound U.S. 19 Frontage Road

Pinellas County Utilities is performing a repair to a 42-inch water main on the southbound U.S. 19 Frontage Road.

Pinellas County Utilities is performing a repair to a 42-inch water main on the southbound U.S. 19 Frontage Road.
Pinellas County Utilities is performing a repair to a 42-inch water main on the southbound U.S. 19 Frontage Road. (Renee Schiavone/Patch)

CLEARWATER, FL — Pinellas County Utilities is performing a repair to a 42-inch water main on the southbound U.S. 19 Frontage Road between Nursery Road and Belleair Road in Clearwater.

Due to the location of the repair, lane restrictions have been implemented. The repair is expected to take two to three weeks. This type of work can be susceptible to the weather, unexpected equipment failures and unforeseen site conditions.

Construction will take place Monday through Friday between 7 a.m. and 4 p.m. Exercise caution while traveling through the work zone and allow for extra travel time.

Find out what's happening in Clearwaterwith free, real-time updates from Patch.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.