Traffic & Transit

​Temporary Detour Set For Southbound U.S. 19 Frontage Road

Pinellas County Utilities is performing a repair to a 42-inch water main on the southbound U.S. 19 frontage road.

Pinellas County Utilities is performing a repair to a 42-inch water main on the southbound U.S. 19 frontage road between Nursery Road and Belleair Road in Clearwater.
Pinellas County Utilities is performing a repair to a 42-inch water main on the southbound U.S. 19 frontage road between Nursery Road and Belleair Road in Clearwater. (Shutterstock)

CLEARWATER, FL — Pinellas County Utilities is performing a repair to a 42-inch water main on the southbound U.S. 19 frontage road between Nursery Road and Belleair Road in Clearwater.

Due to the location of the repair, a detour will be implemented on Monday to facilitate the work. The repair is expected to take one to two weeks. This type of work can be susceptible to the weather, unexpected equipment failures and unforeseen site conditions.

Exercise caution while traveling through the detour and plan for extra travel time.

Find out what's happening in Clearwaterwith free, real-time updates from Patch.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.